stormwater program management plan (spmp)€¦ · mta spmp page 3 december 2013 . this spmp,...
TRANSCRIPT
STORMWATER PROGRAM MANAGEMENT PLAN
(SPMP)
prepared for
Maine Turnpike Authority 2360 Congress Street
Portland, Maine
prepared by
GZA GeoEnvironmental, Inc. 477 Congress Street, Suite 700
Portland, Maine 04101
File No. 09.0025776.00 Task 1
December 2013
STORMWATER PROGRAM MANAGEMENT PLAN
(SPMP)
MAINE TURNPIKE AUTHORITY PREPARED FOR: Maine Turnpike Authority 2360 Congress Street Portland, Maine PREPARED BY: GZA GeoEnvironmental, Inc. 477 Congress Street Suite 700 Portland, Maine December 2013 File No. 09.0025776.00 Task 001 Copyright © 2013 GZA GeoEnvironmental, Inc.
TABLE OF CONTENTS
SIGNATURES AND CERTIFICATION i
GLOSSARY OF ABBREVIATIONS ii
SECTION 1 - GENERAL PERMIT INFORMATION
1.0 OVERVIEW OF REGULATORY PROGRAM 1
2.0 REQUIREMENTS OF REGULATORY PROGRAM 2
2.1 NOI Submission 2 2.2 Stormwater Program Management Plan 2 2.3 Urban Impaired Stream Strategy 3 2.4 Minimum Control Measures (MCMs) 3 2.5 Maintaining an Updated Plan 4 2.6 Evaluation and Assessment 4 2.7 Plan Signatures and Availability 5 2.8 Sharing Responsibility 5 2.9 Annual Reporting and Record Keeping 6 2.10 Impaired Waters and Total Maximum Daily Load (TMDL) 7
SECTION 2 – MINIMUM CONTROL MEASURES
1.0 MCM 1 – PUBLIC EDUCATION AND OUTREACH 8
1.1 Awareness Plan 9 1.2 BMP Adoption Plan 9 1.3 Continuation of Existing Education and Outreach Efforts 10
2.0 MCM 2 – PUBLIC INVOLVEMENT AND PARTICIPATION 10
2.1 Public Notice Requirements 10 2.2 Coordination with Regulated Communities 11
3.0 MCM 3 – ILLICIT DISCHARGE DETECTION AND ELIMINATION 11
3.1 Develop Watershed Based MS4 Infrastructure Map 11 3.2 Develop Dry Weather Outfall Inspection Program 12 3.3 Develop Open Ditch Illicit Discharge Program 12 3.4 Identify Non-Stormwater Discharges 12 4.0 MCM 4 – CONSTRUCTION SITE STORMWATER RUNOFF CONTROL 13
5.0 MCM 5 – POST-CONSTRUCTION STORMWATER MANAGEMENT 14
6.0 MCM 6 – POLLUTION PREVENTION/GOOD HOUSEKEEPING 14
6.1 Potential Pollutant Sources and Operations 14 6.2 MTA Employee Training 15 6.3 Street Sweeping 15 6.4 Cleaning of Stormwater Structures Including Catch Basins 16 6.5 Maintenance and Upgrading of Stormwater Conveyances and Outfalls 16 6.6 Stormwater Pollution Prevention Plans (SWPPP’s) 16
TABLES
TABLE 1 Stormwater Program Management Implementation Schedule
APPENDICES
APPENDIX A MS4 General Permit
APPENDIX B NOI Submittal
MTA SPMP Page ii December 2013
GLOSSARY OF ABBREVIATIONS BLWQ Bureau of Land and Water Quality
BMP Best Management Practice
CGP Maine Construction General Permit
CWA Clean Water Act
DEP Department of Environmental Protection
EPA Environmental Protection Agency
ESC Erosion and Sedimentation Control
GZA GZA GeoEnvironmental, Inc.
IC Impervious Cover
IDDE Illicit Discharge Detection and Elimination
ISWG Interlocal Stormwater Working Group
LID Low Impact Development
MCM Minimum Control Measure
MG Measurable Goal
MaineDOT Maine Department of Transportation
MOA Memorandum of Agreement
MEPDES Maine Pollutant Discharge Elimination System
MM Mile Marker
MS4 Municipal Separate Storm Sewer
MSGP Multi-Sector General Permit
MTA Maine Turnpike Authority
NB Northbound
NOI Notice of Intent
NPDES National Pollutant Discharge Elimination System
O&M Operations and Maintenance
OSHA Occupational Health and Safety Administration
OSRP On-Site Responsible Party
PY Permit Year
ROW Right of Way
SB Southbound
SOP Standard Operating Procedure
SPCC Spill Prevention, Control and Countermeasures
SPMP Stormwater Program Management Plan
MTA SPMP Page iii December 2013
SWMP Storm Water Management Plan (2003 MS4 permit cycle)
SWPPP Storm Water Pollution Prevention Plan
TMDL Total Maximum Daily Load
UA Urbanized Area
UIS Urban Impaired Stream
MTA SPMP Page 1 December 2013
SECTION I – GENERAL PERMIT INFORMATION This Stormwater Program Management Plan (SPMP) was developed for, and will be maintained by, the Maine Turnpike Authority (MTA). The primary location of this document is MTA Headquarters at 2360 Congress Street in Portland.
1.0 OVERVIEW OF REGULATORY PROGRAM On December 8, 1999, the United States Environmental Protection Agency (EPA) published the National Pollutant Discharge Elimination System (NPDES) Regulation for Revision of the Water Pollution Control Program Addressing Storm Water Discharges, which is commonly referred to as the NPDES Phase II Program. State authority was subsequently delegated to the State of Maine Department of Environmental Protection (DEP) in 2003. This document directly addresses the requirements of the NPDES Phase II Program as implemented and administered by the DEP as the regulatory authority for the State of Maine. The NPDES Phase II Program is implemented by the DEP through the issuance of general permits authorizing the discharge of stormwater. This SPMP has been prepared to meet the requirements for authorization of the State of Maine DEP Bureau of Land and Water Quality’s General Permit for the Discharge of Stormwater from Maine Department of Transportation (MaineDOT) and Maine Turnpike Authority (MTA) Municipal Separate Storm Sewer Systems (heretofore referenced as the "General Permit"). DEP originally issued the General Permit on June 3, 2003 and it was subsequently reissued by the Maine Department of Environmental Protection (DEP) on July 1, 2008 and again on July 1, 2013. According to Part I.A of the General Permit, DEP “authorizes the direct discharge of stormwater from a regulated small municipal separate storm sewer system (MS4) operated by MaineDOT or MTA to a MS4 or waters of the State other than groundwater. Discharges must meet the requirements of the General Permit and applicable provisions of Maine's waste discharge and water classification statutes and rules. Compliance with the General Permit authorizes MaineDOT and MTA to discharge stormwater, pursuant to 38 M.R.S.A. § 413.” The General Permit authorizes direct discharges from “operations or activities associated with stormwater runoff from the regulated small MS4 within an identified Urbanized Area1” in those parts of Maine for which the Department has received delegated authority under the Federal NPDES program. The General Permit is effective from July 1, 2013 until midnight June 30, 20182 provided that a completed Notice of Intent (NOI) to seek coverage under the General Permit was submitted by the regulated MS4 (hereafter referred to as “permittee”) and received by the
1 Urbanized Area is defined by the inclusive sum of the 2000 decennial census and the latest decennial census (2010) by the U.S. Bureau of the Census.
2 According to Part I.A of the General Permit, DEP intends subsequent re-issuance of this MS4 permit. Upon reissuance of a new General Permit, the permittee shall submit a new NOI. However, if a new General Permit is not issued prior to the expiration date, coverage shall be administratively continued and remain in force and effect.
MTA SPMP Page 2 December 2013
DEP prior to July 30, 2013. Upon DEP’s receipt of the NOI, interim coverage under the General Permit is authorized for up to 180 days from the effective date of this General Permit or until a complete SPMP is submitted to DEP, at which time the DEP shall provide written notice of coverage to the regulated MS4. A copy of the General Permit is presented in Appendix A.
2.0 REQUIREMENTS OF REGULATORY PROGRAM The General Permit establishes the specific requirements that must be met by MaineDOT and MTA in order for continuous authorization to discharge throughout the effective period described in Section 1.0 of this document.
2.1 NOI SUBMISSION MS4 Permit Part III.A. NOI requirements. MaineDOT and MTA each shall file with the Department a NOI form that meets the requirements of Part III of this General Permit. The NOI must be submitted no later than July 30, 2013. On July 29, 2013, MTA submitted to DEP a completed NOI Form and provided the information requested in Part III.D of the General Permit. A copy of MTA’s NOI submission, including permittee information (e.g., permit number, urban impaired streams and other water bodies, narrative of the roads and drainage ways), is presented in Appendix B.
2.2 STORMWATER PROGRAM MANAGEMENT PLAN MS4 Permit Part IV.A. Stormwater program management plan. Each permittee shall develop, implement and enforce a Stormwater Program Management Plan (“Plan”) implementing six minimum control measures that are designed to reduce the discharge of pollutants from the transportation entity’s regulated small MS4 to the maximum extent practicable to protect water quality, and to satisfy the appropriate water quality requirements of the Clean Water Act. For the purposes of this permit, narrative effluent limitations requiring implementation of BMPs are generally the most appropriate form of effluent limitations when designed to satisfy technology requirements (including reductions of pollutants to the MEP) and to protect water quality. The Plan and all Minimum Control Measures must be substantially implemented by June 30, 20133. The permittee shall describe in its Plan how it will reduce or eliminate polluted stormwater runoff to the maximum extent practicable from its separate storm sewer system within the UA. The permittee shall submit the regulated small MS4’s comprehensive Stormwater Program Management Plan for Department review by no later than December 2, 2013.
3 Although the MS4 permit states June 30, 2013 here, it is assumed to be an error (i.e., should be June 30, 2018) since MS4 permittees have five years from permit issuance to implement requirements.
MTA SPMP Page 3 December 2013
This SPMP, including the accompanying tables and figures, has been developed to satisfy the requirements of the General Permit, including descriptions of how MTA will reduce or eliminate polluted stormwater runoff to the maximum extent practicable within the UA. MTA’s SPMP, which includes Table 1 – SPMP Implementation Schedule, addresses each of the six Minimum Control Measures (MCMs) by (1) establishing Measurable Goals (MGs) for which BMPs will be evaluated; (2) identifying the MTA staff responsible for implementing each BMP; and (3) establishing a date for BMP implementation, as appropriate.
2.3 URBAN IMPAIRED STREAM STRATEGY MS4 Permit Part IV.A.1.b. Additional stormwater treatment controls within the UA are necessary for Urban Impaired Stream watersheds. For discharges from the permittee’s infrastructure and operations within the UA, to an Urban Impaired Stream, the permittee shall implement structural and non-structural measures to the maximum extent practicable necessary to control, the discharge of stormwater runoff including known pollutants of concern. Pollutant(s) of concern refer to the pollutant(s) identified as causing or contributing to the waterbody’s impairment. Urban runoff may be used as a surrogate pollutant of concern where information is lacking on specific causes of impairment. Consistent with previous MS4 permit cycles, MTA continues to consider the two highest priority watersheds within UA to be Hart Brook (also known as Dill Brook) and Goosefare Brook. As specified in Part IV.A.1.b, additional stormwater treatment controls for discharges from MTA infrastructure and operations are required for these two priority watersheds for MTA.
2.4 MINIMUM CONTROL MEASURES (MCMs) MS4 Permit Part IV H. Minimum control measures. For each MCM, the permittee shall: define appropriate BMPs; designate a person(s) responsible for each BMP; define a time line for implementation of each BMP; and define measurable goals for each BMP. This SPMP outlines a program of BMPs and MGs for each of the six MCMs:
1. Public education and outreach on stormwater impacts; 2. Public involvement and participation; 3. Illicit discharge detection and elimination; 4. Construction site stormwater runoff control; 5. Post-construction stormwater management in new development and
redevelopment; and 6. Pollution prevention and good housekeeping in community/facility operations.
For each of the MCMs, MGs will be used to evaluate the designated BMPs. These MGs have been assigned an implementation schedule and/or milestones for each applicable BMP. As mentioned above, additional stormwater treatment controls within UA for
MTA SPMP Page 4 December 2013
MTA’s two highest priority Urban Impaired Streams are addressed and incorporated into the SPMP. These MCMs are discussed in detail in Section II and presented as a work plan in Table 1 along with an implementation schedule and identification of the designated MTA personnel responsible for implementing each BMP.
