Design Traffic Technical Memorandum 64 | Page SR 595/Alternate US 19 Corridor Study From Park Street North to Belleair Road in Pinellas County Table 4-10: Recommended Improvements for Alternative US 19 Intersection Improvements Park Street 1. Add two additional eastbound and westbound through lanes. 2. Add one additional northbound and southbound through lane. 3. Add a right turn lane to eastbound approach and channelize. Also channelize the existing right turn lanes. 4. Add an additional left turn lane to the eastbound, southbound, and northbound approaches. 5. Remove the split signal timing and modify cycle length, splits, and lag/lead options for enhanced operation. 95 th Street 1. Add two additional eastbound and westbound through lanes. 2. Modify signal cycle length, splits, and lag/lead options for enhanced operation. 100th Way 1. Add two additional eastbound and westbound through lanes. 2. Add one westbound right turn lane. 3. Add a westbound left turn lane. 4. Add a left turn lane to the southbound and northbound approaches. The through movement can be combined with one of the left turn lanes. 5. Modify signal cycle length, splits, and lag/lead options for enhanced operation. Park Boulevard* 1. Add channelized right turn lanes for all approaches. 2. Add a left turn lane for the southbound and westbound approaches. 3. Add an additional through lane for eastbound and westbound approaches. 4. Modify signal cycle length, splits, and lag/lead options for enhanced operation. 102nd Avenue* 1. Add right turn lanes for eastbound northbound, and southbound approaches. 2. Add two westbound left turn lanes. 3. Add one eastbound left turn lane to the eastbound and southbound approaches. 4. Add one lane to the southbound departure to aid the westbound left turning movement. 5. Modify signal cycle length, splits, and lag/lead options for enhanced operation. Lark Drive 1. Add one channelized northbound right turn lane. 2. Add one eastbound left turn lane. 3. Add one southbound left turn lane. 4. Add one lane to the southbound departure to aid the westbound left turning movement. 5. Modify signal cycle length, splits, and lag/lead options for enhanced operation. Ulmerton Road* 1. Channelize right turn lanes for all approaches. 2. Add two southbound and westbound left turn lanes. 3. Add one eastbound left turn lane. 4. Add three eastbound and westbound through lanes. 5. Add one through lane northbound. 6. Add one departure lane southbound that will continue to Lark Drive and become the left turn lane at Lark Drive. 7. Modify signal cycle length, splits, and lag/lead options for enhanced operation. Bay Drive 1. Channelize right turn lanes for southbound, northbound, and westbound approaches. 2. Add two eastbound and westbound through lanes. 3. Add one one southbound and westbound left turn lanes. 4. Protect left turn movements. 5. Modify signal cycle length, splits, and lag/lead options for enhanced operation. Rosery Road 1. Add one right turn lane for all movements. 2. Add one westbound and eastbound left turn lane. 3. Modify signal cycle length, splits, and lag/lead options for enhanced operation. Belleair Road 1. Add one westbound left turn lane. 2. Modify signal cycle length, splits, and lag/lead options for enhanced operation. * Improvements obtained LOS E in Synchro intersection analysis. Other evaluation methods may be needed to improve these intersections.

Upload: others

Post on 20-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Design Traffic Technical Memorandum 64 | P a g e

    SR 595/Alternate US 19 Corridor Study From Park Street North to Belleair Road in Pinellas County

    Table 4-10: Recommended Improvements for Alternative US 19

    Intersection Improvements

    Park Street

    1. Add two additional eastbound and westbound through lanes. 2. Add one additional northbound and southbound through lane. 3. Add a right turn lane to eastbound approach and channelize. Also channelize the existing right

    turn lanes. 4. Add an additional left turn lane to the eastbound, southbound, and northbound approaches. 5. Remove the split signal timing and modify cycle length, splits, and lag/lead options for

    enhanced operation.

    95th Street 1. Add two additional eastbound and westbound through lanes. 2. Modify signal cycle length, splits, and lag/lead options for enhanced operation.

    100th Way

    1. Add two additional eastbound and westbound through lanes. 2. Add one westbound right turn lane. 3. Add a westbound left turn lane. 4. Add a left turn lane to the southbound and northbound approaches. The through movement

    can be combined with one of the left turn lanes. 5. Modify signal cycle length, splits, and lag/lead options for enhanced operation.

