Starting soon… WE ARE RECORDING THIS MEETING. THE FILE WILL BE POSTED ON THE PROJECT WEBSITE. WE HAVE MUTED THE AUDIENCE. WE HAVE BLOCKED CAMERAS. PLEASE ASK QUESTIONS AND SUBMIT COMMENTS VIA THE Q&A. WE WILL TAKE QUESTIONS UNTIL THE LAST 15 MINUTES OF THE MEETING. THE FACILITATOR WILL ANNOUNCE “LAST CALL”. QUESTIONS NOT ANSWERED THIS WILL APPEAR IN THE RESPONSE TO THE DOCUMENT. 1

Upload: others

Post on 13-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Starting soon…

WE ARE RECORDING THIS MEETING. THE

FILE WILL BE POSTED ON THE

PROJECT WEBSITE.

WE HAVE MUTED THE AUDIENCE.

WE HAVE BLOCKED

CAMERAS.

PLEASE ASK QUESTIONS AND

SUBMIT COMMENTS VIA

THE Q&A.

WE WILL TAKE QUESTIONS UNTIL

THE LAST 15 MINUTES OF THE

MEETING. THE FACILITATOR WILL ANNOUNCE “LAST

CALL”. QUESTIONS NOT ANSWERED THIS

WILL APPEAR IN THE RESPONSE TO THE

DOCUMENT.

1

Page 2: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Ask a Question or Comment

> Please use Q & A features

> If you are calling in please email [email protected] call our hotline at 213.922.6934• We will respond within 24 hours

2

Page 3: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Closed Captions & Translations

> Closed captioning and translation is available in English, Spanish and Korean

3

Page 4: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Panelist

Purple Line Extension Team• Kasey Shuda, Metro Community Relations Senior Manager• Marlon Walker, Metro Community Relations Manager• Mindy Lake, Metro Principal Community Relations Officer• Lucia Phan, Metro Principal New Media Officer• Scott Donohue, STS Community Relations Coordinator• Yvette Ximenez, TPOG Project Coordinator

Business Interruption Fund• Sidney Urmancheev, Transportation Associate

Eat Shop Play Construction Mitigation Program• Robyn Lopez, Metro Community Relations Officer

4

Page 5: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

COVID-19 Compliance

> As part of the Federal government’s Coronavirus Guidance for America, transportation infrastructure is considered an “Essential Critical Infrastructure”

> Additionally, transit capital projects are not subject to the State - of California’s Stay at Home order, therefore Metro construction projects continue to progress

> Construction activities continue to progress on all active Metro projects, including the Crenshaw/LAX, Purple Line Extension and Regional Connector Transit Projects

> Due to reduced traffic conditions during the Stay at Home orders, local jurisdictions are allowing the Agency to work through “peak hours” on a case by case basis

> Metro’s contractors are following safety precautions during the pandemic, including implementing social distancing when applicable and the use of masks and other PPE

5

Page 6: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Agenda

Thank you for joining us!

> Project Overview

> Section 1 Construction Updates• Wilshire/La Cienega

• Wilshire Bl Center Enclosure • Station Construction• Geotechnical Instrumentation• Investigation and Maintenance• Concrete Placement• Tunneling

> Section 2 Construction Updates• Wilshire/Rodeo Station

• Excavation• Geotechnical

Instrumentation• Holiday Moratorium Exemption• Well Investigation• Tunneling

> Business Interruption Fund

> Eat Shop Play #BeverlyHills

6

Page 7: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Purple Line Extension Alignment

7

Page 8: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Sections 1, 2, & 3 Status

*Subject to change. The PLE project team is working to deliver the project consistent with Measure M.