2.5 MAINTAINING AN UPDATED PLAN MS4 Permit Part IV(B) Keeping Plans Current. The permittee shall keep the Plan current. Circumstances when the Plan must be amended include the following:
1. Amended plan. The Plan must be amended if the Department or the permittee determines that:
a. The actions required by the Plan fail to ensure or adequately protect against pollution of the waters of the State other than groundwater;
b. The Plan does not prevent the potential for a significant contribution of pollutants to waters of the State other than groundwater;
c. The Plan does not meet one or more requirements of this General Permit; or d. New information results in a shift in the Plan’s priorities.
2. Department notification. The Department shall notify the permittee if it determines that the Plan must be amended. Within 30 days of such notification, unless otherwise specified by the Department in writing, the permittee shall respond to the Department indicating how the permittee intends to modify the Plan to address these requirements. Within 90 days of this response or within 120 days of the original notification, whichever is less, unless otherwise specified by the Department in writing, the permittee shall revise the Plan. The permittee shall perform all actions required by the revised Plan in accordance with the timelines in the revised Plan, and certify to the Department that the requested changes have been made and implemented.
3. Permittee information. The permittee shall provide such information as the Department requires to evaluate the Plan and its implementation. The permittee shall note minor modifications to the Plan in its annual report. Major modifications to the Plan such as a change in the Plan’s priorities must be submitted to the Department and approved prior to implementation.
In the event that one of the circumstances listed above occurs, this SPMP will be amended accordingly. MTA understands that failure to complete or update a SPMP in accordance with this General Permit does not relieve a permittee of responsibility to implement actions required to protect the waters of the State and to comply with all conditions of this General Permit.
2.6 EVALUATION AND ASSESSMENT
MS4 Permit Part IV(D) Evaluation and assessment. As specifiedin Part IV(J)(1), the permittee shall evaluate program compliance, the appropriateness of identified BMPs, and progress towards achieving identified measurable goals. With respect to the requirements of this General Permit, MTA will evaluate the program compliance, appropriateness of BMPs, and the progress towards achieving the MGs of the six MCMs identified in Table 1 as part of the annual reporting requirements.
MTA SPMP Page 5 December 2013
2.7 PLAN SIGNATURES AND AVAILABILITY
MS4 Permit Part IV(F)(1) Signature. The Plan must be signed by the chief elected official or principal executive officer. The Plan must be retained by the chief elected official or principal executive officer for the duration of the permit period and copies must be available and retained by permittee’s officials or employees responsible for implementation of the Plan. This SPMP has been certified in accordance the General Permit. The certification is included on Page i. Copies of the SPMP are retained by the Environmental Services Coordinator. MS4 Permit Part IV(F)(2) Plan availability. The permittee shall make a copy of the Plan available to the following immediately upon request: (a.) The Commissioner of the Department; (b.) In the case of a regulated small MS4 adjacent to or interconnected with the permittee's storm sewer system, to the operator of that regulated small MS4; and (c.) In the case of a regulated small MS4 stormwater discharge to a water supply watershed, to the public water supply company. A copy of this SPMP and the associated records are retained at the MTA Headquarters facility. Upon request, a copy of the SPMP will be made available to the following:
The DEP Commissioner; The operator of a host MS4; and The public water supply company.
2.8 SHARING RESPONSIBILITY MS4 Permit Part IV(I)(1)Reliance on another entity. The permittee may satisfy the requirement to implement a BMP for a MCM by having a third party implement the BMP. If the permittee is relying on a third party to implement one or more BMP(s), the permittee shall note that fact in the Plan and annual report. If the third party fails to implement the BMP(s), the permittee remains responsible for its implementation. MTA will identify any BMPs that a third party may be responsible for implementing in the SPMP and subsequent annual reports. MTA understands that failure to implement the BMP by the third party remains the responsibility of the permittee. MS4 Permit Part IV(I)(2) Qualifying State or Federal Program. If a BMP or MCM is the responsibility of a third party under another NPDES or MEPDES permit, the permittee is not required to include such BMP or MCM in its stormwater management program. The permittee shall reference this qualifying program in its Plan. The permittee is not responsible for implementation of a qualifying program if the third party fails to perform. The permittee shall periodically confirm that the third party is still implementing this measure. If the third party fails to implement the measure, the Plan may be modified to address the measure, if necessary. In the event that a qualifying program is relied upon to implement a BMP, MTA will identify these BMPs in Table 1 in the last column entitled, Responsible Party. MTA
MTA SPMP Page 6 December 2013
understands that periodic confirmation of BMP implementation with the third party may be necessary. MS4 Permit Part IV(I)(3) Other MS4 Permittees. The permittee shall identify interconnections within the regulated MS4s and find ways to cooperate with other regulated entities. These interconnections include both those leaving the system and those entering the system. To the extent allowable under State or local law, the permittee shall cooperate with an interconnected MS4 in instances of discharges impacting a regulated small MS4. Although some interconnections to other regulated small MS4s have already been identified to date as part of the previous MS4 permit, MTA will continue to cooperate with host MS4 communities that operate an interconnected MS4 system with MTA, if discharges impact one another.
2.9 ANNUAL REPORTING AND RECORD KEEPING
MS4 Permit Part IV(J) Reporting and record keeping requirements -- 1. The permittee shall keep records required by this permit for at least three (3) years following its expiration or longer if requested by the Commissioner. The permittee shall make records, including its Plan, available to the public at reasonable times during regular business hours. MTA will maintain this SPMP and the associated records required by the General Permit for at least 3 years following expiration of the General Permit, or longer if requested by the Commissioner. A copy of the SPMP and associated records will be maintained at MTA Headquarters and will be made available to the public upon written request at reasonable times during regular business hours. MS4 Permit Part IV(J) Reporting and record keeping requirements – 2. By September 15, 2014, and annually thereafter by September 15, the permittee shall submit a report for the Department's review and approval. The report must include the following: a. The status of compliance with permit conditions, an assessment of the appropriateness of
identified BMPs and progress towards achieving identified measurable goals for each of the MCMs.
b. Results of information collected and analyzed, including monitoring data, if any, during the reporting period.
c. A summary of the stormwater activities the permittee intends to undertake pursuant to its Plan during the next reporting cycle.
d. A change in any identified measurable goals that apply to the program elements. e. A summary describing the activities, progress, and accomplishments for each of the MCMs #1
through #6 (including such items as the status of education and outreach efforts, public involvement activities, stormwater mapping efforts, dry weather inspections, detected illicit discharges, detected illicit connections, illicit discharges that were eliminated, construction site inspections, number and nature of enforcement actions, post construction BMP status and inspections, and the status of the permittee’s good housekeeping/pollution prevention program).
MTA SPMP Page 7 December 2013
MTA will continue to report annually to DEP the requirements listed above from Part IV(J) of the General Permit. On or before September 15 of each permit year, this annual report will be submitted to DEP at the following address:
Municipal/Industrial Stormwater Coordinator Department of Environmental Protection
17 State House Station Augusta, Maine 04333
In the event that comments are received as a result of DEP’s review of the annual report, MTA understands that the specified changes to the report must be submitted to the Department within 30 days of the receipt of the comment(s).
2.10 IMPAIRED WATERS AND TOTAL MAXIMUM DAILY LOAD (TMDL) MS4 Permit Part IV(K) Impaired waters and total maximum daily load (TMDL). If the waterbody to which a discharge drains is impaired and has an EPA-approved TMDL, then the discharge must be consistent with the TMDL waste load allocation and any implementation plan. This General Permit does not authorize a direct discharge that is inconsistent with the waste load allocation (“WLA”) of any EPA approved TMDL. If a TMDL is approved or modified by EPA subsequent to the effective date of this General Permit, the Department shall notify the permittee and may require any of the following. 1. Require the permittee to review its plan for consistency with the TMDL, and propose any
necessary modification to the plan to the Department within six months of the receipt of notification concerning the TMDL.
2. Issue a watershed-specific general permit for the area draining to the impaired water body. The watershed-specific MS4 general permit may reference parts of this General Permit.
3. Require an individual permit. In the event that a TMDL for an impaired water body within MTA’s ROW is approved or modified by EPA subsequent to the effective date of this General Permit, MTA will strive to comply with the requirements of Part IV(K) of the General Permit following DEP notification.
MTA SPMP Page 8 December 2013
SECTION II MINIMUM CONTROL MEASURES MS4 Permit Part IV H. Minimum control measures -- For each MCM, the permittee shall: define appropriate BMPs; designate a person(s) responsible for each BMP; define a time line for implementation of each BMP; and define measurable goals for each BMP. In accordance with the Maine DEP’s General Permit for the Discharge of Stormwater from MaineDOT/MTA MS4 Facilities, this SPMP has been developed to outline a program of BMPs and MGs addressing each of the six MCMs designed to reduce the discharge of pollutants from the MTA’s MS4 to the extent practicable to protect water quality, and to satisfy the appropriate water quality requirements of the Clean Water Act (CWA). This section, along with Table 1, addresses BMPs, MGs, an implementation schedule for BMPs and/or MGs, as well as the delegated responsible party and methodology for implementation of the respective BMPs for each of the six MCMs. The following subsections provide a narrative of MTA’s methodology to satisfy the specific MCM requirements, while detailed information is presented in Table 1 of this SPMP. MS4 Permit Part IV.A.1.b. Additional stormwater treatment controls within the UA are necessary for Urban Impaired Stream watersheds. For discharges from the permittee’s infrastructure and operations within the UA, to an Urban Impaired Stream, the permittee shall implement structural and non-structural measures to the maximum extent practicable necessary to control, the discharge of stormwater runoff including known pollutants of concern. Pollutant(s) of concern refer to the pollutant(s) identified as causing or contributing to the waterbody’s impairment. Urban runoff may be used as a surrogate pollutant of concern where information is lacking on specific causes of impairment. As previously mentioned in Section I, Part IV.A.1.b of the MS4 General Permit requires additional stormwater treatment controls within UA for discharges from MTA infrastructure and operations within UIS watersheds. These UIS strategies to control the discharge of stormwater runoff are detailed in Table 1 for each corresponding MCM, generally in red text. The UIS strategies are primarily applicable to the two chosen highest priority watersheds; these are Hart Brook (also known as Dill Brook) in Lewiston and Goosefare Brook in Saco. A brief narrative summary of UIS strategies is also provided in the subsections below. 1.0 MCM 1 - PUBLIC EDUCATION AND OUTREACH MS4 Permit Part IV(H)(1) Public education and outreach on stormwater impacts. The three goals of this minimum control measure are: 1. To raise awareness that polluted stormwater runoff is one of the most significant sources of water quality problems for Maine’s waters; 2. To motivate staff and contractors to use Best Management Practices (BMPs) which reduce polluted stormwater runoff; and 3. To reduce polluted stormwater runoff as a result of increased awareness and utilization of BMPs.
MTA SPMP Page 9 December 2013
The permittee will fulfill the requirements for Public Education and Outreach by continuing the existing efforts that were initiated under the previous 5-year SPMP. These BMPs include raising awareness, identifying target BMPs, evaluating process and impact indicators annually and maintaining on-going education and outreach efforts.
1.1 AWARENESS PLAN
MS4 Permit Part IV(H)(1)(a)(i) Raise Awareness (Goal 1): Beginning July 1, 2013, each permittee shall continue raising awareness of stormwater issues amongst employees and contractors. 1. Each permittee shall establish measurable goals. Progress of these goals must be reported annually for process indicators and in years 1 (background), 3, & 5 for impact indicators. 2. Each permittee shall include a review in its fifth year Annual Report. The review must include an analysis of the process indicators and impact indicators. MTA will continue to maintain and implement the existing Stormwater Awareness Plan, with an emphasis on raising awareness within the two designated highest priority watersheds. MTA’s progress in raising awareness of polluted stormwater runoff issues will be assessed and reported to DEP in accordance with the specified schedule in the General Permit for process and impact indicator assessments.
1.2 BMP ADOPTION PLAN
MS4 Permit Part IV(H)(1)(a)(ii) Targeted BMP Adoption (Goal 2): Beginning July 1, 2013, each permittee shall continue outreach efforts from the previous permit cycle while encouraging employees and contractors to utilize BMPs that minimize stormwater pollution. 1. Each permittee shall set measurable goals. Progress on these goals must be reported annually for process indicators and in years 1 (background), 3, & 5 for impact indicators. 2. The permittee shall include a review in fifth year Annual Report. The review must include an analysis of the process indicators and impact indicators. MTA will continue to maintain and implement the existing BMP Adoption Plan that identifies target BMPs to be utilized by employees and contractors that minimize stormwater pollution. As part of the UIS strategy associated with this MCM, the BMP Adoption Plan will place emphasis on utilizing target BMPs within MTA’s two designated highest priority watersheds. MTA’s progress in utilizing target BMPs will be assessed and reported to DEP in accordance with the specified schedule in the General Permit for process and impact indicator assessments.
