steven d. adkinswisbuild.doa.state.wi.us/dfd_img/rfi_attachments/8k3j - uwo nrh... · from: steve...
TRANSCRIPT
-
From: Fuhs, Bryan - DOATo: Steve Adkins; Steve Srubas; Stuewer, Gary A - DOACc: Al Sigmund; Ian Griffiths; [email protected]; [email protected]; Jason Pampuch; [email protected]: RE: 08K3J - UWO NRH - Shower DrainsDate: Friday, December 09, 2011 8:15:57 AMAttachments: SHOWER DRAIN.PDF
Noble Seal TS Installation Instructions.pdfimage008.pngimage002.pngimage011.pngimage007.pngimage014.pngimage015.pngimage016.pngimage017.png
Importance: High
The specifications are clear as to what the plumbing contractor has to install. The execution of the safing material is also defined in the specifications. Thesafing will be installed per the manufacturer installation instructions. 1/4 inch per foot pitch to the substrate is required before the safing material is tobe installed. Upon completion of the specified safing material a standing water test will be required and will be witnessed at each built up shower by DSF.The plumbing contractors scope of work ends upon completion of the specified safing material. Any topping required to to level or pitch the floor prior toterrazzo is specified to be done by the terrazzo contractor per 09 66 23-5 & 09 66 23-6 enclosed below. I do not feel it necessary to have a meetingon site as this issue has been discussed previously with the plumbing contractor. Any questions or concerns please feel free to call me. Thank you, Bryan
09 66 23-5
09 66 23-6
Bryan R. Fuhs
From: Steve Adkins [mailto:[email protected]] Sent: Thursday, December 08, 2011 2:41 PMTo: Steve Srubas; Stuewer, Gary A - DOACc: Fuhs, Bryan - DOA; Al Sigmund; Ian Griffiths; [email protected]; [email protected]; Jason Pampuch;[email protected]: RE: 08K3J - UWO NRH - Shower Drains
Steve, I’m requesting that we have a meeting to discuss the attached revised detail for the showers. Can we schedule this after the 12-13-2011 meeting?
Steven D. AdkinsCornerStone Plumbing, LLC1305 Poplar Drive, Waukesha, WI 53188Office: (262)896-9006Fax: (262)896-9004Cell: (414)467-9506
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected] -
3/8"
3/8"
DRAIN BY PLUMBING TRADE.LOWEST SETTING POSSIBLE ONSTRAINER FOR MAXIMUM DRAINAGE.
SAFING BY PLUMBING TRADE.INSTALLED PER MANUFACTURER'SINSTRUCTIONS.
TURN SAFING UP FILLER ATOPEN END OF SHOWER
1"
TURN SAFING UPWALL 6" MIN.
CAST-IN-PLACEINTEGRAL BASE SMOOTHED AND
ROUNDED TRANSITION
SEALANT
ABRASIVE EPOXYTERRAZZO
1/4" SOLID SURFACE WALL PANELS.SET IN SILICON SEALANT. HARD SEAMWITH COLOR MATCHED JOINTADHESIVE.
3/8" x 1 1/2" FILLER
TOILET ROOM WITH SHOWER:PERIMETER OF SHOWER
DRAIN BY PLUMBING TRADE.LOWEST SETTING POSSIBLEON STRAINER FOR MAXIMUMDRAINAGE.
SLOPE TERRAZZO FOR DRAINAGE
3/8" x 1 1/2" FILLER
LATEX FOR SMOOTHTRANSITION.
SAFING BY PLUMBING TRADE.INSTALLED PER MANUFACTURER'SINSTRUCTIONS.
ABRASIVE EPOXYTERRAZZO
MODIFY UNDERCUT OFDOOR AS REQUIRED.
