South Ayrshire Council Local Development Plan Action Programme: Introduction The Action Programme is in three parts: - Part 1: SPG PROGRAMME Outlines all supplementary guidance. The planning guidance contains existing and proposed supplementary guidance with all actions relating to whether that supplementary guidance is linked to LDP policies, or whether it is free-standing guidance. The actions are prioritised on the basis of when the action requires to be carried out. The prioritisation is not an indication of the strategic importance of the guidance, but an indication of when the action requires to be completed, relative to the production of the LDP. As such, low priority items do not require to be completed on or shortly after LDP adoption. Higher priority items may require action (i.e. production of guidance to draft stage) by examination, to identify how a policy within the LDP may be delivered. The action programme also contains a risk log, which indicates the risk of failure to deliver the action, likelihood of risk occurrence, and the required remedial action. Part 2: LDP ACTIONS Contains actions for each LDP policy. This part of the programme also contains risk log and prioritisation of actions, again, based on when the action needs to be completed; not strategic significance of the action. A large portion of policies have no specific completion date, as they will be enacted through the application of LDP policies. These have been identified as ongoing items, and have generally been allocated as the responsible of the Council, due to its role as planning authority. Other policies and masterplans have specific actions identified. Part 3: SITE ACTIONS Contains actions for each LDP housing site. This part of the programme also contains risk log and prioritisation of actions, again, based on when the action needs to be completed; not strategic significance of the action. Many sites have no specific action, other than delivery of site. These actions have, therefore, been left without fixed completion dates, as it is largely at the control of the developer as to when a site is delivered. Timescales were indicated as being delivered in up to 10 years from LDP adoption although the Council has confidence that any site identified in the programme can assist to maintain an effective 5-year supply of housing land. Site constraints have been programmed in, with actions directly related to overcoming constraints. Responsible persons are not necessarily expected to deliver the entire site, but may be named because they play a significance consultative role in respect of a particular part of the action. Additional clarification on stakeholder roles is contained within this part, if necessary.

Upload: others

Post on 21-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • South Ayrshire Council Local DevelopmentPlan Action Programme: IntroductionThe Action Programme is in three parts: -

    Part 1: SPG PROGRAMME Outlines all supplementary guidance. The planning guidance contains existing

    and proposed supplementary guidance with all actions relating to whether that supplementary guidance is

    linked to LDP policies, or whether it is free-standing guidance. The actions are prioritised on the basis of

    when the action requires to be carried out. The prioritisation is not an indication of the strategic importance

    of the guidance, but an indication of when the action requires to be completed, relative to the production of

    the LDP. As such, low priority items do not require to be completed on or shortly after LDP adoption. Higher

    priority items may require action (i.e. production of guidance to draft stage) by examination, to identify how

    a policy within the LDP may be delivered. The action programme also contains a risk log, which indicates the

    risk of failure to deliver the action, likelihood of risk occurrence, and the required remedial action.

    Part 2: LDP ACTIONS Contains actions for each LDP policy. This part of the programme also contains risk log

    and prioritisation of actions, again, based on when the action needs to be completed; not strategic

    significance of the action. A large portion of policies have no specific completion date, as they will be enacted

    through the application of LDP policies. These have been identified as ongoing items, and have generally

    been allocated as the responsible of the Council, due to its role as planning authority. Other policies and

    masterplans have specific actions identified.

    Part 3: SITE ACTIONSContains actions for each LDP housing site. This part of the programme also contains

    risk log and prioritisation of actions, again, based on when the action needs to be completed; not strategic

    significance of the action. Many sites have no specific action, other than delivery of site. These actions have,

    therefore, been left without fixed completion dates, as it is largely at the control of the developer as to when

    a site is delivered. Timescales were indicated as being delivered in up to 10 years from LDP adoption –

    although the Council has confidence that any site identified in the programme can assist to maintain an

    effective 5-year supply of housing land. Site constraints have been programmed in, with actions directly

    related to overcoming constraints. Responsible persons are not necessarily expected to deliver the entire

    site, but may be named because they play a significance consultative role in respect of a particular part of

    the action. Additional clarification on stakeholder roles is contained within this part, if necessary.

  • Action

    Ref.

