![Page 1: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/1.jpg)
POWER FEED AND PRIMARY SWITCHGEAR UPGRADESPUBLIC UTILITIES COMMISSIONCIVIC DESIGN REVIEW - PHASE 1 - NOVEMBER 14, 2016
SOUTHEAST PLANTCITY & COUNTY OF SAN FRANCISCO
![Page 2: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/2.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 2
Project Site
EVA
NS
AVEN
UE
PHELPS STREET
3RD STREET
RANKIN STREET
CALTRAIN RAILROAD
9
1012
9
13
11
6
2
3
5
4
7
8
8
1
14
PROJECT SITE
O 100’ 200’ 400’
ACCESS ROAD
BACKGROUNDThe proposed electrical building is located at the South-east Water Pollution Control Plant (SEP), located at the corner of Evans Avenue and Phelps Street. The plant serves 2/3 of the City’s citizens and is the San Francisco Public Utilities Commission’s (SFPUC) largest wastewater treatment facility.
OBJECTIVETo upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future Sewer System Improvement Program (SSIP) facilities’ demand and peak loads.
BUILDING SOLUTIONTo provide a building enclosure for electrical equipment that is “contemporary” in design and responsive to the existing structures on site. Proposed facility shall also be resistant to the corrosive environment created by the wastewater treatment plant.
1. Secondary Sedimentation Tanks2. Secondary Sludge Control Building3. Gallery4. Pretreatment Facility5. Sedimentation Building6. Aeration Tanks7. Postchlorination Building8. Chlorine Contact Channels9. Administration Laboratory Buildings10. Sedimentation Buildings11. Dryer Building12. Service Building13. Operators Building14. Small Concrete Building
SURROUNDING BUILDINGS LEGEND
PROJECT LOCATION
![Page 3: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/3.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 3
Southeast Plant - Surrounding Buildings
![Page 4: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/4.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 4
Site Plan
SODIUM HYPOCHLORITE TANKS
SECONDARY SEDIMENTATION TANKS
SECONDARY SLUDGE CONTROL BUILDING
SEDIMENTATION BUILDING
AERATION TANKS
PRETREATMENT FACILITY
EVA
NS
AVEN
UE
SECURITY WALL
O 16’ 32’ 64’
ACCESS ROAD
PROJECT SITE: SEP 032
SUBSTATIONAREA
![Page 5: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/5.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 5
SEP 032 - Existing Conditions
![Page 6: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/6.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 6
Site PlanO 15’ 30’ 60’
SODIUM HYPOCHLORITE
TANKS
SECONDARY SEDIMENTATION TANKS
SECONDARY SLUDGE CONTROL BUILDING
SEDIMENTATION BUILDING
PRETREATMENT FACILITY
EVA
NS
AVEN
UE
SECURITY WALL
ACCESS ROAD
SEP 032
![Page 7: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/7.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 7
Second Floor Plan
AA
B
B
MECHANICALROOM
SWITCHGEARROOM
BATTERYROOM
SUBSTATION AREA
SODIUM HYPOCHLORITE TANKS
O 5’ 10’ 20’ First Floor Plan
UP
DN
DN
DN UP
![Page 8: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/8.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 8
SECTION A-A
SECTION B-B
Building Sections
MECHANICALROOM
SWITCHGEARROOM
O 5’ 10’ 20’
MECHANICALROOM
SWITCHGEARROOM
SODIUMHYPOCHLORITE
TANKS
SUBSTATION AREA
SODIUM HYPOCHLORITE TANKS
BATTERYROOM
![Page 9: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/9.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 9
Imagery
![Page 10: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/10.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 10
Previous Design (CDR Phase 1 Approval 05.16.2016) - View from Northeast
![Page 11: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/11.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 11
Proposed Design - Exterior Elevations
EAST ELEVATIONSOUTH ELEVATION
O 4’ 8’ 16’
FIRST FLOOR0’-0”
SECOND FLOOR14’-0”
ROOF30’-0”
![Page 12: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/12.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 12
Proposed Design - Exterior ElevationsO 4’ 8’ 16’
WEST ELEVATIONNORTH ELEVATION
FIRST FLOOR0’-0”
SECOND FLOOR14’-0”
ROOF30’-0”
![Page 13: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/13.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 13
Proposed Design - View from Northeast
![Page 14: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/14.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 14
Proposed Design - View from Southeast
![Page 15: SOUTHEAST PLANT POWER FEED AND PRIMARY … Primary Power Feed and Primary...To upgrade the main switchgear system to provide pow-er for all existing SEP electrical loads and future](https://reader033.vdocuments.site/reader033/viewer/2022060412/5f10d3927e708231d44b00f3/html5/thumbnails/15.jpg)
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 15
Proposed Design - View from Northwest