Amex Corporation has set a vision to create a master planned community within the heart of Ripley Valley on the urban outskirts of Brisbane - A progressive, vibrant and modern new town, that brings back true neighbourhood living.For more information, visit: http://www.providenceripley.com.au/resources/grand-vista-resources

TRANSCRIPT

Page 1: Stage 13 Revised Design Guidelines Grand Vista Release

Home Design GuidelinesMarch 2014Protecting your investment

Page 2: Stage 13 Revised Design Guidelines Grand Vista Release

2

Page 3: Stage 13 Revised Design Guidelines Grand Vista Release

What is Providence? 2

Project Vision 4

Approval Procedure 6

Design Vision 7

Site Planning 8

Climate and Building Orientation 8

Natural Gas 8

National Broadband Network 8

Site Cover and Amenity 9

Setbacks and Height 10

Setback Table 11

Private Open Space 13

Building Design 14

Garages and Driveways 14

Roofs 15

Verandahs Balconies and Porches 15

Building Articulation and Treatment 16

Building Articulation 17

Landscaping 18

Planting Design 19

Front Yard Landscapes 19

Retaining Walls 20

Front Fencing 21

Side and Rear Boundary Fencing 21

Side Fencing and Corner lots 22

Driveways 24

Letter Boxes 25

Ancillary Structures 26

Environmentally Sustainable Design 27

Contents

Appendix A 32

Parkway, Affinity, Grandview Releases

Appendix B 35

Individual lot guidelines -

Stage 8a, 13 and 14 Releases

Appendix C 59

National Broadband Network

Appendix D 62

Approved Plan of Development

Appendix E 64

Minimum Documents Checklist DRC

Appendix F 66

Execution

Appendix G 68

Glossary of Terms

1

Page 4: Stage 13 Revised Design Guidelines Grand Vista Release

Amex Corporation was established in 1987 as a property

development company specialising in residential land

subdivision, operating initially in Perth and then expanding

into Brisbane (1988) and Melbourne (1993).

The company is a family based privately owned organisation

with family members actively involved in the executive

management of the business.

It is Amex’s strategy to make long term investments in future

residential land and the community that is created from it.

World class planning and a collaborative approach to the

statutory approval process are key elements to this strategy.

Amex Corporation has set a vision to create a master planned community within the heart of Ripley Valley on the urban outskirts of Brisbane - A progressive, vibrant and modern new town, that brings back true neighbourhood living.

What is Providence?

2

Page 5: Stage 13 Revised Design Guidelines Grand Vista Release

3

Page 6: Stage 13 Revised Design Guidelines Grand Vista Release

Project Vision “A progressive, vibrant and modern new town, that brings back true neighbourhood living.”

Providence offers a breath of fresh air: A new address that melds the values of the past with benefits and opportunities of the future.

4

Page 7: Stage 13 Revised Design Guidelines Grand Vista Release

A place that harnesses people’s passion. That gives rather than takes. A substantial and prosperous new address that provides all the opportunities of “live, learn, work, play and stay”, but never loses its soul, being its community heart created around true neighbourhood values.

A town with a focus on the future, that is in tune with the desires of its community, that evolves and adds new layers, always centred around people, to create the most desirable new address choice in Brisbane’s western fringe.

A unique and special place built around people and the basic human need to connect with others. To be inspired. To bring out their creative side in ways they may have never thought possible.

5

Page 8: Stage 13 Revised Design Guidelines Grand Vista Release

Step 1 • Once you have purchased your site, discuss the housing and landscaping

design standards with sales staff and/or the DRC

• Please note individual lot guidelines which may apply to allotments in

Parkview, Affinity, Grandview releases (Stages 4-6). Refer to Appendices

A and B.

• Meet with your designer to commence concept design

Step 2 • Submission of Concept or Sketch Drawings to DRC for initial approval

• DRC will give written feedback or may contact you to organise a

meeting with you and your designer

• Address any issues raised by the DRC and resubmit if required

Step 3 • After receiving written approval from DRC, commence Building

Application documents including landscape plans

• Submission of Building Application document to DRC for approval.

• DRC will give written feedback or may contact you to organise a meeting

with you and your designer

• Address any issues raised by the DRC and resubmit if required

Step 4 • After receiving written approval from the DRC, commence your energy

audit, engineering and other consultant documents as required to submit

your Building Application to your private certifier.

• If design changes through this process you must resubmit to the DRC.

• Submit a copy of your stamped approved Building Application and energy

rating assessment to DRC

Step 5 • Construction of Approved home must be commenced within 12 months

of purchase of the land and completed within a further 9 months

• Landscaping is to be completed within the same time frame

• DRC will inspect homes during or after completion to ensure its

compliance with the approved drawings

Approval Procedure To help assess your new home the Design Review Committee

(DRC) require the home builder to provide clear documents

to describe the look, layout and material intended to be used

and to make sure that all homes are in keeping with the vision

for the Providence Community.

Building works may not commence until DRC has issued

formal written approval of the documentation.

All documents should be 1:100 scale at A3 and show your

contact information and site details including lot and

street number.

Your builder must submit all documents via the DRC email

address - [email protected].

To ensure the design review and approval process can be

finalised as soon as possible please include in the submission

a completed Minimum Documents Checklist for DRC - this

can be found in appendix “E” or requested digitally via the

email above.

Plan of DevelopmentAppendix D comprises the Plan of Development. This

plan contains the minimum design controls to be met in

accordance with the relevant Approval Authority at State

and Local Government. The Home Design Guidelines are

aligned with the Plan of Development controls, however

they also provide additional controls so that the preferred

neighbourhood outcomes are achieved as part of the design

vision for Providence. The Design Review Committee may

approve design outcomes that are different to the Home

Design Guidelines subject to demonstration of similar

outcomes. The DRC cannot approve different solutions to

those contained in the Plan of Development.

6

Page 9: Stage 13 Revised Design Guidelines Grand Vista Release

Design VisionThe intent of these guidelines is to foster a modern

contemporary town feel. They comprise guidelines to assist

in the promotion of a consistent and high standard of house

and garden design.

Contemporary modern homes will be achieved through

consistent setback controls, complementary colours and

material selection and gardens that enhance the streetscape

and the neighbourhood of your home.

7

Page 10: Stage 13 Revised Design Guidelines Grand Vista Release

Site Planning

Climate and Building OrientationA home that is well positioned on its site delivers significant

lifestyle and environmental benefits. Correct orientation

assists passive heating and cooling, resulting in improved

comfort and decreased energy bills.

Natural GasWhen designing your home and planning for your homesite,

it is important to consider service and energy connections.

Providence will provide natural gas as an alternative energy

source to electricity that assists in reducing your carbon

footprint and making your home and neighbourhood a cleaner

place to live.

Natural gas is the cleanest burning of all fossil fuels.

In Providence, natural gas is the preferred energy source

for cooking and hot water. Choosing natural gas is a sure

way to reduce your carbon footprint.

National Broadband NetworkHomes to have provision for the NBN Co to be connected

immediately or by subsequent home owners, by providing the

conduiting and power point as detailed in Appendix C ‘ Key

information for builders and cablers’.

8

Page 11: Stage 13 Revised Design Guidelines Grand Vista Release

Site cover and amenitySite cover for each lot is varies and is shown on the setback

table. For specific site cover details relevant to your lot type

please refer to the Plan of Development.

Dwellings must have a minimum area of private open space

at ground or upper levels accessible from a living room

consisting of at least:

- for a two bedroom dwelling, 9.0m2 with a minimum width

of 2.4m.

- for a three or more bedroom dwelling, 12.0m2 with

a minimum width of 2.4m.

9

Page 12: Stage 13 Revised Design Guidelines Grand Vista Release

Setbacks and height• The maximum height of buildings shall be in the order

of 9 metres.

Setbacks are specified as contained in the Setback Table.

• The location of the built to boundary walls are indicated on

the Plan of Development included in your Sales Package.

Where built to boundary walls are not adopted or shown

on the Plan of Development, side setbacks shall be in

accordance with the Setback Table.

• Built to boundary walls on the low side of the lot must be

founded deep enough to allow an adjoining lot to be cut to

an appropriate depth.

• Boundary setbacks are measured to the wall of the building

or edge of balcony, except for street frontage where it is

measured to outermost projection.

• Eaves (except on a wall that is built to the boundary) should

not encroach within 450mm of the side or rear boundaries.

Gutters may not extend beyond the boundaries of the lot.

• First floor setbacks must not encroach within the minimum

ground floor setbacks.

• Garages must not project forward of the front building

setback and must be setback a minimum of 5.0m from the

front property boundary.

• The rear or side setback maybe 0.0m to verandah/balcony

where adjoining park.

