status of the preparations for cpm15-2, ra-15 and wrc-15 · 2013-12-03 · international...
TRANSCRIPT
International Telecommunication Union
Document WRC-15-IRWSP-1319-E 3 December 2013
English only
1st ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION
(Geneva 4 ndash 5 December 2013)
Philippe Aubineau Counsellor
ITU-R Study Groups Radiocommunication Bureau
Status of the preparations for
CPM15-2 RA-15 and WRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 2
WRC
Regional preparation Resolution 72 (RevWRC-07)
Proposals
Coordinated common proposals Member States
(WRC-12 Doc 3)
Final Acts
Informal Group (Structure amp Chairmanship) Proposals
(WRC-12 Doc 4)
Agenda draft in WRC Res amp final in Council Res
Overview of the preparations
Radio Regulations
(CS89) Conference Secretariat (BR amp GS)
RA
(WRC-12)
ATU
CEPT
APT (Doc 26)
RCC
CITEL
ASMG (Doc 25)
(Doc 17)
(Doc 5)
(Doc 10)
(Doc 6)
(WRC-12 Doc 235)
(Doc hellip)
(WRC-15)
(Doc hellip)
(Doc hellip)
(Doc hellip)
(Doc hellip)
(Doc hellip)
(WRC-15 Doc )
(WRC-15 Doc ) CPM Report
Directorrsquos Report
(WRC-15 Doc ) RA Report
(Doc hellip)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 3
Main Steps towards WRC-15 WRC-12 WRC-15 Agenda gt Resolution 807 (WRC-12)
Final meetings of regional groups
2nd Session Conference Preparatory Meeting CPM15-2 Geneva 23 March ndash 2 April 2015
1st Session Conference Preparatory Meeting CPM15-1 held on 20 ndash 21 Feb 2012 Results in CA201 of 190312 + Add 1 of 150113
Council-12 approved WRC-15 Agenda date amp venue See Resolution 1343 (C12) (on line)
Subsequently approved by ITU Member States (CV 42CV 47)
RA-15 26-30 Oct 2015 ndash WRC-15 2-27 Nov 2015 Both in Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 4
RAG SGs preparations for RA-15
Former RAG Correspondence Groups concluded on bull New guidelines for ITU-R Rec format (see Doc RAG13-114) bull Proposed revision of Res ITU-R 6 (see Doc RAG13-19) New Rapporteur to continue the revision of Res ITU-R 1-6 bull Mr A Vallet (F) (e-mail valletanfrfr) (see updated guidelines) RAG will report final results through the Director to RA-15
Monitoring studies on ITU-R Resolutions The BR Director in consultation with the Study Group Chairmen is invited to compile a list of those SGs already conducting studies on ITU-R Resolutions with foreseen dates and expected ITU-R deliverables and report to the next RAG meetings (See Doc RAG13-12 (SG 5) RAG13-18 (SG 1) and RAG13-119 (SG 6))
(RAG webpage wwwituintITU-Rgorag SGs webpage wwwituintITU-Rgorsg)
Summary of Conclusions from the May 2013 meeting of the RAG in Administrative Circular CA211 at httpwwwituintmdR00-CA-CIR-0211en
Next RAG meeting planned on 24-27 June 2014
New Chairman Mr Daniel Obam (KEN)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 5
CPM Conference Preparatory Meeting Rec ITU-R Recommendation RoP Rules of Procedure RR Radio Regulations (treaty status)
WRC
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
CPM-2
RRB Radio Regulations Board SGs Radiocommunication Study Groups SC Special Committee (Regulat amp Procedural) RA Radiocommunication Assembly WRCWorld Radiocommunication Conference
RoP
Radiocommunication Bureau
Director RRB
Final Acts
Revisions to the Radio Regulations
Next WRC
Agenda
WRC Resolu- tion
CPM-1
RA
Adopted by ITU Council
ITU Member States
CPM Report
Rec
The CPM in the WRC Process
CPM-2
CPM-1
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 6
WP 4A
914
16
916 WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14 115
WP 7B
111
113
918
WP 7C
112
SC
7
917
913 915
17
18
191
110
192
911
118
116
117
WP 7A 114
Relevant part
Responsible ITU-R Groups
WRC-15 agenda items amp Resp Groups
2 4 10
CPM15-2
UAS FSS 10-17 GHz
SRS 400MHz
UTC
RR procedures for Satellite filings
Issues for the BR Dirrsquos Report (9)
11
12 JTG 4-5-6-7
WRC-15 8 Art 5 (country) footnotes 3 5 6 9
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 7
914
912
913
911 MSS in the band 406-4061 MHz
CPM15-1 Issues under Agenda item 91
CA Reduction amp technical criteria (RR Nos 941 amp 97)
Satellite orb amp frequency spectrum to deliver International Public Telecommunication Services in developing countries
Updating amp rearrangement of the RR (excepting several Art)
916
918
917
