Bridges Renewal Program Round Two Projects as at 15 January 2018 State Project Name Project Description AG Funding Total Cost Project Status Bridge Count ACT Four Bridges on the Monaro Highway (3190, 3178, 3179, 3161) Strengthening Strengthening of three box culvert bridges and one single span bridge to support Higher Productivity Vehicles as part of the ACT Freight Strategy network. $1,000,660 $2,001,320 Completed 4 NSW Bathurst Regional Council - Rivulet Road Bridge Replacement Replace a one-lane timber bridge with a two lane concrete bridge. $390,000 $782,962 Completed 1 NSW Bega Valley Shire Council - Murrah River Bridge Upgrade Upgrade substructure of iconic timber bridge. $210,000 $420,000 Completed 1 NSW Bellingen Shire Council - Reids Bridge Replacement Bellingen Shire Council - Reids Bridge replacement. $192,000 $547,498 Completed 1 NSW Blacktown City Council - Rouse Road Bridge Replacement Replace existing causeway with a bridge. $3,500,000 $7,000,000 Underway 1 NSW Blayney Shire Council - Coombing Creek Bridge Replacement Replace a one-lane timber bridge with a one lane concrete bridge. $165,000 $384,270 Completed 1 NSW Boorowa Council - Bennett Springs Bridge Replacement Replace a one-lane timber bridge with a two lane concrete bridge. $478,000 $956,000 Underway 1 NSW Cessnock City Council - Fosters Bridge Replacement Replace a one-lane timber bridge with a two-lane bridge to remove load limit. $2,200,000 $4,400,000 Planned 1 NSW Cessnock City Council - Frame Drive Bridge Replacement Replace a single lane closed timber bridge with a two lane concrete bridge and pathway. $2,000,000 $4,000,000 Underway 1 NSW Clarence Valley Council - Jacks Bridge Replacement Replace a two-lane timber bridge with a concrete pipe culvert. $24,377 $48,755 Completed 1 NSW Clarence Valley Council - Kinghorn Bridge Replacement Replace a two-lane timber bridge with a two lane concrete bridge. $190,205 $380,411 Completed 1

Upload: trandien

Post on 26-Jul-2018

234 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

State Project Name Project Description AG Funding Total Cost Project Status

Bridge Count

ACT Four Bridges on the Monaro Highway (3190, 3178, 3179, 3161) Strengthening

Strengthening of three box culvert bridges and one single span bridge to support Higher Productivity Vehicles as part of the ACT Freight Strategy network.

$1,000,660 $2,001,320 Completed 4

NSW Bathurst Regional Council - Rivulet Road Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge.

$390,000 $782,962 Completed 1

NSW Bega Valley Shire Council - Murrah River Bridge Upgrade

Upgrade substructure of iconic timber bridge.

$210,000 $420,000 Completed 1

NSW Bellingen Shire Council - Reids Bridge Replacement

Bellingen Shire Council - Reids Bridge replacement.

$192,000 $547,498 Completed 1

NSW Blacktown City Council - Rouse Road Bridge Replacement

Replace existing causeway with a bridge.

$3,500,000 $7,000,000 Underway 1

NSW Blayney Shire Council - Coombing Creek Bridge Replacement

Replace a one-lane timber bridge with a one lane concrete bridge.

$165,000 $384,270 Completed 1

NSW Boorowa Council - Bennett Springs Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge.

$478,000 $956,000 Underway 1

NSW Cessnock City Council - Fosters Bridge Replacement

Replace a one-lane timber bridge with a two-lane bridge to remove load limit.

$2,200,000 $4,400,000 Planned 1

NSW Cessnock City Council - Frame Drive Bridge Replacement

Replace a single lane closed timber bridge with a two lane concrete bridge and pathway.

$2,000,000 $4,000,000 Underway 1

NSW Clarence Valley Council - Jacks Bridge Replacement

Replace a two-lane timber bridge with a concrete pipe culvert.