SLOPE TERRAZZO FOR DRAINAGE
TURN SAFING UP FILLER ATOPEN END OF SHOWER
SHOWER ROOM:PERIMETER OF SHOWER
SHOWER DRAIN3" = 1'-0"
SHOWER ROOM
TOILET ROOM WITH SHOWER
SEE BELOW FORBASE CONDITION
FOR REVIEW ONLY - NOT FOR CONSTRUCTION.05dec2011
NumberSheet
IssuedDateTypeSet
Scale
Number
Graphic
DSF
Project Location:
Project Title:
Sheet Title:Agency / Institution: ARCHITECTS BUILDING310 PINE STREETGREEN BAY, WI 54301(920)-432-4865
NEW RESIDENCE HALLState of WisconsinDepartment of Administration
Division of State Facilities
December 5, 2011
SD
08K3J
----
ALGOMA BOULEVARD, OSHKOSH WI
SHOWER DRAINUNIVERSITY OF WISCONSIN - OSHKOSH
fuhsb
Highlight
fuhsb
Highlight
fuhsb
Highlight
fuhsb
Highlight
fuhsb
Highlight
fuhsb
Highlight
fuhsb
Highlight
-
NOBLESEAL® TS iNSTALLATiON iNSTrucTiONSINDEX1. General Information ..............................12. Materials ..................................................13. Planning & Layout ..................................24. Preparation & Procedures ....................2 - Inspection ...............................................2 - Substrates ..............................................25. Bonding Sheet to Substrate ..................2 - NobleBond EXT ....................................2
- NobleBond 21 ......................................2 -LatexModifiedThin-Set .....................2
- Seaming & Joining...............................3 - Flashings, Upturns, & Corners ............3 - Drains .....................................................3 - Protection of Sheet ..............................4
1. GENERAL INFORMATION1.1 NobleSeal TS is a composite sheet membrane that
providesthin-bedwaterproofingandcrackisolationfor thin-set tile applications. NobleSeal TS may also be used to bridge control joints. It is suitable for interior applications in new construction and renovation projects.
NOTES:a) Install in strict compliance with these instructions,
and comply with applicable ANSI standards, Tile Council of North America (TCNA) recommendations and building codes.
b) For any procedure not covered by these instructions, contact Noble Company.
2. MATERIALS2.1 MEMBRANE:NobleSealTSisathin0.030”(.75mm)loadbearing,bonded,sheetmembraneforwaterproofingapplications. 2.1.a COMPOSITION: NobleSeal TS is a composite sheet made from an alloy of Chlorinated Polyethylene (CPE) with non-woven fabric laminated to both sides.
2.2 BOND COAT: NobleSealTSshouldbebondedtosubstratewithNobleBondEXTorlatexmodifiedthin-setmortar.Thin-setsmustconformtoANSIA118.4ortheappropriatestandards,andTCNAHandbookrecommendations. Follow manufacturer’s instructions.
NOTE: a) Job-site mortar mixes must conform to ANSI A108.5 and A118.4 and to manufacturer’s instructions.2.3 WATERPROOF SEALANT: Use NobleSealant 150 to seam sheets, seal penetrations (i.e., pipes, wire), drains, and terminal edges. Seal preformed corners to sheet (see Figure 8).2.4 PREFORMED CORNERS: 2.4.a OUTSIDE/DAM CORNERS:Usetoflashcurb/dam(seeFigure8). 2.4.b INSIDE CORNERS:InstalloverLAPstylecornerstopreventpotentialleaks(seeFigure8).2.5 TOOLS: Normaltilesettingtoolsplusscissorsorutilityknife,rubberhandroller,andlinoleumroller(75-100lbs.
recommendedforfloors).ApplicationofNobleSealant150requiresacommercialgradecaulkgun.1
6. Additional Applications .........................4 -CrackIsolation......................................4 - Steam Rooms ........................................5
7. Tile Installation ........................................58. Limitations ................................................59. Warranty .................................................5 10. CAD Details ..........................................5
STANDARD: ASTM E 96 Procedure E ANSI A118.10 IAPMO/UPC ANSI A118.12 ASTM C 627
Description:Moisture/Vapor
Transmission Rate
Load Bearing, Bonded, Waterproof Membranes for
Thin-Set Ceramic Tile and Dimension Stone Installations
Shower ReceptorWaterproofing
Crack Isolation Standard: "System Crack Resistance"
(Jig Test)
Standard Test Method for Evaluating Ceramic Floor Tile Installation Systems using the
Robinson Type Floor Tester
Rating: 0.050 Perms Passed File #4339 High Performance (> 1/8") Extra Heavy
Figure 1.