915 Existing amp future operation of FSS ES 34-42 GHz as an aid to safe operation of aircraft and reliable distribution of meteorological information in some Reg 1 countries
Review def of fixed service fixed station amp mobile station
SM guidelines for emergency amp disaster relief radiocom
Regulatory aspects for nano- and picosatellites
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 8
rArr Examine contributions from the membership rArr Development of draft CPM texts Carry out technical studies Development of necessary
ITU-R Recommendations and Reports Propose method(s) of satisfying the
WRC-15 Agenda Items Prepare preliminary draft examples of
regulatory texts rArr Ensure necessary coordination with the
concerned groups (contributinginterested working parties)
Responsible Groups activities (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 9
Responsible Groups activities (22)
Situation as of November 2013
rArr Submission of texts to CPM Chapter Rapporteurs On or before 15 August 2014
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 2
WRC
Regional preparation Resolution 72 (RevWRC-07)
Proposals
Coordinated common proposals Member States
(WRC-12 Doc 3)
Final Acts
Informal Group (Structure amp Chairmanship) Proposals
(WRC-12 Doc 4)
Agenda draft in WRC Res amp final in Council Res
Overview of the preparations
Radio Regulations
(CS89) Conference Secretariat (BR amp GS)
RA
(WRC-12)
ATU
CEPT
APT (Doc 26)
RCC
CITEL
ASMG (Doc 25)
(Doc 17)
(Doc 5)
(Doc 10)
(Doc 6)
(WRC-12 Doc 235)
(Doc hellip)
(WRC-15)
(Doc hellip)
(Doc hellip)
(Doc hellip)
(Doc hellip)
(Doc hellip)
(WRC-15 Doc )
(WRC-15 Doc ) CPM Report
Directorrsquos Report
(WRC-15 Doc ) RA Report
(Doc hellip)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 3
Main Steps towards WRC-15 WRC-12 WRC-15 Agenda gt Resolution 807 (WRC-12)
Final meetings of regional groups
2nd Session Conference Preparatory Meeting CPM15-2 Geneva 23 March ndash 2 April 2015
1st Session Conference Preparatory Meeting CPM15-1 held on 20 ndash 21 Feb 2012 Results in CA201 of 190312 + Add 1 of 150113
Council-12 approved WRC-15 Agenda date amp venue See Resolution 1343 (C12) (on line)
Subsequently approved by ITU Member States (CV 42CV 47)
RA-15 26-30 Oct 2015 ndash WRC-15 2-27 Nov 2015 Both in Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 4
RAG SGs preparations for RA-15
Former RAG Correspondence Groups concluded on bull New guidelines for ITU-R Rec format (see Doc RAG13-114) bull Proposed revision of Res ITU-R 6 (see Doc RAG13-19) New Rapporteur to continue the revision of Res ITU-R 1-6 bull Mr A Vallet (F) (e-mail valletanfrfr) (see updated guidelines) RAG will report final results through the Director to RA-15
Monitoring studies on ITU-R Resolutions The BR Director in consultation with the Study Group Chairmen is invited to compile a list of those SGs already conducting studies on ITU-R Resolutions with foreseen dates and expected ITU-R deliverables and report to the next RAG meetings (See Doc RAG13-12 (SG 5) RAG13-18 (SG 1) and RAG13-119 (SG 6))
(RAG webpage wwwituintITU-Rgorag SGs webpage wwwituintITU-Rgorsg)
Summary of Conclusions from the May 2013 meeting of the RAG in Administrative Circular CA211 at httpwwwituintmdR00-CA-CIR-0211en
Next RAG meeting planned on 24-27 June 2014
New Chairman Mr Daniel Obam (KEN)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 5
CPM Conference Preparatory Meeting Rec ITU-R Recommendation RoP Rules of Procedure RR Radio Regulations (treaty status)
WRC
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
CPM-2
RRB Radio Regulations Board SGs Radiocommunication Study Groups SC Special Committee (Regulat amp Procedural) RA Radiocommunication Assembly WRCWorld Radiocommunication Conference
RoP
Radiocommunication Bureau
Director RRB
Final Acts
Revisions to the Radio Regulations
Next WRC
Agenda
WRC Resolu- tion
CPM-1
RA
Adopted by ITU Council
ITU Member States
CPM Report
Rec
The CPM in the WRC Process
CPM-2
CPM-1
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 6
WP 4A
914
16
916 WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14 115
WP 7B
111
113
918
WP 7C
112
SC
7
917
913 915
17
18
191
110
192
911
118
116
117
WP 7A 114
Relevant part
Responsible ITU-R Groups
WRC-15 agenda items amp Resp Groups
2 4 10
CPM15-2
UAS FSS 10-17 GHz
