KHURAIS-GOSP PROJECTSPOOLS TRACKING SYSTEM

Programmed by : Renee Gatdula

Spool Tracking System“Special Kind of

Tool”Gathered Data’s from:SPOOLGEN – Master Listing of Plan SpoolsPTS – Master File of Plan/Done, PK/PF (Shop/Field Weld) in Dia-inch.GEMAPI – Master file of Issued MaterialTEDFLOW – Master file of Hydrotest Status (Testpack/Laid-up/Re-ins.)Gives Information and Data’s of:QC Fabrication – Date Released from the Fabrication.Material Controller – Date’s/Ref. of Spools for FBE(Liquid Coating),NDTQC/Painting Department – Date Released from Painting DepartmentTestpack – Status of testpack per Line Number on Weld done/ Test DateRe-Instated – Date Re-ins.

Material Issuance – Date release to site for installation

LAID-UP – Date Laid-up

Author by : Nicola Negri

This is the Main Screen

HEADER’S DESCRIPTION1. TEST PACKAGE NO2. P.I.D NO3. LINE NUMBER4. SPOOL NO5. LINE Dia. (Average Diameter of the Spool)6. PIPING CLASS (Base Material of the Spool)7. Fab PK Plan (Dia-inch Plan as per Welding Map –Shop Welding)8. Fab PK Done (Fabrication status if shop weld is done)9. Fab QC Date Release10. FBE Ref No (Document Reference for Internal FBE Coating)11. FBE Date Send (Date of the Spool send fro FBE Coating)12. FBE Date Received (Date of the Spool received from FBE Coating)13. QC Paint Rel. Date (Date of the Spool Released from Painting

Department)14. LAYDOWN/ISS DATE (Date Issued/Received to WORKSITE)15. SITE PF PLAN (Plan Field Welding as per Welding Map)16. SITE PF DONE (Actual Field Welded Done as per PTS – Pipe Trucking

System)17. PTS Progress (Status of Weld done)18. FAB SOP (Fabrication SCOPE OF WORK – if/or send to SUBCON)

FILTER DATA BY TEST PACKAGE DATAS:

ALL OF THE LINE NUMBER/SPOOL NO UNDER TESTPACK NO 0123 WILL BE FILTERED AND SHOWN ON SCREEN.

FROM THIS POINT OF VIEW YOU CAN SEE/ANALYSE THE STATUS OF YOUR TESTPACK NO 0123 PER LINE NUMBER

BY SPOOL NO.

PRINTING SUMMARY REPORT BY TESTPACK

SUMMARY REPORT OF TESTPACK (TESTED, LAID-UP, RE-INSTATED)

ON SCREEN WILL APPEAR THE

SUMMARY REPORT

LAID-UP DATE

RE-INSTATED DATE And some Info’s

TESTED DATE

SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY

TESTPACK

FILTER DATA BY LINE NUMBER

ALL OF THE INFORMATION REGUARDING LINE NUMBER B32-

SR-0378 WILL BE DISPLAY ON SCREEN.

TAKE NOTE OF THE TESTPACK NUMBER- IN ONE LINE NUMBER THERE MAYBE 2 OR 3 TESTPACK

NO.

SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY

LINE NUMBER