    Relevant LDP

    Policy LDP Action Priority

    Responsible

    Person(s) Notes Draft Stage Consultation Adoption Progress at June 2011

    Progress at May

    2012 Implications of risk occurence

    Likelihood

    of risk

    occurence

    Risk contingency/ remedial

    action

    1

    N/A - no direct link

    to LDP

    Review of dormer windows

    SG Low SAC Planning

    Dependant on revised permitted

    development rights. Post LDP adoption N/A N/A N/A N/A None Low

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    2

    LDP Policy: Rural

    Housing

    Review of housing in

    countryside SG High SAC Planning

    Summer/Autumn

    2012 Autumn 2012

    Immediately

    following LDP

    adoption

    (expected

    Spring 2014)

    Not scheduled to start yet.

    No progress. Not Started.

    If up-to-date guidance is not

    available at or soon after LDP

    adoption, this will compromise

    the effectiveness and operation

    of rural housing policies. Moderate

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    Existing policies and SALP rural

    housing guidance note should be

    used as a last option.

    3

    N/A - no direct link

    to LDP

    Review of velux roof lights

    SG Low SAC Planning

    Dependant on revised permitted

    development rights. Post LDP adoption N/A N/A N/A N/A None Low

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    4

    LDP Policy: Historic

    Environment

    Review of historic

    environment SG High

    SAC Planning;

    consultation with HS

    Summer/Autumn

    2012 Autumn 2012

    Immediately

    following LDP

    adoption

    (expected

    Spring 2014)

    Not scheduled to start yet.

    No progress. Not Started.

    If up-to-date guidance is not

    available at or soon after LDP

    adoption, this will compromise

    the effectiveness and operation

    of historic environment policies. Moderate

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    Existing policiesshould be used as

    a last option.

    5

    LDP Policy: Historic

    Environment

    Review of replacement

    windows in LB's/CA's SG High

    SAC Planning;

    consultation with HS

    Policy content broadly to remain as

    existing; SG to be updated to reflect

    procedures.

    Summer/Autumn

    2012 Autumn 2012

    Immediately

    following LDP

    adoption

    (expected

    Spring 2014)

    Not scheduled to start yet.

    No progress. Not Started.

    If up-to-date guidance is not

    available at or soon after LDP

    adoption, this will compromise

    the effectiveness and operation

    of historic environment policies. Moderate

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    SHEP should be used as a last

    option.

    6

    N/A - no direct link

    to LDP

    Review of Supplementary

    Guidance: Satellite Receiver

    Dishes Low SAC Planning

    Existing guidance in place. May

    benefit from review. Post LDP adoption N/A N/A N/A N/A None Low

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    7

    N/A - no direct link

    to LDP Review of HMO SG Low SAC Planning Complete Post LDP adoption N/A N/A N/A N/A None Low

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    8

    N/A - no direct link

    to LDP

    Review of control of

    sunshades and canopies on

    commercial frontages SG Low SAC Planning Post LDP adoption N/A N/A N/A N/A None Low

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    Milestones

    LDP Action Programme: Supplementary Guidance Actions

    Risk Log

  • 9

    N/A - no direct link

    to LDP

    Supplementary Guidance:

    Shopfront Security Low SAC Planning Post LDP adoption N/A N/A N/A N/A None Low

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    10

    LDP Policy: Historic

    Environment

    Review of window

    alterations policy guidelines

    leaflet High

    SAC Planning;

    consultation with HS

    Future of leaflet to be considered as

    part of formal SPG (as above).

    Summer/Autumn

    2012 Autumn 2012

    Immediately

    following LDP

    adoption

    (expected

    Spring 2014)

    Not scheduled to start yet.

    No progress. Not Started.

    If up-to-date guidance is not

    available at or soon after LDP

    adoption, this will compromise

    the effectiveness and operation

    of historic environment policies. Moderate

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    SHEP should be used as a last

    option.

    11

    LDP Policy:

    Development

    Opportunities

    Review of development

    opportunities High SAC Planning

    Future development opportunities

    to be identified for inclusion in LDP

    For proposed LDP

    Consultation

    Alongside LDP

    Consultation

    Alongside LDP

    Consultation

    (expected

    August 2012)

    Significant amount of work

    has been completed, under

    the site selection process

    for LDP. Due for completion

    before Autumn 2011. Not Started.

    If development opportunity sites

    are not identified by consultation

    on proposed LDP, proposed uses

    may be challenged at

    examination

    Use existing development

    opportunities brochure, for

    remaining opportunities.