SRS 400MHz
UTC
RR procedures for Satellite filings
Issues for the BR Dirrsquos Report (9)
11
12 JTG 4-5-6-7
WRC-15 8 Art 5 (country) footnotes 3 5 6 9
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 7
914
912
913
911 MSS in the band 406-4061 MHz
CPM15-1 Issues under Agenda item 91
CA Reduction amp technical criteria (RR Nos 941 amp 97)
Satellite orb amp frequency spectrum to deliver International Public Telecommunication Services in developing countries
Updating amp rearrangement of the RR (excepting several Art)
916
918
917
915 Existing amp future operation of FSS ES 34-42 GHz as an aid to safe operation of aircraft and reliable distribution of meteorological information in some Reg 1 countries
Review def of fixed service fixed station amp mobile station
SM guidelines for emergency amp disaster relief radiocom
Regulatory aspects for nano- and picosatellites
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 8
rArr Examine contributions from the membership rArr Development of draft CPM texts Carry out technical studies Development of necessary
ITU-R Recommendations and Reports Propose method(s) of satisfying the
WRC-15 Agenda Items Prepare preliminary draft examples of
regulatory texts rArr Ensure necessary coordination with the
concerned groups (contributinginterested working parties)
Responsible Groups activities (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 9
Responsible Groups activities (22)
Situation as of November 2013
rArr Submission of texts to CPM Chapter Rapporteurs On or before 15 August 2014
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 3
Main Steps towards WRC-15 WRC-12 WRC-15 Agenda gt Resolution 807 (WRC-12)
Final meetings of regional groups
2nd Session Conference Preparatory Meeting CPM15-2 Geneva 23 March ndash 2 April 2015
1st Session Conference Preparatory Meeting CPM15-1 held on 20 ndash 21 Feb 2012 Results in CA201 of 190312 + Add 1 of 150113
Council-12 approved WRC-15 Agenda date amp venue See Resolution 1343 (C12) (on line)
Subsequently approved by ITU Member States (CV 42CV 47)
RA-15 26-30 Oct 2015 ndash WRC-15 2-27 Nov 2015 Both in Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 4
RAG SGs preparations for RA-15
Former RAG Correspondence Groups concluded on bull New guidelines for ITU-R Rec format (see Doc RAG13-114) bull Proposed revision of Res ITU-R 6 (see Doc RAG13-19) New Rapporteur to continue the revision of Res ITU-R 1-6 bull Mr A Vallet (F) (e-mail valletanfrfr) (see updated guidelines) RAG will report final results through the Director to RA-15
Monitoring studies on ITU-R Resolutions The BR Director in consultation with the Study Group Chairmen is invited to compile a list of those SGs already conducting studies on ITU-R Resolutions with foreseen dates and expected ITU-R deliverables and report to the next RAG meetings (See Doc RAG13-12 (SG 5) RAG13-18 (SG 1) and RAG13-119 (SG 6))
(RAG webpage wwwituintITU-Rgorag SGs webpage wwwituintITU-Rgorsg)
Summary of Conclusions from the May 2013 meeting of the RAG in Administrative Circular CA211 at httpwwwituintmdR00-CA-CIR-0211en
Next RAG meeting planned on 24-27 June 2014
New Chairman Mr Daniel Obam (KEN)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 5
CPM Conference Preparatory Meeting Rec ITU-R Recommendation RoP Rules of Procedure RR Radio Regulations (treaty status)
WRC
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
CPM-2
RRB Radio Regulations Board SGs Radiocommunication Study Groups SC Special Committee (Regulat amp Procedural) RA Radiocommunication Assembly WRCWorld Radiocommunication Conference
RoP
Radiocommunication Bureau
Director RRB
Final Acts
Revisions to the Radio Regulations
Next WRC
Agenda
WRC Resolu- tion
CPM-1
RA
Adopted by ITU Council
ITU Member States
CPM Report
Rec
The CPM in the WRC Process
CPM-2
CPM-1
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 6
WP 4A
914
16
916 WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14 115
WP 7B
111
113
918
WP 7C
112
SC
7
917
913 915
17
18
191
110
192
911
118
116
117
WP 7A 114
Relevant part
Responsible ITU-R Groups
WRC-15 agenda items amp Resp Groups
2 4 10
CPM15-2
UAS FSS 10-17 GHz
SRS 400MHz
UTC
RR procedures for Satellite filings
Issues for the BR Dirrsquos Report (9)
11
12 JTG 4-5-6-7