MTA SPMP Page 10 December 2013
1.3 CONTINUATION OF EXISTING EDUCATION AND OUTREACH EFFORTS MS4 Permit Part IV(H)(1)(a)(iii) Compliance with this MCM will be based upon: 1. Continued existing education and outreach efforts; 2. Reported process and impact indicators; and 3. Completed annual reports and a 5-year analysis of the plans. MTA will continue the existing education and outreach efforts established during the previous 5-year SPMP, which are included in Table 1. As part of the UIS strategy associated with this MCM, information regarding MTA’s two designated highest priority watersheds will be incorporated into the existing education and outreach efforts continued from previous MS4 permit cycle. MTA’s progress in continuing education and outreach efforts will be assessed and reported to DEP in accordance with the specified schedule in the General Permit for process and impact indicator assessments. 2.0 MCM 2 – PUBLIC INVOLVEMENT AND PARTICIPATION MS4 Permit Part IV(H)(2) Public involvement and participation. The goal of this minimum control measure is to involve the permittee's community including various departments, bureaus or facilities, and when applicable involve regulated small MS4 communities in both the planning and implementation process of improving water quality and reducing quantity via the stormwater program. An active and involved participation process is crucial to the success of a stormwater management program because it allows for broader support, additional expertise and a conduit to other programs. The permittee will fulfill the requirements for Public Involvement and Participation by continuing to notify the public in accordance with FOAA requirements and coordinate with host MS4 communities, MaineDOT and other regional groups.
2.1 PUBLIC NOTICE REQUIREMENT
MS4 Permit Part IV(H)(2)(a)(i) Public notice requirements. The permittee shall comply with applicable state and local Public Notice requirements using effective mechanisms for reaching the public, and comply with the public notice requirements of the Maine Freedom of Access Act, 1 M.R.S.A. §§ 401 et seq. ("FOAA") when the permittee involves stakeholders in the implementation of this General Permit. The permittee shall document the meetings and attendance through the annual report as a way of measuring this goal. MTA will continue to maintain the written public notice policy, announcements, and meeting logs in compliance with FOAA requirements.
MTA SPMP Page 11 December 2013
2.2 COORDINATION WITH REGULATED COMMUNITIES
MS4 Permit Part IV(H)(2)(a)(ii) Coordinate with regulated community(s). The permittee shall coordinate efforts by providing information on planned construction, and maintenance activities to Regulated Small MS4 municipal stormwater coordinators. The permittee shall develop a strategy to ensure involvement, mutual cooperation and coordination with Regulated Small MS4 municipalities, and report on such efforts annually pursuant to Part IV(J) on joint efforts, meetings attended, projects and coordination. MTA will continue open communication with host MS4 communities. Documentation of regular communication and/or meetings (i.e., Interlocal Stormwater Working Group (ISWG) meetings, meetings with MaineDOT and DEP, etc.) will be maintained to be included in the summary for the annual report. 3.0 MCM 3 – ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDDE) MS4 Permit Part IV(H)(3) IDDE – (a) Required strategies. Each permittee shall develop, implement and enforce a program to detect and eliminate illicit discharges and non-stormwater discharges, as defined in 06-096CMR521(9)(b)(2), except as provided in Part IV(H)(3)(b) of this permit. MTA’s IDDE Program includes (a) watershed based storm sewer system infrastructure map(s); (b) prioritized dry weather outfall inspections; and (c) an illicit discharge detection strategy for the open ditch system within the two highest priority watersheds. Specific BMP options and requirements of the MS4 General Permit are discussed in the subsections below and summarized in Table 1.
3.1 VERIFY WATERSHED BASED MS4 INFRASTRUCTURE MAP
MS4 Permit Part IV(H)(3)(a)(i) By June 30, 2015, each permittee shall ground verify its watershed based storm sewer system infrastructure map(s) in its highest priority watershed within the UA showing the location of all stormwater catch basins, connecting surface and subsurface infrastructure depicting the direction of in-flow and out-flow pipes, and the locations of all discharges from all stormwater outfalls operated by the regulated small MS4. Each catch basin must be uniquely identified to facilitate control of potential illicit discharges, and to ensure proper operation and maintenance of the structures. For each outfall, the following information must be included: type, (e.g. 24” concrete pipe or ditch) material, and size of conveyance, or channelized flow the name and location of the immediate surface waterbody or wetland to which the stormwater runoff eventually discharges. If an outfall does not discharge directly to a named waterbody, identify the name and location of the nearest named waterbody to which the outfall eventually discharges. MTA maps of the separate storm sewer system within the two highest priority watersheds will be reviewed, ground verified and updated to reflect the required attributes, in accordance with the implementation schedule in Table 1.
MTA SPMP Page 12 December 2013
3.2 IMPLEMENT COORDINATED INSPECTION PROGRAM
MS4 Permit Part IV(H)( 3)(a)(ii) Each permittee shall continue to implement a prioritized dry weather outfall inspection plan based on drainage areas such as an urban impaired stream watershed, or based on a watershed or sub-watershed that the permittee has identified as having the greatest potential threat to the receiving water. In the first permit year, each permittee shall petition regulated MS4 municipalities to conduct a coordinated dry weather MS4 inspection program. In permit years two through five each permittee shall implement at least two coordinated watershed based illicit discharge detection and elimination programs. Permittees shall continue to implement prioritized dry weather inspections for remaining urban impaired streams within the UA. MaineDOT/MTA shall continue to implement its procedure/policy or protocol that details the steps that must be taken when an illicit discharge is identified during these inspections to locate the source of the illicit discharge and eliminate it. MTA anticipates reviewing and updating the existing dry weather inspection procedure for outfalls within the two highest priority watersheds to identify the greatest perceived potential threat to receiving waters in accordance with the implementation schedule in Table 1. MTA also anticipates identifying two regulated MS4 host municipalities within UA, with which MTA will participate in conducting a coordinated dry weather inspection.
3.3 IMPLEMENT OPEN DITCH ILLICIT DISCHARGE PROGRAM
MS4 Permit Part IV(H)(3)(a)(iii) MaineDOT/MTA shall implement an illicit discharge detection and elimination program to their open ditch system within their two highest priority watersheds. MTA will continue to utilize existing mechanisms (i.e., IDDE Notification Form, Mobile SPCC Plan Spill Report Forms, Highway Safety Incident Response Procedures and the Annual Comprehensive Inspection conducted by MTA’s General Engineering Contractor) to detect and eliminate illicit discharges in the open ditch system within MTA's two highest priority watersheds. These mechanisms will be reviewed and updated as needed, as seen in Table 1.
3.4 IDENTIFY NON-STORMWATER DISCHARGES MS4 Permit Part IV(H)(3)(b) This permit authorizes the following non-stormwater discharges provided they do not contribute to a violation of water quality standards, as determined by the Department; these discharges must be addressed in the Plan if they are identified by the permittee as significant contributors of pollutants to the regulated small MS4.
Landscape irrigation Diverted stream flows Rising ground waters Uncontaminated ground water infiltration (as defined at 40 CFR 35.2005(20)) Uncontaminated pumped ground water Uncontaminated flows from foundation drains Air conditioning and compressor condensate
MTA SPMP Page 13 December 2013
Irrigation water Flows from uncontaminated springs Uncontaminated water from crawl space pumps Uncontaminated flows from footing drains Lawn watering runoff Flows from riparian habitats and wetlands Residual street wash water (where spills/leaks of toxic or hazardous materials have not
occurred, unless all spilled material has been removed and detergents are not used) Hydrant flushing and fire fighting activity runoff Water line flushing and discharges from potable water sources
Consistent with the previous MS4 cycles, a limited number of authorized non-stormwater discharges were identified and documented. These primarily included air conditioner condensate from window-mounted units at Fare Collection facilities (e.g., toll plazas). MTA will continue to identify and document additional authorized non-stormwater discharges as they are discovered.
4.0 MCM 4 – CONSTRUCTION SITE STORMWATER RUNOFF CONTROL MS4 Permit Part IV(H)(4). Construction site stormwater runoff control --–(a) Required Strategies. Continue to implement and enforce a program or modify an existing program, to reduce pollutants in any stormwater runoff including discarded building materials, concrete truck washout, chemicals, litter, and sanitary waste that may cause adverse impacts to water quality from construction activities that result in a land disturbance of greater than or equal to one acre. Reduction of stormwater discharges from construction activity disturbing less than one acre must be included in the program if that construction activity is part of a larger common plan of development or sale that would disturb one acre or more. Each permittee must include standard operating procedures for addressing and implementing compliance inspections and enforcement actions. As discussed with DEP and MaineDOT during previous MS4 permit cycles, MTA has proposed developing a MEPDES Memorandum of Agreement (MOA) with DEP in a coordinated effort with MaineDOT. The purpose of the MEPDES MOA would be to address the requirements of MCM #4 to reduce pollutants in stormwater runoff from construction activities, as well as other MCMs that are somewhat analogous and/or duplicative with other MEPDES general permits. However, when this MEPDES MOA was not developed, MTA instead developed a Construction Project Environmental Compliance (CPEC) Program under the previous MS4 permit cycle to address stormwater management issues, including runoff from construction activities conducted by MTA and/or their contractors. At this time, MTA is prepared to continue implementing (and revising as needed) the CPEC Program, unless or until a MEPDES MOA is established, to address construction site stormwater runoff controls.
MTA SPMP Page 14 December 2013
5.0 MCM 5 – POST-CONSTRUCTION STORMWATER MANAGEMENT MS4 Permit Part IV(H)(5)(a)(i) Each permittee continue to implement, and enforce a program to address stormwater runoff from new development and redevelopment projects that disturb greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale, that discharge into the MS4 or directly to waters of the State other than groundwater. This program must ensure that controls are in place that are designed to prevent or minimize water quality impacts. (ii) Each permittee shall develop and implement strategies that include a combination of structural and/or non-structural best management practices (BMPs) appropriate for its regulated small MS4. (iii) To ensure adequate long-term operation and maintenance of post construction BMPs, each permittee shall develop and implement, as part of its Stormwater Program Management Plan, an approved BMP inspection schedule that at a minimum stipulates that new BMPs are inspected at least once during the first year of installation. Post construction BMP inspections must determine if the BMP is adequately maintained and is functioning as intended or requires maintenance. If the post construction BMP requires maintenance, provide a record of the deficiency and corrective action(s) taken. Each permittee shall include the following in their annual report: The cumulative number of post construction BMPs discharging directly into waters of the State
other than groundwater or into or from their separate storm sewer system; The number of sites with documented functioning post construction BMPs; and The number of sites that required routine maintenance or remedial action to ensure that the
post construction BMP is functioning as intended. Similarly, MTA is prepared to continue implementing (and revising as needed) the CPEC Program, unless or until a MEPDES MOA is established, to address post-construction stormwater management in new development and redevelopment. 6.0 MCM 6 – POLLUTION PREVENTION/GOOD HOUSEKEEPING MS4 Permit Part IV(H)(6) Pollution prevention and good housekeeping in community/facility operations. This MCM has the ultimate goal of preventing or reducing pollutant runoff from MaineDOT’s/MTA’s roads, other paved surfaces, infrastructure, and facilities through the development and implementation of an operation and maintenance (O&M) program. MTA will continue to implement existing mechanisms (e.g., CPEC Program, Training Programs, etc.) to fulfill the requirements for Pollution Prevention and Good Housekeeping within UA at MTA facility operations, unless and until a MEPDES MOA is developed with DEP in cooperation with MaineDOT. 6.1 POTENTIAL POLLUTANT SOURCES AND OPERATIONS MS4 Permit Part IV(H)(6)(a)(i) Each permittee shall evaluate and maintain its inventory of potential pollutant sources and associated operations conducted in, on, or associated with facilities, buildings, roads, travel ways including right-of-way owned or operated by the permittee that have the potential to cause or contribute to stormwater or surface water pollution. Each permittee shall continue to implement its written operation and maintenance procedures that
MTA SPMP Page 15 December 2013
include maintenance schedules and inspection procedures to ensure long-term operation of structural and non-structural controls that reduce stormwater pollution to the maximum extent practicable. These procedures must address, as applicable:
Proper use, storage and disposal of petroleum and non petroleum products, hazardous materials, waste materials, pesticides and fertilizers including minimizing the use of these products and an alternative product analysis;
Spill response and prevention; Vehicle and equipment storage, maintenance and fueling; Landscaping and lawn care including, where applicable and not subject to other
federal regulations, an evaluation of reduced mowing frequencies, establishing and maintaining buffers, cutting vegetation within 100 feet of a stormwater conveyance or surface water;
Erosion and sedimentation control; and Disposal of road-killed wildlife.
