stretch frame procedure - spartan truck stretch.pdf · step # 5: if needed yokes and universal...

5
STRETCH FRAME PROCEDURE

Upload: others

Post on 15-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STRETCH FRAME PROCEDURE - Spartan Truck Stretch.pdf · STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical systems are reinstalled and extended

STRETCH FRAME PROCEDURE

Page 2: STRETCH FRAME PROCEDURE - Spartan Truck Stretch.pdf · STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical systems are reinstalled and extended

STEP # 1 :Unit is completely disassembled, all electrical air and hydraulic systems,

suspensions and braking systems are removed.

STEP # 2: Chassis is cut at 45 degree angle in one single location. New channels are

designed specifically to fit current chassis design. New channel extension is welded at 45

degree angle for higher rigidity and structural strength.

Page 3: STRETCH FRAME PROCEDURE - Spartan Truck Stretch.pdf · STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical systems are reinstalled and extended

STEP # 3: Chassis extensions are bolted and welded. Glove channels are inserted for

additional structural strength

STEP # 4: Suspension is reinstalled. Drive lines stretched and modified for unit, if needed

new brake cams will be installed or added when a single brake cam is present

Page 4: STRETCH FRAME PROCEDURE - Spartan Truck Stretch.pdf · STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical systems are reinstalled and extended

STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical

systems are reinstalled and extended as needed.

STEP # 6: Units is prepared for installation of fish plates, and accessories such as oil

tank, tool boxes. When necessary fuel tanks, oil tanks and tool boxes are relocated for

installation of hoist cylinders.

Page 5: STRETCH FRAME PROCEDURE - Spartan Truck Stretch.pdf · STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical systems are reinstalled and extended

STEP # 7: Fish plates are bolted, lower shaft is welded to fish plate to ensure additional

structural strength for hoisting systems. Chassis rear is modified to accommodate hinges

and shaft. Frame is mounted and connected to all operational systems.

STEP # 8 : Unit is complete and ready for paint.