5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Status of Type-A suspensions for KAGRA Yoshinori Fujii for KAGRA collaboration 1 / 22

Upload: others

Post on 29-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Status of Type-A suspensions for KAGRA

Yoshinori Fujiifor KAGRA collaboration

1 / 22

Page 2: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

-- Mechanical installation

-- Servo filter implementation

-- Verification of suspension performance

What is going on?

Status of Type-A suspensions for KAGRA

2 / 22

Page 3: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Type-A suspensions?

For the test masses,

- Upper 5 stages: room-temperature

- Lower 4 stages: cryogenic-temperature

3 / 22

Page 4: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Type-A suspensions?

INVERTED PENDULUM

(~ 70 mHz)

GEOMETRIC-ANTI SPRING

(~ 0.4 Hz)

IP

F1

F0

F2

F3

BF

4 / 22

Page 5: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Type-A suspensions?

INVERTED PENDULUM

with 3 horizontal -- LVDT & actuator units-- inertial sensors

IP

F1

F0

F2

F3

BF

LVDT&actuator

Inertialsensor

LVDT &actuator

GEOMETRIC-ANTI SPRING

with 1 vertical LVDT & actuator unit

5 / 22

Page 6: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Type-A suspensions?

BOTTOM-FILTER DAMPERwith 3 horizontal & 3 vertical LVDT & actuator units

BF

(With collaboration of group in Pisa)

6 / 22

Page 7: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Type-A suspensions?

JGW-P1809347

Inside cryostat

payload

Heat-linkVIS

+

(+ Wide-angle baffle)

Heat-linkVIS

7 / 22

Page 8: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Type-A suspensions?

Platform

Marionette

Intermediate Mass

Mirror

Mirror Recoil Mass &

MarionetteRecoil Mass &

Intermediate Recoil Mass &

Blade Spring

Moving Mass

Reflective photo-sensor &coil-magnet Actuator units

Heat link

Optical lever

Optical lever

JGW-P1808219

8 / 22

Page 9: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Then, mechanical installation status

for O3-observation

9 / 22

Page 10: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Mechanical installation has done! For all 4 of them!

JGW-G1808885

(Still mechanical-wise repairing work remains though..)

JGW-G1808307

(Finished, for all 4 of them)

10 / 22

Page 11: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

ETMX & ETMY:

Mass tuning, necessary but no accessibility.

Newly made blades could not hold the system..

ITMX & ITMY:

Hitting,, ~No oscillation

for ETMX - F2 GASfor ETMY - F1 & F2 GAS

for ITMX / ITMY – F0 GAS

Blade replacement, necessarybut time consuming (etc).

Frame

Mechanical installation has done! HOWEVER ..

JGW-G1808283

~Last yearNow

11 / 22

Page 12: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Mechanical installation has done! HOWEVER ..

“acceptablefor the O3-run”

(should be)

According to a simulation, assuming 1% coupling,

Requirement

Note: -- Modeled w/o Heat-links-- params are not tuned.

HorizontalDefaultITMX/ITMY caseETMX caseETMY case

w/o controls

12 / 22

Page 13: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Servo filter implementation status

13 / 22

Page 14: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

With displacement sensors, [ for damping ]

IP

BF-damper

Damp

DC+Damp

DC+Damp

For L / T / Yaw

For Yaw

For L / T

Damp

For P / Y(TMoplev)

14 / 22

Page 15: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

ETMX

ETMX

ITMX

ITMX

PITCHPITCH

YAW YAW

With displacement sensors, [ residuals ]

[ ura

d/r

tHz

] or

[ura

d]

[ ura

d/r

tHz

] or

[ura

d]

0.16 0.41

0.15 0.31

Locked! Thanks to Kamioka environment. 15 / 22

Page 16: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

ETMX

ETMX

ITMX

ITMX

With displacement sensors, [ residuals ]

[ ura

d/r

tHz

] or

[ura

d]

[ ura

d/r

tHz

] or

[ura

d]

PITCHPITCH

YAW YAW

In bad weather

NOT locked..

0.25 0.56

0.29 0.55

16 / 22

Page 17: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Candidate (main) resonant modes? Preliminary

damping at tower-part

damping at payload+ decoupling / inertial damping 17 / 22

Page 18: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Verification of suspension performance

18 / 22

Page 19: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Measurement:

Mechanical suspension performancewith X-arm cavity

ETMXITMXBSPR3

PR2PRM

Actuation

19 / 22

Page 20: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

From ground to TM

Vibration isolation ratio, [ Good news! ][

m/m

]

20 / 22

Page 21: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

From BF-GAS to TM

[ m

/m ]

V to L coupling, [ System is not yet identified.. ]

VTM / BF-GAS(V) * 0.5e-2

Real was not so simple.. 21 / 22

Page 22: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Summary:

-- All the Type-A suspensions have been installed.-- Damping controls are working properly, however,

some resonances are not yet damped efficiently.Implement damping controls at payload stages

-- Reducing RMS is necessary when the seismic noise is high.Implement inertial damping at IP stage

For soon next:

Do mode identification including the heat-link peaksDesign the filters in the observation phase.

