S.R. 44 Corridor Management Plan

S.R. 44 Corridor Management Plan

Begin at

Samsula Dr

~7.4 miles

End at

Myrtle Ave

Project Overview

S.R. 44 Corridor Management Plan

• Study Limits – Samsula Drive to Myrtle Avenue

• Evolution of the Need for Planning Study

• Development Activity

• Proactive versus Reactive

• Avoid costly fragmented approach

• More effectively direct monies

S.R. 44 Corridor Management Plan

Study Focus Areas

S.R. 44 Corridor Management Plan

• Access Management Plan

• Operational Needs (Short and Long Term)

• Multi-Modal Evaluation

• Safety Assessment

S.R. 44 Corridor Management Plan

S.R. 44 Corridor Management Plan

Recommendations Overview

• Final Access Management Plan

• Near-Term Intersection Improvements

• Long-Term Intersection Improvements

• Multimodal Improvement Recommendations

• Potential Future Connections

S.R. 44 Corridor Management Plan

Recommendations Overview

• Final Access Management Plan

• Near-Term Intersection Improvements

• Long-Term Intersection Improvements

• Multimodal Improvement Recommendations

• Potential Future Connections

S.R. 44 Corridor Management Plan

Final Access Management Plan

• Maintain four-lane section throughout the length

of the study area

• Identify Potential Future Signal Locations

S.R. 44 Corridor Management Plan

Final Access Management Plan

• Median Modifications

• West corridor: new median cuts to be allowed to

provide access to planned development

• East corridor: modify or close existing median cuts to

better meet FDOT spacing standards, improving

safety and improve traffic flow on SR 44

• Timing / Process for Implementation

S.R. 44 Corridor Management Plan

S.R. 44 Corridor Management Plan

Ex: New median cut to provide access to planned development

Ex: Modify / close existing median cuts to better meet FDOT spacing

standards

S.R. 44 Corridor Management Plan

S.R. 44 Corridor Management Plan

Final Access Management Plan • Additional Consideration based on Public Feedback

• Corbin Park Road

• Commercial Access west and east of Eddie Road

• Chisholm Street

S.R. 44 Corridor Management Plan

Recommendations Overview

• Final Access Management Plan

• Near-Term Intersection Improvements

• Long-Term Intersection Improvements

• Multimodal Improvement Recommendations

• Potential Future Connections

Near-Term Intersection Improvements • New Signal Location(s)

• Sugar Mill Drive (Late 2013)

• Airport Road (Potential Future Signal)

• Signal Coordination: Shoppes at Coronado to Colony Park Rd

• To be completed by Volusia County (Late 2013)

• SR 44 at Mission Drive / Wallace Road

• Exclusive Eastbound Right-Turn Lane

• SR 44 at I-95 Interchange

• Southbound Ramp Improvements

S.R. 44 Corridor Management Plan

Near-Term Intersection Improvements • Right-Turn Lane at Mission Drive / Wallace Road

S.R. 44 Corridor Management Plan

S.R. 44 Corridor Management Plan

Recommendations Overview

• Final Access Management Plan

• Near-Term Intersection Improvements

• Long-Term Intersection Improvements

• Multimodal Improvement Recommendations

• Potential Future Connections

Long-Term Intersection Improvements

• Intersection Turn Lane Improvements

S.R. 44 Corridor Management Plan

Long-Term Intersection Improvements

• I-95 Interchange Loop Ramp Extension

S.R. 44 Corridor Management Plan

S.R. 44 Corridor Management Plan

Recommendations Overview

• Final Access Management Plan

• Near-Term Intersection Improvements

• Long-Term Intersection Improvements

• Multimodal Improvement Recommendations

• Potential Future Connections

Multimodal Improvements

S.R. 44 Corridor Management Plan

• Rural Section (West of Jungle Rd) – Bicycle Lane Markings Recently Completed

• Urban Section (East of Jungle Rd) – Options to Add Bicycle Lanes

• Median and Lane Width Adjustment to Add Bike Lanes within Existing Curb Line

• Conceptual, to be further evaluated in Design

• Multi-Use Paths – Currently Under Evaluation by City

Potential Bike Lane Improvement East of Jungle Road

S.R. 44 Corridor Management Plan

S.R. 44 Corridor Management Plan

Recommendations Overview

• Final Access Management Plan

• Near-Term Intersection Improvements

• Long-Term Intersection Improvements

• Multimodal Improvement Recommendations

• Potential Future Connections

Potential Future Connections • Paige Avenue Extension

• Williamson Boulevard Extension Options

• Cross-Access Connections

S.R. 44 Corridor Management Plan

• Add picture

Cross-Access

Please feel free to browse the displays.

The project team will be available to

answer questions and discuss the

recommendations.

S.R. 44 Corridor Management Plan

S.R. 44 Corridor Management Plan