Maximum Building Height

9.0m

10

Page 13: Stage 13 Revised Design Guidelines Grand Vista Release

Setback table Terrace Allotments 6m

Cottage Allotments8.5m

Villa Allotments 10.5m

Premium Villa Allotments 12.5m

Courtyard Allotments 14m

Traditional Allotments 16m

Premium Traditional Allotments 18m+

Ground Floor

First Floor Ground Floor

First Floor Ground Floor

First Floor Ground Floor

First Floor Ground Floor

First Floor Ground Floor

First Floor Ground Floor

First Floor

Front Setback

Front/Primary Frontage 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4

Garage (not on a laneway) n/a n/a 4.5 n/a 4.5 n/a 4.5 n/a 4.5 n/a 4.5 n/a 4.5 n/a

Side Setback

Built to Boundary 0.0 0.0 0.0 0.0 0.0 0.9 0.0 1.0 0.0 1.0 0.0 1.0 0.0 1.0

Non Built to Boundary 0.9 0.9 0.9 0.9 0.9 0.9 1.0 1.0 1.0 1.0 1.0 1.5 1.0 1.5

Corner Lots - Secondary Frontage 1.0 1.0 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5

Rear Setback

Rear (non-laneway) n/a n/a 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 1.0 0.9 1.0

Rear (from laneway boundary) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Garage (from laneway boundary) 0.5 n/a 0.5 n/a 0.5 n/a 0.5 n/a 0.5 n/a 0.5 n/a 0.5 n/a

Other Requirements

Built to Boundary Length 80% of lot length 75% of lot length 70% of lot length 65% of lot length 65% of lot length 60% of lot length 60% of lot length

On site parking requirements (minimum) 1 or 2 bedroom dwelling: 1 covered space

1 or 2 bedroom dwelling: 1 covered space

1 or 2 bedroom dwelling: 1 covered space

1 or 2 bedroom dwelling: 1 covered space

1 or 2 bedroom dwelling: 1 covered space

1 or 2 bedroom dwelling: 1 covered space

1 or 2 bedroom dwelling: 1 covered space

3+ bedroom dwelling: 2 spaces incl. one covered

3+ bedroom dwelling: 2 spaces incl. one covered

3+ bedroom dwelling: 2 spaces incl. one covered

3+ bedroom dwelling: 2 spaces incl. one covered

3+ bedroom dwelling: 2 spaces incl. one covered

3+ bedroom dwelling: 2 spaces incl. one covered

3+ bedroom dwelling: 2 spaces incl. one covered

Single or tandem garage acceptable with a maximum width of 40% of the lot frontage

Single or tandem garage acceptable with a maximum width of 40% of the lot frontage

Single or tandem garage acceptable

Double garages are only permitted on laneway allotments

Double garages are only permitted on laneway allotments

Double garages are only permitted on laneway allotments or two storey allotments 1

Single, tandem or double garage acceptable

Single, tandem or double garage acceptable

Single, tandem or double garage acceptable

Single, tandem or double garage acceptable

Garage location Garages to be located along the built to boundary wall

Garages to be located along the built to boundary wall

Garages to be located along the built to boundary wall

Garages to be located along the built to boundary wall (Optional where side boundary adjoins a lane)

Garages to be located along the built to boundary wall (Optional where side boundary adjoins a lane)

Garages to be located along the built to boundary wall (Optional where side boundary adjoins a lane)

Garages to be located along the built to boundary wall (Optional where side boundary adjoins a lane)

Site Cover (maximum) 85% 75% 70% 70% 70% 70% 70%

Note 1: For two-storey allotments not on a laneway, the garage must be setback at least 1.0m behind the main facade, excluding balconies, and the garage doors are articulated, and comprise a mix of materials and colours, or are staggered.

For a full copy of the plan of development please refer to Appendix “D”

Note 2: Primary Frontage is your street address, Secondary Frontage occurs on a corner lot or where your allotment may front a public park.

11

Page 14: Stage 13 Revised Design Guidelines Grand Vista Release

PROPERTY BO

UN

DA

RY

PROPERTY BO

UN

DA

RYGutter detailFascia built to boundary

Gutter detailSetback built to boundary

PROPERTY BO

UN

DA

RY

PROPERTY BO

UN

DA

RY

max fall across site 10%

Boundary setbackspecified in setback table

Boundary setbackspecified in setback table

300mmmin

300mmmin

300mmmin

1m m

ax

PROPERTY BO

UN

DA

RY

max fall across site 10%

Face brickwork orpainted render finish

Build to boundary1st floor setback

as per setback table

Not to boundary setback900mm min

as per setback table

1000

mm

max

100m

mm

in

PROPERTY BO

UN

DA

RY

max fall across site 10%

Face brickwork orpainted render finish

Build to boundary1st floor setback

as per setback table

Not to boundary setbackas per setback table

1000

mm

max

100m

mm

in

PROPERTY BO

UN

DA

RY

max fall across site 10%

Face brickwork orpainted render finish

Build to boundary1st floor setback

as per setback table

Not to boundary setbackas per setback table

1000

mm

max

100m

mm

in

NOTE: Drawings based on Practice note No. 7 - Designing for Small Lots published by Economic Development Queensland.

Concealed Gutter Built to Boundary

Boundary Setbacks for Sloping Sites Zero Lot Line Construction Details Options

Recessed Gutter Built to Boundary Conventional Fascia Gutter Built to Boundary

12

Page 15: Stage 13 Revised Design Guidelines Grand Vista Release

Privacy created through fencing and vegetation

Private Open SpaceWhen private open space is designed and located thoughtfully

in site planning for the home, it will dramatically enhance the

lifestyle needs of the residents. Private open space should be

located to have strong relationships with the internal living

areas of the dwelling to maximise entertaining, relaxation and

recreation living areas. It is also important for private open

space to be functional for day to day needs.

• Private open space should be located, where possible

to maximise Northern & North-Eastern exposure of the

allotment. Ensure privacy of the occupants and consider

overshadowing impacts on adjacent buildings and

open space.

• Private open space should have a clear relationship to the

internal living area of the dwelling.

• The design of your home should focus on quality of the

space in terms of orientation, size, shape and landscape

treatment.

• Refer also to section on site cover and amenity.

Indoor/outdoor living

13

Page 16: Stage 13 Revised Design Guidelines Grand Vista Release

Garages and Driveways The design of your home must provide accommodation for

your vehicles on-site with minimal visual obtrusiveness and

adequate provision for vehicle manoeuvring. The location

and treatment of garages and garage doors is to contribute

positively to the streetscape and be in accordance with the

following requirements:

Garages are to be constructed simultaneously with the dwelling

and be compatible with the main building in teams of height, walls,

windows, roof forms, colours and materials.

Additional car parking spaces may be provided in tandem

within the property boundary. No carports are permitted.

Other than where accessed from a laneway, the maximum

width of a driveway at the lot boundary shall be 4.8m where

serving a double garage and 3.0m where serving a single garage.

There is a maximum of one driveway per dwelling, unless it

is a corner lot.

It is envisaged that the presentation of the dwellings at Providence will reflect the modern vibrancy of the Town. The following guidelines aim to ensure your investment by maintaining the overall quality of the neighbourhood through building design and an appreciation of the local environment and lifestyle.

Building Design

14

Page 17: Stage 13 Revised Design Guidelines Grand Vista Release

Roofs Roof design should be representative of the contemporary

Town “feel”, whilst showing respect for local environmental

values. Roof designs that are a simple composition of shapes

will aid in reducing their visual prominence. The use of

verandahs, balconies and other architectural elements are

encouraged to create interest in the roof design. A break in

length shall be provided for fascias longer than 15m, where

fronting a street.

Roof materials shall consist of either colorbond or

a flat profile roof tile.

Roofs should conform to the following types:

• Pitched roofs at a minimum of 22.5° (hip or gable);

• Skillion roofs; and

• Flat parapeted roofs.

Verandahs Balconies and Porches The inclusion of verandahs, balconies and porches in the

design of your home will contribute to your enjoyment, safety

and comfort. Where verandahs, balconies or porches are

included they should complement the dwelling style, materials

and colours and should not dominate or be out of scale with

the front elevation of the dwelling.

Front verandahs, or porches should be designed so as

to identify and emphasise the entrance to the dwelling.

15

Page 18: Stage 13 Revised Design Guidelines Grand Vista Release

Building Articulation and TreatmentExternal colours used in the design of your home should be

an expression of natural finishes that will complement the

colours of the surrounding natural environment. External

materials should be of a harmonious design, selected to

enhance features of the dwelling and be respectful of the

character of nearby dwellings. The building should conform

to the following:

Front facade materials and colours

• Minimum of 2 complementary materials and colours to

facade facing street and no more than 4 different materials

and colours.

• A limit of 80% total wall coverage (excluding windows/

openings) applies to the use of any one material or colour.

• Face Brickwork may be used as a feature to the front facade

to a maximum of 50% of total wall coverage (excluding

windows/openings).

Note: Samples of external colours (roof and walls) must be submitted and approved as part of the approval process. “Feature” colours will be considered on application.

16

Page 19: Stage 13 Revised Design Guidelines Grand Vista Release

Building Articulation Primary Frontage Treatment - Street Address

• Each street or park frontage must be addressed with

inclusion of three or more of the following design

elements in the related facade:

- balconies, porches or verandahs;

- awning and shade structures;

- variation to roof and building lines;

- inclusion of window openings; and

- use of varying building materials.

Secondary Frontage Treatment

All buildings with a facade of more than 10.0m that are

visible from a street or park are articulated to reduce the

mass of the building by two or more of the following:

- windows recessed into the facade;

- balconies, porches or verandahs;

- window hoods; and

- shadow lines are created on the building through

minor changes in the facade (100mm minimum). - use of varying building materials.

17

Page 20: Stage 13 Revised Design Guidelines Grand Vista Release

The landscape in any home is an important part of the lifestyle of the owners and character of the lot. Landscapes also form an important part of the streetscape, neighbourhood and its links to the community and character of the local area. It provides basic needs such as shading, colour, texture and privacy. It also helps to soften the hard elements of the buildings in the neighbourhood and provide us with a link to nature that is too often lost in urban areas.