$24,377 $48,755 Completed 1

NSW Clarence Valley Council - Kinghorn Bridge Replacement

Replace a two-lane timber bridge with a two lane concrete bridge.

$190,205 $380,411 Completed 1

Page 2: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

NSW Clarence Valley Council - Romiaka Channel Bridge Replacement

Replace a two lane concrete bridge with two lane concrete bridge with footpath.

$1,731,000 $3,462,000 Underway 1

NSW Coffs Harbour City Council - Seccombes Bridge Replacement

Replace a two-lane timber bridge with a two lane concrete bridge.

$225,825 $451,650 Completed 1

NSW Coffs Harbour City Council - Taylors Bridge Replacement

Replace a one-lane temporary timber bridge with a two lane concrete bridge.

$176,898 $353,795 Completed 1

NSW Eurobodalla Shire Council - Tyrone Bridge Replacement

Replace a one-lane timber bridge with a one lane concrete bridge.

$1,250,000 $2,500,000 Underway 1

NSW Gilgandra Shire Council - Luckie’s Gully Bridge Replacement

Replace existing pipe culvert with two lane concrete bridge.

$434,500 $869,000 Completed 1

NSW Gilgandra Shire Council - Wallumburrawang Creek Bridge Replacement

Replace a timber bridge with a two lane concrete bridge.

$627,000 $1,254,000 Underway 1

NSW Gilgandra Shire Council - Webb’s Crossing Bridge Replacement

Replace a damaged culvert with two lane concrete bridge.

$401,500 $858,762 Completed 1

NSW Goulburn Mulwaree Council - Komungla Bridge Replacement

Replace a single lane concrete causeway with a two lane concrete bridge.

$1,526,000 $3,052,000 Completed 1

NSW Greater Taree City Council - Abdoos Bridge Replacement

Replace timber bridge with concrete culvert.

$200,000 $424,930 Completed 1

NSW Greater Taree City Council - Kellys Creek Bridge Replacement

Replace timber bridge with concrete culvert.

$600,000 $1,200,000 Underway 1

NSW Gunnedah Shire Council - Simpson Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$800,000 $2,170,000 Underway 1

NSW Guyra Shire Council - Tenterden Road Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$530,000 $1,060,000 Underway 1

Page 3: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

NSW Hawkesbury City Council - West Portland Road Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge on an improved alignment.

$920,000 $2,184,229 Completed 1

NSW Kyogle Council - Barretts Bridge Replacement

Replace a single lane timber bridge with a single lane concrete and steel bridge.

$228,600 $641,031 Completed 1

NSW Kyogle Council - Renewal of Six Bridges on Gradys Creek

Replacement of six timber bridges on Gradys Creek and Lions Roads

$1,973,400 $3,946,800 Underway 6

NSW Narrabri Shire Council - Eulah Creek Road Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$378,000 $756,000 Planned 1

NSW Orange City Council - Forest Road Bridge Replacement

Duplicate a narrow lane bridge to increase the capacity for Higher Productivity Vehicles.

$1,250,000 $2,500,000 Not Currently Proceeding

1

NSW Palerang Council - Back Creek Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge.

$875,000 $1,750,000 Planned 1

NSW Parkes Shire Council - Kadina Bridge Replacement

Replace a two-lane culvert with a two lane concrete bridge.

$297,000 $595,000 Planned 1

NSW Port Macquarie - Hastings Council - Bulli Creek Bridge Replacement

Replace a single lane timber bridge with two lane concrete bridge.

$800,000 $1,600,000 Planned 1

NSW Port Macquarie-Hastings Council - Albert Street Bridge Replacement

Replace a one-lane timber bridge with two-lane concrete box culvert.

$200,000 $400,000 Planned 1

NSW Port Macquarie-Hastings Council - O’Neill’s Bridge Replacement

Replace a two-lane timber bridge with two lane reinforced concrete culverts.

