SOHAR REFINERYIMPROVEMENT PROJECT
Key Facts
Client:Daelim Petrofac SRIP Joint Venture
Period:19 Months
Location:Sohar, Sultanate of Oman
Completion Date:October 2015
EPC works for plant & general buildings (26 no) with a total floor area of 12,790 m2 comprising 13 no. blast resistant building (integrated control building, TA substation, MI substation, substation, SIH buildings & operator shelters) and 13 no. non-blast resistant buildings (TL building, fire station, SWI substation, MR substation, guard house, canopy for truck loading, TLS office, maintenance workshop & extension of existing lab building).