The design of your landscape should look to utilise plants, materials and finishes that complement your lifestyle and your house. It is also a great opportunity to contribute to the appearance and quality of your neighbourhood.

Landscaping

18

Page 21: Stage 13 Revised Design Guidelines Grand Vista Release

Planting DesignSelect plants should be suited to the local climate and rainfall.

Native species that have evolved in your region are best

adapted to cope with local conditions. As the Ripley Valley

area is in Sub-Tropical South East Queensland, there are a

number of local native species as well as appropriate exotic

plants that grow well in the local soil types.

Some of the benefits of native plant species are:

• Encourage local/ native fauna and insect species;

• Often require less watering to thrive;

• Require less fertiliser and additives to thrive;

• Wide range of forms, flowers and colours available.

Front Yard LandscapesThe design and presentation of your front yard can not only

improve the presentation and value of your home but can

help to improve the quality and appearance of the street in

which you live. A well designed and maintained front yard

helps to promote community pride and create awareness of

the importance of the landscape in people’s homes and lives.

When designing your front yard the following should be considered

in maximising presentation, access and amenity aspects:

• Design planting and paths to address the different levels

of access into your home;

• Place trees to provide shade and screening to rooms at the

front of the house;

• Ensure planting selection and garden bed location offer

clear views and surveillance opportunities to the street;

• Look to maximise colour and texture opportunities to

highlight the architectural form and features of your home.

19

Page 22: Stage 13 Revised Design Guidelines Grand Vista Release

Retaining WallsRetaining can walls can help to enhance your house in the

following ways:

• Maximise usable areas in your garden especially where there

is a change of level between your house and the footpath

• Complement your home and garden areas through the

selection of complementary wall materials, colours and

locations.

Some of the materials for retaining walls are:

• Split Face Masonry

• Rendered and painted smooth face masonry

• Landscape ‘key stone’ walls

• A Grade sandstone blocks

The following materials will not be permitted in front

yard landscapes:

• Timber sleeper (treated or untreated);

• Concrete sleeper walls

20

Page 23: Stage 13 Revised Design Guidelines Grand Vista Release

Front FencingFront fencing generally is not permitted except for special

circumstances such as:

• Privacy around outdoor living spaces when located in the

front yard (or side yard in the case of corner lots); and

• Privacy and safety around swimming pools when located

in the front yard or side yard in the case of corner lots.

In such cases, fencing in the front yard shall be limited to:

• 50% transparent or not to exceed 1.2 metres in height

• A maximum of 60% of the front boundary length; and

• Setback 1.5m from the front property boundary to allow

for landscaping and screen planting, for at least 50% of

the fence’s length, except where adequate perforation is

provided to minimise the visual impact on the street.

Side and rear boundary privacy fencingSide and rear boundary fencing should consider the need

for privacy, security and amenity. Materials and colours

should complement your home and garden areas.

21

Page 24: Stage 13 Revised Design Guidelines Grand Vista Release

Side fencing on corner lotsTo create a neighbourhood streetscape it is important for

side fencing on corner lots to not only provide a dwelling

with privacy but also to present well to a public street.

The adjacent plan is an example of locations where side

fencing is required to provide fence types in accordance with

Types A and B as shown in the diagrams. These fence types

will be required on similar lots throughout the Providence

Community.

If visible from a street or park, the tops of fences on sloping

lots must be horizontal and not follow the line of slope.

Steps in the fence will be required in gradual increments.

Site conditions are likely to differ depending on landform,

so alternative solutions will be considered by the Design

Review Committee. T Y P I C A L L A N E W A YMin 1m

Min 1m

1500mm High permeable fencing

Min 1m

Min 1m

Planting Area1800mm High fencing

LEGEND

Side fencing locations

22

Page 25: Stage 13 Revised Design Guidelines Grand Vista Release

Fencing Proposal for Laneway Lots

Fence Type B Fence Type A prop

erty

bou

ndar

y

Fence Type A 1800 highFence Type B 1500 highFence Type A 1800

Fencing Proposal for Laneway Lots

Fence Type B Fence Type A prop

erty

bou

ndar

y

Fence Type A 1800 highFence Type B 1500 highFence Type B 1500

23

Page 26: Stage 13 Revised Design Guidelines Grand Vista Release

DrivewaysThe driveway can often dominate the frontage of the home

and detract from the streetscape appeal. Only one driveway

is permitted for each allotment and it is the intention to soften

the visual impact of the driveway by designing it to address

the following:

• Not greater than 3.0m for a single garage and no greater

than 4.8m wide for a double garage at the street boundary;

• Extend from the kerb edge to the garage/carport;

• Allow for at least 1.0m of screen planting between driveway

and side boundaries (where possible);

• Require minimal earth works and disturbance to existing

surface features by crossing slope and have a maximum

gradient to comply with the relevant Australian Standard;

• Be completed prior to the occupancy of the home; and

• Ensure that finished surface level of the driveway is

consistent with any existing footpaths that it may cross.

Driveway surface materials and colours are to complement

the dwelling and landscape and may include:

• Concrete or clay pavers laid over reinforced concrete base;

• Exposed aggregate; or

• Coloured concrete.

The use of other products or materials must be approved.

Under coated grey, broom-finished concrete and stamped

driveways are NOT acceptable. Car track driveways are

NOT acceptable.

24

Page 27: Stage 13 Revised Design Guidelines Grand Vista Release

Letter BoxesLetter boxes must be clearly visible and identifiable from

the street or lane as relevant and are to be designed and

constructed to be consistent in material and colours with

the dwelling.

It is preferred that letter boxes are constructed of brick or

similar material and incorporated into the landscaping.

Letter boxes on poles are NOT acceptable.

25

Page 28: Stage 13 Revised Design Guidelines Grand Vista Release

Ancillary Structures

Garbage Bin Storage, Plant and EquipmentGarbage bins, plant and equipment (eg. air conditioner

condensers), must not be visible from a street or park.

Appropriate site design or screening measures with fences

or enclosures that complement the material and colours of

the house, should be adopted.

26

Page 29: Stage 13 Revised Design Guidelines Grand Vista Release

Cost efficient homes, smart homes, sustainable homes are all terms used to describe homes

that are designed to save money, increase the value of your investment, feel safer, move around

more easily and help the environment. When designing a home, it is important that it is

environmentally sustainable and responds to the needs of your family as it grows with reduced

maintenance and running costs over time. Principles worth considering and discussing with

your builder are comprised below.

1. Glazing and Frames Materials

a. Consider passive solar design - window placement, size and shading

b. Controlling heat flow through glazing and window frame material

c. Use WERS to determine glazing requirements

2. Insulation for ceilings and walls

a. Combine insulation with design for climate considerations

b. Consider insulation type and material to suit local climatic conditions and external

wall exposure

3. Indoor Air Quality relating to materials and finishes and ventilation

a. Consider the types of paints, glues, plastics, and some manufactured wood products

These can release chemical substances at room temperature, called VOC’s

(Volatile Organic Compounds). Consider toxicity, quantity and proximity of materials

b. Ensure cross-ventilation through passive solar design techniques and ceiling fans

as well as mechanical ventilation in bathrooms

Environmentally Sustainable Design

27

Page 30: Stage 13 Revised Design Guidelines Grand Vista Release

4. Hot Water Systems

a. Review types of hot water systems to meet your expected usage, operating cost and

available energy sources from solar, gas or electricity

5. Lighting and Energy Consumption

a. Consider the range of energy available from solar, gas and electrical

b. Maximise daylight where most required

c. Install multiple switches to control lighting

d. Use compact florescent lights and LED lighting as the most efficient and cost-saving

lighting over longer periods, despite the initial up front cost

e. Spend time with your builder designing the location of lighting and switches to make

your home safe and efficient

6. Water Usage and Harvesting

a. Conserving water saves you money. Install water efficient taps, shower heads, toilets

and appliances. Use drought resistant plants and groundcovers where grass is not

needed. Wash cars, caravan and boats on the grass where possible

b. Whilst rainwater tanks are not mandatory, it makes sense to use free water from the

sky for external use, rather than pay for it

7. Promote resource efficiency

a. When considering your bench tops, splashbacks, doors, shelves and cabinetry, and

floors, use products such as natural stone, reconstituted stone, natural timber,

recycled wood products and some glued-wood products such as composite products,

finger-jointed timber, laminated timber, fibreboard, hardboard and plywood

8. Universal Design

a. Consider the longevity of your home which spans age, gender and ability

b. Provide easy access to your home from your street and your garage

c. Have a room on the ground floor that could be adapted as an additional bathroom

and bedroom

d. Incorporate doors and corridors that allow for easy access and movement – consider

corridor width

e. Consider kitchens that are safe for all people to use

f. Consider handles and tapware within easy reach by all people

9. Construction types

a. Heavyweight and lightweight materials used in construction differ in mass content.