$240,000 $480,000 Planned 1

NSW Shoalhaven City Council - Moona Moona Creek Bridge Replacement

Replace a two-lane timber bridge with a two lane concrete bridge.

$750,000 $1,600,000 Planned 1

NSW Singleton Council - Brookers Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge.

$1,100,000 $2,200,000 Planned 1

Page 4: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

NSW Tamworth Regional Council - Rimbanda Bridge Replacement

Replace a one-lane timber bridge with a one lane concrete causeway.

$82,500 $156,405 Completed 1

NSW Tamworth Regional Council - Swamp Creek Bridge Replacement

Replace a one-lane timber bridge with a one lane concrete bridge.

$190,850 $381,700 Planned 1

NSW Tumut Shire Council - Replacement of Three Bridges on Wee Jasper Road

Replace three single lane timber bridges, with three single lane concrete bridges.

$392,000 $785,000 Completed 3

NSW Upper Hunter Shire Council - Middlebrook Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$1,164,000 $2,328,000 Underway 1

NSW Wagga Wagga City Council - Eunony Bridge Replacement

Replace the existing Eunony Bridge with a Higher Mass Limit capacity bridge.

$4,906,000 $9,812,000 Planned 1

NSW Walcha Council - Aberbaldie Road Bridge Replacement

Replace a two-lane timber bridge with a wider two-lane bridge.

$248,500 $497,000 Completed 1

NSW Walcha Council - Flags Niangala Bridge Replacement

Replace a one-lane timber bridge with a wider, higher load limit one-lane bridge.

$152,500 $305,000 Completed 1

NSW Walcha Council - Kangaroo Flat Road (5218) Bridge Replacement

Replace a single lane timber bridge with a single lane concrete bridge.

$238,500 $477,000 Completed 1

NSW Walgett Shire Council - Blacks Timber Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$445,500 $891,000 Underway 1

NSW Walgett Shire Council - Harris Timber Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$445,500 $891,000 Planned 1

NSW Walgett Shire Council - Wanourie Timber Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$668,250 $1,336,500 Underway 1

NSW Warrumbungle Shire Council - Allison Bridge Replacement

Replace a two-lane bridge increasing the capacity.

$965,000 $2,010,000 Completed 1

Page 5: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

NSW Warrumbungle Shire Council - Ross Crossing Bridge Replacement

Replace a one-lane timber bridge with a concrete bridge.

$350,000 $700,000 Completed 1

NSW Weddin Shire Council - Blacks Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$425,000 $850,000 Completed 1

NSW Wellington Council - Gundy Creek Bridge Replacement

Replace a two-lane timber bridge with a two lane concrete bridge for Higher Mass Limit vehicles.

$620,041 $1,240,082 Planned 1

NSW Wingecarribee Shire Council - Belanglo Rd Culvert Replacement

Replace a one-lane culvert with a two-lane culvert and improve the road approaches.

$197,844 $395,688 Completed 1

NSW Wyong Shire Council - Sohier Park Bridge Replacement

Replace a two-lane timber bridge with a two lane concrete bridge.

$680,000 $1,360,000 Planned 1

NSW Yass Valley Council - Dicks Creek Road Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge.

$723,000 $1,447,652 Completed 1

NSW Young Shire Council - McHenrys Creek Bridge Widening

Widen the bridge and increase the load capacity.

$419,000 $838,000 Planned 1

NT Katherine Town Council - Leight Creek Bridge Replacement

Replace low-level bridge with a raised bridge to increase flood immunity and year round access.

$1,500,000 $3,865,000 Planned 1

QLD Banana Shire Council - Callide Creek Bridge Replacement

Replace a low-level floodway and culvert with a two-lane bridge including sealed approach works.

$2,365,000 $4,730,000 Planned 1

QLD Boulia Shire Council - Georgina River Bridge Upgrade

Upgrade a one lane concrete bridge and approaches to current standards.