NOBLESEAL TS
A. CERAMIC, TERRAZZO TILE OR DIMENSION STONEB. THIN-SET APPROPRIATE FOR APPLICATIONC. NOBLESEAL TS MEMBRANE - 0.030” (.75MM)D. SHEET BONDING AGENTE. SUBSTRATE: CONCRETE, PLYWOOD, BACKER BOARD (BB),
PRIMED GYPSUM UNDERLAYMENT AND RADIANT HEAT SYSTEMS*
*NOBLESEAL TS R-value = 0.8
AB
CD
E
-
3. PLANNING & LAYOUT3.1 MEMBRANE:QuantityofNobleSealTSsheetrequiredshouldincludewaste,upturnsandseams.Usepreformedcornersasnecessary.
NOTE:Waterproofingrequiresa2”overlapofsheetmembrane(refertosection5.9). 3.1.a SHEET DIMENSION: 5’x100’=500sq.ft.(1.5mx30.5m=46m2).Nominalthickness0.030”(.75mm).3.2 SHEET BOND AGENT: 3.2.a NobleBond EXT: Porosity and condition of the substrate can affect coverage, but NobleBond EXT will generally providethefollowingcoverage:90to110sq.ft./gallon.
NOTE: NobleBond EXT allows for more movement than cement based mortar. It also allows tile to be installed immediatelyaftersheetplacementasitdoesnotrequirefurthercuring.Refertoinstallationinstructionsonlabel. 3.2.b Latex Modified Thin-Set:Seemanufacturer’scoverageratefor1/8”to1/4”v-notchedtrowel 3.2.b.1 Cold Weather Procedure: Consult bond agent manufacturer for safe low-temperature limits and cure times. NobleCompanysheetproductsremainflexibleto-25oF. 3.2.b.2 Hot Weather Procedure: Consult bond agent manufacturer for safe high-temperature limits and mixing proceduresforthesespecificconditions.Controlhightemperaturebyshading,mistingsubstratewithwater,
workingatnightoranycombinationofthesetechniques.3.3 NOBLESEALANT 150: A 10.3 oz. tube of NobleSealant 150 seams approximately 75 linear feet.3.4 LAY OUT:Installsheetsothatseamsoverlapinthedirectionoftheslope(shingledfashion).Usechalklinestomaintain sheetalignment.Sheetmaybeprefoldedandcuttoaccommodateupturnsandotherrequirementsperindustry guidelinesandspecifications.
4. PREPARATION & PROCEDURESRECOMMENDED:Testmaterialsandmethodunderjob-siteconditionstoconfirmsuitability.4.1 INSPECTION:SubstratemustmeetrequirementssetforthbytheTCNAandANSIstandards.Reportinwritingany
deficienciesthatmightaffectperformanceofthesystem. NOTES: a)NobleSealTSwillnotcompensateforstructuraldeficienciesinthesubstrate. b) Review all detail drawings (see section 9 - CAD DETAILS).
4.2 PROCEDURE: To incorporate NobleSeal TS into a thin-bed installation, prepare substrate and select appropriate bonding agent.4.3 DRAINAGE : Wet areas must have proper slope. CAUTION: All drains must have a suitable membrane clamping device.4.4 SUBSTRATES: SlabsmustbeflatandshouldbetestedformoisturecontentandpH.Floorpreparations(e.g.patching,
leveling) should be done prior to installation of NobleSeal TS.4.5 INSTALLER:MustbefamiliarwithNobleCompany’scurrentwritteninstructions,TCNAHandbookrecommendationsand ANSI A108 standards.
