STEP 2 STEP 1 STEP 3 STEP 5 STEP 4 STEP 6 STEP 8 STEP 7 STEP 9 How to Erect Access Frame Scaffolding • A scaffold shall be erected, altered, and dismantled by qualified workers or under the direct supervision of a qualified person. The qualified person shall ensure that the erecon is carried out according to acceptable pracces in compliance with any drawings and the manufacturer’s or supplier’s instrucons, and that the correct components and materials are being used. • A scaffold shall be inspected daily before use and aſter a modificaon. A damaged scaffold component shall not be used. • The lower end of the vercal support of a scaffold shall be supported by firm and adequately sized foundaons or sills. Adjustable base plates shall be used to accommodate uneven sloping or stepped surfaces. • Adjustable base plates shall not extend more than the lesser of two- thirds of its total length or 60 cm unless otherwise specified by the manufacturer. • A scaffold shall be erected with vercal members plumb and ledgers and bearers level. • Each lumber and manufactured scaffold plank installed for use shall be secured against dislodgement. • A scaffold shall be effecvely guyed or secured to a building or structure where the height of the scaffold exceeds 3 mes its minimum FOR ROLLING SCAFFOLD • The wheels on one end shall be swivel type. • Wheels shall not be less than 13 cm in diameter. • Height adjusng screws for casters of a rolling scaffold shall not extend more than two-thirds of their total length or 30 cm whichever is lesser. • A wheel of a rolling scaffold shall be equipped with effecve brakes or locking devices which shall be applied when workers are working. • A rolling scaffold mounted on pneumac res shall have addional supports. • A worker is not permied on a rolling scaffold while it is being moved. • The floor or surface over which it is moved shall be sufficiently firm within 3 degrees of level and free from pits, holes, depressions, and obstrucons. Select and prepare the ground area. Place suitable sills and make sure there are no holes under the sills. Put the adjustable base on the sills in the locaon that matches your scaffold dimensions. NOTE: DO NOT SECURE THE BASES TO THE SILLS AT THIS TIME. Adjust the base jack-nuts, starng at the highest point of the ground level. The jack-nut at the highest ground level should be set 7.5 - 15 cm from the top of the sill, depending on the slope. Place the first frame onto the base plates at the high point. Connect the first cross-brace to the frame. Allow the frame to lean slightly forward and rest on the sill while you prepare for the next frame to be installed. Install the second frame onto the base plates. Secure the first cross-brace to the second frame. Install the second cross-brace to both the frames. Next you need to level and plumb the scaffold. Start at the high point of the scaffold. If possible, use the jack-nut to bring the highest corner down closer to the sill. Next bring all four corners up to that point. If the boom cross-members of each frame are level with each other, the frames should also be plumb. Install the decking, which may be manufactured or wood planks. If you are using wooden planks, they shall extend beyond the supporng cross-members at least 15.24 cm and not more than 30.24 cm. Secure the decking so it cannot move. Select the equipment for the guardrail system. NOTE: APPROPRIATE FALL PROTECTION SHALL BE USED DURING ERECTION AND DISMANTLING OF SCAFFOLDING AT A HEIGHT EXCEEDING 1.22 M. Aach the guardrails to the posts on all the exposed sides. Install toeboards as required. Install a suitable means, such as a sloping or vercal ladder secured to the scaffold at the landing point. The ladder shall extend approximately 1 m above the landing. Toll Free OH&S: 1.800.563.5471 Accident Line: 709.729.4444 Website: gov.nl.ca/dgsnl/ohs ACCORDING TO THE NEWFOUNDLAND & LABRADOR OCCUPATIONAL HEALTH AND SAFETY REGULATIONS THE FOLLOWING IS REQUIRED: FOR ACCESS FRAME SCAFFOLDING base. The building e shall be capable of resisng a working load of 4 kilonewtons (900 lbs). • Where building es or guys are used - the first level shall be placed at a height not exceeding 3 mes the scaffold minimum base and addional es placed at vercal intervals not exceeding 6 metres. - the es shall be placed at horizontal intervals at the lesser of every third bay or 6.4 metres. • Guardrails shall be installed on all open sides of the work plaorm 1.22 metres or more above grade or floor level and when an open space greater than 30 cm exist between the work plaorm and structure. • Guradrails shall be secured so they cannot move in any direcon. - top rail between 0.9 metres and 1.1 metres - toeboards required over machinery and work areas • Ladder access may be vercal or sloping. Ladders shall be secured at the point of support and shall extend approximately 1 metre above the landing. A vercal ladder must have a clear space of at east 15 cm behind each rung. - end frames with ladder like structures may be used for access up to 9 metres above floor or grade level. STEPS TO SAFE SCAFFOLDING

Upload: others

Post on 06-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

STEP 2STEP 1 STEP 3

STEP 5STEP 4 STEP 6

STEP 8STEP 7 STEP 9

How to Erect Access Frame Scaffolding

• A scaffold shall be erected, altered, and dismantled by qualifiedworkers or under the direct supervision of a qualified person. Thequalified person shall ensure that the erection is carried out accordingto acceptable practices in compliance with any drawings and themanufacturer’s or supplier’s instructions, and that the correctcomponents and materials are being used.