Forecasted ScheduleSection Section 1 Section 2 Section 3

Length 3.92 Miles 2.59 Miles 2.56 Miles

New Stations Wilshire/La BreaWilshire/FairfaxWilshire/La Cienega

Wilshire/RodeoCentury City/ Constellation

Westwood/UCLAWestwood/VA Hospital

Pre-Construction Activities

2014 – 2015 2016 – 2018 2018 – 2019

Construction 2015 – 2023 2018 – 2025 2019 – 2027

Operations 2023 2025 2027

8

Page 9: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

City of Beverly HillsOctober 7, 2020

Monthly Construction Update

Page 10: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Wilshire/La Cienega Station Rendering

10

Page 11: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Wilshire/La Cienega Station Box

Rendering shows length of the La Cienega underground station box on Wilshire Bl from La Cienega Bl to Tower Dr

11

Page 12: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Wilshire/La Cienega Station Schedule

*As of October 2020, subject to change.

12

Page 13: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

San Vicente Anomaly

> What: • During tunnel investigation work at the Wilshire Bl/San Vicente Bl intersection, an anomaly was discovered

within the tunnel alignment• A work zone has been implemented to support mitigation activities prior to tunneling through the intersection

> When: • The current work zone (Phase 1) will be in place through November• A second phase of work is anticipated to start in November• A new work zone (Phase 2) will be implemented within the Wilshire Bl/San Vicente Bl intersection

> Traffic Controls: • A mix of intermittent and semi-permanent lane closures along Wilshire Bl and San Vicente Bl is continually

implemented to support mitigation work, which will include street investigation and soil improvement work• Traffic control has been implemented within the City of Beverly Hills and the City of Los Angeles

13

Page 14: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

San Vicente Anomaly

14

Current work zone (Phase 1) at Wilshire Bl and San Vicente Bl

Page 15: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

San Vicente Bl Anomaly Traffic Control – Phase 1

15

> Wilshire Bl: • Eastbound Wilshire Bl between Tower Dr and San Vicente Bl

will be reduced to two lanes• Westbound Wilshire Bl between about 500 ft west of La Jolla

Av and San Vicente Bl will be reduced to two lanes

> San Vicente Blvd.:• Northbound San Vicente Bl between Warner Dr and Wilshire

Bl will be reduced to a single lane• Southbound San Vicente Bl between 6th St and Wilshire Bl

will be reduced to a single lane

> Additional Details:• All left turns within the Wilshire Bl/San Vicente Bl intersection

will be closed while the K-Rail is in place• Directional closures will be implemented on weekends• Intermittent single lane closures will be implemented on

Wilshire Bl, reducing eastbound and westbound traffic to one lane

• These lane reductions are anticipated to be in place during off-peak hours

Page 16: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

San Vicente Bl Anomaly Traffic Control – Phase 2*

16

> Wilshire Bl: • Eastbound Wilshire Bl between Tower Dr and San Vicente Bl

will be reduced to one through lane• Westbound Wilshire Bl between La Jolla Av and Tower Dr will

be reduced to one through lane> San Vicente Bl:

• Northbound San Vicente Bl between Warner Dr and Wilshire Bl will be reduced to a single lane

• Southbound San Vicente Bl between 6th St and Wilshire Bl will be reduced to a single lane

> Additional Details:• All left turns within the Wilshire Bl/San Vicente Bl intersection

will be closed while the K-Rail is in place• Directional closures may be implemented on weekends• Left turn movement from westbound Wilshire Bl to

southbound Tower Dr may be restricted while this closure is in place

> Duration• Traffic control is anticipated to be in place starting in

November for a period of 8 – 12 weeks* Pending City of Beverly Hills Approval

Page 17: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

San Vicente Bl Anomaly Detours

17

> Detour routes for the left turn movement restrictions at Wilshire Bl and San Vicente Bl will be established:

• Northbound San Vicente Bl: Westbound Olympic Bl to La Cienega Bl

• Southbound San Vicente Bl: Eastbound 3rd St to Fairfax Av

• Westbound Wilshire Bl: Southbound Fairfax Av to Olympic Bl

• Eastbound Wilshire Bl: Northbound Robertson Bl to 3rd St

Page 18: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Concrete and Material Deliveries