5. INSTALLATION PROCEDURES5.1 BONDED: 5.1.a Clean and prepare substrate as if thin setting tile without sheet. Bond sheet with either of the following: 1) NobleBond EXT: Refer to NobleBond EXT Installation Instructions. 2) Latex Modified Thin-Set: Spreadthin-setwithappropriatetroweltoachievefullcontact(e.g.1/8”to1/4”
“V”-notch). Trowel an area as wide as the sheet and as deep as can be comfortably reached. In order to avoid trapping air under the sheet, trowel mortar in parallel rows across the width or length of the sheet.
NOTES: a) Variation in trowel size, angle at which trowel is held, mixing ratio or any
combination thereof may be necessary to achieve maximum contact. Finenotchedtrowelsincrease“skinning”rate.
b) All ridges of bond coat must be parallel to allow air under sheet to escape when embedding.
5.1.b LAY SHEET: Unrollsheetintobondingagentbeforeitbeginstoform“skin”. 5.1.c EMBED SHEET: EmbedNobleSealTSintobondcoat(flattenalltrowelridges).
Forlargehorizontalareas,use75-100lb.roller.Workfromcenterofsheettoedges.Pullrolleredge-to-edgeinoverlappingpasses.Startatendoffirstsheetinstalled,progressingtoareainstalledlast.Userubberhandrollerorflatsideoftrowel with heavy pressure for vertical or small areas.
Normal installation conditions - apply bond coat. Trowel an area as wide as the sheet and as deep as can be comfortably reached (comb ridges parallel).
2
-
5. INSTALLATION PROCEDURES (con’t.) 5.1.d COVERAGE: Completecoverageofsubstrateandfullpenetrationofbondcoatintothefabricisrequired.Priorto curing, lift sheet and inspect for full contact. If rows or ridges of bonding agent are seen, membrane has not been
properly embedded and additional rolling or bonding agent is necessary. 100% coverage is desired. NOTE: To prevent outer edges from lifting or curling, use weight (i.e., tile, mortar, etc.). 5.2 SEAMING AND JOINING (For Waterproof Installations): When more than one sheet is needed, use NobleSealant 150 or
NobleWeld100toseamsheetstogether.NobleSealant150isappliedwithacommercialgradecaulkgun,andrequires2parallelbeadsforseamingandjoining.Seamareasmustbecleanandfreeofbondbreakers(mortar,adhesives,etc.).
5.2.a NobleSealant 150 (preferred method) - Seams all Noble membranes with or without fabric. 5.2.a.1 Overlap sheets 2” (50mm) minimum.
5.2.a.2Apply1/8”(3mm)bead1/4”(6mm)fromedgeofsheetbeingoverlapped. 5.2.a.3Applyanotherbeadofsealantparalleland1/2”(12mm)fromthefirstbead. 5.2.a.4Overlapsheetsandflattenwithrollerorbypressingwithflatedgeoftrowelorhandroller. NOTE:Beadsmustbecontinuouswithoutskipsorvoids.Seammaybewatertestedaftercuring(atleast30minutes).
5.2.b NobleWeld 100 - Seaming requires bare membrane to bare membrane. See (A) END SEAMS below. NOTE: Do not leave NobleWeld 100 open while fabricating seams as the solventquicklydissipates.Applyfromcanwithdobberor1”to2”natural bristle brush, and spread.
5.2.b.1 Allow 2” for lap seam. 5.2.b.2Onlywork2’to3’ofseamatatime. 5.2.b.3 Clean by lightly applying Xylene or alcohol. Immediately wipe
with clean, lint-free cloth. 5.2.b.4 Roughen both surfaces to be bonded with copper scrub pad or clean
wire brush. 5.2.b.5 Apply NobleWeld 100 liberally and evenly to both surfaces
approximately1”widerthanfinishedseam.DONOTALLOWSOLVENT TODRY.Materialshouldbesoft,wetandtacky.Shouldsolventsdry
before completing seam, re-apply. 5.2.b.6 Close seam while CPE is soft and still wet with solvent.
