status of compass development - stanford university
TRANSCRIPT
Status of Compass Development
Mingquan LU
Tsinghua University
Presented by Grace Xingxin GAO Stanford University
2010.11.09
2/33 2
Outline
System Overview Development Status
Applications International Cooperation
Conclusions & Challenges
3/33 3
Outline
System Overview Development Status
Applications International Cooperation
Conclusions & Challenges
4/33 4
Space Segment Phases
Phase I (by 2003)
Beidou I
Phase II (by 2012)
Beidou II
Phase III (by 2020)
Beidou II/ Compass
3 GEO
Regional positioning
Short text messages
5 GEO
5 IGSO 4 MEO
Regional positioning
Short text messages
5 GEO
3 IGSO 27 MEO
Global positioning
6/33 6
Beidou Signals
Phase I
Satellite -> User: S band
User -> Satellite: L band
Phase II
3 frequencies, 5 signals
Phase III
3 frequencies, 10 signals
7/33 7
Signal Characteristics
PHASE II (deploying)
Component Carrier
(MHz)
Chip Rate
(Mcps)
Bandwidth
(MHz)Modulation Service
B1(I) 1561.098
2.046 4.092
BPSK Open
B1(Q) 2.046 BPSK Authorized
B2(I) 1207.14
2.046 24
BPSK Open
B2(Q) 10.23 BPSK Authorized
B3 1268.52 10.23 24 QPSK Authorized
8/33 8
Signal Characteristics
PHASE III (planned) Component
Carrier
(MHz)
Chip rate
(Mcps)
Data/Symbol
rate (bps/sps) Modulation Service
B1-CD
1575.42
1.023 50/100 MBOC(6,1,1/11
) Open
B1-CP No
B1 2.046 50/100
BOC(14,2) Authorized No
B2aD
1191.795 10.23
25/50
AltBOC(15,10 ) Open B2aP
No
B2bD 50/100
B2bP No
B3
1268.52
10.23 500bps QPSK(10) Authorized
B3-AD 2.5575
50/100 BOC(15,2.5) Authorized
B3-AP No
9/33 9
Signal Spectra
B1
(1575.42MHz)
B2
(1191.795MHz)
B3
(1268.52MHz)
Open Service
Authorized Service
10/33 10
Services and Performances
Global Services Open Service
Positioning: 10 m Timing: 20 ns Velocity: 0.2 m/s
Authorized Service
Regional Services
Wide area differential service
Positioning: 1 m
Short Text Messages (STM)
11/33 11
Time and Coordinate System
Time System Beidou Time (BDT) is aligned to UTC.
Coordinate System China Geodetic Coordinate System 2000 (CGCS2000)
Consistent with International Terrestrial Reference System (ITRS).
12/33 12
Outline
System Overview Development Status
Applications International Cooperation
Conclusions & Challenges
13/33 13
Satellite Launch Plan
Date Satellite Launch
Center
Launch
Carrier
Launch
Cabin
2007.04.14 MEO Xichang CZ-3A DFH-3
2009.04.15 GEO Xichang CZ-3C DFH-3
2010.01.17 GEO Xichang CZ-3C DFH-3
2010.06.02 GEO Xichang CZ-3C DFH-3
2010.08.01 IGSO Xichang CZ-3A DFH-3
2010.11.01 GEO Xichang CZ-3A DFH-3
2010.12(?) IGSO Xichang CZ-3A DFH-3
15/33 15
In-orbit Verification
Orbit determination precision: < 10 m
Time synchronization precision: < 2ns
17/33 17
Beidou Terminal Products
Beidou-1 terminals (1st generation, 2003)
General purpose ICs (FPGA, DSP, etc) based.
Full RDSS function (positioning, timing and STM)
terminal). Communication (STM only) terminal. Timing module.