Heavyweight construction systems are usually masonry and include brick, concrete,

concrete block, tiles, rammed earth, mud brick, etc. Lightweight construction uses

timber or light gauge steel framing as the structural support system for non-structural

cladding and linings (eg. fibre cement, plywood and colorbond steel)

b. Consider construction types and a combination of both according to such things

as site conditions (such as slope), optimising climatic outcomes, and external or

internal usage

The above material has been sourced from the Housing Industry Association and the

Greensmart program. For more information refer to the link below:

http://hia.com.au/hia/channel/Builder/region/National/classification/Greensmart.aspx

28

Page 31: Stage 13 Revised Design Guidelines Grand Vista Release

29

Page 32: Stage 13 Revised Design Guidelines Grand Vista Release

30

Page 33: Stage 13 Revised Design Guidelines Grand Vista Release

10. Passive Heating and Cooling

SummerObjective: Design to reduce heat gain to internal and external areas

Solar Access & Shading

The following principles should be applied:

• design to provide shading to all walls, openings, outdoor living areas and hardstand

paving to minimise heat absorption and reflection through:

• wide eaves designed to shade summer sun;

design shading devices to suit the orientation (east and west require different

shading to north); screening structures; and screening vegetation such as vines on

trellises to shade walls.

• design glazing size and location to minimise heat gain in summer and heat loss in winter.

15% glazing ratio (window to floor area ratio). Too much glass leads to overheating;

• provide fewer windows on the east and west elevations; and

• where applicable consider glazing tint to allow light and minimise heat transfer.

Insulation

The following principles should be applied:

• external lightweight skin insulates the mass in walls from solar gain allowing it to act as

a heat sink during the day to maintain interior cool;

• provide insulation to roofs and walls to prevent heat gain from the exterior in summer; and

• reduce heat gain issues of colours selected for façade and roof.

Thermal Mass

The following principles should be applied:

• provide shading to internal thermal mass in walls and floors for cooling effect of heat sink in

summer; and

• thermal mass may require access to night ventilation for purging of any heat gained during

the day to avoid excess internal heat gain.

Natural Ventilation

The following principles should be applied:

• use open planning to enhance cross ventilation;

• locate openings in buildings and courtyards between buildings to catch the prevailing

breezes (north east or south east); and

• use vegetation plantings to channel cooling breezes into buildings.

WinterObjective: Design to enable heat gain to internal and external areas

Solar Access

The following principle should be applied:

Design of shading to enable solar access to internal and external living areas –

particularly in the morning and afternoon through;

- Eaves designed to allow winter sun

- Window shading designed to allow winter sun

- Deciduous vegetation (trees and vines on trellises)

Thermal Mass

Provide thermal mass in walls and floors (interior and exterior) and expose to radiant

heat (sun). The mass in walls and floors is used to store and release heat energy to

stabilise internal temperatures.

Natural Ventilation

Locate buildings and vegetation plantings to screen outdoor areas from winter westerly winds.

Insulation

The following principles should be applied:

• provide insulation to walls and roofs to prevent heat loss from the exterior in winter; and

• provide curtains to windows / doors to retain heat during night.

31

Page 34: Stage 13 Revised Design Guidelines Grand Vista Release

Appendix A - Stage 8a, 13 and 14 Releases

32

Page 35: Stage 13 Revised Design Guidelines Grand Vista Release

731

730

729

728

727

726

725724

723722

721

720719

718717

716715

714

674673

672671

670669

713

712

711710

709708

707

706

680

679

678

677

676

675

742

741

740

739

738

737

736

735

734

733

732

705

704

703

702

701

700

699

698

697

696

695

694

693

692

691

690

689

688

687

686

685

684

683

682

681

392393

394

391

390

389

413414

415

Amex Corporation Pty Ltd and Daleswan Pty Ltd, their related bodies corporate and associated entities, their directors and officers, employees and agents (Amex) give no warranty that the information contained in this ‘document’ is, or will remain accurate, complete and current. Images are given as a visual aid, and are indicative only.

Plans are subject to final design and council approval, and are not necessarily to scale. Street names are subject to council approval. To the extent permitted by law, Amex excludes all liability for any loss which arises as a result of any reliance on the information contained in this document or otherwise in connection with it.”

33

Page 36: Stage 13 Revised Design Guidelines Grand Vista Release

34

Page 37: Stage 13 Revised Design Guidelines Grand Vista Release

Appendix B - Individual lot guidelines Stage 8a, 13 and 14 Releases Protecting your investment

35

Page 38: Stage 13 Revised Design Guidelines Grand Vista Release

INDIVIDUAL LOT GUIDELINES 38

HOUSING GUIDELINES 40• Two Storey Dwellings

• Primary Frontage Lots

• Corner Lots

• Corner Lots Requiring Specific Treatment

• Multiple Residential Lots

LANDSCAPE GUIDELINES 56• Primary Frontage Lots

• Corner Lot

Contents Page

36

Page 39: Stage 13 Revised Design Guidelines Grand Vista Release

37

Page 40: Stage 13 Revised Design Guidelines Grand Vista Release

Individual lot GuidelinesThe highlighted lots in the adjacent Key Plan are key sites and must consider the

individual lot guidelines contained within this document to ensure a quality outcome.

Appendix B is divided into two sections - Housing Guidelines and Landscaping

Guidelines.

These guidelines are to be read in conjunction with the Plan of Development and

the Home Design Guidelines. This document provides guidelines to homes that

are visually prominent. They are aimed at achieving a quality housing and landscape

outcome that will protect your investment in the neighbourhood.

All individual home designs and landscaping treatments will be reviewed by the

Design Review Committee. It is understood that particular building and on-site

conditions may vary which will require different design solutions that may not be

contained in this document. Therefore alternative treatments may be considered,

provided they demonstrate similar outcomes to the design guidelines.

Building Commencement:

To ensure neighbourhoods are completed in a timely manner, building is to

commence within 12 months of purchase of your home allotment.

Plan of DevelopmentAppendix D comprises the Plan of Development. This plan contains the minimum

design controls to be met in accordance with the relevant Approval Authority at

State and Local Government. The Home Design Guidelines are aligned with the

Plan of Development controls, however they also provide additional controls so that

the preferred neighbourhood outcomes are achieved as part of the design vision

for Providence. The Design Review Committee may approve design outcomes that

are different to the Home Design Guidelines subject to demonstration of similar

outcomes. The DRC cannot approve different solutions to those contained in the

Plan of Development.

38

Page 41: Stage 13 Revised Design Guidelines Grand Vista Release

Key Plan HIG

R

OA

D

RO

AD

AD

New

Roa

d

16

.5m

13.75m W

ide

New

Road

New

Road

13.75m

W

ide

14m Wide

13.75m WideNew Road

13.8.8

112.712.712.7

15.5

15.4

17.5

15.51

14

14

STAGE 1444TAGETAGGE

STAGE 133TAGESS

STAGE 8aE 8a8GESTS11141

12.5

18.2215.45

15.4

18

Primary Frontage Lots

Corner Lots

Multiple Residential

Elevated Lots

Corner Lots Requiring Specific Treatment

• Fencing on Secondary Frontage

• Landscaping

39

dlukin
Polygon
dlukin
Polygon
dlukin
Rectangle
Page 42: Stage 13 Revised Design Guidelines Grand Vista Release

Housing Guidelines

40

Page 43: Stage 13 Revised Design Guidelines Grand Vista Release

HIG

R

OA

D

RO

AD

AD

New

Roa

d

16

.5m

13.75m W

ide

New

Road

New

Road

13.75m

W

ide

14m Wide

13.75m Wide

New Road

13.8.8

112.712.712.7

15.5

15.4

17.5

15.51

14

14

11141

18.2215.45

15.412.5

18

STAGE 1444TAGETAGGE

STAGE 133TAGESS

STAGE 8aE 8a8GESTSMandatory Two Storey Dwellings

Two Storey Dwellings• The lots shown on the adjacent plan are classified as mandatory

two storey dwelling construction or desirable two storey dwelling

construction. These lots are:

• Highly visible from public spaces and major streets

• Located at visually significant intersections

• Located at street corners opposite park

• Lots classified as desirable two storey are preferred with two storey

dwelling construction for visual amenity from open space , but can be of

single storey construction.

41

Desirable Two Storey Dwellings

Page 44: Stage 13 Revised Design Guidelines Grand Vista Release

Private open space

Garage location

Maximum building location envelope (excluding eaves)

Letterbox

Optional built to boundary wallEntrance delineation by facade treatment and / or protrusion of porches, verandahs,balconies or equivalent

Bin storage / Bin pad

Home entry

Balcony, wall articulation or window treatment mandatory

Preferred Locations:

Allotment Details:

413414

390

393

394

New

Roa

d

16

.5m

620m²

580m²

755m²

640m²

640m²

2.43

1

0.9

Street

5

32.4

1

0.9

1

0.9

32.4

5

1

0.9

2.4

35

53

10.9

5

Control Diagram for Lots 390, 393, 394, 413 and 414

Primary Frontage Lots

42

Page 45: Stage 13 Revised Design Guidelines Grand Vista Release

Key Plan - Lots 390, 393, 394, 413 and 414

2 storey

Controls (Two Storey)Lots 390, 393, 394, 413 and 414 require two

storey construction which includes:

Balcony, wall articulation or window treatment

• Balconies to the second storey are

mandatory.

• Balcony design and wall articulation

emphasises the height of the ground storey.

• Must include material variation between

upper and lower storeys.

• Window openings should be well

proportioned emphasising the vertical

dimension.

• Walls over 8m in length on any elevation

without windows or articulation are not

permitted.

• Face brick to be used as feature only.

• Rear setback for ground floor is 0.9m

• Rear setback for first floor is 1.0m

• Consider balcony treatment for privacy with

regard to balustrade finish and balcony size

with regard to adjoining internal room.

Roofing

• Colorbond or a flat profile roof tile are

preferred.