$41,000 $82,000 Underway 1

QLD Boulia Shire Council - Wills River Bridge and Double Creek Bridge Upgrades

Upgrade a concrete bridge on Wills River Crossing and a concrete bridge and a culvert on Double Creek.

$118,051 $236,103 Completed 1

QLD Bundaberg Regional Council - Monduran Road Bridge Replacement

Replace existing one lane timber bridge with a two lane concrete bridge.

$1,590,000 $3,180,000 Completed 1

Page 6: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

QLD Cairns Regional Council - Deep Creek Bridge Replacement

Replace a one lane steel girder bridge with a two lane concrete bridge.

$1,200,000 $2,400,000 Completed 1

QLD Cairns Regional Council - Rudge Bridge Replacement

Replace a one lane steel girder bridge with a two lane concrete bridge.

$1,900,000 $3,800,000 Underway 1

QLD Cassowary Coast Regional Council - Victory Creek Bridge Replacement

Replace a one-lane bridge with a two-lane bridge with realigned approaches.

$1,518,000 $3,036,000 Planned 1

QLD Charters Towers Regional Council - Eight Mile Creek Bridge Replacement

Replace a one-lane grid bridge with a strengthened one lane concrete bridge.

$200,000 $400,000 Completed 1

QLD Charters Towers Regional Council - Reedybrook Creek Bridge Replacement

Replace a one-lane grid bridge with a strengthened one lane concrete bridge.

$95,500 $191,000 Completed 1

QLD Somerset Regional Council - Gallanani Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$490,139 $980,278 Completed 1

QLD Somerset Regional Council - Larkhill Boundary Road Bridge Replacement

Replace a single lane timber bridge with a double lane concrete bridge.

$430,206 $860,413 Completed 1

QLD South Burnett Regional Council - Marshlands Bridge Replacement

Replace a timber bridge reduced to single lane with a two lane concrete bridge.

$601,509 $1,203,018 Completed 1

QLD Southern Downs Regional Council - Boxs Bridge Replacement

Replace a single lane timber bridge with a concrete bridge.

$474,041 $948,082 Completed 1

QLD Southern Downs Regional Council - Connells Bridge Replacement

Replace a single lane timber bridge with a concrete bridge.

$407,832 $815,664 Completed 1

QLD Whitsunday Regional Council - Gregory River Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$1,250,000 $2,500,000 Completed 1

Page 7: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

QLD Toowoomba Regional Council - Lemontree-Bostock Road Bridge Replacement

Lemontree-Bostock Road Bridge Replacement.

$1,390,250 $2,780,500 Planned 1

QLD Toowoomba Regional Council - Scrubby Road Culvert Replacement

Scrubby Road Culvert Replacement.

$157,281 $314,563 Completed 1

QLD Western Downs Regional Council - Charleys Creek Bridge Two Replacement

Replace a single lane timber bridge with a new two lane concrete bridge.

$885,586 $1,771,172 Completed 1

QLD Townsville City Council - Rollingstone Bridge Upgrade

Upgrade closed bridge with new superstructure.

$382,045 $764,090 Completed 1

QLD Rockhampton Regional Council - Sandy Creek Bridge Replacement

Replace existing timber bridge with five cell concrete box culverts.

$338,000 $676,000 Planned 1

QLD Scenic Rim Regional Council - Adams Bridge Replacement

Replace single lane bridge with a dual lane concrete bridge.

$1,666,000 $3,332,000 Completed 1

QLD Scenic Rim Regional Council - Tramway Bridge Replacement

Replace a single-lane timber bridge with a concrete bridge.

$694,372 $1,388,745 Completed 1

QLD Somerset Regional Council - Crossdale Bridges 1 and 2 Replacements

Replace two single lane timber bridges with two single lane concrete crossings.

$618,051 $1,236,103 Completed 2

QLD Somerset Regional Council - Duffys Bridge Replacement

Replace a two-lane timber bridge with a two lane concrete bridge.