MTA will continue to rely on existing structural and non-structural controls to reduce stormwater pollution from MTA facilities, buildings, roads, and travel ways, such as:
Abbreviated Storm Water Pollution Prevention Plan (SWPPP) elements integrated into SPCC Plans at MTA Maintenance Facilities;
Standard contract language requiring contractors to utilize secondary containment and develop spill plans at construction sites;
Road kill policies and procedures; MaineDOT’s BMP Manual for Erosion and Sedimentation Control at construction
projects; or Other mechanism to be determined or as applicable.
6.2 MTA EMPLOYEE TRAINING MS4 Permit Part IV(H)(6)(a)(ii) Each permittee shall continue to implement annual employee training to prevent and reduce stormwater pollution from permittee operations and facilities. The permittee shall report annually on the types of trainings presented, the number of employees and contractors that received training, the length of the training, and training effectiveness. The existing training program addressing stormwater pollution prevention, and erosion and sediment control for MTA employees will be continued and revised, as appopriate. The annual report will include the required training information.
6.3 STREET SWEEPING MS4 Permit Part IV(H)(6)(a)(iii) The permittee shall continue to implement a program to sweep all paved streets and parking lots maintained by the permittee at least once a year as soon as possible after snowmelt. As reported in previous MS4 permit cycles and the Chapter 500 Stormwater Management MOA annual reports, MTA currently maintains a regular street sweeping program ensuring
MTA SPMP Page 16 December 2013
that all paved areas are swept at least one time per year, with a greater priority given to paved areas within UIS watersheds (e.g., swept as soon after snowmelt as possible). 6.4 CLEANING OF STORMWATER STRUCTURES INCLUDING CATCH BASINS MS4 Permit Part IV(H)(6)(a)(iv) The permittee shall continue to implement a program to evaluate and, if necessary, clean catch basins and other stormwater structures that accumulate sediment at least once every other year and dispose of the removed sediments consistent with the requirements of current state law. The permittee shall clean catch basins more frequently if inspections indicate excessive accumulation of sediment. Excessive accumulation is greater than or equal to 50 percent filled. Consistent with previous MS4 permit cycles, MTA currently operates an annual catch basin cleanout program that also includes inspection of outfalls within UA. MTA expects to continue this program throughout the coming 5-year SPMP. 6.5 MAINTENANCE AND UPGRADING OF STORMWATER CONVEYANCES AND OUTFALLS MS4 Permit Part IV(H)(6)(a)(v) The permittee shall evaluate and implement a prioritized schedule, as necessary, for repairing or upgrading conveyances, structures and outfalls of the regulated small MS4. Consistent with previous MS4 permit cycles, a comprehensive inspection of the MTA infrastructure is conducted on an annual basis by MTA’s general engineering consultant. This annual inspection includes observation of all MTA-owned infrastructure, including conveyance structures and outfalls. A prioritized list of repairs and upgrades are then presented to MTA Highway Maintenance and/or Engineering for consideration. 6.6 STORMWATER POLLUTION PREVENTION PLANS (SWPPP’s) MS4 Permit Part IV(H)(6)(a)(vi) The permittee shall evaluate and implement their stormwater pollution prevention plan(s) (“SWPPP”) for vehicle maintenance facilities operated by the permittee within the UA unless the facility is currently regulated under Maine’s Industrial Stormwater Program. The SWPPP must meet the requirements including the quarterly visual monitoring per Maine’s Multi-Sector General Permit (“MSGP”) published April 26, 2011. Unless and until a MEPDES MOA is developed to address SWPPP requirements for Maintenance Facilities, MTA will continue to rely on existing mechanisms (e.g., SWPPP elements incorporated into SPCC Plans); however, all MTA Maintenance Facilities are located outside of MS4-regulated UA.
TABLE 1 Stormwater Program Management Plan Implementation Schedule
TABLE 1STORMWATER PROGRAM MANAGEMENT PLAN (SPMP) IMPLEMENTATION SCHEDULE
Maine Turnpike Authority
MINIMUM CONTROL MEASURE (MCM) #1
MCM REQUIREMENT BEST MANAGEMENT PRACTICES
(BMPs)
METHODOLOGY/PURPOSE DOCUMENTATION RESPONSIBLE PARTY
(1) Each permittee shall establish
measurable goals. Progress on
these goals must be reported
annually for process indicators and
in years 1 (background), 3 & 5 for
impact indicators.
Process indicators relate to the execution of the
program (e.g., percent or number of employees
attending training, additional information provided
at a facility or job site).
Years 1-5: Assess process indicators as
part of the Annual Report
Maintain annual training schedules, rosters
and other materials to assess process
indicators
(2) Each permittee shall include a
review in its fifth year Annual Report.
The review must include an analysis
of the process indicators and impact
indicators.
Impact indicators relate to the achievement of the
goals and objectives of the program (e.g.,
changing behavior as a result of
training/information).
Year 1, 3 & 5: Assess impact indicators as part
of the Annual Report
Conduct an evaluation (i.e., exam, pop-quiz,
etc.) following training to measure awareness
of stormwater pollution, BMPs and/or runoff
issues
(a)(ii) Target BMP Adoption (Goal 2):
Beginning July 1, 2013, each permittee
shall continue outreach efforts from
the previous permit cycle while
encouraging employees and
contractors to utilize BMPs that
minimize stormwater pollution.
Maintain a BMP Adoption Plan for
employees and contractors to
minimize stormwater pollution
Continue to identify target BMPs to be utilized
by employees and contractors that minimize
stormwater pollution
Years 1-5: Continue to maintain and
implement the BMP Adoption
Plan to identify target BMPs to
be utilized by employees and
contractors
Maintain compliance with Chapter 500
standards, MOA requirements and/or
MaineDOT BMP Manual for MTA projects
constructed and maintained
(1) Each permittee shall set
measurable goals. Progress on
these goals must be reported
annually for process indicators and
in years 1 (background), 3 & 5 for
impact indicators.
Process indicators relate to the execution of the
programYears 1-5: Assess process indicators as
part of the Annual Report
Conduct inspections of work sites to provide a
baseline for future assessment of process
indicators
(2) Each permittee shall include a
review in its fifth year Annual Report.
The review must include an analysis
of the process indicators and impact
indicators.
Impact indicators relate to the achievement of
the goals and objectives of the programYear 1, 3 & 5: Assess impact indicators as part
of the Annual Report
Maintain copies of inspection logs for
construction, maintenance activity records
and/or other documents referenced in BMP
Adoption Plan to demonstrate achievement of
goals and program objectives.
(a)(iii) Compliance with this MCM will
be based upon:
a. Conduct training to address
pollution reduction in stormwater
runoff for MTA employees
Ensure MTA employees are educated and
appropriately trained
Years 1-5: Continue Annual Stormwater
Training Program for MTA staff
Maintain stormwater training schedule, rosters,
quizzes, etc.
Environmental Services
Coordinator and MTA
Training Coordinator
b. Require contractors to maintain an
on-site responsible party (OSRP) who
is trained in erosion and sediment
control
Require that OSRP has the authority to
promptly remedy any deficient controls
Years 1-5: Continue to obtain ESC
certification from contractor's
OSRP
Maintain ESC certification documents from
contractors
Environmental Services
Coordinator in combination
with Engineering
c. Continue to coordinate with local
groups as appropriate
UIS Strategy:
Information regarding MTA's highest
priority watershed will be continue to be
incorporated into the existing education
and outreach efforts.
Ensure that MTA continues to coordinate with
the public, municipalities, MaineDOT, ISWG,
etc. regarding stormwater information
Years 1-5: Continue to address stormwater
topics at meetings and on MTA
website
Maintain log of meetings and update of website Environmental Services
Coordinator and/or Public
(Government and
Community) Relations
Office
Continue to maintain and
implement an Awareness Plan
for employees and contractors
Years 1-5: Maintain a copy of the Plan and associated
documents (i.e., updated training, etc.)
(a)(i) Raise Awareness (Goal 1):
Beginning July 1, 2013, each permittee
shall continue raising awareness of
stormwater issues amongst employees
and contractors.
(1) Continued existing education and
outreach efforts;
(2) Reported process and impact
indicators; and
(3) Completed annual reports and a 5-
year analysis of the plans.
MEASURABLE GOALS
The Awareness Plan will continue to raise
awareness of polluted stormwater runoff issues
and will provide for assessment of process and
impact indicators.
MPDES Permit Part IV(H) 1. Public education and outreach on stormwater impacts. The three goals of this minimum control measure are:
1. to raise awareness that polluted stormwater runoff is the most significant sources of water quality problems for Maine's waters;
2. to motivate staff and contractors to use Best Management Practices (BMPs) which reduce polluted stormwater runoff; and
3. to reduce polluted stormwater runoff as a result of increased awareness and utilization of BMPs. The permittee shall document changes in awareness and BMP adoption (behavior change) in target audiences.
Environmental Services
Coordinator and/or
Designated Consultant
Maintain an Awareness Plan to raise
awareness of stormwater issues
amongst employees and contractors
UIS Strategy:
The Awareness Plan will continue to
place emphasis on raising awareness
within MTA's highest priority watersheds
(e.g., Hart Brook or Goosefare Brook).
UIS Strategy:
The BMP Adoption Plan will place
emphasis on utilizing target BMPs within
MTA's highest priority watersheds (e.g.,
Hart Brook or Goosefare Brook).
Italic Font = 2013 MS4 permit language
Red font = UIS Strategy P:\MTA\25776 - 2013 SW Services\TASK 01 MS4 Compliance\2013 SPMP\FINAL Table 1 BMP Work Plan and Implementation Schedule (120213).xlsx
Table 1
MTA's 2013 SPMP
Page 1 of 7
TABLE 1STORMWATER PROGRAM MANAGEMENT PLAN (SPMP) IMPLEMENTATION SCHEDULE
Maine Turnpike Authority
MCM #2
MCM REQUIREMENT BEST MANAGEMENT PRACTICES
(BMPs)
METHODOLOGY/PURPOSE DOCUMENTATION RESPONSIBLE PARTY
(a)(i) Public notice requirements. The
permittee shall comply with applicable
state and local Pulic Notice
requirements using effective
mechanisms for reaching the public,
and comply with the public notice
requirements of the Maine Freedom of
Access Act, 1 M.R.S.A. 4401 et seq.
("FOAA") when the permittee involves
stakeholders in the implementation of
this General Permit. The permittee
shall document the meetings and
attendance through the annual report
as a way of mesuring this goal.
Ensure that appropriate public notice
requirements are met when public
meetings are held that address
stormwater topics
Comply with applicable state and local Public
Notice requirements using effective
mechanisms for reaching the public, and
comply with the public notice requirements of
the Maine Freedom of Access Act, 1
M.R.S.A. 401 et seq. ("FOAA") when the
permittee involves stakeholders in the
implementation of this general permit. The
permittee shall document the meetings and
attendance through the annual report as a
way of measuring this goal.
Years 1-5: Continue to ensure all public
meetings that address
stormwater meet FOAA
requirements
Maintain written public notice policy that
complies with FOAA requirements, public
notice announcements and a log of applicable
meetings
Environmental Services
Coordinator and/or
Government Relations
Office
Contact each host MS4 community to identify
the respective stormwater coordinator
Year 1: Update list of Stormwater
Coordinators for host MS4
communities
Maintain list of Stormwater Coordinators for
each host MS4 community
Years 2-5: Communicate with host MS4
communities via the designated
Stormwater Coordinator
Maintain documentation regarding
communication and/or coordination with host
MS4 communities
Report annually on involvement, mutual
cooperation and coordination with host MS4s
Years 1-5: Continue strategy for
coordinating with host MS4s and
document subsequent
coordination
Summarize coordination in each annual report
(a)(ii) Coordinate with regulated
communities. The permittee shall
coordinate efforts by providing
information on planned construction,
and maintenance activities to
Regulated Small MS4 municipal
stormwater coordinators. The
permittee shall develop a strategy to
ensure involvement, mutual
cooperation and coordination with the
Regulated Small MS4 municipalities,
and report on such efforts annually
pursuant to Part IV(J) on joint efforts,
meetings attended, projects and
coordination.
MEASURABLE GOALS
Coordinate with host MS4
communities, as well as MaineDOT,
by sharing information on planned
construction and maintenance
activities
MPDES Permit Part IV(H) 2. Public involvement and participation. The goal of this minimum control measure is to involve the permittee's community including various departments, bureaus or facilities, and when applicable involve regulated small MS4 communities in both the planning
and implementation proess of improving water quality and reducing quantity via the stormwater program. An active and involved participation process is crucial to the success of a stormwater management program because it allows for broader support, additional expertise and a conduit to
other programs.