    12

    N/A - no direct link

    to LDP

    Supplementary Guidance:

    Wildlife Strategy Low AJPU Spring 2012 Summer 2012 Autumn 2012

    Not scheduled to start yet.

    No progress. ? ?

    13

    LDP Policy: Wind

    Energy

    Supplementary Guidance:

    Wind Farms: Addendum to

    Ayrshire Joint Structure Plan

    Technical Report High

    SAC Planning and

    AJPU

    A review of the document is

    necessary prior to the publication of

    the Proposed LDP, to determine if

    further, more significant changes

    require to be made to that

    document.

    SEPA consultation advses that

    review should consider SEPA

    guidance on impact on peat

    resources.

    Summer/Autumn

    2012 TBC TBC

    Not scheduled to start yet.

    No progress. Not Started.

    If up-to-date guidance is not

    available at or soon after LDP

    adoption, this will compromise

    the effectiveness and operation

    of wind energy policy. Moderate

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    Existing standards should be used

    as a last option.

    14

    LDP Policy:

    Affordable Housing

    and LDP Policy:

    Delivering

    Infrastructure

    Review affordable housing

    SG High

    SAC Planning and

    Housing

    Existing policy to be updated as set

    out in existing MIR. It should be

    noted that the inclusion of an

    education infrastructure SG does

    not imply that education faciltiies

    are not the only infrastructure

    services required for a site. The

    programme indicated that work on

    an education SG requires to be

    undertaken because, currently, no

    such SG exists.

    Summer/Autumn

    2012 Jan-12

    Immediately

    following LDP

    adoption

    (expected

    Spring 2014)

    Not scheduled to start yet.

    No progress. Not Started.

    If up-to-date guidance is not

    available at or soon after LDP

    adoption, this will compromise

    the effectiveness and operation

    of housing policies and collection

    methods for contributions. Moderate

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    Existing standards should be used

    as a last option.

    15

    LDP Policy:

    Residential

    Development

    within Settlements,

    Release sites and

    Windfall Sites.

    Prepare residential amenity

    standards SG High SAC Planning

    Summer/Autumn

    2012 Autumn 2012

    Immediately

    following LDP

    adoption

    (expected

    Spring 2014)

    Not scheduled to start yet.

    No progress. Not Started.

    If up-to-date guidance is not

    available at or soon after LDP

    adoption, this will compromise

    the assessment of applications

    for residential and householder

    development. Low

    Existing standards should be used

    as a last option.

    16

    LDP Policy: Open

    Space Review open space SG Low

    SAC Planning,

    Sustainable

    Development and

    Parks Complete N/A N/A N/A Complete Complete N/A Low

    Review timescales and produce at

    earliest opportunity. Review

    whether existing guidance is out-

    of-date, and requires increased

    emphasis and higher priority.

    17

    LDP Policy:

    Delivering

    Infrastructure

    Preparation of Education

    Contributions SG High

    SAC Planning and

    Education

    Required by LDP adoption to avoid

    policy void. Strategic Direction must

    be set prior to proposed plan.

    Summer/Autumn

    2012 Jan-12

    Immediately

    following LDP

    adoption

    (expected

    Spring 2014)

    Minimal progress. Inital

    consultation meeting with

    Education Service;

    however, the Proposed LDP

    must precede the

    preparation of this SPG. Not Started.

    If policy is not drafted by

    adoption, there will be no

    standard method of collecting

    contributions. Moderate

    Policies must at least be

    implementable as a draft.

  • Low: SPG

    completion to

    draft or adoption

    does not need to

    follow imminently

    after LDP

    adoption.

    Medium: SPG

    should be adopted

    shortly after LDP

    adoption. Should

    at least be

    completed to

    draft.High: SPG ideally

    to be progressed

    to draft before the

    LDP can be

    submitted to

    DPEA for

  • Action Ref. Relevant LDP Policy LDP Action Priority

    Responsible

    Person(s) Notes

    Progress at

    June 2011

    Progress at May

    2012

    Implications of risk

    occurence

    Likelihood of

    risk occurence

    Risk contingency/

    remedial action

    Strategic Policy

    18

    LDP Policy: Spatial

    Strategy

    Multiple actions as expressed

    more fully in LDP policies Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A Failure of LDP strategy Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    19

    LDP Policy:

    Greenbelt

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Failure of greenbelt policy,

    which could result in harm

    to the high value rural

    landsacpe and the growth

    stratgey for the main

    urban area within South

    Ayrshire. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    20

    LDP Policy: The

    Coast

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Harmful impacts to the

    coast and prominent

    adverse impacts on the

    coastal areas of South

    Ayrshire. Potential harm to

    the CSGN implementation. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    21

    LDP Policy:

    Sustainable

    Development

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    harmful impacts on the

    character and amenity of

    the natural and built

    environment. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    N/A

    LDP Policy:

    Delivering

    Infrastructure

    Produce a SG on Developer

    contributions - Education,

    Affordable Housing and Open

    SpaceEconomic

    Development

    22 LDP Policy: Tourism

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Failure to capitalise on

    tourism opportunities.

    New tourism development

    being directed to

    inaprpopraite locations. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    23

    LDP Policy: Business

    & Industry

    Preparation of Industrial and

    Employment Land Supply

    Report and maintenance of

    industrial land supply. High

    South Ayrshire

    Council Complete study N/A

    Draft land supply

    complete. Requires

    editorial work.

    If supply is not accurate

    and up-to-date, land

    supply and allocations may

    be challenged at

    examination stage.

    Direction of policy may be

    affected by challenge if not

    complete. High

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    Identification of

    additional

    industrial land.

    24

    LDP Policy: Glasgow

    Prestwick Airport

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Failure of policy would

    undermine the airport,

    which is one of the key

    economic assets for South

    Ayrshire. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    LDP Action Programme: LDP Policy Actions

    Risk Log

    SEE SPG ACTIONS 14, 16 & 17

    Ongoing action.

    Due date for completion

    Complete by August 2012; review

    annually.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

  • 25

    LDP Policy: Newton-

    on-Ayr

    Prepare masterplan for

    Newton-on-Ayr. Moderate

    SAC/ Port

    Authority

    Masterplan for Ayr Port

    completed N/A None.

    Risk that before

    masterplan completion,

    development of the area is

    not co-ordinated to ensure

    best fit for varying uses,

    and implications for

    amenity impact. Moderate

    26

    LDP Policy:

    Heathfield

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that industrial

    development at Heathfield

    is displaced or lost. Risk

    that Heathfield becomes

    open out-of-centre retail

    operation, undermining

    town centre. Moderate

    27

    LDP Policy: Office

    Development

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that office

    development isn't

    effectively guided to

    preferred areas. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    28 LDP Policy: Ports

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that role of ports is

    undermined: the major

    ports in terms of their

    economic role, and the

    existence of smaller ports. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    N/A

    LDP Policy:

    Development

    Opportunities

    Preparation of list of

    development opportunities,

    indicating preferred uses for

    opp. sites.

    29

    LDP Policy: Galloway

    and Southern

    Ayrshire Biosphere

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that inappropraite

    development harms the

    environmental quality of

    biospehere. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    Communities

    30

    LDP Policy: General

    Retail

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that town centre is

    undermined and declines

    as retail centre. Growth of

    out-of-centre retailing. Moderate

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    31

    LDP Policy: Town

    Centres

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that town centre is

    undermined and declines

    as retail centre. Growth of

    out-of-centre retailing. Moderate

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    32

    LDP Policy: Local

    Centres & Small

    Settlement Town

    Centres

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk of loss of local retail

    amenities. Moderate

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    33

    LDP Policy:

    Maintenance and

    Protection of an

    Effective Housing

    Land Supply

    Maintain an effective 5 year

    residential land supply and

    annually review effective

    supply High

    SAC/ Private

    Sector

    Site allocated are developed

    out over plan period N/A

    2011 & 2012

    reviews currently

    underway

    Risk that if 2011 and 2012

    figures do not match,

    housing supply could be

    too high or low; and

    therefore LDP may be

    challengable at

    examination. High

    Urgent review of

    policy, monitoring

    of appeal decisions

    and effectiveness

    of housing sites.

    Potentially allocate

    additional sites to

    make up any

    SEE SPG ACTION 11

    Ongoing action.

    For LDP adoption, or soon after.

    Estimated December 2013.