5.2.b.7Useroller,puttyknifeorrubseamwithclothtoremoveexcesssolvent andeliminateairbubbles.Overlapsheetsandflattenwithhandroller orbypressingwithflatedgeoftrowel.
NOTE: Theapplicationofheatimprovestheefficiencyofseamingatlow temperatures. A hot air gun is recommended to cure seam below
7oC (45oF).Donotheatwithanopenflame. 5.2.b.8Toinsurecontinuousseam,peelseambackseveralinchesinto
just completed section before starting next section. 5.2.b.9 Seams must be allowed to cure to develop strength. Do not stress until
allowed to cure for 24 hours at 21oC (70oF) and 40% relative humidity. Cure times may be reduced by heating with a heat gun.
(A) END SEAMS: Use NobleSealant 150 (see 5.2.a) or NobleWeld 100 (see 5.2.b) and follow these instructions. NobleSealTSfabricmustberemovedtomakeachemicallyfusedseam(see6.foroptions).Mark2”wideseamarea ontopofbottomsheetand2”onbottomofoverlappingtopsheet.SoakareatobeseamedwithXyleneapproximately1”widerthantheseammarks.Keepwetforatleastoneminute.FabricisreadytopeelifitwillslideontheCPEwhenscuffedneartheedgewithfingernailormargintrowel.Ifsolventdriesorfabricdoesnotdelaminateeasily,re-applyXylene.Peelfabricbacktomark.Cutfabricatthemarkwithscissors(asifslittingopenanenvelope).WhileCPEisstillsoftandwet,strayfabricpieces(orfibers)maybere-bondedtotheCPEwithheavypressureonthehandroller.
5.3 FLASHINGS, UPTURNS AND CORNERS 5.3.aTurnsheetupverticalsurface1”to2”higherthanfloodplane.Plumbingcodesrequireshowerwaterproofing
membranebeflashed3”higherthanthefinisheddam,wheninstalledbehindbackerboard. 5.3.b Corners - See Figure 8.
5.3.b.1 Lap corners. Bond overlap and seal inside corner with NobleSealant 150. 5.3.b.2 BondPreformedCornerstosheetand/orsubstratewithNobleSealant150.5.4 DRAINS:Alldrainsmusthaveclampingringtosecuremembranetodrainbody.Inspectfloortoinsurethatproperslope has been provided to eliminate ponding of water on top of membrane. 5.4.a Remove strainer and clamping ring. 5.4.b Place NobleSeal TS over drain body. Press membrane to feel outline of drain opening. Cut drain opening. 5.4.c Carefully punch or notch openings for clamping ring bolts through sheet. 5.4.d Apply bead of NobleSealant 150 on the drain lip under the NobleSeal TS. 5.4.e Install sheet, see section 5. 5.4.f Installclampingringandfirmlytightenbolts. 5.4.g Install strainer and adjust to proper height for tile.
Apply first bead of NobleSealant 150 as shown.
Apply second bead, then press seam.
3
-
5. INSTALLATION PROCEDURES (con’t.) 5.4.h FLOOD TESTING: Waterproofinginstallationsshouldbefloodtestedtoinsurethattheyarewatertight.
The procedure follows: 1. Plug drain with test plug or dam areas to be tested. 2. Fill with water to desired height. 3.Inspectforleakage(allowsufficienttime). 4.Repairanyleaksandre-testuntilwatertight.5.5 PROTECTION OF SHEET: Afterinstallation,sheetmustbekeptcleantoenabletileadhesivetobond.Ifnotcoveredby
wearingsurface,protecttheinstalledsheetfromdamageandallfootorvehiculartraffic(usemortarskimcoat,rugs,plywood,etc.).
