Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.

Upload: justin-waters

Post on 23-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Spring 2013 Section Engineers

ConferenceMarch 5, 2013

Guardrail ItemsTerry Chism, Div of Const.

Page 2: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Yes, there are & will be more changes and clarification for

Guardrail Many of the changes being made

now are the results of the comments received from the Field during the Guardrail Installation Training.

You made the difference with your concerns and comments – YOU DID GOOD!!!

Page 3: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Guardrail Mounting Height Important -What is

Maintenance to do on Damaged Guardrail??

27” Guardrail that is damaged will be replaced to a minimum height of 27”

If existing NCHRP 350/MASH Approved Guardrail End Treatments are damaged they may be repaired – if destroyed - then replace with current KY Approved NCHRP 350/MASH End Treatments

If non-NCHRP 350/MASH Guardrail End Treatments are damaged they must to be replaced with current NCHRP 350/MASH End Treatments

Page 4: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Proprietary Guardrail End Treatments will remain at

27” Mounting Height KY will continue using NCHRP 350 Approved 27”

Guardrail End Treatments until 29” End Treatments are Tested and Approved

TRANSITION: Utilize the last 2 sections of 12’ 6” Guardrail (25’) prior to the Pay Limits of the End Treatment to Transition from the 29”Guardrail Mounting Height to the 27” End Treatment --- ie do not change the mounting height within the pay limits of the end treatment

Page 5: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Mounting Height for Type 2A and Type 3 End Treatments

is 29” +/- 1” WHY?? These End Treatments are Built with

Generic Materials – they are not Proprietary Beginning with the June 2012 Letting Sect 719.03 KY 2012 Standard Specifications

has been changed to read “Construct guardrail 29 inches to the top of the rail, with a tolerance of plus or minus one inch above the theoretical pavement elevation” (shoulder slope extended)

Page 6: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Std Draw BHS-008 Rail System Type 3: Replaced by

Sepia #0066-15-2012 - Changed

dimension

1’ 9” dimension Changed to 1’ 11”

Page 7: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Std Draw RBR-025-05 Guardrail End Treatment Type 2A

Replaced by Sepia #07 6-15-12 – Added Details

Page 8: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Std Draw RBR-005-10 Guardrail Components Replaced by Sepia #008 6-15-2012 Removed Cable

Detail

Cable DetailRemoved

Page 9: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Std Draw RBE-100-09 Crash Cushion Type VI-BT & CT Replaced

by Sepia #009 8-24-2012

Note:A Class CT (reusable or self restoring) can beUsed at the Contractors Discretion

Page 10: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Std Draw RBR-001-11 Steel Beam Guardrail (W Beam)

Replaced by Sepia #012 12-11-2012

RemovedRequirement& Detail forBack-up Plate –PermanentChangePermits the

use of both 12’ 6”& 25’ GuardrailSections May & June Lettings

Page 11: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Sepia #12 Replaces RBR-001

NO Backup Plates NeededAllows 12’6” & 25’ Rail

Sections

RBR-001

Sepia #012

Page 12: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Low Fill Culverts with Guardrail Spans up to 25’

Without Post – What do we do??

Page 13: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

For Low Fill Culverts 25’ OpeningUse RBR-031 Guardrail End

Treatment Type 3 Pipe Drainage

Page 14: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const
Page 15: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const
Page 16: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

16

Type 7 End Treatment

50 Foot (2 break away post) Turndown end treatment attached to concrete anchor block (MUST HAVE). Flared 0’ to 4’ (desirable) from the normal guardrail line

Note 3 Std Draw RBR-050 “This guardrail end treatment is not for use on approach end on high speed NHS.”

Page 17: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Critical!!!Type 7 Concrete Anchor

1. The concrete anchor block maybe precast or cast-in-place. When the anchor is cast-in-place forming of the sides shall be required.