    Continuous; annual review.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

  • 34

    LDP Policy:

    Residential Policy

    within Settlements,

    Release Sites and

    Windfall Sites

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that new residential

    development is not of an

    adequate amenity or

    design standard. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    N/A

    LDP Policy: Rural

    Housing Prepare SG on Rural Housing

    N/A

    LDP Policy:

    Affordable Housing Prepare new SG

    35

    LDP Policy: Gypsy

    and traveller

    Accommodation

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk of lack of provision of

    sites, and use of non-

    planned sites. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    36

    LDP Policy:

    Telecommunications

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A Minimal risk. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    37

    LDP Policy: Open

    Space

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Impact could include loss

    of valued open spaces and

    associated facilities. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    38

    LDP Policy: Belleisle

    & Rozelle Prepare Masterplan Moderate

    SAC - Children

    & Community

    Directorate;

    planning;

    roads;parks

    services

    Regeneration of Belleisle

    Park and Restoration of

    Listed Buildings Completion

    of Masterplan and adoption

    as SG N/A N/A

    Potential deterioration of

    open space and historic

    building, particularly at

    Belleisle. Moderate

    Review timescales

    for production of

    masterplan;

    continue to apply

    relevant LDP

    policies.

    39

    LDP Policy: Craigie

    Estate Prepare Masterplan Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk to the project of the

    relocation of Ayr Academy. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    40

    LDP Policy:

    Community Facilities

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Potential loss of important

    community facilities. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    41TO BE

    COMPLETE

    D

    FOLLOWIN

    G

    CONSULTAT

    ION Girvan Harbour side

    Development Brief to be

    prepared to Project to include

    multi-faceted community

    facility.

    Moderate

    SAC/ Children

    & Community

    Directorate/

    Local

    Community

    Preparation of a

    development brief N/A

    Girvan community

    charrette held,

    outcome report

    prepared

    If masterplan not

    completed, there could be

    land-use difficulties at

    planning application stage;

    development may not be

    co-ordinated. Moderate

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    Environment &

    Climate Change N/A

    SEE SPG ACTION 2

    SEE SPG ACTION 14

    Ongoing action.

    Construction to begin on multi-

    faceted facility in December 2012

    For LDP adoption, or soon after.

    Estimated December 2013.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

  • 42

    LDP Policy:

    Landscape Quality

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that landscape

    character and quality of

    South Ayrshire is harmed

    by development. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    43

    LDP Policy:

    Landscape

    Protection

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that landscape

    character and quality of

    South Ayrshire is harmed

    by development. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    44

    LDP Policy:

    Woodland &

    Forestry

    Adoption of Ayrshire & Arran

    Woodland Strategy Low AJPU

    1. Visual improvement of

    commercial forest from out

    with 2. Improvement in

    biodiversity N/A

    ? - seek update from

    AJPU ? - seek input from AJPU Moderate

    45

    LDP Policy: Tree

    Preservation

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk of loss of important

    trees/ treebelts. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    46

    LDP Policy: Central

    Scotland Green

    Networks

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    47

    LDP Policy: Water

    Environment

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Harmful impacts of water

    environment. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    48

    LDP Policy: Flooding

    & Development

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Risk that flooding is not

    properly accounted for in

    new development. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    49

    LDP Policy:

    Agricultural Land

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Loss of prime quality

    agricultural land. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    50

    LDP Policy: Air,

    Noise and Light

    Pollution

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Adverse impact on

    amenity. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    51

    LDP Policy: Minerals

    & Aggregates

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Innappropraite extratcion

    of minerals, resulting in

    landsacpe harm and

    adverse impact on

    communities. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    52

    LDP Policy: Low and

    Zero Carbon

    Buildings

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    New building will not be as

    energy efficient as

    possible. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    ? - seek update from AJPU

    Ongoing action.

    Ongoing action.

  • 53

    LDP Policy:

    Renewable Energy

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    renewable energy

    proposals will be more

    difficult to control, in

    terms of landsacpe impact. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    N/A

    LDP Policy: Wind

    Energy

    Review current AJSP technical

    appendix; undertake

    landscape character

    assessment.

    N/A

    LDP Policy: Historic

    Environment Preparation of SG.