WRC-15 8 Art 5 (country) footnotes 3 5 6 9
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 7
914
912
913
911 MSS in the band 406-4061 MHz
CPM15-1 Issues under Agenda item 91
CA Reduction amp technical criteria (RR Nos 941 amp 97)
Satellite orb amp frequency spectrum to deliver International Public Telecommunication Services in developing countries
Updating amp rearrangement of the RR (excepting several Art)
916
918
917
915 Existing amp future operation of FSS ES 34-42 GHz as an aid to safe operation of aircraft and reliable distribution of meteorological information in some Reg 1 countries
Review def of fixed service fixed station amp mobile station
SM guidelines for emergency amp disaster relief radiocom
Regulatory aspects for nano- and picosatellites
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 8
rArr Examine contributions from the membership rArr Development of draft CPM texts Carry out technical studies Development of necessary
ITU-R Recommendations and Reports Propose method(s) of satisfying the
WRC-15 Agenda Items Prepare preliminary draft examples of
regulatory texts rArr Ensure necessary coordination with the
concerned groups (contributinginterested working parties)
Responsible Groups activities (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 9
Responsible Groups activities (22)
Situation as of November 2013
rArr Submission of texts to CPM Chapter Rapporteurs On or before 15 August 2014
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 4
RAG SGs preparations for RA-15
Former RAG Correspondence Groups concluded on bull New guidelines for ITU-R Rec format (see Doc RAG13-114) bull Proposed revision of Res ITU-R 6 (see Doc RAG13-19) New Rapporteur to continue the revision of Res ITU-R 1-6 bull Mr A Vallet (F) (e-mail valletanfrfr) (see updated guidelines) RAG will report final results through the Director to RA-15
Monitoring studies on ITU-R Resolutions The BR Director in consultation with the Study Group Chairmen is invited to compile a list of those SGs already conducting studies on ITU-R Resolutions with foreseen dates and expected ITU-R deliverables and report to the next RAG meetings (See Doc RAG13-12 (SG 5) RAG13-18 (SG 1) and RAG13-119 (SG 6))
(RAG webpage wwwituintITU-Rgorag SGs webpage wwwituintITU-Rgorsg)
Summary of Conclusions from the May 2013 meeting of the RAG in Administrative Circular CA211 at httpwwwituintmdR00-CA-CIR-0211en
Next RAG meeting planned on 24-27 June 2014
New Chairman Mr Daniel Obam (KEN)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 5
CPM Conference Preparatory Meeting Rec ITU-R Recommendation RoP Rules of Procedure RR Radio Regulations (treaty status)
WRC
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
CPM-2
RRB Radio Regulations Board SGs Radiocommunication Study Groups SC Special Committee (Regulat amp Procedural) RA Radiocommunication Assembly WRCWorld Radiocommunication Conference
RoP
Radiocommunication Bureau
Director RRB
Final Acts
Revisions to the Radio Regulations
Next WRC
Agenda
WRC Resolu- tion
CPM-1
RA
Adopted by ITU Council
ITU Member States
CPM Report
Rec
The CPM in the WRC Process
CPM-2
CPM-1
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 6
WP 4A
914
16
916 WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14 115
WP 7B
111
113
918
WP 7C
112
SC
7
917
913 915
17
18
191
110
192
911
118
116
117
WP 7A 114
Relevant part
Responsible ITU-R Groups
WRC-15 agenda items amp Resp Groups
2 4 10
CPM15-2
UAS FSS 10-17 GHz
SRS 400MHz
UTC
RR procedures for Satellite filings
Issues for the BR Dirrsquos Report (9)
11
12 JTG 4-5-6-7
WRC-15 8 Art 5 (country) footnotes 3 5 6 9
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 7
914
912
913
911 MSS in the band 406-4061 MHz
CPM15-1 Issues under Agenda item 91
CA Reduction amp technical criteria (RR Nos 941 amp 97)
Satellite orb amp frequency spectrum to deliver International Public Telecommunication Services in developing countries
Updating amp rearrangement of the RR (excepting several Art)
916
918
917
915 Existing amp future operation of FSS ES 34-42 GHz as an aid to safe operation of aircraft and reliable distribution of meteorological information in some Reg 1 countries
Review def of fixed service fixed station amp mobile station
SM guidelines for emergency amp disaster relief radiocom