Beidou-1 handsetBeidou-1 timing module
(52mmx26mm
18/33 18
Beidou Terminal Products
Beidou-1 terminals (2nd generation, 2009)
ASIC (RF IC, BB IC, etc) based. Beidou-1 terminal. Beidou/GPS combined terminal. … …
2nd gen. Beidou-1 handset
(antenna opened)
2nd gen. Beidou-1 handset
(with Nokia N97)
19/33 19
Outline
System Overview Development Status
Applications International Cooperation
Conclusions & Challenges
20/33 20
Some Successful Applications
60,000+ registered users
A large number of non-registered users Passive timing, positioning, etc
Main successful applications in China Fishery
Transportation
Water conservancy
Meteorology
Forest Fire Prevention
Soil Monitoring
Disaster Prevention and Mitigation
Timing
… …
21/33 21
Fishery
Since 2007, more than 14,000 fishing users. Fishery management services
Fishing boat services STM services for fishing boat emergency alarms Vessel cross-border warnings, etc.
Marine fishery applications in China Beidou-based fishery information service
22/33 22
Water Conservancy
Beidou based hydrologic monitoring system
More than 4,000 users The Yangzi river valley The Yellow river basin Barrier lake during the Wenchuan earthquake
23/33 23
Disaster Prevention and Mitigation
Improving rescue response and decision making capability Rapid and timely disaster forecast warning report Rescue command scheduling
Rapid emergency communication (STM)
During the earthquakes in Wenchuan, Sichuan Province and Yushu, Qinghai
Province, Beidou terminals sent out the disaster and rescue information at the first
time.
24/33 24
Timing
Devices: Beidou/GPS dual-mode time synchronization equipment, embedded Beidou/GPS timing module.
Timing tests: CDMA networks in 7 provinces.
Successful trials: more than 200 sets of base station equipment.
Time synchronization accuracy: < 100ns. Locations of timing tests
BD-1/GPS timing equipment for CDMA
25/33 25
Outline
System Overview Development Status
Applications International Cooperation
Conclusions & Challenges
26/33 26
Frequency Coordination
Table of Frequency Coordination meetings
Beidou & GPS
Sequence Time Location
1 Jun 2007 Geneva, Switzerland
2 May 2008 Xi’an, China
3 Oct 2008 Geneva, Switzerland
4 Dec 2009 Sanya, China
5 Sep 2010 Chengdu, China
Beidou & Galileo 1 May 2007 Beijing, China
2 Jan 2010 Beijing, China
Beidou & GLONASS 1 Jan 2007 Moscow,Russia
27/33 27
Technical Working Group on Compatibility and Interoperability
Table of Technical Working Group meetings on Compatibility and Interoperability
Beidou
&
Galileo
Sequence Time Location
1 Sep 2008 Beijing, China
2 Dec 2008 Beijing, China
3 Jun 2009 Brussels, Belgium
4 Jan 2010 Beijing, China
5 Oct 2010 Brussels, Belgium
28/33 28
The 1st China Satellite Navigation Conference (CSNC’2010), Conference + 2 Workshops
CSNC’2010, China National Conference Center, Beijing, May 19~21, 2010
1000+ people, 400+ papers
Dozens of companies, several academic institutes
CSNC’2011 will be held in Shanghai, May 18-20, 2011
29/33 29
Two GNSS Workshops
Workshop on Beidou/GNSS Applications, May 21, 2010, Peking University, Beijing.
Workshop on GNSS Compatibility and Interoperability, May 21, 2010, Tsinghua University, Beijing.
Workshop on GNSS Compatibility and Interoperability, Tsinghua
30/33 30
Outline
System Overview Development Status
Applications International Cooperation
Conclusions & Challenges
31/33 31
Conclusion
Regional PNT and STM by 2012 Global PNT service by 2020. Highly emphasize on international cooperation and academic exchange. Beidou for China, Beidou for the world.
Challenges & future work Signal design for compatibility and interoperability with limited frequency resources Stable, reliable, long-lasting, small-size atomic clocks Global monitoring system, especially monitors overseas Smooth transition from Phase II to Phase III Consumer market adoption
32/33 32
Major Beidou Websites
Beidou (Compass) Navigation Satellite System
www.beidou.gov.cn or www.compass.gov.cn
China Satellite Navigation Conference
www.beidou.org