$408,569 $817,138 Completed 1

QLD City of Gold Coast Council - Chardon Road Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge.

$1,610,000 $3,220,000 Planned 1

QLD Fraser Coast Regional Council - Gutchy Creek Bridge Replacement

Replace a timber bridge with a two lane concrete bridge.

$1,109,479 $2,218,959 Completed 1

Page 8: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

QLD Gladstone Regional Council - NRG Balloon Loop Railway Crossing Upgrade

Increase the structural capacity of the bridge to maintain load limit requirements for a Higher Mass Limit route.

$250,000 $500,000 Underway 1

QLD Gympie Regional Council - Goomong Road Bridge Replacement

Replace a single lane timber bridge with a concrete bridge.

$955,500 $1,911,000 Completed 1

QLD Gympie Regional Council - Kandanga Creek Road Bridge Replacement

Replace timber bridge with a two lane concrete bridge.

$758,328 $1,516,656 Completed 1

QLD Isaac Regional Council - Cherwell Creek Bridge Replacement

Replace existing narrow low-level bridge.

$2,750,000 $5,500,000 Completed 1

QLD Mareeba Shire Council - Oakey Creek Bridge Replacement

Replace a one-lane timber bridge with a one lane concrete bridge.

$170,000 $350,561 Completed 1

QLD McKinlay Shire Council - Punchbowl Rd Bridge Replacement

Replace a one-lane culvert with a one lane, concrete bridge and realign the road.

$1,314,538 $2,629,077 Completed 1

QLD Moreton Bay Regional Council - Drapers Crossing Bridge Replacement

Replace a low-level single lane timber bridge and causeway with a high level two lane concrete bridge.

$3,430,000 $6,860,000 Underway 1

QLD North Burnett Regional Council - Deep Creek Bridge Replacement

Replace the existing timber bridge with a concrete bridge.

$2,200,000 $4,400,000 Planned 1

QLD Palm Island Aboriginal Council - Sandy Boyd Creek Bridge Upgrade

Upgrade width, strength and safety of existing bridge.

$216,000 $432,000 Completed 1

QLD Rockhampton Regional Council - Louisa Creek Bridge Replacement

Replace existing timber bridge with three cell concrete box culverts.

$180,000 $360,000 Planned 1

QLD Scenic Rim Regional Council - Churchbank Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge.

$1,360,000 $2,720,000 Underway 1

QLD Somerset Regional Council - Dunlops Bridge Replacement

Replace a single lane timber bridge with a single lane concrete crossing.

$100,152 $200,304 Completed 1

Page 9: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

SA Clare and Gilbert Valley Councils - Simmo's Bridge Replacement

Replace a one-lane bridge with a two-lane bridge.

$165,000 $377,639 Completed 1

SA Kangaroo Island Council - Bark Hut Road Bridges (10 & 11) Upgrades

Strengthening and widening of two bridges to support heavy vehicles.

$53,500 $107,000 Completed 2

SA Light Regional Council - Orchard Bridge Replacement

Replace a load-limited concrete and stone masonry bridge with a reinforced concrete arch bridge.

$300,000 $812,988 Completed 1

SA Naracoorte Lucindale Council - Sandstone Ave/Cadgee Road Bridge Replacement

Replace existing culvert with a wider culvert and increase load limit.

$73,000 $146,000 Completed 1

SA City of Port Lincoln - London Street Bridge Replacement

Replacement of the London Street bridge with a bridge suitable for Greater Mass Limit vehicles.

$2,242,500 $4,521,231 Completed 1

SA The District Council of Mount Remarkable - Spear Creek Rd Bridges (1077, 9024, 9025,9030) Upgrades

Strengthen one culvert and three masonry arches to enable heavy vehicle access.

