Some updates on development of new energy system in the framework of energy system in the framework of the Smart Community initiatives December 2nd 2011 December 2nd, 2011 Hidekazu Takakura Smart Community Department NEDO, Japan

Upload: lenhu

Post on 22-Apr-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Some updates on development of new energy system in the framework of energy system in the framework of

the Smart Community initiatives

December 2nd 2011December 2nd, 2011

Hidekazu TakakuraSmart Community Department

NEDO, Japan

Page 2: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

What is NEDO

As Japan's public management organization promoting research and development as well as the dissemination of industrial, energy and environmental technologies, NEDO has a crucial mission to carry out.environmental technologies, NEDO has a crucial mission to carry out.

• Enhancement of Japan's industrial competitiveness• Addressing energy and global environmental problems

FoundationOriginally established as a semi governmental organization on October 1 1980;Originally established as a semi-governmental organization on October 1, 1980;reorganized as an Incorporated Administrative Agency on October 1, 2003.

Ch i M K F kChairman Mr. Kazuo FurukawaMinister in charge The Minister of Economy, Trade

and Industry (METI)and Industry (METI)Location Kawasaki city , Kanagawa Pref., JapanPersonnel About 1,000

1

Page 3: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

EXPERIENCES INRENEWABLES INTEGRATIONRENEWABLES INTEGRATION

2

Page 4: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Japanese Experiencei R bl I i

FY2006 FY2007 FY2008FY2005 FY2009 and

in Renewables Integration

Up to FY2005 FY2006 FY2007 FY2008FY2005 FY2009 and onward

Up to FY2005

Technology development of renewable energies (PV, WT, etc.) (New Sunshine Project, Large-scale wind power technology development, Advanced photovoltaic technology

development, Future technology development, and Ultra-high efficiency photovoltaic technology development)

Demonstrative Project on Grid interconnection of Research and Development of

Single renewable energy grid-connection technology development (such as the

p )

Grid-connected SystemOperation and grid-connection of high penetration renewable energy or energy storage and

EMS application technology to reduce fluctuation of renewable energy output

Demonstrative Project on Grid-interconnection of Clustered Photovoltaic Power Generation Systems (FY2002-FY2007)

Research and Development of Islanding Testing Technology for Clustered Photovoltaic Power Generation Systems (FY2008-FY2009)

Demonstrative Project of Regional Power Grids

Wind Power Stabilization Technology Development Project(FY2003-FY2007)

p (Rokko Island project)

Demonstrative Project of Regional Power Grids with Various New Energies(FY2003-FY2007)

Demonstrative Project on New Power Network Systems(FY2004-FY2007)

Verification of Grid Stabilization with Large-scale PV Power Generation Systems(FY2006-FY2010)

Development of an Electric Energy Storage System for Grid-connection with New Energy Resources (FY2006-FY2010)

3Promoting Continuous Efforts to Develop Smart Community Technologies

Page 5: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Grid‐interconnection of Clustered PVPower Generation Systems : FY2002 ‐ FY2007

Ota City Demonstration Site

Number of PV equipped houses: 553Development of a new inverter to detect islanding Number of PV‐equipped houses: 553Total PV capacity: 2,129 kWAverage capacity per house: 3.85 kW

p gDevelopment of battery storage operation and network voltage controlDevelopment of simulation technologies

4

Page 6: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Verification of Grid Stabilizationwith Large‐scale PV Power Generation Systems (FY2006 ‐ FY2010) 

Wakkanai site

Tokyo

Wakkanai site 5 MW: Most PV cells are crystalline

Hokuto site5 MW: Most PV cells are crystalline.NaS battery: 1500 kW‐7.2hrs 

Hokuto site 1.8 MW: 27 types of PVs

Technology development to reduce voltage fluctuation with batteryD l f i i bl f

5

Development of a new inverter suitable for mega‐solar plantTesting various types of PV modules

5

Page 7: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

66

Page 8: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

77

Page 9: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

μ‐grid demonstration project in Sendai(FY2004‐2007)D t ti P j t P S l S tDemonstrative Project on Power Supply System

by Service Level

High Quality ANo Interruption. Compensating voltage at a wave level.

High Quality BHigh Quality BRemoving interruption within 15 ms

Standard Quality CInterruption is usually  removed within 1 minute.

DCDCNo Interruption. DC supply.

Great East Japan Earthquake: 2:46 pm on March 11.

8

Sendai system recovered before noon of March 12. And supply electricity to Hospital and High Quality A load (UPS). Utility system recovered at March 14.