Page 18: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Bill Gulick say’s Type 7 Alternate End Treatment

OK

Page 19: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Bill Gulick say’s Type 7 Alternate End Treatment

OK

Page 20: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Do NOT Use this Drawing with the Title Block with

Manufacture on it

Page 21: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Use this Drawing with the Title Block without Manufacture on it

Page 22: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const
Page 23: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Deflections Bridge Pier NOT Considered – Cap

within 2’Heavy Coal Haul Route

Page 24: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

New York City Bus CrashHigh Center Gravity

VehicleNormal Guardrail to Close

Page 25: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Design, Construction & Maintenance be Aware!!!

Just because a Guardrail End Treatment is in place or in a set of plans it doesn’t make it right!!!!: It may NOT be at the proper location It may not be the best end treatment for that

location Design & Consultants need to check in

the field – so often 3R/4R plans place new treatments at the old/current location (may be 30 years old & incorrect)

Page 26: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Design, Construction & Maintenance be Aware!!!

Maintenance & Safety Projects need to be checked in the field for proper End Treatment Type and Location

Construction can/should make changes whenever they note an end treatment in the plans that does not look correct

When a Guardrail End Treatment is damaged and needs replaced, a field determination should be made as to proper Type and Location

Page 27: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Old BCT Replaced with Type 1 @ same Location – NOT long Enough to Shield

hazard

Page 28: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Minimum Length of Guardrail - including End Treatment – before a Fixed Object – 200

FeetTypical Guardrail Installations: Std Draw RBI-001, 002,Std Draw RBI-004 Type 1Std Draw RBI-005 Bridge ColumnStd Draw RBI-006 Sign Support

ALL CONTAIN THE FOLLOWING NOTE:

ALL CONTAIN THE FOLLOWING NOTE:

Std Draw RBB-001 & 002Guardrail & Bridge End

Std Draw RBB-010 Guardrail Transition From Normal ShdTo Narrow Bridge

Page 29: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Per Bill Gulick

“You CANNOT Disconnect(or separate)

Grading and Guardrail”

Page 30: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Grading Requirements Pads & SlopesGetting Good Pads but Poor Slopes beside

PadsGuardrail End Treatments Type 1 & 4A’s

2012 Std Draw shows 5’ of widening in the “Adjacent” area behind the guardrail – Sect A-A Side slopes 4:1 Desirable 3:1 Max

Page 31: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Extruder Head should be Parallel to the

Guardrail/Ground – Not dipping down like these

Page 32: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Extruder Heads shall be Parallel to the

Guardrail/Ground – Not dipping down like this

Page 33: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Improper Installation - Extruder Head not Pushed all the way on

Page 34: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Problems with Older ET’s with Wood Post

Lag Screws stripped and fall out – either replace Post or Rotate Old Post 180 Degrees and install new Lag screws (Pilot Holes)

Page 35: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

By Change Order – any/all of the following may be

changed on Pre June 2012 Projects

Guardrail Mounting Height 27” to 29” Change old stiff Type 2A End Treatment

to newer, softer Type 2A – Sepia 007 (no concrete required)

Guardrail Post in Rock can be changed to the new method of installation (no concrete required)

Delete backup plates Can be combined in one Change Order

Page 36: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Questions or Problems with new Guardrail

Specifications or Standard Drawings

Give me a call and we can discuss to help determine what changes or clarifications need to be made

502-564-4780 [email protected] I will work with Jeff Lail, Bill Gulick, Nasby

Stroop, Rachel Mills etc. to Correct I work Part Time so keep trying to get me

Page 37: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Yes, there are & will be more changes and clarification for

Guardrail Many of the changes being made

now are the results of the comments received from the Field during the Guardrail Installation Training.

You made the difference with your concerns and comments – YOU DID GOOD!!!

Page 38: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

Closing Thank you for your attention Hope you have found this

presentation and the Guardrail Installation Training to be Useful and Informative

More Classes in March Questions??

Page 39: Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const

2012 Standard Specification Section 719.03Guardrail:

New Requirement “Prior to ordering guardrail materials the Engineer

and the Contractor shall meet on the job site to check the guardrail end treatments locations designated in the plans against actual field conditions to determine if the locations and end treatment  types are appropriate.  Adjustments will be made as appropriate and final location and end treatment types will be approved by the engineer.  If considered necessary, the Engineer will consult with the Division of Design.”

Comments, performed any, useful, made changes??