> Where: Structural work on the station underneath Wilshire Bl is generally conducted from the Gale Yard and from Wilshire Bl

> Work Hours: Typically between 7am and 4pm, intermittently between 10pm and 7am

> Traffic Controls*: • Wilshire Bl will be intermittently reduced to two lanes in each

direction between La Cienega Bl and San Vicente Bl• Daily closures will be utilized in support of ongoing work

activities in the station box• Turn restrictions will be implemented at the intersection of

Wilshire Bl and Hamilton Dr• Wilshire Bl will be intermittently reduced to one lane in either

direction between La Cienega Bl and Gale Dr to support material deliveries during off peak and nighttime hours

*Traffic control implementation varies depending on activity

Outside Gale Staging Yard

18

> Noise Mitigations: will remain in place • Sound blankets around noisy equipment• Trucks equipped with low-impact backup alarms• Nylon straps used to lift material

Page 19: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Intermittent Daily Closure of N Gale Dr

> Gale Dr will be intermittently closed Monday to Saturday, 4am to 6pm*

> Closure is a public safety measure due to high volumes of ingress/egress from the property

> Material deliveries to the Wilshire/La Cienega Station Box will continue through 2020

> Access to N Gale Dr will be maintained from San Vicente Bl

*Work hours may transition to overnight, pending City of Beverly Hills approval

Gale Dr from north of Wilshire Bl

19

Page 20: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Next Steps: Station Construction

> Construction on interior and exterior lift walls will continue in October

> Each wall will rise 20 feet above the invert slab, and provide support for the future concourse slab

> Work activities in support of concrete and deliveries will be conducted within the staging yards

> Daily construction activities may be conducted underneath Wilshire Blvd. and from both Staging Yards for 24 hours a day

Illustration of station interior design

20

Page 21: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Next Steps: Roof Construction

> Construction on the roof has begun

> The concrete for each roof section will be poured from Wilshire Bl into the station box.

> These pours are anticipated to occur once every 2 – 3 weeks. Lane reductions on Wilshire Bl will be required to support this work. Typical work hours are between 12am and 4pm.

> Intermittent daily lane reductions on Wilshire Bl may be utilized for ongoing material delivery in advance of roof pours.

21

Page 22: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Wilshire/La Cienega Appendage Work

> Why: Multiple appendages will be required for each station on the Purple Line Extension

> Each appendage structure houses a vital function for the stations:• Emergency exits• Utility rooms• Ventilation rooms• Entrance/exit structures

> When: Anticipated to start in January 2021*

> Where: Information about specific traffic control and work hours will be available in future community meetings and construction notices

> Coordination with impacted businesses will be done before the start of the appendage work

22

*Dates subject to change.

Page 23: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Tunnel Boring Machine (TBM) Arrival

> Construction of the tunnel eye has begun on the east side of the Wilshire/La Cienega Station

> The tunnel eye provides a stable gateway for the Tunnel Boring Machines (TBMs) to enter the Wilshire/La Cienega Station

> Breakthrough at Wilshire/La Cienega Station is anticipated to occur in January 2021*

Building tunnel eye inside Wilshire/La Cienega Station

23

*Dates subject to change.

Page 24: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Wilshire/La Cienega Construction Progress

Arched roof construction

24

Page 25: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Wilshire/La Cienega Construction Progress

Final station walls

25

Page 26: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Instrumentation Work

> When: Ongoing in 2020

> Traffic Controls:• Intermittent lane reductions on

Wilshire Bl, La Cienega Bl, and side streets during off-peak hours may be in place to support the maintenance of geotechnical instruments in the Wilshire/La Cienega area

• Intermittent lane reductions may be in place on Wilshire Bl, west of La Cienega Bl, to support coring survey work under Wilshire Bl

> Additional details on this work will be available in future construction notices