• A scaffold shall be inspected daily before use and after a modification.A damaged scaffold component shall not be used.

• The lower end of the vertical support of a scaffold shall be supportedby firm and adequately sized foundations or sills. Adjustable baseplates shall be used to accommodate uneven sloping or steppedsurfaces.

• Adjustable base plates shall not extend more than the lesser of two-thirds of its total length or 60 cm unless otherwise specified by themanufacturer.

• A scaffold shall be erected with vertical members plumb and ledgersand bearers level.

• Each lumber and manufactured scaffold plank installed for use shall besecured against dislodgement.

• A scaffold shall be effectively guyed or secured to a building orstructure where the height of the scaffold exceeds 3 times its minimum

FOR ROLLING SCAFFOLD• The wheels on one end shall be swivel type.• Wheels shall not be less than 13 cm in diameter.• Height adjusting screws for casters of a rolling scaffold shall

not extend more than two-thirds of their total length or 30 cmwhichever is lesser.

• A wheel of a rolling scaffold shall be equipped with effective brakesor locking devices which shall be applied when workers are working.

• A rolling scaffold mounted on pneumatic tires shall have additionalsupports.

• A worker is not permitted on a rolling scaffold while it is beingmoved.

• The floor or surface over which it is moved shall be sufficiently firmwithin 3 degrees of level and free from pits, holes, depressions, andobstructions.

Select and prepare the ground area. Place suitable sills and make sure there are no holes under the sills. Put the adjustable base on the sills in the location that matches your scaffold dimensions.

NOTE: DO NOT SECURE THE BASES TO THE SILLS AT THIS TIME.

Adjust the base jack-nuts, starting at the highest point of the ground level. The jack-nut at the highest ground level should be set 7.5 - 15 cm from the top of the sill, depending on the slope. Place the first frame onto the base plates at the high point. Connect the first cross-brace to the frame. Allow the frame to lean slightly forward and rest on the sill while you prepare for the next frame to be installed.

Install the second frame onto the base plates. Secure the first cross-brace to the second frame.

Install the second cross-brace to both the frames. Next you need to level and plumb the scaffold. Start at the high point of the scaffold. If possible, use the jack-nut to bring the highest corner down closer to the sill. Next bring all four corners up to that point. If the bottom cross-members of each frame are level with each other, the frames should also be plumb.

Install the decking, which may be manufactured or wood planks. If you are using wooden planks, they shall extend beyond the supporting cross-members at least 15.24 cm and not more than 30.24 cm. Secure the decking so it cannot move.

Select the equipment for the guardrail system.

NOTE: APPROPRIATE FALL PROTECTION SHALL BE USED DURING ERECTION AND DISMANTLING OF SCAFFOLDING AT A HEIGHT EXCEEDING 1.22 M.

Attach the guardrails to the posts on all the exposed sides. Install toeboards as required. Install a suitable means, such as a sloping or vertical ladder secured to the scaffold at the landing point. The ladder shall extend approximately 1 m above the landing.

Toll Free OH&S: 1.800.563.5471 Accident Line: 709.729.4444 Website: gov.nl.ca/dgsnl/ohs

ACCORDING TO THE NEWFOUNDLAND & LABRADOR OCCUPATIONAL HEALTH AND SAFETY REGULATIONS THE FOLLOWING IS REQUIRED: FOR ACCESS FRAME SCAFFOLDING

base. The building tie shall be capable of resisting a working load of 4 kilonewtons (900 lbs).

• Where building ties or guys are used- the first level shall be placed at a height not exceeding 3 times

the scaffold minimum base and additional ties placed at verticalintervals not exceeding 6 metres.

- the ties shall be placed at horizontal intervals at the lesser of everythird bay or 6.4 metres.

• Guardrails shall be installed on all open sides of the work platform1.22 metres or more above grade or floor level and when an openspace greater than 30 cm exist between the work platform andstructure.

• Guradrails shall be secured so they cannot move in any direction.- top rail between 0.9 metres and 1.1 metres- toeboards required over machinery and work areas

• Ladder access may be vertical or sloping. Ladders shall be secured atthe point of support and shall extend approximately 1 metre abovethe landing. A vertical ladder must have a clear space of at east 15 cmbehind each rung.- end frames with ladder like structures may be used for access up to

9 metres above floor or grade level.

STEPS TO SAFE SCAFFOLDING