Stormwater Management at Honey Creek Resort Park. Donna Lutz Steve Jones. Concept: Iowa’s First Destination Resort Park Lodge 108 rooms, conference center, restaurant, indoor water park 18-hole golf course 28 family & group cabins RV campground Boat Ramp, Boat Docks Beach - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Stormwater Management at Honey Creek Resort Park

Stormwater Managementat Honey Creek Resort Park

Donna LutzSteve Jones

Page 2: Stormwater Management at Honey Creek Resort Park

Concept:Iowa’s First Destination Resort Park• Lodge

108 rooms, conference center, restaurant, indoor water park

• 18-hole golf course•28 family & group cabins•RV campground•Boat Ramp, Boat Docks•Beach•Day use area, paved/unpaved trails•Ped Bridge to exisiting park

Page 3: Stormwater Management at Honey Creek Resort Park

Lodge Complex$19 million project

Page 4: Stormwater Management at Honey Creek Resort Park

Lodge opened Sep 19, 2008

Page 5: Stormwater Management at Honey Creek Resort Park

Cabins available June 2009

Pedestrian Bridge 2010?

Page 6: Stormwater Management at Honey Creek Resort Park
Page 7: Stormwater Management at Honey Creek Resort Park

HCRP is intended to exemplify a sustainable approach to development, by protecting the natural environment of both the site itself and the neighboring Rathbun Lake. To meet this goal both water quality monitoring and stormwater management must be part of the development plans.

Water Quality Monitoring

Stormwater Management & Design

Page 8: Stormwater Management at Honey Creek Resort Park

Before, During Constructionand Not Quite Done

Page 9: Stormwater Management at Honey Creek Resort Park

Boat ramp and RV Park

Lodge Construction

Page 10: Stormwater Management at Honey Creek Resort Park

Water Quality MonitoringGoal : To protect Rathbun Lake from

contaminants due to construction activities at HCRP

Work Plan:• Baseline monitoring • Construction monitoring • Post-construction / Operational

monitoring??Components:

Lake (near shore and offshore)Surface and integrated depth samples

Stormwater inputsStatic/first flush and automated samplers

Page 11: Stormwater Management at Honey Creek Resort Park

HCRP WQ Monitoring Sites

Page 12: Stormwater Management at Honey Creek Resort Park

Monitoring ProtocolStorm Events

First flush samples with static samplers at many locations

Automatic sampling at prime location for 12 -24 hours

Parameters- Solids (total, suspended

and volatile) Turbidity, pH and

Conductivity

In –lake SamplingNear shore

locationsDepth integrated

samples for solids and nutrients

Depth profiles (YSI) for temp, DO, conductivity

Other parameters - BTEX, pesticides,

nutrients, metals

Page 13: Stormwater Management at Honey Creek Resort Park

Static stormwater samplers

Page 14: Stormwater Management at Honey Creek Resort Park

Site nearest Lodge Construction

Page 15: Stormwater Management at Honey Creek Resort Park
Page 16: Stormwater Management at Honey Creek Resort Park

In-stream sampling for BTEX

Page 17: Stormwater Management at Honey Creek Resort Park

Automated stormwater sampling

Page 18: Stormwater Management at Honey Creek Resort Park

Automated stormwater sampling

Page 19: Stormwater Management at Honey Creek Resort Park
Page 20: Stormwater Management at Honey Creek Resort Park
Page 21: Stormwater Management at Honey Creek Resort Park

Most important aspect:Communication to Steve aboutmonitoring results and site inspections