Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Upload: joy-bishop

Post on 27-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Statewide ITS Strategic Plan

and Architecture

Statewide ITS Strategic Plan

and Architecture

Illinois Public Transportation AssociationBoard Meeting

01-11-2005Scott Lee

IDOT ITS Technical Coordinator

Page 2: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

What is ITS?• Transportation Projects where

Technology is being implemented and Integrated.– The National Architecture has a great

listing of ITS functions and services http://itsarch.iteris.com/

– A lot of projects already become part of a traditional construction job. Those projects where electronic data and data integration are a focus are ITS.

– Security is the latest area. GIS, Maintenance DB’s, Traveler Information and Traffic Management

Page 3: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Project Overview• Statewide and Regional Workshops

– Data Collection – Survey and Scenarios

• Overview of the Architecture Process

• Turbo Architecture 3.0 Training• Making ITS Part of Regional

Transportation Planning

• Statewide Strategic Plan

Page 4: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Consultant Roles and Responsibilities

• Facilitate the Process• Provide the Starter File and Technical

Support as needed.• Build the Statewide Architecture and

Strategic Plan based on ‘our’ needs and goals.

• The team should be able to answer most questions at most levels.

• The team and the ITS Office will focus support to the Champions

Page 5: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Consultant Roles and Responsibilities

• Regions are defined.• Regions can choose to break out an

Architecture as needed.• We expect Rural Area needs to be

encompassed in the Statewide Architecture.

Page 6: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Keys to the Regional Architectures…

• Identify key stakeholders and interrelationships

• Describe required activities or functions

• Define interconnections and interdependencies between functions

• Develop a blueprint for integration of systems – Define Projects

Page 7: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator
Page 8: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Architecture Development Process

Page 9: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

How does this apply to Projects?

• Projects are typically defined by need.• FHWA via its programs has committed

to the Systems Engineering Process.– Allows for methodical process to define an

implementation project.

• Identification of addition integration options

• Consideration of options and standards

Page 10: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Systems Engineering Process

Page 11: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Project Outputs• Regional Architectures

– Metro East Collinsville/East St. Louis– Champaign-Urbana– Peoria– Quad Cities– Rockford– Springfield

• Statewide Architecture and Strategic Plan

• www.ilits.org

Page 12: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Transit Focus w/in the Architecture

• Service Area’s– Archived Data Management– Public Transportation– Traveler Information– Traffic Management– Vehicle Safety– Commercial Vehicles– Emergency Management– Maintenance and Construction

Management

Page 13: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Public Transportation Market Packages

• APTS1 – Transit Vehicle Tracking• APTS2 – Transit Fixed-Route Operations• APTS3 – Demand Response Transit

Operations• APTS4 – Transit Passenger and Fare

Management• APTS5 – Transit Security• APTS6 – Transit Maintenance• APTS7 – Multi-modal Coordination• APTS8 – Transit Traveler Information

Page 14: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Integration Opportunities• AD1 – ITS Data Warehouse or AD2 – ITS

Virtual Data Warehouse• ATIS1 – Broadcast Traveler Information• ATIS2 – Interactive Traveler Information• ATMS6 – Traffic Information Dissemination• ATMS9 – Traffic Forecast and Demand

Management• EM2 – Emergency Routing• EM8 – Disaster Response and Recovery• EM10 – Disaster Traveler Information• MC10 - Maintenance and Construction

Activity Coordination

Page 15: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

The Real Stuff• Vehicle Location Systems for Transit

Management• Arrival Information Systems• Asset Management Systems• Transit Security – cameras,

emergency call boxes• Traveler Information• Trip Planning –Multi-Modal

Page 16: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Concept of Operations• Identify current and planned ITS services

and functions

• What is the Statewide Transit Vision?• Signal Priority Barriers• Staffing to Support ITS• AVL Meeting Traveler Information

Requirements• Standards proving• How do I use the data?• Integration of electronic payment systems

Page 17: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator
Page 18: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator
Page 19: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator
Page 20: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator
Page 21: Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

Focus• Regions have been ‘turned loose’

– MPO, IDOT ITS Coordinators and ITS Program Office are Championing the efforts.

• Project Team and ITS Office Review• Technical Committee Meeting was

held on January 5th in Springfield.

• Next Technical Committee – March 3rd

• Next Steering Committee – March 10th