• A minimum of 450mm eaves must be

provided for houses with pitched roofs. Eaves

must be provided to all sides of a double

storey house.

• Where garages are not built under the 2nd

level of a house, eaves are not required to the

side of a garage where it is constructed on

the boundary.

Garage

• Garage door profiles must reflect the style

of the facade. No historical decorative

treatment is permitted. Alternative

decorative treatments such as timber finishes

are permitted and will be assessed on their

merits.

• The colour of garage doors must

complement the palette used on the house

façade.

• Panel lift or tilt type doors are encouraged.

Roller type doors are not permitted.

43

Page 46: Stage 13 Revised Design Guidelines Grand Vista Release

• Must include material variation between upper and

lower storeys through the use of building projection,

balconies, pergolas and other similar elements.

• Balcony design and wall articulation emphasises the

height of the ground storey.

• Face brick to be used as feature only.

Sour

ce: H

oton

doSo

urce

: Pla

ntat

ion

Hom

es

• A minimum of 450mm eaves must be provided for

houses with pitched roofs.

• Window openings should be well proportioned

emphasising the vertical dimension.

Primary Frontage Lots

44

Page 47: Stage 13 Revised Design Guidelines Grand Vista Release

Acceptable Facade Treatments (Source: Stylemaster/Alliance; Plantation Homes; Metricon)

Key Plan - Lots 390, 393, 394, 413 and 4142 storey

Primary Frontage Lots

45

Page 48: Stage 13 Revised Design Guidelines Grand Vista Release

Primary Frontage Lots

Private open space

Garage location

Maximum building location envelope

Letterbox

Optional built to boundary wallEntrance delineation by facade treatment and / or protrusion of porches, verandahsor equivalent

Bin storage / Bin pad

Home entry

Wall articulation or window treatmentmandatory

Preferred Locations:

Allotment Details:(excluding eaves)

392450m²1

53

2.4

0.9

Key Plan - Lot 392

Lot 392 can be of single or two storey

construction which includes (for two storey

construction refer to page 42 controls):

Wall articulation and window treatment

• Front facade should emphasise the vertical

dimension through use of verandah columns

or porticos.

• Entry to front door and window openings

should be well proportioned emphasising the

vertical dimension. Window openings may

not be placed against the soffit.

• Face brick to be used as feature only.

Roofing

• Colorbond or a flat profile roof tile are

preferred.

Control Diagram for Lot 392

Controls (Single Storey)• A minimum of 450mm eaves must be

provided for houses with pitched roofs.

Eaves are not required to the front or side

of a garage where it is constructed on the

boundary.

Garage

• Garage door profiles must reflect the style

of the facade. No historical decorative

treatment is permitted. Alternative

decorative treatments such as timber finishes

are permitted and will be assessed on their

merits.

• The colour of garage doors must

complement the palette used on the house

façade.

• Panel lift or tilt type doors are encouraged.

Roller type doors are not permitted.

46

Page 49: Stage 13 Revised Design Guidelines Grand Vista Release

Sour

ce: A

usbu

ildSo

urce

: Aus

build

• Front facade should emphasise the vertical

dimension through use of verandah columns or

porticos.

• Windows not placed against soffit.

• Skillion roofs are acceptable.

• Entry to front door and window openings should

be well proportioned emphasising the vertical

dimension.

• Panel lift or tilt type doors are encouraged.

Primary Frontage Lots

Page 50: Stage 13 Revised Design Guidelines Grand Vista Release

Corner Lots

Private open space

Garage location

Maximum building location envelope

Letterbox

Optional built to boundary wallEntrance delineation by facade treatment and / or protrusion of porches, verandahs,balconies or equivalent

Bin storage / Bin pad

Home entry

Balcony, wall articulation or window treatment mandatory

Preferred Locations:

Allotment Details:

Bin collection

(excluding eaves)

742645m²

693600m²

1.5

2.4

5

3

Street

Street

Street

1.5

0.9

5

2.43

Balcony, wall articulation or window treatment

• Balconies to the second storey are

mandatory.

• Must include material variation between

upper and lower storeys.

• The secondary street frontage may use forms

of articulation other than balcony treatments

such as window hoods, second storey

delineation, wall articulation and height

variation.

• Balcony design and wall articulation

emphasises the height of the ground storey.

• Windows on the front and side facades are of

similar proportions and materials and must

emphasise the vertical dimension. Non-

habitable rooms are to be avoided on the

facades fronting the street.

Control Diagram for Lot 693, 742 & 391

These controls do not apply to single storey dwellings.

• Windows are required within 3m of the front

corner of the side facade to address the side

street. Windows which wrap around the

corner of the facade are encouraged.

• Walls over 8m in length on any elevation

without windows or articulation are not

permitted.

• Face brick to be used as a feature only.

Roofing

• Colorbond or a flat profile roof tile are

preferred.

• A minimum of 450mm eaves must be

provided for houses with pitched roofs. Eaves

must be provided to all sides of a double

storey house.

• Where garages are not built under the 2nd

level of a house, eaves are not required to the

side of a garage where it is constructed on

the boundary.

Garage

• Garage door profiles must reflect the style

of the facade. No historical decorative

treatment is permitted. Alternative

decorative treatments such as timber finishes

are permitted and will be assessed on their

merits.

Controls (Two Storey)

742645m²

693600m²

1.5

2.4

5

3

Street

Street

Street

1.5

0.9

5

2.43

694575m²

2.4

511.5

5

Street

0.9

391665m²

5

2.4

1.5

5

0.9

1

48

Page 51: Stage 13 Revised Design Guidelines Grand Vista Release

Corner Lots

HIG

R

OA

D

RO

AD

AD

New

Roa

d

16

.5m

13.75m W

ide

New

Road

New

Road

13.75m

W

ide

14m Wide

13.75m Wide

New Road

13.8.8

112.712.712.7

15.5

15.4

17.5

15.51

14

14

11141

18.2215.45

15.412.5

18

STAGE 1444TAGETAGGE

STAGE 133TAGESS

STAGE 8aE 8a8GESTS

Key Plan - Lot 693, 742 & 391

Note: Lot 693, 742 & 391 are desirable two storey only

and may be single storey construction, but will still be

required to address the Building Articulation intent in

the Home Design Guidelines for secondary frontage

• Window articulation to

secondary street facade.

• Non-habitable rooms are to

be avoided on the facades

fronting the street.

• Windows are required within 3m of the front corner of the

side facade to address the street. Windows which wrap

around the corner of the facade are encouraged.

• The colour of garage doors must

complement the palette used on the house

façade.

• Panel lift or tilt type doors are encouraged.

Roller type doors are not permitted.

Bin Storage

• Bins must not be visible from the street and

are either screened behind fencing or within

an enclosure integrated within the fencing

and landscape design.

49

Page 52: Stage 13 Revised Design Guidelines Grand Vista Release

Key Plan - Lots 389, 415, 674, 675, 713, 714, 726 and 727

HIGHWAY

AB

RA

HA

MS

RO

AD

New

Roa

d

16

.5m

14m W

ide

13.75m W

ide

New

Road

New

Road

13.75m

W

ide

14m Wide

13.75m Wide

New Road

32

32

32

32

32

32

32

32

32

14

13.8

12.7

15.5

16.3

13.8

13.9

13.9

15.5

14

15.4

17.5

19.5

15.514

28

28

28

28

28

28

28

28

28

32

32

32

32

16.1

14

12.510.5

12.512.5

16.5

14

17.3

15.3

15.2

20.4

8.58.5

10.5

12.5

12.5

12.510.5

14

17.2

12.514

1412.5

12.5

24.9

32

31.9

32

32

19.819.8

16.518.2

15.415.2

32

32

32

32

17.6

14

15.4

15.4

15.4

15.4

15.4

16

32

7 27.8

16.8

32

32.2

32

3.510.5

12.513.9

7.38.3

16

17

16

14

17.1

19.7

12.5

14

18

16.4

15.3

STAGE 14

STAGE 13

STAGE 8a

Corner Lots Requiring Specific Treatment

Controls The materials, finishes and type of fencing for these allotments will be

discussed in consultation with the purchaser and the DRC before the

application for approval is made.

50

Page 53: Stage 13 Revised Design Guidelines Grand Vista Release

Corner Lots Requiring Specific Treatment

51

Page 54: Stage 13 Revised Design Guidelines Grand Vista Release

Key Plan - Lots 695-712, 721-725 and 728-741

Elevated Lots Treatment

HIGHWAY

AB

RA

HA

MS

RO

AD

New

Roa

d

16

.5m

14m W

ide

13.75m W

ide

New

Road

New

Road

13.75m

W

ide

14m Wide

13.75m Wide

New Road

32

32

32

32

32

32

32

32

32

14

13.8

12.7

15.5

16.3

13.8

13.9

13.9

15.5

14

15.4

17.5

19.5

15.514

28

28

28

28

28

28

28

28

28

32

32

32

32

16.1

14

12.510.5

12.512.5

16.5

14

17.3

15.3

15.2

20.4

8.58.5

10.5

12.5

12.5

12.510.5

14

17.2

12.514

1412.5

12.5

24.9

32

31.9

32

32

19.819.8

16.518.2

15.415.2

32

32

32

32

17.6

14

15.4

15.4

15.4

15.4

15.4

16

32

7 27.8

16.8

32

32.2

32

3.510.5

12.513.9

7.38.3

16

17

16

14

17.1

19.7

12.5

14

18

16.4

15.3

STAGE 14

STAGE 13

STAGE 8a

Controls For Lots 695-712, 721-725 and 728-741

• Maximum front setback is no more than 3 metres

• For Elevated Lots below street the finished floor level is no less than

0.76m below kerb level of street.

