STRATEGY TO BOOST GAS AND LNG SUPPLIES TO MEET INCREASING DOMESTIC DEMAND
Bali, 14 September 2016 Muliawan
‹#›
OIL RESERVES (MMSTB) GAS RESERVES (TSCF)
33.9
9.51
50.84
12.5923.42
3.83
15.211,683.43
534.38
7.48
48.14 99.39
17.13
OIL AND GAS RESERVES
311.234,650.14
PROVEN (P1) = 3,623.74 POTENTIAL (P2+P3) = 3,727.59 TOTAL (3P) = 7,351.33
PROVEN (P1) = 100.25 POTENTIAL (P2+P3) = 49.04 TOTAL (3P) = 149.29
Indonesia’s gas reserves is 1,6% of world’s gas reserve
(bp statistical review 2014)
‹#›
MADURA BDEPC Phase : 110 MMscfd, 6,600 bopd (Q1 2017)
SOUTH SULAWESI
NORTH SUMATERA
WEST JAVA
EAST JAVA
MASELA
PAPUA
ACEH
CENTRAL SULAWESI
JANGKRIK IDD
EAST KALIMANTAN
CENTRAL SUMATERA
SOUTH SUMATERA
LAMPUNG
CENTRAL JAVA
RIAU ISLANDS
DONGGI SENORO
ABADI
TANGGUH TRAIN-3EPC Phase : 450 MMscfd, 4100 bopd (Q3 2017)
Production: Bangka: 120 MMscfd (Q1 2016) POD Revision – 1: Gehem : 420 MMscfd (Q4 2022) Gendalo : 700 MMscfd (Q2 2023)
Pre_FEED Onshore LNG : 7,5 MTPA (1200 MMscfd) (Q4 2026)
Production : Senoro: 310 MMscfd, 6000 bopd (Q2 2015) Donggi: 60 MMscfd (Q2 2016), EPC Phase : Matindok : 65 MMscfd, 500 bopd (Q1 2017)
EPC Phase 3,8 MTPA LNG , 3200 bopd (Q2 2020)
JTB-C
EPC Phase: 330 MMscfd 3,420 bopd (Q1 2019)
BUKIT TUA Production (Q1 2016): 20000 bopd 50 MMscfd
BLOK AEPC Phase: 55 MMscfd 3,100 bopd (Q2 2017)
UPSTREAM GAS PROJECTS
GENTING KASURI
Pre-FEED : 285 MMscfd (Q4 2019)
KARENDANProduction (Q3 2016): 25 MMscfd 300 bopd
SIMENGGARISProduction: 25 MMscfd (Q4 2015, 0.5 MMscfd)
Preparation for FEED tender: 110 MMscfd (Q2 2020)
JAMBU AYE UTARA
MDA dan MBK
EPC Phase : 175 MMscfd, (Q1 2019)
‹#›
UPSTREAM GAS PROJECTS
Jan 2016
2017 2018 2019 2020 2021
Donggi Senoro
LNG
Q2 2015
2022 2023 2024
! to keep maintain the projects on time, on budget and on quality
Challange : • Project permits • Gas buyers readiness • Downstream gas infrastructure
IDD (Bangka)
120 MMscfd
Q1 2016
Bukit Tua
50 MMscfd
Q1 2016
Eni Jangkrik
450 MMscfd
Q2 2017
HCML BD
110 MMscfd
Q1 2017
Medco Blok A
55 MMscfd
Q2 2017
Karendan
25 MMscfd
Q3 2016
Simenggaris
25 MMscfd
Q4 2015
BP Tangguh Train-3
3.8 MTPA Q2 2020
JTB-C
330 MMscfd
Q1 2019
HCML MDA dan MBK
175 MMscfd
Q1 2019
Genting Kasuari
285 MMscfd
Q4 2019
Jambu Aye Utara
110 Mscfd
Q2 2020
IDD Gehem
420 MMscfd
Q4 2022
IDD Gendalo
700 MMscfd
Q2 2023
INPEX Abadi
7.5 MTPA Q4 2026
‹#›
Existing Upstream Production Facilities
Turbo machinery & Rotating Equipment
Pipelines Vessels & Tanks Platforms
> 6.100 > 2300 Segment > 10.800 > 500
• To maintain the reliability and availability of existing production facilities
• Challenge: aging facilities
‹#›
Investment Trend in Upstream Oil & Gas
$ Million
0
12,500
25,000
37,500
50,000
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015*
15340.0329
20367.798520377.6848
17896.6917
16105.51
12691.727
11341.25112096.32
10737.08
8523.8968166.749
5557.92745737.7565438.6595
4201.96553931.027
48.195395.5684105.018112.3303110.845678.873461.594295.989671.106362.879152.484736.695128.700924.58423.614928.2066
ICP ($/bbl)Investasi Blok EksploitasiInvestasi Blok EksplorasiTOTAL
*) data as per per Juli 2016, unaudited
ICP: $/bbl
Exploration Block
Exploitation Block