stress test bvr design - efdi.eu · the purpose of our institutional protection scheme is to avert...
TRANSCRIPT
![Page 1: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/1.jpg)
BVR
Stress Test – BVR design
EFDI EU Committee Meeting
Bonn, 17th March 2017
Ralf Benna / Frank Kuerten /
Volker Conze / Thorbjoern Karp
![Page 2: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/2.jpg)
1. Specialties of an Institutional Protection Scheme (IPS)
2. Schedule for BVR-ISG Stress Tests
3. First step: Test of the SCV file
17th March 2017 1 | BVR | EFDI EU Committee Meeting
![Page 3: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/3.jpg)
The purpose of our Institutional Protection Scheme
is to avert or remedy imminent or existing financial
difficulties at the member institutions
+
… remedy
Rehabilitation
… avert
Prevention
Saving the TRUST in the Cooperative Banks
(Stability of the whole cooperative banking sector in Germany!)
Avert or remedy imminent or existing
financial difficulties at the member institutions...
B U T : N O r e s o l u t i o n c a s e s O u r „ r e h a b i l i t a t i o n “ i s a k i n d o f „ r e c o v e r y “ !
17th March 2017 BVR | EFDI EU Committee Meeting 2 |
Est. 1934
![Page 4: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/4.jpg)
DGSD kept the national DGSs / IPSs – but on a harmonized level.
Our IPS complied with most of the aspects of the DGSD but some
points had to be adjusted
Areas of adjustements for our IPS to comply with the
DGSD had been „technical aspects“ – solved successfully
and on-time 3rd of July 2015!
■ Create a new „offcially recognized“ deposit protection
scheme as an IPS (Art. 1 (2) c DGSD)
■ Integrate 100.000 EURO reimbursement claim per
depositor in the legal framework of the IPS
■ Sinlge customer view to calculate the covered deposits
■ Basic parameters and internal structures for payout in 7
days – although this is an unrealistic and non-nature case
for an IPS (!)
17th March 2017 BVR | EFDI EU Committee Meeting 3 |
![Page 5: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/5.jpg)
The “Dual System”
The set-up of the Institutional Protection System of the
German Cooperative Banks – The „DUAL SYSTEM“
„Dual
System“
Three core functions of the BVR (as in the by-laws):
(1) Lobbying(2) Strategic Center of
Competence(3) Protection Scheme
100%- ltd. Comp. of BVR
BVR-Sicherungseinrichtung*
(= additional voluntary IPS)BV
R-S
E
BVR-Institutssicherung GmbH*
(= officially recognized DGS
as IPS, as per DGSD & EinSiG)BV
R-I
SG
Accession- and obligation-
declaration of every cooperative
CRR-Institute
* IPS as per Art. 113 (7) CRR
17th March 2017 BVR | EFDI EU Committee Meeting 4 |
![Page 6: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/6.jpg)
Conclusion
No payouts! This would be against the nature of an IPS.
(If necessary) funds are used for rehabilitation (recovery)
measures only (“alternative measures”).
However, all rules set by DGSD burden BVR-ISG (!) as well.
This applies also for the stress test topic…
17th March 2017 BVR | EFDI EU Committee Meeting 5 |
![Page 7: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/7.jpg)
1. Specialties of an Institutional Protection Scheme (IPS)
2. Schedule for BVR-ISG Stress Tests
3. First step: Test of the SCV file
17th March 2017 6 | BVR | EFDI EU Committee Meeting
![Page 8: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/8.jpg)
EBA guidelines on stress tests
of deposit guarantee schemes
According to Art. 4(10) DGSD DGSs have to perform a first stress
test by 3 July 2017.
EBA guidelines require DGSs to
define a programme of test exercises over a period of not less
than two to five years
complete a set of priority tests by 3 July 2019
BVR is cooperating on the stress test matter with
“Einlagensicherungs- und Treuhandgesellschaft mbH” (“EIS”)
17th March 2017 BVR | EFDI EU Committee Meeting 7 |
![Page 9: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/9.jpg)
Basic schedule for BVR-ISG stress tests
SCV file tests (indicators 1, 2, 4) until 30 June 2017
Operational capabilities test (indicators 5 – 14) until 30 June 2018
incl. SCV file tests (indicators 1 – 4)
Operational capabilities test (indicators 5 – 14) until 30 June 2019
incl. SCV file tests (indicators 1 – 4)
incl. cross-border cooperation test (indicators 15 – 19)
incl. funding capabilities test (indicators 20 – 23)
17th March 2017 BVR | EFDI EU Committee Meeting 8 |
![Page 10: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/10.jpg)
1. Specialties of an Institutional Protection Scheme (IPS)
2. Schedule for BVR-ISG Stress Tests
3. First step: Test of the SCV file
17th March 2017 9 | BVR | EFDI EU Committee Meeting
![Page 11: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/11.jpg)
17th March 2017 BVR | EFDI EU Committee Meeting 10 |
![Page 12: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/12.jpg)
BVR
Any questions?
![Page 13: Stress Test BVR design - efdi.eu · The purpose of our Institutional Protection Scheme is to avert or remedy imminent or existing financial difficulties at the member institutions](https://reader030.vdocuments.site/reader030/viewer/2022041204/5d5381a488c9937b448ba238/html5/thumbnails/13.jpg)
BVR
Thank you !