• Building finish floor level cannot be lower than 0.76m from top of batter at front boundary / primary frontage boundary

• Front building setback is close to boundary.

• Building addresses the street with pad drop less than 0.5m in height from front boundary.

52

Page 55: Stage 13 Revised Design Guidelines Grand Vista Release

Elevated Lots Treatment

• Retaining wall step back from the front boundary.• Building pad step up to integrate with slope.

• Building Pad not respond to existing slope• Retaining wall on the rear is too high

• Front building setback is close to boundary.

• Building addresses the street with pad drop less than 0.5m in height from front boundary.

• Slope integrated into the building.• Garage setback to far from front boundary53

Page 56: Stage 13 Revised Design Guidelines Grand Vista Release

Private open space

Garage location

Maximum building location envelope

Letterbox

Optional built to boundary wall

Entrance delineation by facade treatment and / or protrusion of porches, verandahsor equivalent

Bin storage / Bin pad

Home entry

Wall articulation or window treatmentmandatory

Preferred Locations:

Allotment Details:

Mandatory built to boundary wall

(excluding eaves)

HIG

R

OA

D

RO

AD

AD

New

Roa

d

16

.5m

13.75m W

ide

New

Road

New

Road

13.75m

W

ide

14m Wide

13.75m Wide

New Road

13.8.8

112.712.712.7

15.5

15.4

17.5

15.51

14

14

11141

18.2215.45

15.412.5

18

STAGE 1444TAGETAGGE

STAGE 133TAGESS

STAGE 8aE 8a8GESTS

Key Plan - Lot 694

694575m²

2.4

511.5

5

Street

0.9

391665m²

5

2.4

1.5

5

0.9

1

Control Diagram for Lot 694

The above control diagram demonstrates one solution to a multiple

residential lot. Designs not in accordance with the above will be considered

provided they demonstrate the intent of the controls.

Multiple Restidential Lots

54

Page 57: Stage 13 Revised Design Guidelines Grand Vista Release

Lot 694 requires the following which includes:

Balcony, wall articulation or window treatment

• Balconies to the second storey are

mandatory.

• Must include material variation between

upper and lower storeys.

• The secondary street frontage may use forms

of articulation other than balcony treatments

such as window hoods, second storey

delineation, wall articulation and height

variation.

• Balcony design and wall articulation

emphasises the height of the ground storey.

• Windows on the front and side facades are of

similar proportions and materials and must

emphasise the vertical dimension. Non-

habitable rooms are to be avoided on the

facades fronting the street.

• Windows are required within 3m of the front

corner of the side facade to address the side

street. Windows which wrap around the

corner of the facade are encouraged.

• Walls over 8m in length on any elevation

without windows or articulation are not

permitted.

• Face brick to be used as feature only.

Multiple Residential LotsControls (Single and Two Storey)

Roofing

• Colorbond or a flat profile roof tile are

preferred.

• A minimum of 450mm eaves must be provided for houses with pitched roofs. Eaves must be provided to all sides of a double storey house.

• Where garages are not built under the 2nd level of a house, eaves are not required to the side of a garage where it is constructed on the boundary.

Garage

• Garage door profiles must reflect the style of

the facade. No historical decorative treatment

is permitted. Alternative decorative

treatments such as timber finishes are

permitted and will be assessed on its merits.

• The colour of garage doors must

complement the palette used on the house

façade.

• Panel lift or tilt type doors are encouraged.

Roller type doors are not permitted.

Bin Storage

• Bins must not be visible from the street and

are either screened behind fencing or within

an enclosure integrated within the fencing

and landscape design.

55

Page 58: Stage 13 Revised Design Guidelines Grand Vista Release

Preferred

Nat

ive Plant SpeciesSuggested Native Tree Species

Acmena smithii (Lilly Pilly)

Buckinghamia

celsissima

(Ivory Curl)

Harpulia pendula

(Tulipwood)

Eucalyptus curtisii

(Plunkett Malee)

Hymenosporum

flavum

(Native Frangipani)

Brachychiton discolour

(Lacebark)

As contained in the Home Design Guidelines selected plants should be suited to

the local climate and rainfall. Preferred native species include:

Landscape Guidelines

56

Page 59: Stage 13 Revised Design Guidelines Grand Vista Release

ACCEPTABLE FRONT LANDSCAPE TREATMENT

Small trees provide shade to front

garden and amenity to streetscape

Shrubs and groundcovers extend

to property boundary alignment.

Minimum width of planting bed 2m

Fence set back

min. 500mm

2.0mmin

side fence 1.0m set back

1 fence panel

1.8m high fence

0.9m low fence

Letterbox design integrated

into fence design.

Provide 2 trees to front garden

min. height at time of installation

to be 2.0m.

Key Plan

Lot 390

Pathway from footpath to front door

with letterbox at path edge

Prop

erty

Bou

ndar

y

Plan

Section

Front Elevation

Preferred

Nat

ive Plant Species

Primary Frontage Lots

57

Page 60: Stage 13 Revised Design Guidelines Grand Vista Release

Key Plan

ACCEPTABLE FRONT LANDSCAPE TREATMENT

Preferred

Nat

ive Plant Species

Lot 693

1.8m high fence0.9m low fence

Shrubs and groundcovers extend to property

boundary alignment. Minimum width of

planting bed 2m

Small trees provides shade to

front garden and amenity to

streetscape

Fence set back

min. 500mm

1 fence panel

Pathway from footpath to front

door with letterbox at path edge

2.0mmin

low fence set back 5.0m min from front of house at corner

Prop

erty

Bou

ndar

y

Letterbox design integrated into fence design.

Provide 2 trees to front garden min. height at

time of installation to be 2m.

Tree to corner of the lot.

Screen for rubbish bins.

Plan

Front Elevation

Section A

A

A

section

Corner Lots

Page 61: Stage 13 Revised Design Guidelines Grand Vista Release

Appendix C - National Broadband Network

Page 62: Stage 13 Revised Design Guidelines Grand Vista Release

Key

info

rmat

ion

for b

uild

ers

and

cabl

ers

FGL

Str

eet C

ondu

it

Pro

pert

y B

ound

ary

Pro

pert

y B

ound

ary

ALL

CO

ND

UIT

FIT

TIN

GS

MU

ST

BE

GLU

ED

OR

AN

GE

CO

ND

UIT

MU

ST

NO

T B

E U

SE

D

Min

. 100

mm

rad

ius

bend

s

Min

. 410

mm

hei

ght f

rom

fin

ishe

d gr

ound

leve

l

Min

. 300

mm

set

bac

kfro

m b

uild

ing

corn

er

Min

. 300

mm

rad

ius

bend

100m

m –

140

mm

ho

rizon

tal s

epar

atio

nM

in. 3

00m

m

1 x

P23

Con

duit

(bui

lder

to s

uppl

y)

P23

Lea

d-in

C

ondu

it

Min

. 100

mm

ra

dius

ben

d

Flo

or

Sla

b

1 x

P23

Con

duit

(bui

lder

to s

uppl

y)

Inte

rnal

Con

duit

PC

D

NT

D

GP

O

PS

U

P23

Lea

d-in

C

ondu

it

Pro

pert

y E

ntry

P

oint

Ele

ctric

ityE

nclo

sure

Inte

rnal

P23

Con

duit

Inte

rnal

P23

Con

duit

PC

D

Str

eet P

it (ty

pica

l)

Fig

ure

1.E

lect

rici

ty e

nclo

sure

on

the

sam

e si

de

of

the

bui

ldin

g t

o t

he p

rop

erty

ent

ry p

oin

t

Fig

ure

2.E

lect

rici

ty e

nclo

sure

on

the

opp

osit

e si

de

of

the

bui

ldin

g t

o t

he p

rop

erty

ent

ry p

oin

t

Ele

ctric

ityE

nclo

sure

PC

D

Wal

l Cav

ity

Pro

pert

y E

ntry

P

oint

Ref

er t

o t

he d

iag

ram

ab

ove

fo

r th

e In

tern

al P

23 a

nd L

ead

-in

Co

ndui

t co

nfig

urat

ions

Str

eet P

it (ty

pica

l)

Sup

ply

inte

rnal

and

ex

tern

al c

ondu

it pa

ths:

• U

se ri

gid

whi

te P

23 te

leco

mm

unic

atio

ns c

ondu

its

(23m

m In

tern

al D

iam

eter

) in

the

tren

ch (c

onne

ctin

g to

the

serv

ice

drop

con

duit)

and

with

in th

e ho

use.