    Park Boulevard*

    1. Add channelized right turn lanes for all approaches. 2. Add a left turn lane for the southbound and westbound approaches. 3. Add an additional through lane for eastbound and westbound approaches. 4. Modify signal cycle length, splits, and lag/lead options for enhanced operation.

    102nd Avenue*

    1. Add right turn lanes for eastbound northbound, and southbound approaches. 2. Add two westbound left turn lanes. 3. Add one eastbound left turn lane to the eastbound and southbound approaches. 4. Add one lane to the southbound departure to aid the westbound left turning movement. 5. Modify signal cycle length, splits, and lag/lead options for enhanced operation.

    Lark Drive

    1. Add one channelized northbound right turn lane. 2. Add one eastbound left turn lane. 3. Add one southbound left turn lane. 4. Add one lane to the southbound departure to aid the westbound left turning movement. 5. Modify signal cycle length, splits, and lag/lead options for enhanced operation.

    Ulmerton Road*

    1. Channelize right turn lanes for all approaches. 2. Add two southbound and westbound left turn lanes. 3. Add one eastbound left turn lane. 4. Add three eastbound and westbound through lanes. 5. Add one through lane northbound. 6. Add one departure lane southbound that will continue to Lark Drive and become the left turn

    lane at Lark Drive. 7. Modify signal cycle length, splits, and lag/lead options for enhanced operation.

    Bay Drive

    1. Channelize right turn lanes for southbound, northbound, and westbound approaches. 2. Add two eastbound and westbound through lanes. 3. Add one one southbound and westbound left turn lanes. 4. Protect left turn movements. 5. Modify signal cycle length, splits, and lag/lead options for enhanced operation.

    Rosery Road 1. Add one right turn lane for all movements. 2. Add one westbound and eastbound left turn lane. 3. Modify signal cycle length, splits, and lag/lead options for enhanced operation.

    Belleair Road 1. Add one westbound left turn lane. 2. Modify signal cycle length, splits, and lag/lead options for enhanced operation.

    * Improvements obtained LOS E in Synchro intersection analysis. Other evaluation methods may be needed to improve these intersections.

  • Design Traffic Technical Memorandum 65 | P a g e

    SR 595/Alternate US 19 Corridor Study From Park Street North to Belleair Road in Pinellas County

    Figure 4-16: Design Year (2040) Build Design Traffic Volumes and Lane Configuration Segment (Park Street North to Tom Stuart Causeway)

    Signalized ntersec on

    AADT

    A ea our olumes

    2, 00

    xxx xxx

    age of

    US Alt 19 at Park St.

    1

    US Alt 19 at 95th St.

    2

    US Alt 19 at 100th Way

    3

    Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri

    Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, ©OpenStreetMap contributors, and the GIS User Community

    0 0.40.2

    Miles

    313 1,578 726 (1,330)

    (764) (981)

    887 (1,089)

    984 836

    (587) (626)

    91 145 442 6 263 (275)

    (121) (36) (468) (1) 1,437 (1,943)

    583 (58)

    1 (8)

    (7) 13

    (163) 114

    (1,406) 1,771 0 46 21 52

    (38) 570 (0) (373) (32) (242)

    132 32 149 0 60 (158)

    (158) (2) (150) (0) 2,084 (2,051)

    323 (65)

    1 (2)

    (1) 3

    (113) 115

    (1,986) 1,944 0 11 9 56

    (8) 46 (0) (25) (25) (252)

    664 677 550 0 684 (564)

    (387) (728) (542) (1) 1,348 (1,285)

    32 (54)

    0 (2)

    (2) 0

    (436) 324

    (1,533) 1,368 2 655 703 27

    (495) 584 (2) (699) (659) (25)

    40,400

    33,700

    44,800

    14,500

    14,700

    6,700

    4,20052,700 40,400

    29,600

    44,100

    48,800

  • Design Traffic Technical Memorandum 66 | P a g e

    SR 595/Alternate US 19 Corridor Study From Park Street North to Belleair Road in Pinellas County

    Figure 4-17: Design Year (2040) Build Design Traffic Volumes and Lane Configuration Segment (Tom Stuart Causeway to Park Boulevard)

    Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri

    Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, ©OpenStreetMap contributors, and the GIS User Community

    0.1 0 0.10.05

    Miles

    Signalized ntersec on

    AADT

    A ea our olumes

    2, 00

    xxx xxx

    age 2 of

    US Alt 19 at Park Blvd.