Regulatory aspects for nano- and picosatellites
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 8
rArr Examine contributions from the membership rArr Development of draft CPM texts Carry out technical studies Development of necessary
ITU-R Recommendations and Reports Propose method(s) of satisfying the
WRC-15 Agenda Items Prepare preliminary draft examples of
regulatory texts rArr Ensure necessary coordination with the
concerned groups (contributinginterested working parties)
Responsible Groups activities (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 9
Responsible Groups activities (22)
Situation as of November 2013
rArr Submission of texts to CPM Chapter Rapporteurs On or before 15 August 2014
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 5
CPM Conference Preparatory Meeting Rec ITU-R Recommendation RoP Rules of Procedure RR Radio Regulations (treaty status)
WRC
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
CPM-2
RRB Radio Regulations Board SGs Radiocommunication Study Groups SC Special Committee (Regulat amp Procedural) RA Radiocommunication Assembly WRCWorld Radiocommunication Conference
RoP
Radiocommunication Bureau
Director RRB
Final Acts
Revisions to the Radio Regulations
Next WRC
Agenda
WRC Resolu- tion
CPM-1
RA
Adopted by ITU Council
ITU Member States
CPM Report
Rec
The CPM in the WRC Process
CPM-2
CPM-1
SC amp Study Groups SG-1 Spectrum management SG-3 Radiowave propagation SG-4 Satellite services SG-5 Terrestrial services SG-6 Broadcasting service SG-7 Science services
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 6
WP 4A
914
16
916 WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14 115
WP 7B
111
113
918
WP 7C
112
SC
7
917
913 915
17
18
191
110
192
911
118
116
117
WP 7A 114
Relevant part
Responsible ITU-R Groups
WRC-15 agenda items amp Resp Groups
2 4 10
CPM15-2
UAS FSS 10-17 GHz
SRS 400MHz
UTC
RR procedures for Satellite filings
Issues for the BR Dirrsquos Report (9)
11
12 JTG 4-5-6-7
WRC-15 8 Art 5 (country) footnotes 3 5 6 9
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 7
914
912
913
911 MSS in the band 406-4061 MHz
CPM15-1 Issues under Agenda item 91
CA Reduction amp technical criteria (RR Nos 941 amp 97)
Satellite orb amp frequency spectrum to deliver International Public Telecommunication Services in developing countries
Updating amp rearrangement of the RR (excepting several Art)
916
918
917
915 Existing amp future operation of FSS ES 34-42 GHz as an aid to safe operation of aircraft and reliable distribution of meteorological information in some Reg 1 countries
Review def of fixed service fixed station amp mobile station
SM guidelines for emergency amp disaster relief radiocom
Regulatory aspects for nano- and picosatellites
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 8
rArr Examine contributions from the membership rArr Development of draft CPM texts Carry out technical studies Development of necessary
ITU-R Recommendations and Reports Propose method(s) of satisfying the
WRC-15 Agenda Items Prepare preliminary draft examples of
regulatory texts rArr Ensure necessary coordination with the
concerned groups (contributinginterested working parties)
Responsible Groups activities (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 9
Responsible Groups activities (22)
Situation as of November 2013
rArr Submission of texts to CPM Chapter Rapporteurs On or before 15 August 2014
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 6
WP 4A
914
16
916 WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14 115
WP 7B
111
113
918
WP 7C
112
SC
7
917
913 915
17
18
191
110
192
911
118
116
117
WP 7A 114
Relevant part
Responsible ITU-R Groups
WRC-15 agenda items amp Resp Groups
2 4 10
CPM15-2
UAS FSS 10-17 GHz
SRS 400MHz
UTC
RR procedures for Satellite filings
Issues for the BR Dirrsquos Report (9)
11
12 JTG 4-5-6-7
WRC-15 8 Art 5 (country) footnotes 3 5 6 9
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 7
914
912
913
911 MSS in the band 406-4061 MHz
CPM15-1 Issues under Agenda item 91
CA Reduction amp technical criteria (RR Nos 941 amp 97)
Satellite orb amp frequency spectrum to deliver International Public Telecommunication Services in developing countries