$192,500 $385,000 Completed 4

SA Town of Gawler Council - Gawler Bridge Upgrade

Structural renewal and remediation of the historic Gawler Bridge.

$660,000 $1,320,000 Planned 1

TAS Dorset Council - Dead Horse Hill Road Bridge (1614) Replacement

Replace a single lane timber and concrete bridge with a single lane concrete bridge.

$192,405 $384,810 Completed 1

TAS Meander Valley Council - Union Bridge Replacement

Replace a single lane timber bridge with a dual lane concrete bridge.

$1,360,000 $2,720,000 Completed 1

TAS Break O’Day Council - Cornwall Road Bridge Replacement

Replace a one-lane timber bridge with a two-lane concrete bridge.

$110,000 $253,054 Completed 1

TAS Northern Midlands Council - Lake River Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$719,500 $1,463,953 Completed 1

Page 10: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

TAS Derwent Valley Council - Tyenna and Newbury Road Bridges Replacement

Replace two single lane timber bridges with single lane concrete bridges.

$270,000 $570,000 Completed 2

TAS Break O’Day Council - Golden Fleece Rivulet Bridge Replacement

Replace a single lane timber bridge with a two-lane concrete bridge.

$665,525 $1,331,051 Completed 1

TAS Burnie City Council - Tittie Gee Creek Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$121,500 $269,114 Completed 1

VIC Alpine Shire Council - Morses Creek Bridge Upgrade

Strengthen load-limited bridge to provide access for heavy vehicles and emergency services.

$131,831 $263,662 Completed 5

VIC Alpine Shire Council - Smarts Creek Bridge Upgrade

Strengthen a load-limited bridge to provide access for heavy vehicles and emergency services.

$23,169 $46,338 Completed 1

VIC Ararat Rural City Council - Ritchies Bridge Replacement

Replace a single lane, load limited timber bridge with a two lane concrete bridge.

$229,718 $459,437 Completed 1

VIC Baw Baw Shire Council - Daveys Road Bridge Replacement

Replace a 15 tonne limit bridge with a 70 tonne limit concrete bridge.

$332,624 $665,249 Completed 1

VIC Benalla Rural City - Williams Road Bridge Strengthening

Strengthen the existing bridge to maintain load limits.

$190,042 $380,084 Completed 1

VIC Cardinia Shire Council - Bunyip-Modella Road Bridge Replacement

Replace a 10 tonne load limited bridge to provide access for heavy vehicles and emergency services.

$694,000 $1,388,000 Completed 1

VIC Central Goldfields Shire Council - Parker’s Bridge Replacement

Replace a one lane timber and steel bridge with a two lane concrete bridge.

$250,000 $500,000 Completed 1

VIC City of Ballarat - Kennedys Road Culvert Renewal

Strengthen the existing bridge to maintain load limits.

$95,000 $190,000 Completed 1

VIC City of Ballarat - Miners Rest Road Bridge Replacement

Replace a load-limited bridge with a concrete bridge.

$265,621 $531,242 Completed 1

Page 11: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

VIC Strathbogie Shire Council - Curries Road Bridge Upgrade

Re-deck timber bridge to increase load limit and provide access to heavy vehicles and emergency services.

$30,000 $105,333 Completed 1

VIC Strathbogie Shire Council - Nelsons Road Bridge Upgrade

Replace one abutment to increase load limit.

$25,000 $53,380 Completed 1

VIC Warrnambool City Council - Ziegler Parade Bridge Upgrade

Upgrade bridge to increase load limit.

$600,000 $1,200,000 Planned 1

VIC Yarriambiack Shire Council - Dunmunkle Creek Culverts Upgrade

Renew and upgrade major culverts over the Dunmunkle Creek, on the Banyena Pimpinio Road.

$44,000 $110,000 Completed 1

VIC Horsham Rural City Council - Polkemmet Road Culvert Replacement

Replacement of a major box culvert.