6. ADDITIONAL APPLICATIONS 6.1 WATERPROOFING/CLEAVAGE MEMBRANE: NobleSealTScanbelooselaidasawaterproofing/cleavagemembrane
under a full mortar bed installation (see TCNA guidelines). 6.2 ISOLATING CRACKS AND CONTROL JOINTS: Refer to current NobleSeal CIS Installation Instructions.
Forapplicationsthatdonotrequirewaterproofing,useNobleSealCIS,ormodifyNobleSealTSasfollows:remove the 2” seaming area on each edge. Follow NobleSeal CIS Installation Instructions.
6.3 STEAM ROOM: NobleSeal TS is suitable for commercial and residential projects. There are two options for placement of thesheetonwallsandfloors.InstallthesheetinfrontorbehindtheBBormortarwall.(RefertoTCNADetails,ANSI standards and industry guidelines.)
NOTES: 1)Ifinstalledonthebackerboard,NobleSealTSmustbebondedwithalatexportlandcementmortar. 2)Wallscommontoexteriorsrequirespecialdesigntopreventcondensationinwallcavity.Consultwithprojectarchitect. 3)Temperature:Althoughmaximumroomtemperatureislimitedto50°C(120°F)byequipmentsafetycontrols, NobleSeal TS is not affected by that temperature.
6.3.a INSTALLATION 6.3.a.1 CEILINGS: NobleSeal TS should be installed before (under) the BB. Place heavy bead of NobleSealant 150 on studsandusemechanicalfastenerstoholdsheet.Installbackerboardpermaunfacturer’sinstructions.Sealscrew
penetrations with NobleSealant 150. 6.3.a.2 FLOORS: FULL MORTAR BED METHOD: Use Chloraloy 240. Refer to current written instructions. See Figure 4.
THIN BED METHOD: Use NobleSeal TS. See Figure 5. 6.3.a.3 WALLS:NobleSealTScanbeinstalledoneithersideofbackerboard(BB). SHEET BEHIND BB: Refertosection6.3.a.1.SeeFigure6.InstallNobleSealTSonlowerportionfirst. SHEET BONDED TO BB:ProcedureissameasotherNobleSealTSwaterproofingapplicationsusinglatex modifiedthinset.
4
Figure 2. JOINT BRIDGING/CRACK ISOLATION
GROUT JOINT
SOFT JOINT
GROUT JOINT
TILE BOND COAT
CONTROL JOINT
NOBLE SHEETMEMBRANE
(CONSTRUCTION, ISOLATION, CONTRACTION)
NOTE: One soft joint required, two recommended.
-
5
7. TILE INSTALLATION7.1SettileinaccordancewithTCNAHandbookrecommendations,ANSIA108standardsandbondcoatmanufacturer’sdirections.CompletecoverageofNobleSealTSbythebondcoatisrequired.NOTES:a) Refer to bond coat manufacturer’s instructions for cure time and suitability. Allow additional time (approximately 50%)
when installed over NobleSeal TS. b) Rapid-curing type of thin-set mortar may be used with approval of mortar manufacturer.c) For wood or VCT applications, contact Noble Company.d) For any procedure not covered by these instructions, contact Noble Company.
8. LIMITATIONSNobleSeal TS is not designed for use as a wearing surface or exposed roof membrane. NobleSeal TS cannot accomodate deflectiongreaterthanindustryguidelinesfortheflooringsurface.Foranyapplicationnotspecificallydetailedintheinstallation instructions, contact Noble Company.