    7 207 1,236 595 16 576 (590)(174) (1,152) (698) (30) 1,232 (1,321)443 (532)

    7 (4)

    (1) 0

    (210) 96

    (1,061) 1,419 17 200 1,219 614

    (269) 156 (20) (299) (1,070) (503)

    183 1,660 27 22 19 (23)

    (109) (1,884) (27) (31) 54 (61)

    143 (150)

    0 (0)

    (0) 0

    (65) 60

    (45) 86 1 60 1,894 165

    (115) 97 (5) (91) (1,765) (96)

    17 1,834 103 3 158 (121)

    (48) (1,894) (173) (6) 0 (1)

    71 (90)

    0 (0)

    (0) 0

    (32) 32

    (0) 0 2 9 1,829 163

    (15) 19 (0) (19) (1,759) (71)

    69 1,592 186 2 343 (245)

    (261) (1,497) (230) (14) 130 (185)

    43 (45)

    0 (0)

    (0) 0

    (116) 104

    (135) 109 0 122 1,560 63

    (268) 348 (4) (211) (1,634) (41)

    43,900

    35,700 52,300

    43,800

    5,200 5,000

    45,300

    1,100 4,900

    42,800

    12,000 11,000

    40,400

  • Design Traffic Technical Memorandum 67 | P a g e

    SR 595/Alternate US 19 Corridor Study From Park Street North to Belleair Road in Pinellas County

    Figure 4-18: Design Year (2040) Build Design Traffic Volumes and Lane Configuration Segment (Park Boulevard to Walsingham Road)

    Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri

    Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, ©OpenStreetMap contributors, and the GIS User Community

    0.15 0 0.150.075

    Miles

    Signalized ntersec on

    AADT

    A ea our olumes

    2, 00

    xxx xxx

    age 3 of

    US Alt 19 at 110th Ave.

    11

    US Alt 19 at Walsingham Rd.

    12

    US Alt 19 at 102nd Ave.

    10

    122 1,512 3 0 6 (31)

    (176) (1,447) (12) (2) 38 (62)

    96 (47)

    0 (0)

    (3) 3

    (150) 186

    (47) 26 1 194 1,485 22

    (241) 262 (5) (233) (1,567) (39)

    73 1,757 13 2 44 (47)

    (62) (1,609) (23) (8) 13 (22)

    93 (69)

    0 (0)

    (0) 0

    (30) 34

    (36) 6 0 83 1,572 90

    (102) 143 (8) (93) (1,723) (67)

    185 1,054 645 1 460 (514)

    (115) (1,207) (416) (3) 884 (1,101)

    601 (515)

    29 (9)

    (0) 3

    (215) 54

    (929) 1,214 12 152 1,196 558

    (118) 96 (22) (176) (1,199) (374)

    68 1,668 23 4 8 (6)

    (183) (1,711) (9) (6) 5 (5)

    6 (7)

    0 (0)

    (0) 0

    (125) 134

    (25) 16 28 74 1,644 8

    (130) 154 (6) (131) (1,753) (10)

    92 1,803 4 0 5 (8)

    (82) (1,660) (9) (3) 10 (12)

    46 (41)

    0 (0)

    (0) 0

    (154) 128

    (15) 2 23 73 1,799 1

    (230) 68 (36) (72) (1,779) (9)

    37,800

    10,200 3,000

    39,400

    3,900 3,200

    40,400

    29,200 45,700

    41,000

    6,500 400

    40,600

    4,600 1,300

    43,900

  • Design Traffic Technical Memorandum 68 | P a g e

    SR 595/Alternate US 19 Corridor Study From Park Street North to Belleair Road in Pinellas County

    Figure 4-19: Design Year (2040) Build Design Traffic Volumes and Lane Configuration Segment (Walsingham Road to Bay Drive)

    US Alt 19 at Bay Dr.