Italic Font = 2013 MS4 permit language
Red font = UIS Strategy P:\MTA\25776 - 2013 SW Services\TASK 01 MS4 Compliance\2013 SPMP\FINAL Table 1 BMP Work Plan and Implementation Schedule (120213).xlsx
Table 1
MTA's 2013 SPMP
Page 2 of 7
TABLE 1STORMWATER PROGRAM MANAGEMENT PLAN (SPMP) IMPLEMENTATION SCHEDULE
Maine Turnpike Authority
MCM #3
MCM REQUIREMENT BEST MANAGEMENT PRACTICES
(BMPs)
METHODOLOGY/PURPOSE DOCUMENTATION RESPONSIBLE PARTY
Ground veridy watershed-based
Storm Sewer System Infastructure
Maps in its highest priority watershed
within UA
Year 1: Review existing MS4 maps for
the highest priority watersheds
Maps for portions of MTA facility within UA
Identify areas where ground
verification and/or potential
updates to maps may be needed
Maintain punchlist of areas to ground verify
Year 2: Conduct field work to ground
verify infrastructure in MTA's
highest priority watershed
Years 3-5: Revise maps to include ground
verification information
Continue to implement prioritized dry
weather inspection program
Year 1: Review and/or update the SOP,
policy and protocol for dry
weather inspections
Retain written policy and documents for dry
weather inspection
Environmental Services
Coordinator and/or
Designee
UIS Strategy:
Priority will be given to host MS4
communities of MTA's two designated
highest priority UIS watersheds (e.g., Hart
Brook and Goosefare Brook.
Years 2-5: Continue to conduct inspections
and implement the steps that
must be taken to locate and
eliminate the source of an illicit
discharge when it is identified
Maintain inspection records and source
location determinations, as well as corrective
actions taken to eliminate the illicit
connection/discharge
Year 1: Identify two regulated MS4
municipalities to conduct a
coordinated dry weather
inspection program
Maintain correspondence with host MS4
municipalities
Years 2-5: Implement at least two
coordinated watershed based
illicit discharge detection and
elimination programs
Document coordinated dry weather inspections
Review and/or update the dry weather
inspection program and the existing IDDE
Standard Operating Procedure (SOP) to
identify the greatest perceived/potential
threat to the receiving water
Maintain updated maps that include:
- uniquely identified CBs and associated
surfaces
- flow directions
- outfall description (e.g., type, material, size)
- name of receiving waterbody (or host MS4
system)
Communicate directly with host MS4
stormwater contacts to choose, schedule
and conduct a coordinated dry weather
MS4 inspection program
MEASURABLE GOALS
(a)(i) By June 30, 2015, each permittee
shall ground verify its watershed based
storm sewer system infrastructure
map(s) in its highest priority watershed
within the UA showing the location of
all stormwater catch basins,
connecting surface and subsurface
infrastructure depicting the direction of
in-flow and out-flow pipes, and the
locations of all discharges from all
stormwater outfalls operated by the
regulated small MS4.
Coordinate with two host MS4
communities, such as Saco
(Goosefare Brook), Lewiston (Hart
Brook) or Portland (multiple UIS
watersheds)
In the first permit year, each permittee
shall petition regulated MS4
municipalities to conduct a
coordinated dry weather MS4
inspection program. In permit years
two through five each permittee shall
implement at least two coordinated
watershed based illicit discharge
detection and elimination programs.
(a)(ii) Each permittee shall continue to
implement a prioritized dry weather
outfall inspection plan based on
drainage areas such as an urban
impaired stream watershed, or based
on a watershed or sub-watershed that
the permittee has identified as having
the greatest potential threat to the
receiving water.
MPDES Permit Part IV(H) 3. Illicit Discharge Detection and Elimination (IDDE). Each permittee must develop, implement and enforce a program to detect and eliminate illicit discharges and non-stormwater discharges, as defined in 06-096CMR521(9)(b)(2), except as provided in Part
IV(H)3(b) of this permit.
Environmental Services
Coordinator in
coordination with MTA's
GIS Coordinator and/or
Designated Consultant
Environmental Services
Coordinator in
coordination with
Government Affairs
personnel and/or
Highway Maintenance
Supervisor
Each catch basin must be uniquely identified:
-to facilitate control of potential illicit
discharges, and
-to ensure proper operation and maintenance
of the structures.
For each outfall, the following information
must be included:
-type, material, and size of conveyance or
channelized flow;
-the name and location of the immediate
surface waterbody or wetland to which the
stormwater runoff eventually discharges.
If an outfall does not discharge directly to a
named waterbody, identify the name and
location of the nearest named waterbody to
which the outfall eventually discharges.
UIS Strategy:
Consistent with previous MS4 permit
cycles, MTA will continue to consider
either Hart Brook (Lewiston) or Goosefare
Brook (Saco) the highest priority
watershed.
Italic Font = 2013 MS4 permit language
Red font = UIS Strategy P:\MTA\25776 - 2013 SW Services\TASK 01 MS4 Compliance\2013 SPMP\FINAL Table 1 BMP Work Plan and Implementation Schedule (120213).xlsx
Table 1
MTA's 2013 SPMP
Page 3 of 7
TABLE 1STORMWATER PROGRAM MANAGEMENT PLAN (SPMP) IMPLEMENTATION SCHEDULE
Maine Turnpike Authority
MCM #3
MCM REQUIREMENT BEST MANAGEMENT PRACTICES
(BMPs)
METHODOLOGY/PURPOSE DOCUMENTATION RESPONSIBLE PARTY
Year 1: Review existing mechanisms for
potential revisions to document
any detected illicit discharges
Year 2: Implement revisions to
document illicit discharges
detected in open ditch system
within MTA's two highest priority
watersheds, as necessary
Years 3-5: Continue to document illicit
discharges detected in open
ditch system within MTA's two
highest priority watersheds, as
necessary
MCM #4
MCM REQUIREMENT BEST MANAGEMENT PRACTICES
(BMPs)
METHODOLOGY/PURPOSE DOCUMENTATION RESPONSIBLE PARTY
Year 1: Continue to implement the
CPEC Program and/or develop
MEPDES MOA with DEP in a
coordinated effort with
MaineDOT
Maintain documentation associated with the
CPEC Program and MOA development
process with DEP
Environmental Services
Coordinator and/or
Designee
Year 2: Continue to implement the
CPEC Program and/or finalize
MEPDES MOA and identify
specific requirements
Maintain CPEC Program binders/documents
and/or a copy of the established MEPDES
MOA
Years 3-5: Continue to implement the
CPEC Program and/or begin
implementing MEPDES MOA
Maintain CPEC Program and/or MEPDES
MOA records for MTA projects (e.g., annual
MOA report, etc.)
Maintain source location determinations, as
well as corrective actions taken to eliminate the
illicit connection/discharge within MTA's open
ditch within two highest priority watersheds
Environmental Services
Coordinator in
coordination with
Designated Consultant
and MTA's Highway
Maintenance
Years 1-5: Identify and document non-
stormwater discharges as they
are discovered during dry
weather inspections, mapping,
etc. and revise Plan accordingly
Maintain log of identified non-stormwater
discharges that potentially contribute to a
violation of water quality standards
MEASURABLE GOALS
(b) This permit authorizes non-
stormwater discharges provided they
do not contribute to a violation of water
quality standards, as determined by the
Department; these discharges must be
addressed in the Plan if they are
identified by the permittee as
significant contributors of pollutants to
the regulated small MS4.
(a)(iii) MaineDOT/MTA shall implement
an illicit discharge detection and
elimination program for their open
ditch system within their two highest
priority watersheds.
Implement a strategy for addressing
illicit discharges to open ditch
systems within two highest priority
watersheds (i.e., Hart Brook and
Goosefare Brook)
MEASURABLE GOALS
The program will include
continuation of MTA's Construction
Project Environmental Compliance
(CPEC) Program and its
subsequent revisions, unless or
until a Memorandum of Agreement
(MOA) between MDEP, MTA and
MaineDOT is developed for MS4
applicability (e.g., MEPDES MOA).
MPDES Permit Part IV(H) 3. Illicit Discharge Detection and Elimination (IDDE). Each permittee must develop, implement and enforce a program to detect and eliminate illicit discharges and non-stormwater discharges, as defined in 06-096CMR521(9)(b)(2), except as provided in Part
IV(H)3(b) of this permit.
MPDES Permit Part IV(H) 4. Construction site stormwater runoff control. Continue to implement, and enforce a program or modify an existing program, to reduce pollutants in any stormwater runoff including discarded building materials, concrete truck washout, chemicals, litter, and
sanitary waste that may cause adverse impacts to water quality from construction activities that result in a land disturbance of greater than or equal to one acre. Reduction of stormwater discharges from construction activity disturbing less than one acre must be included in the program if
that construction activity is part of a larger common plan of development or sale that would disturb one acre or more. Each permittee must include standard operating procedures for addressing and implementing compliance inspections and enforcement actions.
Continue to utilize existing mechanisms (e.g.,
IDDE Notification Form, Mobile SPCC Plan
Spill Reporting, Highway Safety Incident
Response, General/Specific Contract
Language, Annual Comprehensive Inspection
conducted by General Engineering
Consultants) to provide consistent protocol
for internal reporting through an established
chain-of-command, which establishes a
central point of contact for MTA to notify state
and municipal enforcement authorities
Ensure that this SPMP addresses identified
non-stormwater discharges that are
considered significant contributors of
pollutants to the regulated MS4
Modify this Plan, as necessary, to
address non-stormwater discharges
that are identified as significant
contributors of pollutants to the MS4
MEPDES MOA, when developed, may
provide permit coverage to MTA and
MaineDOT associated with the duplicative
requirements of the three MEPDES
programs: MS4 GP, MCGP and MSGP. The
MOA will be reasonably consistent with the
standards established by the DEP in MCMs
#4 through #6 of this MS4 General Permit
(GP), as well as the Maine Construction
General Permit (MCGP) and DEP's Multi-
Sector General Permit (MSGP).
Continue to implement CPEC
Program, unless and until a MEPDES
MOA is established to reduce
pollutants in stormwater runoff from
construction activities at regulated
projects.
Italic Font = 2013 MS4 permit language
Red font = UIS Strategy P:\MTA\25776 - 2013 SW Services\TASK 01 MS4 Compliance\2013 SPMP\FINAL Table 1 BMP Work Plan and Implementation Schedule (120213).xlsx
Table 1
MTA's 2013 SPMP
Page 4 of 7
TABLE 1STORMWATER PROGRAM MANAGEMENT PLAN (SPMP) IMPLEMENTATION SCHEDULE
Maine Turnpike Authority
MCM #5
MCM REQUIREMENT BEST MANAGEMENT PRACTICES
(BMPs)
METHODOLOGY/PURPOSE DOCUMENTATION RESPONSIBLE PARTY
Year 1: Continue to implement CPEC
Program and/or develop
MEPDES MOA with DEP in a
coordinated effort with
MaineDOT
Maintain documentation associated with CPEC
Program and/or MOA development process
with DEP
Environmental Services
Coordinator and/or
Designee
Year 2: Continue to implement CPEC
Program and/or finalize
MEPDES MOA
Maintain CPEC Program binders and/or a copy
of the established MEPDES MOA
Years 3-5: Continue to implement the
CPEC Program and/or begin
implementing MEPDES MOA
Maintain CPEC Program and/or MOA records
for MTA projects (e.g., annual MOA report)
Year 1: Continue to implement CPEC
Program and/or develop
MEPDES MOA
Maintain CPEC Program binders and/or
documentation associated with MOA
development process with DEP
Year 2: Continue to implement CPEC
Program and/or finalize
MEPDES MOA
Maintain CPEC Program binders and/or a copy
of the established MEPDES MOA
Years 3-5: Continue to implement the
CPEC Program and/or begin
implementing MEPDES MOA
Maintain CPEC Program and/or MOA records
for MTA projects (e.g., annual MOA report)
Year 1: Continue to implement CPEC
Program and/or develop
MEPDES MOA
Maintain documentation associated with CPEC
Program and/or MOA development process
with DEP
Year 2: Continue to implement CPEC
Program and/or finalize
MEPDES MOA
Maintain CPEC Program binders and/or a copy
of the established MEPDES MOA
Years 3-5: Continue to implement the
CPEC Program and/or begin
implementing MEPDES MOA
Maintain CPEC Program and/or MOA records
for MTA projects (e.g., annual MOA report)
MEASURABLE GOALS
(a)(ii) Each permittee shall develop and
implement strategies that include a
combination of structural and/or non-
structural best management practices
(BMPs) appropriate for its regulated
small MS4.