Updating amp rearrangement of the RR (excepting several Art)
916
918
917
915 Existing amp future operation of FSS ES 34-42 GHz as an aid to safe operation of aircraft and reliable distribution of meteorological information in some Reg 1 countries
Review def of fixed service fixed station amp mobile station
SM guidelines for emergency amp disaster relief radiocom
Regulatory aspects for nano- and picosatellites
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 8
rArr Examine contributions from the membership rArr Development of draft CPM texts Carry out technical studies Development of necessary
ITU-R Recommendations and Reports Propose method(s) of satisfying the
WRC-15 Agenda Items Prepare preliminary draft examples of
regulatory texts rArr Ensure necessary coordination with the
concerned groups (contributinginterested working parties)
Responsible Groups activities (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 9
Responsible Groups activities (22)
Situation as of November 2013
rArr Submission of texts to CPM Chapter Rapporteurs On or before 15 August 2014
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 7
914
912
913
911 MSS in the band 406-4061 MHz
CPM15-1 Issues under Agenda item 91
CA Reduction amp technical criteria (RR Nos 941 amp 97)
Satellite orb amp frequency spectrum to deliver International Public Telecommunication Services in developing countries
Updating amp rearrangement of the RR (excepting several Art)
916
918
917
915 Existing amp future operation of FSS ES 34-42 GHz as an aid to safe operation of aircraft and reliable distribution of meteorological information in some Reg 1 countries
Review def of fixed service fixed station amp mobile station
SM guidelines for emergency amp disaster relief radiocom
Regulatory aspects for nano- and picosatellites
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 8
rArr Examine contributions from the membership rArr Development of draft CPM texts Carry out technical studies Development of necessary
ITU-R Recommendations and Reports Propose method(s) of satisfying the
WRC-15 Agenda Items Prepare preliminary draft examples of
regulatory texts rArr Ensure necessary coordination with the
concerned groups (contributinginterested working parties)
Responsible Groups activities (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 9
Responsible Groups activities (22)
Situation as of November 2013
rArr Submission of texts to CPM Chapter Rapporteurs On or before 15 August 2014
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 8
rArr Examine contributions from the membership rArr Development of draft CPM texts Carry out technical studies Development of necessary
ITU-R Recommendations and Reports Propose method(s) of satisfying the
WRC-15 Agenda Items Prepare preliminary draft examples of
regulatory texts rArr Ensure necessary coordination with the
concerned groups (contributinginterested working parties)
Responsible Groups activities (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 9
Responsible Groups activities (22)
Situation as of November 2013
rArr Submission of texts to CPM Chapter Rapporteurs On or before 15 August 2014
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 9
Responsible Groups activities (22)
Situation as of November 2013
rArr Submission of texts to CPM Chapter Rapporteurs On or before 15 August 2014
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 10
Information for the preparation of texts for the Draft CPM Report to WRC-15
References Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev RA-12)
httpwwwituintpubR-RES-R2-6-2012 CA201 of 19 Mar 2012 and its Add 1 of 15 Jan 2013
httpwwwituintmdR00-CA-CIR-0201en Proposed detailed Structure for the Draft CPM Report to WRC-15
httpwwwituintothR0A0A000007en
CPM-11 Chairmanrsquos Documents to ITU-R Resp Groups httpwwwituintmdR12-WP1B-C-0094en of 10 Sep 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 11
Radio Regulations 2012 Edition
httpwwwituintpubR-REG-RR-2012
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 12
Summary of CPM Report Preparation
WP 4A
914
16
916
WRC-15 (agenda items incl issues under AI 91)
CPM15-2
CPM Management Team Meeting
WP 1B
WP 4C
912
WP 5A 13
WP 5B 15
14
115
WP 7B 111 113 918
WP 7C 112
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3 (draft texts) Chapter 4