    56

    LDP Policy:

    Archaeology

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Loss of archaeological

    resources. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    57 LDP Policy: Estates

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    The quality of estates

    declines or development

    within grounds has

    unacceptable impact. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    58

    LDP Policy: Natural

    Heritage

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Harm to natural heritage

    resources. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    59

    LDP Policy: Waste

    Management

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Lack of guidance on

    location of waste

    management facilities. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    60

    LDP Policy: Dark

    Skies

    Prepare guidance for lighting

    within Dark Sky area and

    periphery Low

    SAC/EAC/D&GC

    /FC

    Prepare Guidance (non-

    statutorily linked to LDP) on

    acceptable lighting

    standards within Dark Sky

    Park. N/A N/A

    Lack of consistency in

    dealing with planning

    applications for

    development in dark sky

    park, if guidance is not in

    place. Low

    Transportation N/A

    61

    LDP Policy: Land Use

    and Transportation

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Wide ranging adverse

    transport impacts. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    62

    LDP Policy: Rail

    Investment

    Upgrading of rail stations and

    improved and increased rail

    infrastructure Moderate

    SAC/ Network

    Rail/ Prestwick

    Airport/Transp

    ort Scotland, as

    consultee

    1. Renovation of Prestwick

    airport station, 2)

    Completion of railway

    platform elongation

    programme N/A

    Network Rail has

    increased the length

    of platforms to allow

    for the use of longer

    trains to service

    customer demand.

    No indication of

    upgrading of GPA

    station.

    If GPA station is not

    improved, it may hinder

    aiport growth aspirations. Low

    Ongoing action.

    SEE SPG ACTIONS 4, 5 & 10

    For LDP adoption, or soon after.

    Estimated December 2013.

    Completion date to be agreed with

    Transport Scotland, Network Rail and

    Infratil (or future aiport operator).

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    Ongoing action.

    SEE SPG ACTION 13

  • 63

    LDP Policy: Strategic

    Road Development

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Lack of strategic approach

    to trunk road network. Low

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    64

    LDP Policy: Public

    Transport

    Deliver park and ride at Dutch

    House Low

    SPT/ SAC/

    Stagecoach/

    Transport

    Scotland (as

    consultee only)

    Delivery dependant on

    external agencies. N/A

    Park and Ride

    scheme at Dutch

    House has planning

    permission. No

    development

    commenced.

    If park and ride is not

    improved, it may hinder

    LDP spatial strategy

    objectives of good range of

    public transport nodes to

    increase central belt

    connectivity. Low

    65

    LDP Policy: Freight

    Transport

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    Lack of strategic approach

    to freight transport

    network.

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    66

    LDP Policy: Town

    Centre Traffic

    Management

    Introduction of measures to

    facilitate accessibility, giving

    priority to walking, cycling and

    public transport. Application

    maximum parking standards. Low

    South Ayrshire

    Council Roads

    Service None. N/A N/A

    Lack of sustainable

    transport modes,

    congestion within town

    centre.

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    67

    LDP Policy: Outdoor

    Public Access and

    Core Paths

    Planning decisions must be

    taken in line with this policy Low

    Head of

    Planning/

    Regulatory

    Panel/LRB None. N/A N/A

    failure to meet statutory

    requirement to produce

    core paths plan. Lack of

    development of routes.

    Planning

    applications

    determined in line

    with policy. Policy

    reviews.

    Low: Actions

    are not

    required to

    adopt LDP -

    action is

    ongoing

    through policy

    implementati

    on

    Medium: Not

    required to

    adopt LDP,

    but as a

    specific

    delivery date.High: Require

    an action to

    be delivered

    before the

    LDP can be

    submitted to

    DPEA for

    examination.

    Ongoing action.

    Ongoing action.

    TBC

    Ongoing action.

    Completion date to be agreed with

    SPT.

  • DIA may be required.

    Action Ref. Settlement Map Ref. Site Constraints* Site Actions Responsible Person(s)

    Person(s)/Authorities with a

    Signiciant Consultative Role Timescale for Completion Priority Risk Log•Landscaping and transport proposals

    to be submitted with planning

    application. •Developer

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Site should incorporate access linkages

    for vehilces, pededstrian and cycling. •Developer

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Development Impact Assessment will

    be required to assess impact on drainage

    and sewerage system.

    •Developer •South Ayrshire Council (Head of

    Planning)

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low •Developer should identify any

    archaeological remains on site, in

    consultation with WoSAS, prior to any

    permission being issued.

    •Developer

    •South Ayrshire Council (Head of

    Planning)

    •WoSAS

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Developer should ensure proposals

    include the sensitive re-use of the

    existing buildings. •Developer

    •South Ayrshire Council (Head of

    Planning) (Supervisory Planner

    Environment).