$50,000 $100,101 Completed 1

VIC Horsham Rural City Council - Three Bridges Road Bridge Replacement

Replace the bridge on Three Bridges Road over Mackenzie River.

$538,500 $1,077,000 Completed 1

VIC Mansfield Shire Council - Mansfield Heavy Vehicles Bypass Bridge Replacement

Replace one lane, low level crossings with two lane concrete bridges.

$450,000 $950,000 Completed 2

VIC Macedon Ranges Shire Council - Romsey Road Culvert Replacement

Replace two culverts on an existing two-lane road.

$62,500 $176,334 Completed 2

VIC Rural City of Wangaratta Council - Morton’s Bridge Replacement

Replace a single lane timber bridge with two lane concrete bridge.

$174,300 $348,600 Completed 1

VIC Strathbogie Shire Council - Cullens Road Bridge Replacement

Replace a load-limited bridge with a bridge providing access to heavy vehicles and emergency services.

$161,789 $323,578 Completed 1

VIC Moyne Shire Council - Scotts North Road Bridge Strengthening and Realignment

Strengthening and realignment of the bridge suitable for B-Double and Higher Mass Limit vehicles.

$110,000 $220,000 Completed 1

Page 12: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

VIC Moyne Shire Council - Tarrone Lane Bridge Upgrade

Widening, strengthening and realignment of a single lane bridge suitable for B-Doubles and Higher Mass Limit vehicles.

$309,215 $618,431 Completed 1

VIC Mitchell Shire Council - Highlands Rd (1405 & 1411) Bridge Replacements

Replace two bridges (1405 and 1411) to a 160 tonne load limit.

$292,034 $584,068 Completed 2

VIC Mitchell Shire Council - Dropmore Road (1394) Bridge Replacement

Replace a one-lane 20 tonne limit concrete bridge with a two-lane 160 tonne limit concrete bridge.

$184,000 $398,843 Completed 1

VIC City of Wodonga Council- Conisbee Lane Bridge Replacement

Replace a load limited timber bridge with six cell concrete box culverts.

$35,000 $154,900 Completed 1

VIC Corangamite Shire Council - Castle Carey Road Bridge Replacement

Replace and realign a one-lane timber bridge with a two lane concrete bridge.

$2,600,000 $5,200,000 Underway 1

VIC East Gippsland Shire Council - Lindenow Glenaladale Road Bridge Replacement

Replace a one lane steel and timber 44 tonne limit bridge with a one-lane 70 tonne limit concrete bridge.

$1,202,500 $2,405,000 Underway 1

VIC Gannawarra Shire Council - Wells Bridge Replacement

Replace a one lane timber and steel bridge with a two-lane concrete bridge.

$838,000 $1,707,323 Completed 1

VIC Golden Plains Shire Council - Pitfield-Cressy Rd Bridge Replacement

Replace a 15 tonne limit two-lane bridge with a 68 tonne limit two lane concrete bridge.

$300,000 $602,665 Completed 1

VIC City of Greater Bendigo Council - Sheepwash Creek Bridge Replacement

Replace a one lane timber and steel bridge with a two lane concrete bridge.

$741,545 $1,483,090 Completed 1

WA Shire of Boyup Brook - Bridge 270, Cranbook Road Bridge Replacement

Replace a single lane timber bridge with a two lane concrete bridge.

$2,450,000 $4,900,000 Underway 1

WA Shire of Pingelly - Bullaring Road Bridge (1191) Replacement

Replace a two lane timber bridge with a two lane strengthened box culvert.

$81,000 $163,000 Completed 1

Page 13: State Project Name Project Description AG Funding Total ...investment.infrastructure.gov.au/files/bridges_renewal_programme/... · State Project Name Project Description AG Funding

Bridges Renewal Program Round Two

Projects as at 15 January 2018

WA Shire of Donnybrook - Balingup, Bridge 3643A, Trevena Road Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge.

$750,000 $1,500,000 Planned 1