snowman hat

Upload: suzanne-yates-byford

Post on 03-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Snowman Hat

    1/13

    Snowman Hat (newborn size)

    MATERIALS:

    1 oz. Blue worsted

    2 oz. White worsted

    Size 8 needles (single point, circular and dp needles)

    G Hook (for ties)

    yarn needle

    small amount of black and orange yarn for embroidery

    stuffing

    HAT:Cast on 60 sts w/blue.Work in K1, P1 ribbing for 3.

    Change to white and work in stockinette stitch for 3.5-4.

    Decrease as follows (switch to dp needles or use 2 circulars)

    to form head of snowman:*K3, k2tog, repeat from * around.Knit 1 round even.*K2, k2tog, repeat from * around.Knit even in stockinette st for 2.5.

    Decrease head of snowman as follows:*K1, k2tog, repeat from * around.

    Knit 1 round even.*K2tog, repeat from * around.Cut yarn, weave through, pull tight; end off.

    Cut a strand of white yarn and weave it through the stitches in the row above the 2nd rnd

    of decreasing on main hat. Stuff head & embroider eyes/nose/mouth with black for

    eyes/mouth and orange for nose. End off, weave in ends.

    Blue scarf:With blue, cast on 60 sts. Knit 3 rows garter stitch, cast off; weave in ends.

    Blue snowman hat:With blue, cast on 36 sts.Work in K1, P1 ribbing for 3.5Decrease as follows:*K2tog, P2tog, repeat from * across.*K1, P1, repeat from * across.*K2tog, P2tog, repeat from * across.

  • 7/28/2019 Snowman Hat

    2/13

    Cut 12 yarn, weave through sts and pull tight, sew back seam.Fold up for cuff, tack in place; sew cap to top of snowman head.

    Make 2 ties:Using size G hook, ch 50, sl st back across, end off.

    Tie to sides of hat, weave in ends.

  • 7/28/2019 Snowman Hat

    3/13

    Ladybug Hat for Baby

    Materials:WW yarn in red (I used Caron Simply Soft, about 2 oz)

    Small amount of WW yarn in black

    Size 8 circular needles

    DPN size 8 (or second circular needle)One marker

    Crochet hook, size G

    Yarn needle

    Hat:With red yarn, cast on 64 sts, and being careful to not twist, join; place stitch marker tomark beginning of rounds.

    Rounds 1, 3, 5: Knit

    Rounds 2, 4, 6: Purl

    Knit around until hat is 6.

    Decrease as follows (switch to DPN or use second circular as needed):

    Round 1: *Knit 6, K2tog, repeat from * around (56 sts).

    Rounds 2, 4, 6, 8, 10: Knit around even.

    Round 3: Knit 5, K2tog, repeat from * around (48 sts).

    Round 5: Knit 4, K2tog, repeat from * around. (40 sts)

    Round 7: Knit 3, K2tog, repeat from * around (32 sts).Round 9: Knit 2, K2tog, repeat from * around (24 sts).

    Round 11: Knit 1, K2tog, repeat from * around (16 sts).

    Round 12: K2tog around (8 sts).

    Cut yarn about 10 long, weave in through remaining sts and pull tight, end off and

    weave in ends.

  • 7/28/2019 Snowman Hat

    4/13

    Antenna:Using black yarn and 2 dpn, cast on 3 sts.

    Knit across, pull to other end of needlePull yarn tight and knit across starting at beginning of row again (so you form it into a

    tube as you go)

    Keep knitting this way until tube is about 3 long, end off and weave in end.

    Make a second one. Sew them to top of hat, about 2 from center, across from one

    another.

    Spots:Using black yarn and size G hook, ch4 and join, ch2.Work 12 dc into center of circle, join and end off, cutting yarn about 12 long. Weave

    this end of yarn up and down through the 12 dc tops and pull tight into a ball, then stitch

    securely onto the sides of thered hat.

    Make 6 spots and evenly spread them out around the sides of the hat.

    http://www.serverlogic3.com/lm/rtl3.asp?si=0&k=red%20hathttp://www.serverlogic3.com/lm/rtl3.asp?si=0&k=red%20hathttp://www.serverlogic3.com/lm/rtl3.asp?si=0&k=red%20hat
  • 7/28/2019 Snowman Hat

    5/13

    Becky's Baby Booties

    In 2 Sizes

    BOOTIES (4" sole)

    NEEDLES: Size 5 needles

    YARN: Baby or Sport yarn

    Cast on 38 stitches.