G

lue

all j

oint

s us

ing

solv

ent c

emen

t•

Ensu

re th

e co

ndui

ts ru

n as

str

aigh

t as

poss

ible

• In

stal

l dra

wst

rings

in b

oth

cond

uits

• Fi

x al

l con

duits

sec

urel

y us

ing

cond

uit s

addl

es

or s

imila

r•

Pro

vide

a p

ower

poi

nt (G

PO

) with

in 1

500m

m

of th

e N

etw

ork

Term

inat

ion

Dev

ice

(NTD

) loc

atio

n•

Eac

h be

nd ra

dius

of t

he s

tree

t con

duit

mus

t be

no

less

than

300

mm

Eac

h be

nd ra

dius

of t

he in

tern

al c

ondu

it m

ust

be n

o le

ss th

an 1

00m

m•

Use

no

mor

e th

an 3

x 9

0º (m

ax) b

ends

bet

wee

n dr

aw p

oint

s

Unm

aint

aine

d co

py. F

or m

ost r

ecen

t ver

sion

, ref

er to

: w

ww

.nbn

co.c

om.a

u/co

nten

t/da

m/n

bnco

/doc

umen

ts/k

ey-in

form

atio

n-fo

r-bu

ilder

s-an

d-ca

bler

s.pd

f

For

mo

re d

etai

ls a

nd

inst

alla

tio

n o

pti

on

s re

fer

to: N

BN

Co

Res

iden

tial

Pre

par

atio

n an

d In

stal

lati

on

Gu

ide

: SD

Us

and

MD

Us

ww

w.n

bn

co.c

om

.au

/ass

ets/

do

cum

ents

/pre

par

atio

n-a

nd

-in

stal

lati

on

-gu

ide-

for-

sdu

s-an

d-m

du

s.p

df

NB

N C

o m

inim

um

Pre

mis

es

Co

nn

ecti

on

Dev

ice

(PC

D) s

epar

atio

ns:

Min

imum

250

mm

from

ser

vice

s in

clud

ing:

• El

ectr

icity

, gas

* or

wat

er m

eter

enc

losu

res

• W

ater

taps

or d

ownp

ipes

Min

imum

1.5

m s

ide

clea

ranc

e fro

m g

as c

ylin

ders

**C

heck

with

you

r lo

cal A

utho

ritie

s fo

r th

eir

sepa

ratio

ns

NT

D E

ncl

osu

re V

enti

lati

on

Ale

rt:

If th

e N

TD is

to b

e en

clos

ed, t

hen

vent

ilatio

n is

re

quire

d fo

r saf

ety

reas

ons.

Ref

er to

NB

N C

o R

esid

entia

l Pre

para

tion

and

Inst

alla

tion

Gui

de:

SD

Us

and

MD

Us

for s

peci

ficat

ions

.

NB

N C

o t

o s

up

ply

:•

The

P23

ser

vice

dro

p co

ndui

t fro

m p

it to

1

met

er in

side

the

prop

erty

• Th

e se

rvic

e dr

op c

able

to th

e P

CD

loca

tion

• Th

e P

CD

• Th

e in

tern

al fi

bre

optic

cab

le fr

om th

e

PC

D to

the

NTD

• Th

e N

TD•

NTD

Enc

losu

re w

ith S

tand

ard

Pow

er

Sup

ply

(Bat

tery

Bac

kup

Uni

t if r

equi

red

durin

g pr

e-in

stal

latio

n)•

All

the

fibre

opt

ic c

able

s

60

Page 63: Stage 13 Revised Design Guidelines Grand Vista Release

565

mm

325 mm

This

doc

umen

t is

subj

ect t

o co

pyrig

ht a

nd m

ust n

ot b

e us

ed e

xcep

t as

perm

itted

bel

ow o

r und

er th

e Co

pyrig

ht A

ct 1

968

(Cth

). Yo

u m

ust n

ot re

prod

uce

or p

ublis

h th

is d

ocum

ent i

n w

hole

or i

n pa

rt fo

r com

mer

cial

gai

n w

ithou

t the

prio

r writ

ten

cons

ent o

f NBN

Co.

Yo

u m

ay re

prod

uce

and

publ

ish

this

doc

umen

t in

who

le o

r in

part

for e

duca

tiona

l or n

on-c

omm

erci

al p

urpo

ses

as a

ppro

ved

by

NBN

Co

in w

ritin

g.

This

doc

umen

t is

inte

nded

as

an in

form

atio

nal g

uide

onl

y. N

BN C

o do

es n

ot w

arra

nt th

at th

e pr

oces

ses

and

info

rmat

ion

outli

ned

in th

is d

ocum

ent c

ompl

y w

ith a

ll (o

r any

) app

licab

le la

ws,

cod

es o

f pra

ctic

e or

sta

ndar

ds. T

he re

cipi

ent m

ust e

xerc

ise

its o

wn

judg

emen

t as

to h

ow b

est t

o pe

rfor

m th

e ac

tiviti

es d

escr

ibed

in th

is d

ocum

ent i

n a

safe

way

, and

so

as to

mee

t the

requ

irem

ents

of

all a

pplic

able

law

s, c

odes

of p

ract

ice

and

stan

dard

s. T

he c

onte

nts

of th

is d

ocum

ent s

houl

d no

t be

relie

d up

on a

s re

pres

entin

g an

y N

BN C

o’s

final

pos

ition

on

the

subj

ect m

atte

r of t

his

docu

men

t, ex

cept

whe

re s

tate

d ot

herw

ise.

NBN

-NEW

DV-

BCA4

-JUL

Y14

For m

ore

info

rmat

ion:

Pho

ne 1

800

OU

R N

BN

(180

0 68

7 62

6)

Vis

it ou

r w

ebsi

te a

t: w

ww

.nb

nco

.co

m.a

u/n

ewd

evel

op

men

tsE

mai

l us

at: n

ewd

evel

op

men

ts@

nb

nco

.co

m.a

u

Pre

parin

g ne

w d

evel

opm

ents

for t

he N

BN

It’s

impo

rtan

t tha

t bui

lder

s an

d ca

bler

s ta

lk to

new

hom

eow

ners

abo

ut th

e te

leco

mm

unic

atio

ns s

ervi

ces

they

may

wan

t to

acc

ess

in th

eir

hom

es a

nd p

rovi

de g

uida

nce

on w

here

NB

N e

quip

men

t, ph

one

and

data

out

lets

sho

uld

be lo

cate

d.

Bot

h fix

ed li

ne in

tern

et a

nd te

leph

one

serv

ices

will

be d

eliv

ered

ove

r th

e N

BN

. The

NB

N C

o eq

uipm

ent s

houl

d be

loca

ted

in a

saf

e lo

catio

n, w

here

it is

con

veni

ent t

o co

nnec

t tel

epho

ne a

s w

ell a

s co

mpu

ters

and

inte

rnet

TV.

It’s

impo

rtan

t to

rem

embe

r th

at if

cus

tom

ers

wan

t to

utilis

e ap

plic

atio

ns li

ke IP

TV

via

Sm

art T

Vs in

thei

r liv

ing

room

an

d te

lew

ork

via

HD

vid

eo c

onfe

renc

ing

in th

eir

offic

e th

ey s

houl

d co

nsid

er fi

xed

cabl

ing

in th

e ho

me

to c

onne

ct

thes

e de

vice

s.

ww

w.n

bnc

o.co

m.a

u

NB

N e

quip

men

t ins

talle

d w

ithin

the

hom

e –

wal

l spa

ce re

serv

atio

ns

Pow

er S

upp

ly w

ith B

atte

ry B

acku

p (P

S/B

)La

yout

exa

mpl

e on

ly –

for

othe

r con

figur

atio

ns re

fer

to N

BN C

o Re

side

ntia

l Pr

epar

atio

n an

d In

stal

latio

n Gu

ide:

SD

Us a

nd M

DUs

Net

wo

rk T

erm

inat

ion

Dev

ice

(NT

D)

Insi

de

Yo

ur P

rem

ises

Out

sid

e Y

our

Pre

mis

es

Pre

mis

es C

onn

ectio

n D

evic

e (P

CD

)

Sp

ace

rese

rved

for

Pow

er S

upp

ly w

ith

Bat

tery

Bac

kup*

* Bu

ilder

s sh

ould

alw

ays

prov

isio

n sp

ace

and

envi

ronm

ent f

or P

S/B.

It m

ay b

e pr

e-in

stal

led

or

requ

este

d by

the

end

user

dur

ing

the

life

of th

e bu

ildin

g.

Req

uest

ing

equi

pmen

t pre

-inst

alla

tion

To e

nabl

e a

smoo

th a

nd e

ffici

ent c

onne

ctio

n to

the

Nat

iona

l Bro

adba

nd N

etw

ork,

bui

lder

s/de

velo

pers

may

requ

est

a pr

e-in

stal

latio

n of

the

in-h

ome

equi

pmen

t sup

port

ing

NB

N a

cces

s on

beh

alf o

f all

owne

rs/o

ccup

iers

of t

he p

rem

ises

.

Pre

-inst

alla

tion

of th

e N

BN

in-h

ome

equi

pmen

t sho

uld

be a

rran

ged

to ta

ke p

lace

at l

east

20

days

ahe

ad o

f the

est

imat

ed

hom

e co

mpl

etio

n da

te.

