status of the a lice core construction budgets c. decosse

9
27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009- 085 Status of the ALICE CORE Construction Budgets C. Decosse CERN-RRB-2009-85

Upload: ferdinand-anderson

Post on 03-Jan-2016

29 views

Category:

Documents


0 download

DESCRIPTION

CERN-RRB-2009-85. Status of the A LICE CORE Construction Budgets C. Decosse. 2010 Draft CORE budget Status of the Common Fund MoU Addenda. Preliminary 2010 construction budget. Unit = kCHF. CORE Expenditure 1997 – 2008 and estimates for 2009-2010 (unit: kCHF). Status of the Common Fund. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Status of the A LICE  CORE Construction Budgets C. Decosse

27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009-085

Status of the ALICE CORE Construction Budgets

C. Decosse

CERN-RRB-2009-85

Page 2: Status of the A LICE  CORE Construction Budgets C. Decosse

27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009-085

• 2010 Draft CORE budget• Status of the Common Fund• MoU Addenda

2

Page 3: Status of the A LICE  CORE Construction Budgets C. Decosse

27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009-085

Preliminary 2010 construction budget

3

Unit = kCHF

Preliminary Budget 2010 System      F/A TRD EMCal HLT Grand TotalGermany BMBF     280.0 280.0Germany GSI 1,900.0    1,900.0United States DOE   2,359.5  2,359.5Grand Total 1,900.0 2,359.5 280.0 4,539.5

Page 4: Status of the A LICE  CORE Construction Budgets C. Decosse

27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009-085

CORE Expenditure 1997 – 2008 and estimates for 2009-2010 (unit: kCHF)

4

Page 5: Status of the A LICE  CORE Construction Budgets C. Decosse

27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009-085

Status of the Common Fund

5

Page 6: Status of the A LICE  CORE Construction Budgets C. Decosse

27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009-085 6

Common Fund, C&I contributions 1997-

2009

Unit: kCHFCutoff date: 21/9/2009

Balance = Funds received – Funds due

In 2009Brazil, Korea, Mexico and

RussiaPaid all their obligations

Outstanding contributions:Centro Fermi 50 kCHF

China 112 kCHFUkraine 77 kCHF

US DOE 150 kCHF

   Total payments         Funds due Additional (agreed)        Fee Cash C&I InKind Total   MoU funds C&I   BalanceCERN   30.0 3,616.0 5.0 346.9 3,997.9  2,700.0 1,292.9 5.0   Czech Republic   80.0 40.0 46.0  166.0  120.0 14.0 32.0   Denmark   40.0 80.0 49.0  169.0  120.0  49.0   Finland   40.0 79.3 22.8  142.0  100.0  42.0   France CEA   40.0 110.0 71.0  221.0  150.0  71.0   France IN2P3   125.0 1,024.7 347.0  1,496.7  900.0 249.7 347.0   Germany BMBF   210.7 1,069.3 490.0  1,770.0  1,280.0  490.0   Germany GSI   40.0 680.0 278.0  998.0  720.0  278.0   Greece   47.5 77.5 5.0  130.0  125.0  5.0   Hungary   45.0 45.0 37.0  127.0  100.0  27.0   Italy Centro Fermi              45.0  5.0  -50.0Italy INFN   445.0 1,155.0 649.7  2,249.7  1,600.0 0.7 649.0   Netherlands   40.0 180.0 87.0  307.0  220.0  87.0   Norway   85.0 55.0 66.0  206.0  140.0  66.0   Poland   122.0 13.0    135.0  120.0  15.0   Slovak Republic   90.0 -6.4 36.0 16.4 136.0  100.0  36.0   Spain/Cuba     45.0    45.0  45.0       Sweden   45.0 255.0 124.0  424.0  300.0 5.0 119.0   Switzerland   5.0      5.0  5.0       United Kingdom   40.0 120.0 64.0  224.0  160.0  64.0   