Continue to implement CPEC
Program unless or until a MEPDES
MOA is established to address
strategies that include appropriate
structural and non-structural BMPs.
Continue to implement CPEC
Program, unless or until a MEPDES
MOA is established for new
development and redevelopment that
addresses stormwater runoff from
projects that disturb one acre or more
discharging to the MS4 or directly to
waters of the State.
(a)(iii) To ensure adequate long-term
operation and maintenance of post
construction BMPs, each permittee
shall develop and implement, as part of
its Stormwater Program Management
Plan, an approved BMP inspection
schedule that at a minimum stipulates
that new BMPs are inspected at least
once during the first year of
installation. Post construction BMP
inspections must determine if the BMP
is adequately maintained and is
functioning as intended or requires
maintenance. If the post construction
BMP requires maintenance, provide a
record of the deficiency and corrective
action(s) taken.
Continue to implement CPEC
Program unless or until a MEPDES
MOA that includes guidelines for post-
construction BMPs inspections.
MPDES Permit Part IV(H) 5. Post-construction stormwater management in new development and redevelopment.
(a)(i) Each permittee shall continue to
implement, and enforce a program to
address stormwater runoff from new
development and redevelopment
projects that disturb greater than or
equal to one acre, including projects
less than one acre that are part of a
larger common plan of development or
sale, that discharge into the MS4 or
directly to waters of the State other
than groundwater. This program must
ensure that controls are in place that
are designed to prevent or minimize
water quality impacts.
MEPDES MOA would provide permit coverage
to MTA and MaineDOT associated with the
duplicative requirements of multiple MEPDES
program permits:
MS4 GP,
MCGP and
MSGP.
This potential MOA is expected to be
reasonably consistent with the standards
established by the DEP in MCMs #4 through #6
of this MS4 General Permit (GP), as well as the
analogous requirements in the Maine
Construction General Permit (MCGP) and
DEP's Multi-Sector General Permit (MSGP).
Each permittee shall include the following in
their annual report:
-the cumulative number of post construction
BMPs discharging directly into waters of the
State other than groundwater or into or from
their separate storm sewer system;
-the number of sites with documented
functioning post construction BMPs; and
-the number of sites that require routine
maintenance or remedial action to ensure that
the post construction BMP is functioning as
intended.
Italic Font = 2013 MS4 permit language
Red font = UIS Strategy P:\MTA\25776 - 2013 SW Services\TASK 01 MS4 Compliance\2013 SPMP\FINAL Table 1 BMP Work Plan and Implementation Schedule (120213).xlsx
Table 1
MTA's 2013 SPMP
Page 5 of 7
TABLE 1STORMWATER PROGRAM MANAGEMENT PLAN (SPMP) IMPLEMENTATION SCHEDULE
Maine Turnpike Authority
MCM #6
MCM REQUIREMENT BEST MANAGEMENT PRACTICES
(BMPs)
METHODOLOGY/PURPOSE DOCUMENTATION RESPONSIBLE PARTY
Year 1: Continue to implement CPEC
Program and/or develop
MEPDES MOA
Maintain documentation associated with CPEC
Program and/or MOA development process
with DEP
Year 2: Continue to implement CPEC
Program and/or finalize
MEPDES MOA
Maintain CPEC Program binders and/or a copy
of the established MEPDES MOA
Years 3-5: Continue to implement the
CPEC Program and/or begin
implementing MEPDES MOA
Maintain CPEC Program and/or MOA records
for MTA projects (e.g., annual MOA report)
Continue to implement Stormwater
Pollution Reduction Training Program
for MTA target audience (employees
and contractors)
Year 1: Conduct existing training
program that addresses
stormwater pollution provention,
as well as erosion and sediment
control
See MCM #1 See MCM #1
Revise existing training program,
as necessary
UIS Strategy:
Revise Stormwater Training Program, as
needed to include additional information
pertaining to UIS watersheds and
additional BMPs.
Review current files to ensure
that contractors are certified by
DEP in stormwater pollution
prevention, as well as erosion
and sediment control
Include the required training
information in the annual report
Years 2-5: Continue training program and
annual reporting
Environmental Services
Coordinator and/or
Designee
(a)(i) Each permittee shall evaluate and
mainatain its inventory of potential
pollutant sources and associated
operations conducted in, on, or
associated with facilities, buildings,
roads, travel ways including right-of-
way owned or operated by the
permittee that have the potential to
cause or contribute to stormwater or
surface water pollution. Each
permittee shall continue to implement
its written operation and maintenance
procedures that include maintenance
schedules and inspection procedures
to ensure long term operation of
structural and non-structural controls
that reduce stormwater pollution to the
maximum extent possible.
These procedures must address, as
applicable:
(1) proper use, storage and disposal of
petroleum and non petroleum products,
hazardous materials, waste materials,
pesticides and fertilizers including minimizing
the use of these products, and an alternative
product analysis;
(2) spill response and prevention;
(3) vehicle and equipment storage,
maintenance and fueling;
(4) landscaping and lawn care including,
where applicable and not subject to other
federal regulations, an evaluation of reduced
mowing frequencies, establishing and
maintaining buffers, cutting vegetation within
100 feet of a stormwater conveyance or
surface water;
(5) erosion and sedimentation control; and
(6) disposal of road-killed wildlife.
Continue to implement CPEC
Program or develop a MEPDES MOA
that includes an O&M Plan that
addresses potential pollutant sources
and O&M procedures.
The existing training programs conducted for
MTA employees will be reviewed and
updated, as necessary.
Because MTA does not conduct training for
contractors, MTA will rely on contractors to
become certified through the DEPs Non-Point
Source Training Center or an equivalent
program. Contractors will provide proof of
certification to MTA as part of the Training
Program.
(a)(ii) Each permittee shall continue to
implement annual employee training to
prevent and reduce stormwater
pollution from permittee operations and
facilities. The permittee shall report
annually on the types of training
presented, the number of employees
and contractors that received training,
the length of the training and training
effectiveness.
MPDES Permit Part IV(H) 6. Pollution prevention and good housekeeping in community/facility operations. This MCM has the ultimate goal of preventing or reducing reducing pollutant runoff from MaineDOT's/MTA's roads, other paved surfaces, infrastructure, and facilities through
the development and implementation of an operation and maintenance (O&M) program. The O&M program must include the following:
MEASURABLE GOALS
Italic Font = 2013 MS4 permit language
Red font = UIS Strategy P:\MTA\25776 - 2013 SW Services\TASK 01 MS4 Compliance\2013 SPMP\FINAL Table 1 BMP Work Plan and Implementation Schedule (120213).xlsx
Table 1
MTA's 2013 SPMP
Page 6 of 7
TABLE 1STORMWATER PROGRAM MANAGEMENT PLAN (SPMP) IMPLEMENTATION SCHEDULE
Maine Turnpike Authority
MCM #6
MCM REQUIREMENT BEST MANAGEMENT PRACTICES
(BMPs)
METHODOLOGY/PURPOSE DOCUMENTATION RESPONSIBLE PARTY
Year 1:
Year 2:
Years 3-5:
Year 1:
Year 2:
Years 3-5:
Year 1: Environmental Services
Coordinator and/or
Designated Consultant
Year 2:
Years 3-5:
Year 1:
Year 2:
Years 3-5:
(a)(iv) The permittee shall continue to
implement a program to evaluate and,
if necessary, clean catch basins and
other stormwater structures that
accumulate sediment at least once
every other year and dispose of the
removed sediments in accordance with
current state law.
(a)(iii) The permittee shall continue to
implement a program to sweep all
paved streets and parking lots
maintained by the permittee at least
once a year as soon as possible after
snowmelt.
Continue to implement MTA's
existing annual sweeping
program, unless or until a
MEPDES MOA with DEP
addresses this requirement
Maintain documentation for sweeping program
and/or MOA development, implementation, etc.
Environmental Services
Coordinator and/or
Designated Consultant
Environmental Services
Coordinator and/or
Designated Consultant
Environmental Services
Coordinator and/or
Designated Consultant
MPDES Permit Part IV(H) 6. Pollution prevention and good housekeeping in community/facility operations. This MCM has the ultimate goal of preventing or reducing reducing pollutant runoff from MaineDOT's/MTA's roads, other paved surfaces, infrastructure, and facilities through
the development and implementation of an operation and maintenance (O&M) program. The O&M program must include the following:
(a)(vi) The permittee shall evaluate and
implement their stormwater pollution
prevention plan(s) ("SWPPP") for
vehicle maintenance facilities operated
by the permittee within the UA unless
the facility is currently regulated under
Maine's Industrial Stormwater Program.
The SWPPP must meet the
requirements including the quarterly
monitoring per Maine's Multi-Sector
General Permit ("MSGP") published
April 26, 2011.
MEASURABLE GOALS
Continue to implement existing
programs
Continue existing annual
comprehensive inspection of MTA
infrastructure and operations
conducted by General Engineering
Consultant that includes a prioritized
schedule for repairing and upgrading
MS4 associated infrastructure
UIS Strategy:
Additional information will be provided in
the two highest priority UIS watersheds.
(a)(v) The permittee shall evaluate and
implement a prioritized schedule, as
necessary, for repairing or upgrading
conveyances, structures and outfalls of
the regulated small MS4.
Continue to implement existing
annual catch basin cleanout program
UIS Strategy:
Priority will continue to prioritize
cleaning out catch basins within two
highest priority UIS watersheds before
others within UA.
Unless and until a MEPDES MOA is
developed to address this requirement, MTA
will continue to implement the existing annual
programs (e.g., sweeping memo from
Highway Maintenance Director with prioritized
areas, catch basin and outfall inspection
program by Highway Maintenance,
maintenance facility inspections/SWPPPs,
etc.)
Continue to implement existing
annual sweeping program
UIS Strategy:
Priority will continue to be given to
sweeping within two highest priority UIS
watersheds as soon as possible after
snowmelt.
Continue to implement MTA's
existing program, unless or until
a MEPDES MOA with DEP
addresses this requirement
Maintain documentation for SWPPP
compliance and/or MOA development,
implementation, etc.
Continue to implement MTA's
existing annual catch basin
cleanout program, unless or until
a MEPDES MOA with DEP
addresses this requirement
Maintain documentation for catch basin
cleanout program and/or MOA development,
implementation, etc.
Maintain documentation for annual inspection
program and/or MOA development,
implementation, etc.