    17

    Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri

    Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, ©OpenStreetMap contributors, and the GIS User Community

    0.1 0 0.10.05

    Miles

    Signalized ntersec on

    AADT

    A ea our olumes

    2, 00

    xxx xxx

    age of

    15

    US Alt 19 at Ulmerton Rd.

    US Alt 19 at Lark Dr.

    14

    332 1,143 344 15 422 (414)

    (257) (1,128) (436) (13) 1,497 (1,378)

    384 (510)

    0 (0)

    (0) 0

    (226) 143

    (1,450) 1,534 0 225 1,085 468

    (17) 16 (1) (256) (1,092) (429)

    150 1,403 87 2 76 (68)

    (135) (1,434) (73) (0) 158 (187)

    103 (110)

    0 (0)

    (0) 0

    (203) 216

    (191) 216 2 287 1,490 99

    (243) 205 (11) (262) (1,469) (135)

    179 1,100 432 21 433 (468)

    (299) (945) (444) (44) 2,015 (2,126)

    493 (582)

    5 (16)

    (13) 8

    (463) 325

    (1,789) 2,240 16 232 1,145 432

    (223) 122 (10) (277) (1,186) (353)

    81 1,457 111 37 62 (85)

    (49) (1,494) (103) (40) 12 (29)

    236 (223)

    0 (0)

    (0) 0

    (102) 95

    (28) 35 8 54 1,620 175

    (51) 51 (11) (60) (1,578) (208)

    88 1,602 25 0 10 (15)

    (89) (1,611) (15) (0) 8 (14)

    33 (19)

    0 (0)

    (0) 0

    (71) 91

    (10) 0 1 112 1,648 7

    (74) 77 (5) (95) (1,642) (27)

    39,200

    39,200 49,200

    38,000

    13,600 7,800

    40,100

    57,600 68,200

    39,000

    4,200 7,200

    39,700

    37,800

    3,600 1,100

  • Design Traffic Technical Memorandum 69 | P a g e

    SR 595/Alternate US 19 Corridor Study From Park Street North to Belleair Road in Pinellas County

    Figure 4-20: Design Year (2040) Build Design Traffic Volumes and Lane Configuration Segment (Bay Drive to Belleair Road)

    94 1,252 128 3 73 (94)

    (68) (1,327) (200) (5) 348 (214)

    263 (323)

    0 (0)

    (0) 0

    (140) 125

    (374) 346 5 125 1,412 180

    (71) 69 (10) (94) (1,253) (232)

    94 1,463 26 7 15 (22)

    (74) (1,638) (5) (6) 21 (12)

    20 (27)

    0 (0)

    (0) 0

    (113) 74

    (18) 45 10 64 1,466 27

    (80) 75 (10) (85) (1,323) (29)

    14 1,372 52 0 67 (84)

    (70) (1,449) (39) (1) 46 (40)

    98 (87)

    0 (0)

    (0) 0

    (86) 81

    (55) 44 2 42 1,370 51

    (103) 118 (21) (102) (1,254) (88)

    161 1,277 131 16 118 (130)

    (105) (1,258) (210) (13) 405 (372)

    287 (245)

    0 (0)

    (0) 0

    (207) 239

    (343) 296 27 151 1,226 195

    (85) 99 (47) (215) (1,180) (156)

    9 1,658 25 39 50 (35)

    (8) (1,691) (19) (14) 4 (4)

    85 (110)

    0 (0)

    (0) 0

    (38) 35

    (0) 0 5 16 1,585 88

    (14) 17 (20) (37) (1,613) (24)

    Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri

    Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, ©OpenStreetMap contributors, and the GIS User Community

    0.1 0 0.10.05

    Miles

    US Alt 19 at Belleair Rd.

    22

    US Alt 19 at Rosery Rd.

    19

    Signalized ntersec on

    AADT

    A ea our olumes

    2, 00

    xxx xxx

    age of

    34,200

    12,500 14,600

    36,800

    4,500 1,300

    33,500

    5,200 4,500

    33,900

    14,700 17,300

    37,000

    1,200 3,200

    39,200