9. WARRANTY NobleSeal TS brand CPE membrane is guaranteed for the life of the original tile installation by Noble Company against failurecausedbyrotting,crackingandmicroorganismdeteriorationwhenproperlyinstalledintilesystemsforwhichitsuseis recommended by Noble Company. This warranty is limited to replacement of defective material and freight charges to destination only. There are no other expressed or implied warranties, and this warranty is in lieu of any other warranty, including,butnotlimitedto,impliedwarrantiesofmerchantabilityandfitnessforpurpose.NobleCompanyisnotresponsibleforconsequentialdamages.Theremedyofthepurchasersetforthhereinisexclusive.NOTE: NOBLESEAL TS MUST BE INSTALLED IN STRICT COMPLIANCE WITH THESE INSTRUCTIONS, APPLICABLE ANSI STANDARDS, TCNA RECOMMENDATIONS AND ALL APPLICABLE BUILDING CODES.These suggestions and data are based on information Noble Company believes to be reliable. Users should verify by tests thatNobleSealTS,aswellastheseinstallationmethods,aresuitablewiththeproductsbeingusedintheirapplication.Sincespecificuse, materials and handling are not controlled by Noble Company, this warranty is limited to the replacement of defectiveNobleCompanyproducts.NobleCompanydisclaimsanyresponsibilityfor(a)warrantiesofmerchantabilityandfitnessforpurpose;(b)verbalrecommendationsofitsrepresentatives;and(c)consequentialdamages.
ANT BACKER BOARD
WALLS: THIN-SET WITH WATER RESISTANT BACKER BOARD
FLOOR: MORTAR WITH SLOPE OR PRO-SLOPE
FLASHING/UPTURN (75mm/3" ABOVE FLOOD POINT)
NOBLESEALANT 150
6mm (.250") WATER RESISTANT BACKER BOARDOR MORTAR PLUMB WITH BACKER BOARD
TILE SET ON MORTAR BED OR BOND COAT
WIRE REINFORCED MORTAR BED
CHLORALOY 1.0mm (.040")
SLOPED FILL OR PRO-SLOPE™(PRE-FORMED SLOPE)
TILE
BOND COAT
NOBLESEAL TS
BOND COAT
BACKER BOARDS*
STUDRECOMMENDED BY MANUFACTURER
*WATER RESISTAS
FOR APPLICATION( )
MORTAR AND THIN-BED DETAIL
OR NOBLESEAL TS
Figure 4. SHOWER – NOBLESEAL TS MEMBRANE BONDED OVER BB WITH CHLORALOY SHOWER PAN
Figure 5. THIN-SET METHOD / SHOWER RECEPTORWATERPROOFING
10. CAD DETAILS - NOT TO SCALE
-
Figure 6. STEAM ROOM (for thin-set floor applications, refer to Figure 7)
Figure 7. THIN-SET SHOWER
Figure 9. LAP CORNER
STEP 1: CREASE SHEET (SOLID LINES). CUT SHEET ON DOTTED LINE.
STEP 2: FOLD AND SEAL WITH NOBLESEALANT 150.
LAP CORNER
Figure 8. FOLDED, TUCKED, PREFORMED INSIDE & OUTSIDE CORNERS10. CAD DETAILS - NOT TO SCALE (con’t.)
FormNSTSINST01/09SupersedesformNSTS3/08
P.O. Box 350 · Grand Haven, MI 49417-0350 · 800-878-5788 · Fax: 231-799-8850 · www.noblecompany.com®RegisteredTrademarkofNobleCompany,GrandHaven,MI.™TrademarkofNobleCompany,GrandHaven,MI.
Figure 10. WHEELCHAIR ACCESSIBLE SHOWER AREA - THIN-SET METHOD
1/4” (6.4mm) Tile
3/4” - 1-1/2” (33.8-38.1mm) Mortar
Latex Mod.Thin-SetNobleSeal TS
NobleSealant 150
NobleFlex® DrainFlashingLatex Mod.Thin-SetSloped Mortar Bed
1/8” (3.2mm)
7/16” (11.1mm)
1/16” (1.6mm)
1/25” (1.0mm)
1/64” (0.4mm)
1/32” (0.8mm)
1/4” per ft.slope
NobleSealant 150
(NOT TO SCALE)
NobleSeal TSNobleSeal TS
backer board (BB)soft joint soft joint
drain with clamping ring
SHOWER AREADRYING AREA
Ramp floor to createhigh point
Note: Slope under sheet
4’ - 0” MIN. CURB TO DRAIN(per code)
6” APPROX(per code)
COLLAR IN LOW POSITION
Install NobleSeal TS to height of shower head if in front of BB or flash a minimum of 3” higher than finished dam if installed behind BBSTUD WALL
BACKER BOARD
TILE
NOBLESEAL TS FLASHED BEHIND BACKER BOARD AND UP WALLS 3” HIGHER THAN FLOOD PLANE OR BONDED TO THE FRONT SIDE OF BACKER BOARD TO THE HEIGHT OF THE SHOWER HEAD. STEAM ROOMS REQUIRE FLOORS, WALLS AND CEILINGS TO BE WATERPROOFED WITH NOBLESEAL TS.