Continue to implement MTA's
existing annual inspection
program of infrastructure and
operations, unless or until a
MEPDES MOA with DEP
addresses this requirement
Italic Font = 2013 MS4 permit language
Red font = UIS Strategy P:\MTA\25776 - 2013 SW Services\TASK 01 MS4 Compliance\2013 SPMP\FINAL Table 1 BMP Work Plan and Implementation Schedule (120213).xlsx
Table 1
MTA's 2013 SPMP
Page 7 of 7
APPENDIX A MS4 General Permit
APPENDIX B NOI Submittal
MAINE TURNPIKE AUTHORITY
Notice of Intent (NOI) to Comply with MEPDES MS4 (Permit #MER04301)
REGULATED LINEAR DISTANCE ASSUMED AREA3
ASSUMED AREA3
CALCULATED MTA FACILITY FEATURES 3
SMALL MS4 Northern Southern OF UA SEGMENT OF UA SEGMENT WITHIN UA AREA IN UA WITHIN UA LAKES 4MM
COMMUNITY Boundary Boundary (linear miles) (sq. miles) (approx. acreage) (sq. miles) (Roadway and ROW assumed)
SABATTUS MM 84.3 MM 83.6 0.7 0.04 None identified None identified None identified
Lisbon Road Underpass Sabattus Town Line
LEWISTON MM 83.6 MM 78.9 4.7 0.27 25 0.04 Exit 80 Interchange (ramps) None identified 83.4 Unnamed tributary of No Name Brook
Lewiston / Sabattus Androscoggin River Exit 80 Park and Ride (parking lot) (crosses Turnpike south of Grove Street overpass)
town line 82.6 No Name Brook
Hart Brook 5 (aka Dill Brook) crosses 4 times80.3 At Alfred A Plourde Parkway overpass
79.9
79.6
79.4
North of Goddard Road
South of Goddard Rd
South of River Road)
78.9 Androscoggin River
AUBURN MM 78.9 MM 78.8 0.1 0.01 None identified None identified 78.9 Androscoggin River
Androscoggin River Riverside Drive
MM 75.8 MM 75.0 0.8 0.05 25 0.04 Exit 75 Interchange (ramp)
Danville Corner Road
Underpass
Kitty Hawk Avenue
Underpass
Exit 75 Park and Ride (parking lot)
MM 74.5 MM 73.5 1.0 0.06 None identified 74.4 Moose Brook
Canadian National Railroad New Gloucester / Auburn
town line
FALMOUTH MM 53.4 MM 51.8 1.6 0.09 25 0.04 Exit 53 Interchange (ramp) None identified 52.5 Unnamed tributary of Presumpscot River
Mountain Road Underpass Presumpscot River
Portland/Falmouth Line
Exit 53 Toll Plaza
Exit 53 West Falmouth Park and Ride
(crosses Turnpike near Exit 53 NB on-ramp)
Falmouth Spur (F3.8) Falmouth Spur (F3.5) 0.3 0.02 None identified None identified
Rail Road Overpass
(MaineDOT)
Just South of Falmouth
Road/ Middle Road (Route
9) Overpass
Falmouth Spur (F1.8) Falmouth Spur (F0.2) 1.6 0.09 None identified F2.4 Johnson Branch of Presumpscot River
Just North of Falmouth
Road Underpass
Presumpscot River
Portland/Falmouth Line
51.8
F1.2
Presumpscot River
(crosses Turnpike and Falmouth Spur)PORTLAND Falmouth Spur (F0.0) Falmouth Spur (F0.2) 0.2 0.01 25 0.04 Exit 52 Interchange (ramps and spur) None identified 51.8 Presumpscot River
Exit 52 Interchange Portland/Falmouth Town F1.2 (crosses interstate and spur)MM 51.8 MM 46.5 5.3 0.30 Exit 52 Interchange (ramps and spur) 50.8 Northerly unnamed tributary of Presumpscot River
Presumpscot River Congress St. Overpass 25 0.04 Exit 48 Interchange (ramps) (crosses Turnpike south of Riverside Street overpass)Exit 48 Toll Plaza 49.8 Southerly unnamed tributary of Presumpscot River
25 0.04 Exit 47 Interchange (ramps) (crosses Turnpike south of Route 302 overpass)Exit 47 Toll Plaza 48.7 Capisic Brook 5
Exit 47 Westbrook Park and Ride (parking lot) (within Turnpike ROW south of Warren Ave overpass)MM 46.5 MM 46.4 Exit 46 Jetport Interchange 47.8 Nasons Brook 5
Congress St. Overpass Portland/South Portland Exit 46 Jetport Park and Ride (crosses Turnpike south of Brighton Ave and RR overpass)Line 46.8 Stroudwater River
SOUTH PORTLAND MM 46.4 MM 44.8 Exit 45 South Portland/I-295 Interchange 45.9 Long Creek6
South Portland / Scarborough / South 45.0 Unnamed Tributary of Long CreekPortland town line Portland town line
SCARBOROUGH MM 44.6 MM 44.7 None identified 44.4 Red Brook 5
Scarborough / South 43.5 Nonesuch RiverPortland town line 41.6 Unnamed tributary of Beaver Brook
MM 44.7 MM 41.2 3.5 0.20 25 0.04 Exit 44 Interchange (ramps) (crosses Turnpike south of Two Rod Road underpass)Just South Exit 42 Interchange (ramps) - Unnamed tributary of Mill Brook (flows into)
of Beechridge 25 0.04 Exit 42 Scarborough Park and Ride (parking lot) 41.5 Beaver Brook
Rd Underpass 41.2 Finnerd Brook
SACO MM 35.9 MM 33.0 2.9 0.16 25 0.04 Exit 36 Interchange (ramps) None identified 35.9 Goosefare Brook 5
Goosefare Brook Saco River Former Exit 36 Interchange (ramps) 33.6 Deep Brook
Saco Hotel and Conference Center Exit 33.4 Cole Brook
33.0 Saco River
BIDDEFORD MM 33.0 MM 30.6 2.4 0.14 25 0.04 Exit 32 Interchange (ramps) None identified 33.0 Saco River
Saco River Arundel / Biddeford Exit 32 Biddeford Park and Ride (parking lot) Thatcher Brook 5 (crosses MTA ROW 3 times)town line 32.7 South of South Street and runs parallel MTA ROW
32.2 North of Biddeford connector (Ex 32)
31.9 South of Biddeford connector (Ex 32)
YORK MM 7.5 MM 6.2 1.3 0.07 25 0.04 Exit 8 Interchange None identified 7.5 Little River
North of York Toll/ Cider Hill Road Exit 8 York Barrier Toll Plaza 6.8 Unnamed tributary of Moulton Brook
Little River Exit 8 Park and Ride 5.2 York River
MM 5.3 MM 4.8 0.5 0.03 5.2 York River
York River Beech Ridge Road
KITTERY MM 4.2 MM 2.2 2.0 0.11 25 0.04 Rest Area Welcome Center None identified 4.0 Libby Brook
Kittery / York town line Spruce Creek (operated by MaineDOT) 3.6 (crosses Turnpike in two places near Welcome Plaza)
(southern boundary of 2.7 Unnamed tributary of Fuller Brook
MTA-operated UA (Crosses Turnpike south of Cutts Road)
as of July 1, 2013) 2.3 Spruce Creek
MaineDOT Territory 8 MM 2.2 MM 0.0 2.2 0.13 25 0.04 Exit 1 Interchange 2.3 Spruce Creek
(not included in summation Spruce Creek Maine/New Hampshire 25 0.04 Exit 2 Interchange 1.7 Chickering Creek
of MTA's regulated UA) (As of July 1, 2013 State Line 25 0.04 Exit 3 Interchange 1.2 Unnamed tributary of Chickering Creek
not operated by MTA) 0.0 Piscataqua River
28.9 1.64 300 0.47
2.12 TOTAL SQUARE MILES OF MTA PROPERTY WITHIN UA (As of July 1, 2013)SUMMATION WITHIN UA INCLUDING 2 MILES IN KITTERY: 31.1 1.77 375 0.59
MILE MARKER DELINEATION 2 6
STREAMS 4
LINEAR ROW ONLY
Approximately 200 ft North
of Cummins Rd Overpass
Approximately 200 ft North
of Cummins Rd Overpass
2013 Permit1 MTA FACILITIES
SUMMATION OF MTA PROPERTY WITHIN UA:(As of July 1, 2013)
NOTES:
1.) UA for 2013 Permit is based on 2010 Census data downloaded from DEP'swebsite. The 2013 UA maps that apply to MTA ROW have been attached as Figures1 through 5. Corresponding MM designations were determined using featuresidentified on MTA's Mileage Chart with Stationing - 2012 (printed September 24,2012).
2.) Mile Marker (MM) designations for UA delineations should be consideredapproximate and will be confirmed and updated, as necessary and as more detailedmapping information is made available.
3.) MTA facility features identified within each host MS4 communities include theroadway (i.e., paved roads, bridges, etc.) and ROW (i.e., approximate 300-foot widecorridor along MTA roadway), as well as interchanges, park-and-ride lots and tollplazas as indicated (i.e., each interchange is estimated to be 25 acres on average)."None identified" indicates that only MTA roadway and ROW are present within theUA delineation. This table will be updated as more detailed mappinginformation is made available and/or in the event that MTA facility features areconstructed within UA delineations.
4.) In 2013, streams were identified by using the National Hydrography Dataset(NHD), available from USGS. The NHD is a digital vector dataset used bygeographic information systems (GIS). It contains features such as lakes, ponds,streams, rivers, canals, dams and streamgages. These data are designed to be used ingeneral mapping and in the analysis of surface-water systems."None identified"indicates that no waterbodies are present within the UA delineation.
5.) Maine DEP classifies several specific waterways within the state designated asUrban Impaired Streams (UIS) in Code of Maine Rules Chapter 502. These streamscrossing MTA's ROW in UA have been identified in emboldened text, includingHart Brook (aka Dill Brook, Lewiston), Capisic Brook (Portland), Nasons Brook(Portland), Red Brook (Scarborough), and Goosefare Brook (Saco). AlthoughThatcher Brook is not included in Chapter 502, the current CMR Chapter 500proactively identified Thatcher Brook; therefore, this waterbody is not emboldened.Streams included in the statewide Impervious Cover Total Maximum Daily Load (ICTMDL) Assessment for Impaired Streams are presented in red text.
6.) Areas to be mapped under 2013 MS4 permit include:
- AuburnMM 73.5 to MM 74.5 (1.0 miles)
- ScarboroughMM 42.3 to MM 44.2 (1.9 miles)
F MM 1.5 to F MM 1.8 (0.3 miles)- Biddeford
MM 30.6 to MM 31.6 (1.0 miles)- York
MM 5.2 to MM 5.3 (0.1 miles)MM 6.2 to MM 7.5 (1.3 miles)
- KitteryMM 2.2 to MM 2.85 (0.6 miles)
~ Total area to be mapped = 6.2 miles
7.) Orange highlighted areas indicate coverage under MEPDES Long CreekGeneral Permit
Yellow highlighted areas indicate newly regulated areas to bemapped/incorporated into IDDE Program
Maine Pollutant Discharge Elimination System(MEPDES) Permit coverage has already been obtained
by MTA for this area under DEP'sGeneral Permit - Post-Construction Discharge of
Stormwater in the Long Creek Watershed7
8.) Blue highlighted areas indicate that MTA does not currently own/operatethis portion of I-95. A property transfer of this area is anticipated; the change inUA owned/operated by MTA will be reflected in the following Annual Report.
Revised: 07/23/2013\\Gzaportland\Jobs\MTA\25776 - 2013 SW Services\TASK 01 MS4 Compliance\2013 SPMP\2013 NOI\Table 1 - MTA MS4 UA (07232013 FINAL)
Page 1 of 1 Table 1
MTA MS4 NOI
© 20
13 - G
ZA G
eoEn
viron
menta
l, Inc
. P:\M
TA\25
776 -
2013
SW
Servi
ces\T
ASK
01 M
S4 C
ompli
ance
\MCM
3 ID
DE P
rogram
\MS4
Perm
it Map
s\201
3 MS4
Perm
it Map
1of5
(Aub
-Lew-
Sab).
mxd,
7/16/2
013,
9:30:3
1 AM,
aime
e.mou
ntain
PREPARED FOR:PREPARED BY:
GZA GeoEnvironmental, Inc.Engineers and Scientists
www.gza.com
DATE: REVISION NO.PROJECT NO.DESIGNED BY:PROJ MGR:
DRAW N BY:REVIEW ED BY:
SCALE:CHECKED BY:
UNLESS SPECIFICALLY STATED BY WRITTEN AGREEMENT, THIS D RAWIN G IS TH E SOLE PROPERTY OF GZAGEOENVIR ON MENTAL, INC. (GZA). THE INFORMATION SH OWN ON TH E DR AWING IS SOLELY FOR THE U SE BY GZA'SCLIENT OR THE C LIENT 'S DESIGNATED R EPR ESENTAT IVE FOR TH E SPECIF IC PROJECT AN D LOC ATION IDENTIFIED ONTHE D RAWIN G. TH E DR AWING SHALL NOT BE TRAN SFERRED, R EU SED , COPIED, OR ALTER ED IN ANY MANN ER FORUSE AT ANY OTHER LOCAT ION OR FOR AN Y OTHER PUR POSE WITHOUT TH E PRIOR WRITTEN CON SENT OF GZA, ANYTRANSFER , REUSE, OR MODIFICATION TO THE DRAWIN G BY THE CLIENT OR OTHERS, WITHOUT THE PR IOR WR ITTENEXPRESS C ON SEN T OF GZA, WILL BE AT THE U SER'S SOLE RISK AN D W ITH OU T ANY RISK OR LIABILITY TO GZA.