Subtotal MS   1,570.2 8,638.3 2,377.4 363.3 12,949.2  9,050.0 1,562.2 2,387.0  -50.0Armenia   38.0 8.3  4.8 51.0  40.0  11.0   Brazil   45.0  5.0  50.0  45.0  5.0   China   23.0      23.0  120.0  15.0  -112.0Croatia   50.0 50.0 17.0  117.0  100.0  17.0   India   120.0 80.0  137.2 337.2  300.0 22.2 15.0   Japan     150.0    150.0  150.0       JINR   40.0  5.0 200.0 245.0  240.0  5.0   Korea, Rep. of     150.0    150.0  150.0       Mexico   110.0      110.0  100.0  10.0   Romania ISS   40.0 5.0    45.0  40.0  5.0   Romania NIPNE   40.0 65.0    105.0  100.0  5.0   Russia   85.0    1,225.0 1,310.0  1,300.0  10.0   Ukraine   70.0      70.0  100.0  47.0  -77.0South Africa   40.0  5.0  45.0  40.0  5.0   USA CalPoly     50.0    50.0  50.0       USA Creighton   30.0      30.0  40.0  5.0  -15.0USA DOE     225.0    225.0  360.0      -135.0USA (OSU)   40.0  9.0  49.0  40.0  9.0   Subtotal NMS   771.0 783.3 41.0 1,567.0 3,162.2  3,315.0  164.0  -339.0Subtotal MS + NMS   2,341.2 9,421.6 2,418.4 1,930.3 16,111.4  12,365.0 1,562.2 2,551.0  -389.0Interest   455.5  10.5  466.0           

Totals   2,796.7 9,421.6 2,428.9 1,930.3 16,577.4  12,365.0 1,562.2 2,551.0  -389.0

Page 7: Status of the A LICE  CORE Construction Budgets C. Decosse

27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009-085

Common Fund balance

7

Unit: kCHFBased on situation

on 8 Oct. 2009

Contributions:   1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 8 Oct. 2009   TotalCommon Fund   330 892 1,405 1,624 1,990 341 795 1,796 410 679 1,383 118  11,763In-kind contributions   65 54 64 75 118 13 40 202 906 271 72 49  1,930Interest CF     7 47 107 100 83 73 33    5     456C&I contributions           17 242 620 481 876 153 24 5  2,418Interest C&I             2 4 5          11Total contributions, including interest and in-kind   395 953 1,516 1,806 2,225 682 1,531 2,517 2,192 1,104 1,484 172   16,577Cumulative contributions (C/F and C&I) 395 1,348 2,864 4,670 6,895 7,577 9,108 11,625 13,817 14,921 16,405 16,577                                                                  Expenditure:                              Payments   85 127 171 782 769 1,372 923 1,960 4,601 3,085 380 214  14,470In-kind contributions   65 54 64 75 118 13 40 202 906 271 72 49  1,930Total spending   150 181 235 857 887 1,385 963 2,163 5,507 3,356 452 263   16,400Cumulative spending   150 331 566 1,423 2,310 3,696 4,659 6,822 12,328 15,685 16,136 16,400                                   End year balance   245 1,017 2,298 3,247 4,585 3,881 4,449 4,804 1,489 -764 268 177    

Page 8: Status of the A LICE  CORE Construction Budgets C. Decosse

27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009-085

Common Fund balance

Page 9: Status of the A LICE  CORE Construction Budgets C. Decosse

27th meeting of the ALICE RRB - 14 October 2009 - RRB-2009-085

Memorandum of Understanding AddendaBrazil• Participation of Sao Paulo /Universidade Estadual de Campinas and Sao Paulo,

Universidade de Sao Paulo• Activity: EMCal, computing• MoU Status: under discussion

Italy• Participation of Centro Fermi Roma• Activity: TOF, physics• MoU Status: signed

Peru• Participation of Pontificia Universidad Católica del Perú, Lima• Activity V0D design and operation, V0 offline and Physics.• MoU Status: under discussion, institute not yet official member of the

Collaboration (submitted to the upcoming CB)

9