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •A DIA may be required to show Nil

    Impact from Brownfield site •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Transport Scotland indicate transport

    appraisal should be undertaken for site. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    71 AYR 3(Peebles Street)

    Separate system of

    drainage required, if

    possible. A DIA may

    be required to show

    Nil Impact from

    Brownfield site

    •A DIA may be required to show Nil

    Impact from Brownfield site •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    72 BAL1

    Separate system of

    drainage required for

    the development.

    Development Impact

    Assessment will be

    required. There is a 6"

    water main crossing

    western area of site.

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    Implications of

    risk

    occurence/

    Likelihood of

    risk

    occurence/

    Risk

    contingency/

    remedial

    action all

    shown in

    Action 33.70 AYR1

    Requirement for

    transport appriasal for

    site to determine

    impact of

    development on

    Whitletts

    r'about.Separate

    system of drainage

    required, if possible.

    A DIA may be required

    to show Nil Impact

    from Brownfield site

    LDP Action Porgramme: Site Actions

    Potential drainage and

    sewerage issues.

    Depending on the

    proposed demand and

    infrastructure

    capacity, a flow and

    pressure test may be

    required. Surface

    water to be kept out

    of combined

    sewer.DIA may be

    required.ANN168

    The building is listed.

    DIA may be required.

    AYR 2 (Holmston

    House)69

  • •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Transport appraisal to be undertaken

    to determine impact of development on

    A77 at Holmston Roundabout •Developer

    •South Ayrshire Council(Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Transport Assessment to be

    undertaken to determine impact of

    development on A77 at Holmston

    Roundabout •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Transport Assessment to be

    undertaken to determine impact of

    development on A77 at Holmston

    Roundabout •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low •Transport Assessment to be

    undertaken to determine impact of

    development on A77 at Holmston

    Roundabout •Developer

    •Developer

    •South Ayrshire Council(Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    •Site investigations to be undertaken for

    consultation with SEPA to establish if

    culvert runs beneath site and whether a

    no-development zone is required. •Developer

    •Developer

    •South Ayrshire Council(Head of

    Planning)

    •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Transport appraisal to be undertaken

    to determine impact of development on

    A77 at Holmston Roundabout •Developer

    •South Ayrshire Council(Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    •Development will require to

    demonstrate to SEPA that the

    wtercourse has been taken account of.

    FRA may be required to demonstrate

    flood plain has been avoided. •Developer

    •South Ayrshire Council(Head of

    Planning)

    •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    COY3 As above

    As aboveCOY477

    76

    73 COY1

    Whether land is

    released for housing

    depends on the effect

    housing will have on

    the Coylton road

    network, particularly

    the cumulative impact

    of development on

    Holmston R'about.

    74 COY2 As above

    75 COY5 As above

  • •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Site investigations to be undertaken for

    consultation with SEPA to establish if

    culvert runs beneath site and whether a

    no-development zone is required. •Developer

    •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Develop site •Developer

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    80 DUN1 DIA may be required.

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    81 DUN2 DIA may be required.

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Site investigations to be undertaken for

    consultation with SEPA to establish if

    culvert runs beneath site and whether a

    no-development zone is required. •Developer • SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    83 GIR1 DIA may be required.

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment may be required to

    show nil impact from brownfield site. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Site investigations and remedial works

    required for any site contamination •Developer •Environmental Health

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    85 GIR2 DIA may be required.

    •Separate system of drainage required

    for the development. Development

    Impact Assessment may be required to

    show nil impact from brownfield site. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    KIRKM1 DIA may be required.

    DIA may be required.DUN382

    84 GIR3 DIA may be required.

    DIA may be required.CRO178

    79 DAI1 DIA may be required.

  • •Site investigations to be undertaken for

    consultation with SEPA to establish if

    culvert runs beneath site and whether a

    no-development zone is required. •Developer •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    87 KIR1 DIA may be required.

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required.

    Capacity of the various PS between

    Kirkoswald and Girvan WWTW's will

    require to be checked. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Transport appraisal to be undertaken

    to determine impact of development on

    A77 at existing junctions on south of

    A77. •Developer

    •South Ayrshire Council(Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    •Development will require to

    demonstrate to SEPA that the

    wtercourse has been taken account of.

    FRA may be required to demonstrate •Developer

    •South Ayrshire Council(Head of

    Planning)

    •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low •Transport Assessment to be

    undertaken to determine impact of

    development on A77 at existing

    junctions on south of A77. •Developer

    •South Ayrshire Council(Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    •Development will require to

    demonstrate to SEPA that the

    wtercourse has been taken account of.