Page 10: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

ON GOING ACTIVITIES

9

Page 11: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Japan’s Smart Community and smart grid Goal 

More convenient, reliable and greener systemby means of IT through coordination and cooperationBetween energy suppliers and demand side users Between energy suppliers and demand side users.

Mega Solar Construct an energy system which is mutually beneficial for main grid operator and regional 

Main Grid

Zero Emission Buildings

Wind Power

be e c a o a g d ope ato a d eg o aenergy management provider. Connect BEMS with regional 

EMS.

Energy Management SystemGEGE

Storage Battery

Na‐S Battery

Enable better use of heat in addition to electricity.

Regional Energy

CogenerationSolar PowerWind Power

BatteryBiogas

Regional Energy Management Provider

GEGE

Information Network

New‐generation Gas Station

Solar Power EVs and PHEVs

Home Storage

Wasted Heat

Smart Meter:Visualization of home 

energy use and demand control

Smart House

Home Storage BatteryUtilize IT for 

peak cuts.

Construct charging stations for EVs.

10

Page 12: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Japan Smart Community Alliance

JSCA carries out various work for the development of roadmaps orp pdissemination of information to achieve international standardization andstrengthen collaboration among a wide range of relevant people andorganizations.

Utilities Developers

InstitutionsManufacturers

Members: 646 (As of November, 2011 )

Established: April, 2010p ,

JSCA is a public‐private organization, consists of a broad range of Japaneseorganizations and companies, including electric power, gas, automobile,information and communications electric machinery construction andinformation and communications, electric machinery, construction andtrading industries as well as the public sector and academia. NEDO is apermanent secretary of JSCA.

Page 13: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

International Smart Community Activities

12

Page 14: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Project in the United States, New Mexico • Reliable power supply under high penetration of PhotovoltaicReliable power supply under high penetration of Photovoltaic

by using CEMS, DER, NaS etc,.• 2009-2013

Partners; The State of New Mexico, The County of Los Alamos, LANL, Mesa del Sol, PNM, UNM, SNL

Entrusted parties; Toshiba, Kyocera, Shimizu, Itochu, Cyber Defense, etc., 19 companies as total

[Los Alamos]• Utility-Scale PV + NaS• Schedule by Predicting PV generation

[Albuquerque]• Commercial building + DER with BEMS• Absorb fluctuation from Utility Scale PV

Entrusted parties; Toshiba, Kyocera, Shimizu, Itochu, Cyber Defense, etc., 19 companies as total

• Schedule by Predicting PV generation• Optimize by DR and NaS• HEMS demo

Absorb fluctuation from Utility Scale PV

13

Page 15: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Project in the United States, Hawaii• Reliable power supply under high penetration of Wind PowerReliable power supply under high penetration of Wind Power

by managing EV charging etc.,• 2011-2015

Partners; The State of Hawaii,HECO, MECO, HNEI, The County of Maui, The Maui Economic Development Board etc.,

Entrusted parties; Hitachi, Mizuho Corporation, Cyber Defense

[Whole Maui island]• Manage EV charge

Shift to midnightStop charging when unexpected downStop charging when unexpected down ramp occurs etc.,

[Kihei District][Kihei District]• DLC thru μ-DMS• Optimize usage of low Volt transformer• Optimize PV generation by Smart PCS

14

Page 16: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Project in Spain, Malaga• Avoiding congestion of distribution lineAvoiding congestion of distribution line

under high penetration of EV quick chargersby navigating EV users to optimal places

• 2011-20152011 2015• Currently under Feasibility Study

15

Page 17: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Project in France, Lyon• 3 Tasks are under consideration3 Tasks are under consideration

ZEB demoEnergy use monitoring and management for PV and EVsE dit i AMIEnergy audit program using AMI

• 2011-2015• Currently under Feasibility Study

16

Page 18: Some updates on development of new energy system in …¼‐grid demonstration project in Sendai(FY2004‐2007) DttiPjtPSlStDemonstrative Project on Power Supply System by Service

Concluding remarks

Establishment of smart communities is required to improve the quality of life

both in Japan and around the world.

It is important to develop and demonstrate smart community-related technologies in a real environment, deploying current smart grid technologies developed through previous development and demonstration activities. g p p

Public-private sector cooperation across various industries is necessary to establish smart communitiesestablish smart communities.

To realize smart communities around the world, it is crucial to facilitate international deployment activities and strengthen collaboration with overseasinternational deployment activities and strengthen collaboration with overseas organizations. JSCA will play a significant role in this.

NEDO will contribute to develop sustainable world through building smartNEDO will contribute to develop sustainable world through building smart communities.