Example of instrumentation drillingPhoto taken prior to COVID-19 Safer at Home Orders

26

Page 27: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Elsie and Soyeon

Tunneling Statistics (9/30/20)

Elsie 17,912 feet (total journey)91% complete

Soyeon 17,901 feet (total journey)90% complete

Page 28: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

City of Beverly HillsOctober 7, 2020

Monthly Construction Update

Page 29: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Wilshire/Rodeo Station Rendering

29

Page 30: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Wilshire/Rodeo Station Box

Rendering shows length of the underground station box on Wilshire Bl from Cañon Dr to Beverly Dr

30

Page 31: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Wilshire/Rodeo Station Schedule

*As of October 2020, subject to change. Pending Council approval.31

Page 32: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Station Excavation & Hauling

> May 2020 through 1st Quarter 2021 to a depth of about 100 feet.

• Currently at an average of 60 feet deep across the station box and entrance

> Excavation Underneath the Deck Work Hours: • 24 hours a day, 7 days a week*

> Excavation and Hauling Hours from Deck Openings

• Work Hours: • Weekdays: 7am – 4pm & 8pm – 7am* • Weekends: 8am – 6pm • Note: Metro will seek city approval to

excavate at night 7 days a week from 8pm – 7am*

*Requires City Council approval

32

Truck staging for hauling

> Per MOA, Wilshire Bl may be reduced to two lanes in each direction during daytime hours and one lane in each direction during nighttime hours

Page 33: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Station Excavation

Excavation progress for Wilshire/Rodeo Station box

33

Page 34: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Station Excavation

Excavation progress for Wilshire/Rodeo Station box

34

Page 35: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

> Reeves Dr is closed from Wilshire Bl to the alley to facilitate excavation > Through access will be provided to Rolex building employees

> Pedestrian Closures: • Sidewalk closure on south side Wilshire Bl from Reeves Dr to

Beverly Dr• Sidewalk closure west side of Reeves Dr from Wilshire Bl to alley• Pedestrian detour to be provided for sidewalk closure around

Reeves yard• Crosswalk across Reeves Dr will be closed

Traffic plan for south Wilshire Bl and station entrance decking at Reeves Dr 35

*Requires City Council approval

Reeves Dr Closure Proposed through Feb. 2021*

Page 36: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Traffic Signal Installation - ON HOLD

> Where: Clifton Wy/Crescent Dr

> Anticipated Completion Date: TBD

> Remaining Work:• Restoration of sidewalks and ADA ramps

*Dates subject to change.

Intersection of Clifton Wy/Crescent Dr

36

Page 37: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Geotechnical Instrumentation

> Where: Instruments will be installed within the tunnel alignment and station box area to monitor ground movement, settlement and other geological conditions

• Installations will be within the public right of way and within privately owned properties

> Duration: Ongoing• Note: Installations occur at 1-2 locations at a

time and can last anywhere between 30 minutes to 3 days depending on the instrument

> Work Hours Off Wilshire Bl:• Weekdays: 8am – 6pm• Saturdays: 8am – 7pm

> Work Hours On Wilshire Bl:• Weekdays: 7am – 4pm• Weekends: 8am – 7pm

Example of geotechnical instrumentation in Century City. Photo was taken before COVID-19 Safer at Home Orders.

37

Page 38: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Geotechnical Instrumentation

> Traffic Controls: • On street parking restrictions, intermittent lane, sidewalk, alley, and crosswalk closures will be required

for this work

> Lane Reductions: • Two lanes in each direction will be maintained for day work on Wilshire Bl• Young Dr, Lasky Dr, S Moreno Dr, Charleville Bl, Spalding Dr, Linden Dr, Swall Dr, Wetherly Dr, S Oakhurst

Dr, Brighton Wy, alleys, and other streets adjacent to Wilshire Bl may be reduced to one lane with flaggers available to direct traffic

38

Page 39: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Request for 2020 Holiday Moratorium Exemption