    FRA may be required to demonstrate •Developer

    •Developer

    •South Ayrshire Council(Head of

    Planning)

    •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low •Transport Assessment to be

    undertaken to determine impact of

    development on A77 at existing

    junctions on south of A77. •Developer

    •Developer

    •South Ayrshire Council(Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    •Development will require to

    demonstrate to SEPA that the

    wtercourse has been taken account of.

    FRA may be required to demonstrate •Developer

    •South Ayrshire Council(Head of

    Planning)

    •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    MAYB2 As above.

    89 MAYB3 As above.

    90 MAYB1 As above.

    86 KIRKM1 DIA may be required.

    88 MAYB4

    Whether land is

    released depends on

    the effect housing will

    have on the Maybole

    road network and the

    cumulative impacts of

    development on the

    existing junctions on

    the south side of A77,

    through Maybole.DIA

    may be required.

  • •Transport appraisal to be undertaken

    to determine impact of development on

    A77 at existing junctions on south of

    A77. •Developer

    •South Ayrshire Council(Head of

    Planning)

    •Transport Scotland

    Prior to submission of LDP to DPEA

    for examination. Expected by

    December 2012. High

    •Development will require to

    demonstrate to SEPA that the

    wtercourse has been taken account of.

    FRA may be required to demonstrate

    flood plain has been avoided. •Developer

    •South Ayrshire Council(Head of

    Planning)

    •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    92 MIN1 DIA may be required.

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    93 MIN2 DIA may be required.

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required; and

    that brownfield site will have Nil impact. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low Masterplan to be prepared for the site

    to

    •ensure built heritage resources are not

    harmed by any development;

    •to ensure transport implications of site

    development can be dealt with;

    •and to ensure integration of the site

    with the existing settlement can be

    achieved.

    •A transport appraisal must be

    undertaken to determine implications of

    development on trunk road network,

    and, where necessary, transport

    interventions must be provided by the

    developer. •Developer

    •South Ayrshire Council(Head of

    Planning)

    •Transport Scotland

    •Historic Scotland High

    •Depending on numbers of units a WIA

    may be required. No Drainage in close

    proximity to this development site. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low •Develop site

    •consideration should be taken to how

    this watercourse is treated within the

    development proposals. •Developer •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    95 STA1 DIA may be required.

    SYM1

    This site will not be

    developed until

    Transport Scotland is

    satisfied that the

    planned

    improvements to the

    A77 between Bogend

    Toll and Dutch House

    roundabout have

    been completed. DIA

    may be required.

    91 MAYB2 As above.

    94 MON1

    Whether land is

    released depends on

    the effect housing will

    have on the road

    network (particularly

    Dutch House R'about),

    and a master plan

    being prepared for the

    site showing that its

    development will not

    harm heritage

    resources within the

    site or the quality of

    the landscape or value

    of the area, while

    making sure the

    development can fit in

    with the existing

    settlement.DIA may

    be required.

  • •Site cannot be developed until A77

    (between Bogend Toll and Dutch House)

    as been upgraded by TS

    •Developer

    •Transport Scotland Completed by 2014 Medium

    •Separate system of drainage required

    for the development. Development

    Impact Assessment will be required. •Developer

    •South Ayrshire Council (Head of

    Planning)

    •Scottish Water

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low •Develop site

    •a basic Flood Risk Assessment should

    identify the areas which are suitable for

    development •Developer •SEPA

    At stage of planning application.

    Within years 1 - 10 of plan

    adoption. Low

    * Site constraints can

    include issues with

    sewerage and water

    capacity, as identified

    by Scottish Water;

    even though Scottish

    Water does not

    consider lack of

    capacity to be a

    development

    constraint.

    Low: Actions

    associated with

    delivery of the

    site are not

    required to

    adopt LDP Medium: Not

    required to

    adopt LDP, but

    as a specific

    delivery date.

    High: Require an

    action to be

    delivered before

    the LDP can be

    submitted to

    DPEA for

    examination.

    97 TAR1

    FRA required.DIA may

    be required.

    96 SYM1

    This site will not be

    developed until

    Transport Scotland is

    satisfied that the

    planned

    improvements to the

    A77 between Bogend

    Toll and Dutch House

    roundabout have

    been completed. DIA

    may be required.