(draft texts) Chapter 5 (draft texts) Chapter 6
(draft texts)
CPM Report to WRC-15
SC
Responsible ITU-R Groups
11 12
Draft CPM Report
917
913 915 Regulatory and procedural aspects
17 18 191
110 192 911
118
116 117 118
WP 7A 114 Relevant part
2 CPM15-2 4 10
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 13
CPM Management Team meeting (Res ITU-R 2-6) = CPM Steering Committee (CPM+SC CampVC + Chapter Rap) +
Chairmen of Study Groups and Responsible Groups rArr consolidate the output from the responsible groups into
the draft CPM Report to WRC-15 Special Committee on RegulatoryProcedural matters (Res ITU-R 38-4) rArr prepare a report to the CPM15-2 based on
- Results of studies of the SC Working Party - Extracts from the draft CPM Report - Contributions from ITU-R membership
2nd Session of Conference Preparatory Meeting (CPM15-2) (see Res ITU-R 2-6)
rArr Prepare the CPM Report to WRC-15 using - the draft CPM Report
- the Report of the Special Committee - Contributions from ITU-R membership
rArr Consider the preliminary BR Directorrsquos Report to WRC-15
Final steps of CPM Report Preparation
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 14
~ 25 years of studies
Timetable towards WRC-15
Situation as of today
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 15
Overview of Resp Groups meetings
Dates for 2014 2nd half and 2015 not yet finalized
Meeting overlaps shown in the table below are just for convenience of the presentation and do not represent the real situation
(see the up-to-date ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
16
WP 4A (5th)
914
16
916 WP 1B (3rd)
WP 4C (5th)
912
WP 5A (5th) 13
WP 5B (5th) 15
14
115
WP 7B (4th) 111 113 918
WP 7C (4th) 112
7
Responsible ITU-R Groups
917
913 915
17 18 191
110 192 911
118
116 117
WP 7A (4th) 114
Relevant part
118
20 ndash 28 Jan 2014
5 ndash 13 Feb 2014
13 ndash 19 Feb 2014
[19 ndash 30 May 2014]
6 ndash 13 May 2014
Next Meetings of Resp Groups
(see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R)
JTG 4-5-6-7 (5th) 11 12 20 ndash 28 Feb 2014
[19 ndash 30 May 2014]
WRC-15 (agenda items including issues under AI 91)
SC-WP 6 ndash 12 Dec 2013
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 17
Summary of the CPM Process Radiocommunication Assembly +
World Radiocommunication Conference
2nd CPMsession
SpecialCommittee
(regulatoryprocedural)
ITU-R Study GroupsSG 1 Spectrum managementSG 3 Radiowave propagationSG 4 Satellite servicesSG 5 Terrestrial servicesSG 6 Broadcasting service SG 7 Science services
Contributions from membership(ITU MS amp ITU-R SM)
CPM Report to WRC
Res ITU-R 4-6 Res ITU-R 38-3Re
s IT
U-R
2-6
1st CPMsession
Draft CPM Report to WRC
WRC
Age
nda
WRCProposals from ITU Member States
RA
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 18
wwwituintITU-Rgorcpm CPM Web Pages (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 19
wwwituintITU-Rgorcpm-wrc-15-studies
CPM Web Pages (22)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 20
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 21
WRC Regional Preparation wwwituintgowrc-15-regional
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st Meeting 4-5 Dec 2013
22
bull To be scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items) Presentation and review of the regional groupsrsquo draft
views positions and common proposals
2nd Meeting [Q4 of 2014]
bull To be scheduled few months prior to WRC-15 Presentation of the CPM amp Dir Reports to WRC-15 Presentation and review of the regional groupsrsquo draft
views positions and common proposals
ITU Inter-regional Workshops on WRC-15 Preparation
3rd Meeting [Q3 of 2015]
bull Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views
draft priorities and positions of the regional groups Invitation letter in Administrative Circular CA209
see the ITU-R Meetings schedule at wwwituinteneventsPagesCalendar-Eventsaspxsector=ITU-R
Webpage
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 23
wwwituintgowrc-15
WRC-15 Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 24
WRC-15-IRWSP Web Page
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 25
wwwituintgoITU-Rwrc-15-irwsp-13
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 26
wwwituintgoITU-Rwrc-15-irwsp-13 - Programme