> The Holiday Moratorium Waiver Request will go forward for City Council consideration on Tuesday, October 27, 2020

> The following conditions apply until the earlier of June 30, 2021, or when restaurants within the City of Beverly Hills are

permitted by applicable public health orders to provide indoor dining at 100% capacity

• Minimum two (2) lanes in each direction to remain open on Wilshire Bl from Beverly Dr to Crescent Dr from 10:45am

to Midnight

• S Reeves Dr to remain closed from Wilshire Bl to the alley

• Compliance would be monitored and enforced by the Independent Compliance Monitor (ICM) in accordance with the

Memorandum of Agreement (MOA)

• No work to occur on Thanksgiving Day, Friday after Thanksgiving, 1st night of Hanukkah (December 10, 2020),

Christmas Eve, Christmas Day, New Year’s Eve, and New Year’s Day

• If there is a City Sponsored Event (i.e. Holiday BOLD, Awards Event, etc.), no work can occur

39

Page 40: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

From S Reeves Staging Yard Closure (current traffic set up as of July 2020)

• Station Excavation/Hauling, Material Delivery, Utility Maintenance

• 1am to 4pm*

• Work within the South Reeves staging yard will end at 4pm daily and can resume at 1am

On Wilshire Bl (outside current closure)

• Station Excavation/Hauling, Material Delivery, Utility Maintenance

• 1am to 10:45am* – Wilshire Bl will be reduced to one lane each direction

• Traffic control setup will occur from Midnight to 1am

• No additional traffic control or work allowed on Wilshire Bl west of Crescent Dr between 10:45am and midnight

• Survey/Potholing/Geotechnical Borings/Instrumentation & Monitoring east of Crescent Dr only• 7am to 4pm – weekdays along Wilshire Bl, 8am to 4pm – weekdays off of Wilshire Bl

Request for 2020 Holiday Moratorium Exemption

* Subject to the Nighttime Noise Control Plan approval by the City.

Page 41: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Well Abandonment Work

> Two were confirmed (A and B) to be oil wells in the path of the second TBM

> BHUSD contractor is in the process of removing and capping Anomaly A

> Work on Anomaly A has been completed

> Well abandonment work has begun on Anomaly B

41

Page 42: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Ruth and Harriet

Tunneling Statistics (9/30/20)

Ruth 11,510 feet (total journey)3% complete

Harriet 11,510 feet (total journey)2% complete

Page 43: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Business Interruption Fund (BIF)

43

Page 44: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Metro’s BIF during COVID-19 Pandemic

44

> Metro’s Pilot Business Interruption Fund does not cover revenue loss nor fixed operating expenses related to COVID-19 impacts.

• Is Metro’s BIF still active? Yes.• Have the eligibility requirements changed? No.• Who can small business owners contact for questions?

Please contact BIF Fund Administrator Pacific Coast Regional at 213.739.2999 or Metro at [email protected].

Page 45: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Stay in touch

> Facebook & Instagram ad> Featuring 3 businesses

45

Page 46: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Stay in touch

> Eat Shop Play Fall Newsletter > 20%+ open rate > Over 3k subscribers

46

Page 47: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Stay in touch

Contact Us

> For more information on Eat Shop Play visitmetro.net/eatshopplay

> Send an email to [email protected]

47

Page 48: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Upcoming Webinars

Update Lunch with Us Webinar:Sections 1, 2 & 3 Construction Update Wednesday, November 412pm – 1pm

That’s a wrap for 2020!

More information will be provided on our website for meetings held in 2021.

Link to webinar available atmetro.net/purple

48

Page 49: Starting soon…media.metro.net/2020/PLE-BH-Section-1.2-Cmty-PPT_10.7.20_red.pdfOct 07, 2020  · > Additionally, transit capital projects are not subject to the State - of California’s

Stay in Touch

213.922.6934

[email protected]

metro.net/purple

@purplelineext

facebook.com/purplelineext

49