109.0025776.00 T1
RAB1 in = 3,500 ftN/A
RLS RLSADM 1
FIG OR DWG
1 OF 5SHEET NO.
Maine Turnpike Authority2360 Congress St
Portland, Maine 04102
2013 MS4 Summary of MTA Facilitiesand Other Features within UA
Auburn, Lewiston, and Sabattus, Maine
07/16/2013
1 inch = 1,500 feet
³Auburn Maintenance
(flow through a 2-dimensional feature,such as a lake or a double-banked stream)
Legend
Urban Area
Artificial PathEstuary
Reservoir
USGS National Hydrography Dataset (NHD)Stream
Lake or Pond
Marsh
2013 MS4 Urban Area
40 7,0003,500
Feet
© 20
13 - G
ZA G
eoEn
viron
menta
l, Inc
. P:\M
TA\25
776 -
2013
SW
Servi
ces\T
ASK
01 M
S4 C
ompli
ance
\MCM
3 ID
DE P
rogram
\MS4
Perm
it Map
s\201
3 MS4
Perm
it Map
2of5
(Por
t-Fal)
.mxd
, 7/16
/2013
, 9:35
:35 A
M, ai
mee.m
ounta
in
PREPARED FOR:PREPARED BY:
GZA GeoEnvironmental, Inc.Engineers and Scientists
www.gza.com
DATE: REVISION NO.PROJECT NO.DESIGNED BY:PROJ MGR:
DRAW N BY:REVIEW ED BY:
SCALE:CHECKED BY:
UNLESS SPECIFICALLY STATED BY WRITTEN AGREEMENT, THIS D RAWIN G IS TH E SOLE PROPERTY OF GZAGEOENVIR ON MENTAL, INC. (GZA). THE INFORMATION SH OWN ON TH E DR AWING IS SOLELY FOR THE U SE BY GZA'SCLIENT OR THE C LIENT 'S DESIGNATED R EPR ESENTAT IVE FOR TH E SPECIF IC PROJECT AN D LOC ATION IDENTIFIED ONTHE D RAWIN G. TH E DR AWING SHALL NOT BE TRAN SFERRED, R EU SED , COPIED, OR ALTER ED IN ANY MANN ER FORUSE AT ANY OTHER LOCAT ION OR FOR AN Y OTHER PUR POSE WITHOUT TH E PRIOR WRITTEN CON SENT OF GZA, ANYTRANSFER , REUSE, OR MODIFICATION TO THE DRAWIN G BY THE CLIENT OR OTHERS, WITHOUT THE PR IOR WR ITTENEXPRESS C ON SEN T OF GZA, WILL BE AT THE U SER'S SOLE RISK AN D W ITH OU T ANY RISK OR LIABILITY TO GZA.
109.0025776.00 T1
RAB1 in = 4,000 ftN/A
RLS RLSADM 2
FIG OR DWG
2 OF 5SHEET NO.
Maine Turnpike Authority2360 Congress St
Portland, Maine 04102
2013 MS4 Summary of MTA Facilitiesand Other Features within UA
Portland and Falmouth, Maine
07/16/2013Crosby Maintenance
1 inch = 1,500 feet
³
(flow through a 2-dimensional feature,such as a lake or a double-banked stream)
Legend
Urban Area
Artificial PathEstuary
Reservoir
USGS National Hydrography Dataset (NHD)Stream
Lake or Pond
Marsh
2013 MS4 Urban Area
40 8,0004,000
Feet
© 20
13 - G
ZA G
eoEn
viron
menta
l, Inc
. P:\M
TA\25
776 -
2013
SW
Servi
ces\T
ASK
01 M
S4 C
ompli
ance
\MCM
3 ID
DE P
rogram
\MS4
Perm
it Map
s\201
3 MS4
Perm
it Map
3of5
(Sca
rb-So
Po).m
xd, 7
/16/20
13, 9
:39:12
AM,
aime
e.mou
ntain
PREPARED FOR:PREPARED BY:
GZA GeoEnvironmental, Inc.Engineers and Scientists
www.gza.com
DATE: REVISION NO.PROJECT NO.DESIGNED BY:PROJ MGR:
DRAW N BY:REVIEW ED BY:
SCALE:CHECKED BY:
UNLESS SPECIFICALLY STATED BY WRITTEN AGREEMENT, THIS D RAWIN G IS TH E SOLE PROPERTY OF GZAGEOENVIR ON MENTAL, INC. (GZA). THE INFORMATION SH OWN ON TH E DR AWING IS SOLELY FOR THE U SE BY GZA'SCLIENT OR THE C LIENT 'S DESIGNATED R EPR ESENTAT IVE FOR TH E SPECIF IC PROJECT AN D LOC ATION IDENTIFIED ONTHE D RAWIN G. TH E DR AWING SHALL NOT BE TRAN SFERRED, R EU SED , COPIED, OR ALTER ED IN ANY MANN ER FORUSE AT ANY OTHER LOCAT ION OR FOR AN Y OTHER PUR POSE WITHOUT TH E PRIOR WRITTEN CON SENT OF GZA, ANYTRANSFER , REUSE, OR MODIFICATION TO THE DRAWIN G BY THE CLIENT OR OTHERS, WITHOUT THE PR IOR WR ITTENEXPRESS C ON SEN T OF GZA, WILL BE AT THE U SER'S SOLE RISK AN D W ITH OU T ANY RISK OR LIABILITY TO GZA.
109.0025776.00 T1
RAB1 in = 2,500 ftN/A
RLS RLSADM 3
FIG OR DWG
3 OF 5SHEET NO.
Maine Turnpike Authority2360 Congress St
Portland, Maine 04102
2013 MS4 Summary of MTA Facilitiesand Other Features within UA
Scarborough and South Portland, Maine
07/16/2013
Crosby Maintenance(flow through a 2-dimensional feature,such as a lake or a double-banked stream)
Legend
Urban Area
Artificial PathEstuary
Reservoir
USGS National Hydrography Dataset (NHD)Stream
Lake or Pond
Marsh
2013 MS4 Urban Area
40 5,0002,500
Feet
© 20
13 - G
ZA G
eoEn
viron
menta
l, Inc
. P:\M
TA\25
776 -
2013
SW
Servi
ces\T
ASK
01 M
S4 C
ompli
ance
\MCM
3 ID
DE P
rogram
\MS4
Perm
it Map
s\201
3 MS4
Perm
it Map
4of5
(Bid-
Saco
).mxd
, 7/16
/2013
, 9:41
:48 A
M, ai
mee.m
ounta
in
PREPARED FOR:PREPARED BY:
GZA GeoEnvironmental, Inc.Engineers and Scientists
www.gza.com
DATE: REVISION NO.PROJECT NO.DESIGNED BY:PROJ MGR:
DRAW N BY:REVIEW ED BY:
SCALE:CHECKED BY:
UNLESS SPECIFICALLY STATED BY WRITTEN AGREEMENT, THIS D RAWIN G IS TH E SOLE PROPERTY OF GZAGEOENVIR ON MENTAL, INC. (GZA). THE INFORMATION SH OWN ON TH E DR AWING IS SOLELY FOR THE U SE BY GZA'SCLIENT OR THE C LIENT 'S DESIGNATED R EPR ESENTAT IVE FOR TH E SPECIF IC PROJECT AN D LOC ATION IDENTIFIED ONTHE D RAWIN G. TH E DR AWING SHALL NOT BE TRAN SFERRED, R EU SED , COPIED, OR ALTER ED IN ANY MANN ER FORUSE AT ANY OTHER LOCAT ION OR FOR AN Y OTHER PUR POSE WITHOUT TH E PRIOR WRITTEN CON SENT OF GZA, ANYTRANSFER , REUSE, OR MODIFICATION TO THE DRAWIN G BY THE CLIENT OR OTHERS, WITHOUT THE PR IOR WR ITTENEXPRESS C ON SEN T OF GZA, WILL BE AT THE U SER'S SOLE RISK AN D W ITH OU T ANY RISK OR LIABILITY TO GZA.
109.0025776.00 T1
RAB1 in = 2,500 ftN/A
RLS RLSADM 4
FIG OR DWG
4 OF 5SHEET NO.
Maine Turnpike Authority2360 Congress St
Portland, Maine 04102
2013 MS4 Summary of MTA Facilitiesand Other Features within UA
Biddeford and Saco, Maine
07/16/2013
(flow through a 2-dimensional feature,such as a lake or a double-banked stream)
Legend
Urban Area
Artificial PathEstuary
Reservoir
USGS National Hydrography Dataset (NHD)Stream
Lake or Pond
Marsh
2013 MS4 Urban Area
40 5,0002,500
Feet
© 20
13 - G
ZA G
eoEn
viron
menta
l, Inc
. P:\M
TA\25
776 -
2013
SW
Servi
ces\T
ASK
01 M
S4 C
ompli
ance
\MCM
3 ID
DE P
rogram
\MS4
Perm
it Map
s\201
3 MS4
Perm
it Map
5of5
(Kit-Y
ork).m
xd, 7
/16/20
13, 9
:44:20
AM,
aime
e.mou
ntain
PREPARED FOR:PREPARED BY:
GZA GeoEnvironmental, Inc.Engineers and Scientists
www.gza.com
DATE: REVISION NO.PROJECT NO.DESIGNED BY:PROJ MGR:
DRAW N BY:REVIEW ED BY:
SCALE:CHECKED BY:
UNLESS SPECIFICALLY STATED BY WRITTEN AGREEMENT, THIS D RAWIN G IS TH E SOLE PROPERTY OF GZAGEOENVIR ON MENTAL, INC. (GZA). THE INFORMATION SH OWN ON TH E DR AWING IS SOLELY FOR THE U SE BY GZA'SCLIENT OR THE C LIENT 'S DESIGNATED R EPR ESENTAT IVE FOR TH E SPECIF IC PROJECT AN D LOC ATION IDENTIFIED ONTHE D RAWIN G. TH E DR AWING SHALL NOT BE TRAN SFERRED, R EU SED , COPIED, OR ALTER ED IN ANY MANN ER FORUSE AT ANY OTHER LOCAT ION OR FOR AN Y OTHER PUR POSE WITHOUT TH E PRIOR WRITTEN CON SENT OF GZA, ANYTRANSFER , REUSE, OR MODIFICATION TO THE DRAWIN G BY THE CLIENT OR OTHERS, WITHOUT THE PR IOR WR ITTENEXPRESS C ON SEN T OF GZA, WILL BE AT THE U SER'S SOLE RISK AN D W ITH OU T ANY RISK OR LIABILITY TO GZA.
109.0025776.00 T1
RAB1 in = 2,500 ftN/A
RLS RLSADM 5
FIG OR DWG
5 OF 5SHEET NO.
Maine Turnpike Authority2360 Congress St
Portland, Maine 04102
2013 MS4 Summary of MTA Facilitiesand Other Features within UA
Kittery and York, Maine
07/16/2013
York MaintenanceYork Toll
(flow through a 2-dimensional feature,such as a lake or a double-banked stream)
Legend
Urban Area
Artificial PathEstuary
Reservoir
USGS National Hydrography Dataset (NHD)Stream
Lake or Pond
Marsh
2013 MS4 Urban Area
40 5,0002,500
Feet
MTA MS4 NOI Public Notice Tracking
SW Coordinator
MS4 Community Contact Date Sent Date of Acknowledgement
Auburn area Zach Henderson (Woodard & Curran) 7/29/2013 8/14/2013
Auburn Dan Goyette, City Engineer 7/29/2013 8/14/2013
Biddeford Tom Milligan 7/29/2013 8/19/2013
Falmouth Jay Reynolds 7/29/2013 8/15/2013
Kittery Mary-Anne Conroy 7/29/2013
Jessa Kellog 8/19/2013 8/19/2013
Lewiston Justin Early 7/29/2013 7/30/2013
Portland Kathi Earley 7/29/2013 *
Doug Roncarati 7/29/2013 7/29/2013
Sabattus Andrew Gilmore, Town Mgr. (PWD, pro tem) 7/29/2013 *
Saco Angela Blanchette 7/29/2013 7/31/2013
Scarborough Mike Shaw 7/29/2013 7/29/2013
Steve Buckley 7/29/2013 *
Jim Wendell 7/29/2013 *
South Portland Fred Dillon 7/29/2013 7/29/2013
Dave Thomes 7/29/2013 7/30/2013
York
Dean Lessard, PW Director AND
Leslie Hinz, Stormwater Manager 7/29/2013 7/30/2013
York County MS4s
Kristie Rabasca (Integrated Environmental
Engineering) 7/29/2013 7/29/2013
MaineDOT Rhonda Poirier 7/29/2013 7/30/2013
Steve Tibbetts 7/29/2013 *
* Indicates that a read receipt or verbal acknowledgement had not been received by the time the NOI package was finalized.
NOI Notice
\\gzaportland\jobs\MTA\25776 - 2013 SW Services\TASK 01 MS4 Compliance\2013 SPMP\2013 NOI\FINAL MS4 SW Coordinators NOI Public Notice Tracking 08 19 13.xlsx Updated 8/19/13
Proof of Delivery
Tracking Number: 1ZX868370356583030Service: UPS GroundWeight: .50 lbShipped/Billed On: 07/29/2013Delivered On: 07/30/2013 1:46 P.M. Delivered To: AUGUSTA, ME, US Signed By: DEMOIRLeft At: Office
Print This Page
Close Window
Dear Customer,
This notice serves as proof of delivery for the shipment listed below.
Thank you for giving us this opportunity to serve you.
Sincerely,
UPS