22 / 22

Page 23: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Backup

23 / 22

Page 24: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Seismic noise

10-8

Seismic noise (Tokyo)

Seismic noise

(KAGRA site)

Target sensitivity

24

Page 25: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Seismic attenuation

x

X

Frequency [ Hz ]

GroundSingleDoubleTriple

KAGRA suspension

Mir

ror

dis

pla

cem

en

tx

[ m

/𝐇𝐳

]

-3010

10.1

-2510

-2010

-1510

-1010

-510

10

Requirement

Mirror(dummy)

Mirror

Ex. KAGRA

3 m

5-stage

(Type-B suspension case)

25

Page 26: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Resonance damping

Servo

Actuator Displacement sensor

Active control

Starting interferometer operation

Stable interferometer operation

26

Page 27: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

1. Calm-down phase

2. Lock-acquisition phase

3. Observation phase

Suppress large disturbance

Reduce RMS velocity RMS angle

(Root-Mean-Square)

Keep positionwith low noise control

Designing active control system / Control phase

27 / 22

Page 28: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Type-A suspensions?

JGW-P1809347

Inside cryostat

28 / 22

Page 29: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Type-A suspensions?

JGW-P1809382

29 / 22

Page 30: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

With displacement sensors, [ residuals ] In bad weather

NOT locked..

Seismic motion when the weather was normal/bad(From page #16)

30 / 22

EXV IXV

2.4e-2

1.2e-2

2.6e-2

1.2e-2

[ um

/rtH

z]

or

[um

]

[ um

/rtH

z]

or

[um

]

Page 31: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Vertical transfer functions (fitted)

ETMX ITMX

BF-GAS(V) / BF-GAS(V)_act BF-GAS(V) / BF-GAS(V)_act

31 / 22

Page 32: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Measurement:

Mechanical suspension performancewith X-arm cavity

ETMXITMXBSPR3

PR2PRM

Actuation

32 / 22

Page 33: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Force transfer functions From (TM-RM)-act to TM

???

33 / 22

Page 34: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Force transfer functions From (IM-IMR)-act to TM?

34 / 22

Page 35: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

Force transfer functions From (MN-MNR)-act to TM?

35 / 22

Page 36: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

(*1) Some resonances have to be identified, as shown in the above.(*2) measurement files are stored under /users/VISsvn/ though, Not much organized well now..

please let me know if you want to have them ASAP.

Excited stage name Degree of freedom

TM L

P

IM L

V

MN L

BF GAS

(L)

IP L

Note: Measurement ofmechanical suspension performance with X-arm cavity

All the local sensors for ETMX and ITMX

Excitation point: Sensing point:

36 / 22

Page 37: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#3#2 #4#1 #5 #6

Type-A SAS,

‘TyrpeA180429_20K’

Eigen mode: 75 modes

#8#7

IP translationalmodes

0.067 Hz 0.067 Hz

Less interest now

37 / 22

Page 38: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#9 #10 #11 #12 #15#14 #16#13

Less interest now

38 / 22

Page 39: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#19#18 #20#17 #21 #22 #24#23

Less interest now

39 / 22

Page 40: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#27#26 #28#25 #29 #30 #32#31

Less interest now

40 / 22

Page 41: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#35#34 #36#33 #37 #38 #40#39

Less interest now

41 / 22

Page 42: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#43#42 #44#41 #45 #46 #48#47

Less interest now

42 / 22

Page 43: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#51#50 #52#49 #53 #54 #56#55

Less interest now

43 / 22

Page 44: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#59#58 #60#57 #61 #62 #64#63

Less interest now

44 / 22

Page 45: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#67#66 #68#65 #69 #70 #72#71

Less interest now

45 / 22

Page 46: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

#75#74#73

Less interest now

46 / 22

Page 47: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

WFS

Designing active control system / ex. Type-Bp SAS

DC + Damp

DC

Damp

Damp

DC+Damp

Opticalsensors

Displacementsensor (OSEM)

Displacementsensor (LVDT)

Displacementsensor (LVDT)

Damp

Damp

Damp

DC

DC+Damp

Opticalsensors

Displacementsensor (OSEM)

Displacementsensor (LVDT)

Displacementsensor (LVDT)

Damp

DC

DC+Damp

Damp

DC+Damp

Displacementsensor (OSEM)

Displacementsensor (LVDT)

Displacementsensor (LVDT)

1. Calm-down phase 2. Lock-acquisition phase 3. Observation phase

Damp

47

Page 48: Status of Type-A suspensions for KAGRA...5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii Summary:-- All the Type-A suspensions have been installed.-- Damping

5th KAGRA international workshop on February 14th 2019, Yoshinori Fujii

DC

2. Decay time measurement

Damp

1/e decay time

For damping resonances

We have to measure the decay time constantsw/ and w/o damping controls,in order to verify the damping control performance,FOR ALL THE TYPE-A/B/Bp SUSPENSIONS.

(Example)

For the resonant modes which disturb the lock acquisition.

48