FILL 1/4” GAP UNDER BACKER BOARD WITH NOBLESEALANT 150 TILE BONDING AGENT (THIN-SET)
NOBLESEAL TS
LATEX MODIFIED PORTLAND CEMENT MORTAR (THIN-SET) OR NOBLEBOND EXT
SLOPED MORTAR (1/4” PER FT.)
FOLDED CORNER TUCKED CORNER
PREFORMED DAM CORNER
PREFORMEDOUTSIDE CORNER
PREFORMED INSIDE CORNER
-
From: Steve Srubas [mailto:[email protected]] Sent: Thursday, December 08, 2011 9:46 AMTo: Steve Adkins; Stuewer, GaryCc: Fuhs, Bryan - DOA; Al Sigmund; Ian Griffiths; [email protected]; [email protected]; Jason Pampuch;[email protected]: RE: 08K3J - UWO NRH - Shower Drains Steve, et al:We looked through the submittal – the sloping substrate is required by the manufacturer; this responsibility lies with the contractor providing/installingthe safing.Regards,S.
From: Steve Adkins [mailto:[email protected]] Sent: Tuesday, December 06, 2011 10:05 AMTo: Steve Srubas; Stuewer, GaryCc: Fuhs, Bryan - DOA; Al Sigmund; Ian Griffiths; [email protected]; [email protected]; Jason Pampuch;[email protected]: RE: 08K3J - UWO NRH - Shower Drains Steve, It appears that your shower detail is moving in the right direction to correct the original bid documents. Based on your revised detail it states “safing by plumbing trade installed per manufacturer’s instructions”To be clear, which prime contractor is responsible to provide the pitched substrate in the showers? Thank you,
Steven D. AdkinsCornerStone Plumbing, LLC1305 Poplar Drive, Waukesha, WI 53188Office: (262)896-9006Fax: (262)896-9004Cell: (414)467-9506
From: Steve Srubas [mailto:[email protected]] Sent: Monday, December 05, 2011 9:31 AMTo: Al Sigmund; 'Stuewer, Gary'; [email protected]; '[email protected]'; Steve AdkinsCc: Ian GriffithsSubject: 08K3J - UWO NRH - Shower Drains Attached are the details we discussed at the last progress meeting. Filler block under the terrazzo for some added protection for containing the showerwater. Per the original bid docs, the safing to be installed per manufacturer’s instructions. Showed the filler strip at the door in the shower rooms.Showed the filler strip at the perimeter of the shower at the toilet rooms. Miron – please share with Terrazzo installer for review and possible coordination of door undercut. Please note – for review only. Thanks, Steve Srubas Project Coordinator BERNERS-SCHOBERarchitecture + engineering + interiors
http://cstoneplumbing.blogspot.com/https://www.facebook.com/CornerstonePlumbinghttps://www.facebook.com/CornerstonePlumbinghttps://www.facebook.com/CornerstonePlumbinghttp://cstoneplumbing.blogspot.com/https://www.facebook.com/CornerstonePlumbinghttps://www.facebook.com/CornerstonePlumbinghttps://www.facebook.com/CornerstonePlumbing
-
310 Pine Street | Green Bay, WI | 54301Reception: 920-432-4865 | [email protected] our portfolio: www.bsagb.com or visit our newsfeed: www.bsagb.com/blog
mailto:[email protected]://www.bsagb.com/http://www.bsagb.com/blog