WRC-15-IRWSP-13 Web Page (12)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva
1st ITU Inter-regional Workshop on WRC-15 Preparation - Programme
1 Presentation amp explanation of on-going ITU-R preparatory studies for WRC-15 by the resp groups amp of the draft preliminary common views positions andor proposals from the regional groups (African GroupATU APT-APG Arab GroupASMG CITEL-PCCII RCC CEPT-CPG) amp organizations like IMO WMO
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 28 28
wwwituintgoWRC-15
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 29
CPM-15 Chairman amp Vice-Chairmen
Chairman Mr A ZOURMBA (CME) E-mail aboubakarzourmbatiesituint
Vice-Chairmen CPM Mr M AL-MUATHEN (UAE) E-mail almuathen77hotmailcom Mr G FELDHAKE (USA) E-mail glennsfeldhakenasagov Dr S M SHARMA (IND) E-mail sheshsharmatiesituint Mr N VARLAMOV (RUS) E-mails varlamovtiesituint
intcoopminsvyazru Dr K-J WEE (KOR) E-mail kjweekccgokr
(see details at httpwwwituintonlinecompasscvcv2shtopic=CPM)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 30
1 Mobile and Amateur issues
2 Science issues
3 Aeronautical Maritime and Radiolocation issues
4 Satellite services 41 Fixed-satellite service 42 Mobile-satellite service
5 Satellite regulatory issues
6 General issues
CPM-15 Report ndash Table of contents Chapters of CPM Report WRC-15 Agenda items
(incl issues under AI 91)
2 4 914 916 917 10
11 12 13 14
111 112 113 114
15 115 116 117 118
16 17 18 191 192 110
7 911 912 913 915 918 93
(see details in Annexes 6 and 7 to CA201)
Issues under AI 91
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 31
CPM-15 Report ndash Chapter Rapporteurs
Chapters Rapporteurs 1 Mobile and Amateur issues - Agenda items 11 and 12 Ms C COOK (CAN) CindyCookicgcca
- Agenda items 13 and 14 Mr Ch GLASS (USA) cglassntiadocgov
2 Science issues Mr A VASSILIEV (RUS) alexandrevassilievtiesituint
3 Aeronautical Maritime and Radiolocation issues
Mr M WEBER (D) martinweberbnetzade
4 Satellite services 41- Fixed-satellite service Mr X GAO (CHN)
gaoxiaoyangchinasatcomcom
42- Mobile-satellite service Mr MA NAZARI (IRN) anazaricrair
5 Satellite regulatory issues Mr K AL-AWADHI (UAE) khalidalawaditragovae
6 General issues Mr PN NGIGE (KEN) ngigecckgoke
(see details at httpwwwituintITU-Rgorcpm-chp-rapporteurs)
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 32
List of radio service abbreviations (1)
Abbre-viations Radio services RR definition
AMS aeronautical mobile service No 132 AM(R)S aeronautical mobile (route) service No 133 AMSS aeronautical mobile-satellite service No 135 AMS(R)S aeronautical mobile-satellite (route) service No 136 ARNS aeronautical radionavigation service No 146 ARNSS aeronautical radionavigation-satellite service No 147 ARS amateur service No 156 ARSS amateur-satellite service No 157 BS broadcasting service No 138 BSS broadcasting-satellite service No 139 EESS Earth exploration-satellite service No 151 FS fixed service No 120 FSS fixed-satellite service No 121 ISS inter-satellite service No 122 LMS land mobile service No 126 LMSS land mobile-satellite service No 127 MetAids meteorological aids service No 150
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-
1st ITU Inter-regional Workshop on WRC-15 Preparation 4-5 December 2013 Geneva 33
Abbre-viations Radio services RR
definition MetSat meteorological-satellite service No 152 MMS maritime mobile service No 128 MMSS maritime mobile-satellite service No 129 MRNS maritime radionavigation service No 144 MRNSS maritime radionavigation-satellite service No 145 MS mobile service No 124 MSS mobile-satellite service No 125 RAS radio astronomy service No 158 RDS radiodetermination service No 140 RDSS radiodetermination-satellite service No 141 RLS radiolocation service No 148 RLSS radiolocation-satellite service No 149 RNS radionavigation service No 142 RNSS radionavigation-satellite service No 143 SOS space operation service No 123 SRS space research service No 155
List of radio service abbreviations (2)
- Slide Number 1
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Slide Number 18
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Slide Number 28
- Slide Number 29
- Slide Number 30
- Slide Number 31
- Slide Number 32
- Slide Number 33
-