To re

ques

t a P

re-In

stal

latio

n of

the

NB

N E

quip

men

t, vi

sit:

ww

w.n

bn

co.c

om

.au

/pre

inst

allr

equ

est

The

follo

win

g in

form

atio

n w

ill be

requ

ired

whe

n su

bmitt

ing

a re

ques

t:

• C

onfir

mat

ion

that

you

hav

e au

thor

ity o

f all

owne

rs a

nd

occu

pier

s to

mak

e th

is re

ques

t

• C

onfir

mat

ion

that

you

hav

e th

e ag

reem

ent o

f all

owne

rs

and

occu

pier

s to

wai

ve th

eir r

ight

to b

e gi

ven

notic

e by

N

BN

Co

of th

e pr

e-in

stal

latio

n un

der S

ched

ule

3 of

the

Tele

com

mun

icat

ions

Act

199

7

• P

rem

ises

add

ress

or a

ddre

sses

• D

evel

oper

est

ate

nam

e an

d st

age

num

ber

• C

onfir

mat

ion

that

pow

er is

ava

ilabl

e

• D

ate

by w

hich

the

prem

ises

will

be a

t sec

ure

‘lock

up’

sta

ge

• Es

timat

ed c

ompl

etio

n or

han

dove

r dat

e

• A

n on

site

con

tact

and

con

firm

atio

n th

at y

ou h

ave

thei

r pe

rmis

sion

to s

ubm

it th

eir c

onta

ct d

etai

ls

• C

onfir

mat

ion

that

an

Inte

rnal

and

Lea

d-in

Con

duit

has

been

in

stal

led

in a

ccor

danc

e w

ith N

BN

Co

guid

elin

es

• C

onfir

mat

ion

whe

ther

Pow

er S

uppl

y w

ith B

atte

ry B

acku

p w

ill or

will

not b

e re

quire

d

• P

refe

rred

inst

alla

tion

date

* Fo

r ind

oor i

nsta

llatio

n on

ly, N

BN e

quip

men

t is

not

inst

alle

d in

pro

hibi

ted

loca

tion,

suc

h as

bat

hroo

m, l

aund

ry

etc.

as

per N

BN-N

O-G

DE-

0011

Gui

des.

61

Page 64: Stage 13 Revised Design Guidelines Grand Vista Release

Appendix D - Approved Plan of Development

62

Page 65: Stage 13 Revised Design Guidelines Grand Vista Release
Page 66: Stage 13 Revised Design Guidelines Grand Vista Release

Appendix E - Minimum Documents Checklist DRC

64

Page 67: Stage 13 Revised Design Guidelines Grand Vista Release

Minim

um D

ocum

ents

Chec

klist

for D

RC

Site

Plan

(s) in

cludin

g but

not li

mited

to;

Bu

ilding

enve

lope,

ease

ments

with

dime

nsion

s (if a

pplic

able)

Setba

cks (

as pe

r POD

)

Lo

catio

n of a

ny re

tainin

g wall

s (if a

pplic

able)

Drive

way d

etails

inclu

ding f

inish

, colo

ur an

d cro

ss ov

er de

tails

Bin,

air-co

nditio

ning,

letter

box t

ype,

unit l

ocati

on an

d all a

ncilla

ry se

rvice

s (cl

othes

line,

rainw

ater t

anks

etc.)

Ar

ea sc

hedu

les

Fenc

ing P

lan an

d Elev

ation

inclu

ding b

ut no

t limi

ted to

;

Loca

tion

He

ight a

nd ty

pe

Ma

terial

s

Lette

rbox

Loca

tion i

n elev

ation

□ Flo

or pl

ans a

re to

inclu

de dw

elling

area

s with

area

sche

dule

Elev

ation

s sho

wing

mate

rials

and f

inish

es as

per g

uideli

nes i

nclud

ing bu

t not

limite

d to;

Na

tural

grou

nd le

vels

at ea

ch el

evati

on fa

ce

Ex

terna

l mate

rial s

electi

ons a

nd he

ights

Land

scap

ing pl

an in

cludin

g but

not li

mited

to;

ha

rd la

ndsc

aping

area

s

de

tails

and m

ateria

ls;

fencin

g deta

ils

lan

dsca

pe dr

ainag

e;

□ Ex

terna

l colo

ur sc

heme

and m

ateria

ls as

per G

uideli

nes

Bu

ilding

spec

ificati

on as

inclu

ded i

n the

build

ing co

ntrac

t

□ Re

nder

s

Fron

t elev

ation

Floor

plan

□ Al

l plan

s at s

cale:

1:10

0

□ Th

e guid

eline

s will

need

to be

read

care

fully

- for

exam

ple -

Gara

ges a

nd D

rivew

ays s

tates

that

for a

doub

le ga

rage

the m

axim

um w

idth

shall

be 4.

8m or

3.0m

for a

sing

le. W

e wou

ld ex

pect

that d

imen

sions

such

as th

is wi

ll be c

learly

mar

ked.

Apply

ing th

is ap

proa

ch to

all

eleme

nts of

the g

uideli

nes w

ill ma

ke fo

r an e

fficien

t app

rova

l pro

cess

. St

reet

Numb

er:

……

……

……

……

. Lo

t Num

ber:

……

……

……

……

……

……

….

Stre

et Na

me:

……

……

……

……

. Su

bmitte

rs Si

gnatu

re:

……

……

……

……

……

……

….

Page 68: Stage 13 Revised Design Guidelines Grand Vista Release

Appendix F - Execution

66

Page 69: Stage 13 Revised Design Guidelines Grand Vista Release

Providence Home Design Guidelines

Appendix F: Execution

The Buyer acknowledges having read and understood and agrees to comply with the Providence Home Design Guidelines in accordance with the terms of the Contract for the

purchase of the Lot. The Buyer acknowledges and agrees that the Lot is part of a master planned community the object of which is to establish a modern and well-designed residential

community and it is desirable that supervision and control be exercised by Daleswan Pty Ltd ACN 105 650 075 (the Seller) for the protection and in the interests of the Buyer and

other residents of the estate in relation to the nature and type of construction to be erected and in recognition of the desirability of the construction of a sound, modern and attractive

development.

Lot Number: ……………………………………………………………

Stage: ……………………………………………………………

Buyers Name: ……………………………………………………………

Address: ……………………………………………………………

……………………………………………………………

Signed: ……………………………………………………………

Dated: ……………………………………………………………

Buyers Name: ……………………………………………………………

Address: ……………………………………………………………

……………………………………………………………

Signed: ……………………………………………………………

Dated: ……………………………………………………………

Page 70: Stage 13 Revised Design Guidelines Grand Vista Release

Appendix G - Glossary of Terms

1

2

3

4

5

6

Balcony

Building Wall

Built to Boundary Wall

Driveways

Front Setback - Garage

Porch

• Pitched roofs

Site Cover Setbacks Corner Lot Setback

• Skillion roofs • Flat parapet roofsMaximum Building Height

9.0m

Bui

lt to

Bou

ndar

y W

all

Bui

lt to

Bou

ndar

y W

all

maxsite cover

Front Setback

Front Setback

STREETSTREET

Sid

e S

etba

ckS

ide

Set

back

Rear Setback Rear Setback

STREET

STR

EE

T

Sec

onda

ry F

ront

age

Set

back

Front Setback- Garage

Front Setback- Garage Front

Setback

1

23

5

6

Image Source: Plantation Homessite boundary4

68

Page 71: Stage 13 Revised Design Guidelines Grand Vista Release

BalconyA balcony occurs at the second level of your

home providing outdoor living access. It may

be covered or uncovered.

Building WallThe building wall is defined as the main wall of

your home and excludes eaves, awnings, shade

structures, porches, verandahs and balconies.

Built to Boundary WallRefers to a wall that is built up to the boundary

of an adjoining lot. Typically an allowance

is made for construction tolerance and roof

gutters to ensure no part of the building and/

or footings extend over the side boundary.

Corner Lot – Secondary Frontage SetbackThe secondary frontage setback is measured

to the building wall, edge of balcony and

verandah.

DrivewaysDriveway width is defined as the width of the

driveway as it crosses the allotment boundary.

Front Building Setback

??

Front SetbackThe front setback is measured to wall of the

building or edge of balcony and verandah.

Front Setback - Garage The garage setback refers to the wall

supporting the garage door or opening to your

garage.

Maximum Building HeightThe maximum building height of your home

is in the order of 9 metres from the allotment

ground surface level excluding projections

such as an antenna aerial, chimney, flagpole

or the like. This level is defined as the ‘as-

constructed’ finished level of the lot provided

by the developer.

PorchA porch delineates the entry to your home and

may extend forward of the front building wall.

Rear or Side Setback

adjoining a ParkIf your rear or side boundary fronts a park,

then balconies or verandahs may be built to

the boundary, provided eaves and gutters do

not extend beyond the boundary.

Roof MaterialRoof materials include:

• Colourbond style

• Flat profile roof tile

Roof TypesThere are 3 preferred roof types defined as

follows:

• Pitched roofs

• Skillion roofs

• Flat parapet roofs

Side and Rear SetbackThe side and rear setback is measured to the

building wall, edge of balcony and verandah.

Eaves (except on a built to boundary wall),

should not encroach within 450mm of the side

or rear boundaries. Gutters may not extend

beyond the boundary of the allotment.

Site CoverSite cover is defined as the proportion of

the site covered by buildings including roof

overhangs (eaves).

Street FrontagePrimary Frontage is the street to which

your address and house number is

allocated, where the Primary Frontage is not

specifically identified on the approved Plan of

Development or in Appendix D.

Secondary Frontage occurs on a corner

allotment where the side elevation of your

home also fronts the street (excluding a laneway).

VerandahA verandah is a covered area at ground level

that extends beyond the normal width of

eaves.

Verandah

69

Page 72: Stage 13 Revised Design Guidelines Grand Vista Release

Disclaimer:

This document and its content forms part of the contract for properties in Providence. Maps, photographs, drawings and plans are indicative only and may not be to scale. Prospective purchasers should undertake their own enquiries for their own benefit and satisfaction. It is recommended that you seek independent advice before entering into any agreement of any nature with any party.