    Rows 1 through 12: Knit

    Row 13: Knit 16, Knit 2 together, Knit 2, Knit 2 together, Knit 16

    Row 14: Purl 15, Purl 2 together, Purl 2, Purl 2 together, Purl 15

    Row 15: Knit 14, Knit 2 together, Knit 2, Knit 2 together, Knit 14

    Row 16: Purl 13, Purl 2 together, Purl 2, Purl 2 together, Purl 13

    Row 17: Knit 12, Knit 2 together, Knit 2, Knit 2 together, Knit 12

    Row 18: Purl 11, Purl 2 together, Purl 2, Purl 2 together, Purl 11

    Row 19: Knit 10, Knit 2 together, Knit 2, Knit 2 together, Knit 10

    Row 20: Purl 9, Purl 2 together, Purl 2, Purl 2 together, Purl 9Rows 21 through 28: Knit

    Bind off, leaving tail of yarn to sew up back seam.

    Make 2.

    SMALLER BOOTIES (3" sole)

    Cast on 29 stitches.

    Rows 1 through 10: Knit

    Row 11: Knit 12, Knit 2 together, Knit 1, Knit 2 together, Knit 12.

    Row 12: Purl 11, Purl 2 together, Purl 1 Purl 2 together, Purl 11.Row 13: Knit 10, Knit 2 together, Knit 1, Knit 2 together, Knit 10

    Row 14: Purl 9, Purl 2 together, Purl 1, Purl 2 together, Purl 9.

    Row 15: Knit 8, Knit 2 together, Knit 1, Knit 2 together, Knit 8.

    Row 16: Purl 7, Purl 2 together, Purl 1, Purl 2 together, Purl 7.

    Rows 17 through 22: Knit.

    Bind off, leaving tail of yarn to sew up back seam.

    Make 2.

  • 7/28/2019 Snowman Hat

    6/13

    Clown Shelf Doll

    Materials: In 8ply/DK/Sport weight for America & Canada. allow50grms(2 ozs) of Red and yellow and oddments of blue, cream andgreen. No.11 (3mm)(USA2) knitting needles; toy stuffing.

    Tension & Size:Worked at a tension of 26 stitches and 36 rows to 10 x 10cm over

    stocking stitch, using No.11(3mm) needles throughout. Height: 34cm(17").

    Abbreviations:K, knit; p, purl; st(sts), stitch, stitches; sl, slip; tog, together; inc,increase (by working twice into same st); dec, decrease (by taking 2sts tog); ss, stocking stitch (k on right side and p on wrong side); psso,pass sl st over; skpo, (sl1, k, psso); ytb, yard to back of work.

    The Legs: (both alike)Using green yarn cast on 18sts and knit increasing into every st

    (36sts).2nd row: p. 3rd row: k. 4th row: p.*5th row: Using yellow yarn k. 6th row: p.7th row: Using blue yarn k. 8th row: P.9th row: Using red yarn k. 10th row: p.11th row: Using green yarn k. 12th row: p.**Repeat from * to ** 3 times. (36 rows) Leave these stitches on spareneedle and repeat process for 2nd leg.

    http://www.serverlogic3.com/lm/rtl3.asp?si=0&k=knitting%20needleshttp://www.serverlogic3.com/lm/rtl3.asp?si=0&k=knitting%20needles
  • 7/28/2019 Snowman Hat

    7/13

    The Body:Continuing with the 2nd leg and using yellow yarn knit 34sts, k2togand then joining first knitted leg k2tog k to end. Next row: P.Continuing stripe sequence work 37 rows.

    Next row: p3 purl 2 tog to last 3 sts p3. (38sts).

    The Head:Using cream yarn ss 33 rows.Next row: p2tog to end (19sts).Next row: k2tog to last st k1. (10sts).Break yarn leaving a long end and thread yarn through remaining sts.loosely. To make up the body: join row ends of each leg together andthen join back and head seam. Stuff: head, body and legs and thensew/close head.

    The Shoes: (both alike)Using red yarn cast on 16sts and ss 16 rows.17th row: k and cast off 1st each end of row.18th row: p. 19th row: Same as 17th.20th row: p. (mark each end here).21st row: k and inc. 1st each end of row (14sts).22nd row: p.23rd row: Same as 21st.ss 21 rows. cast off.Fold in half at markers and join side seams, easing the long side to fitto the shorter side and 1cm around back of foot. Fill with stuffing and

    sew up opening and then attach to body.

    Arms: (both alike)With green yarn cast on 14sts and k1 row increasing in every stitch.(28sts).Next row: p. Next row: k. Next row: p.Continuing in stripe sequence and using yellow yarn ss 29 rows.Next row: p2tog to end of row (14sts).Next row: Using cream yarn ss10 rows.Next row: k2tog to end of row (7sts).Leave long end and thread yarn through sts and pull up tightly and sew

    up. Stuff and attach to body at the second stripe down from neckline.

    The Hat:Using green yarn cast on 60sts and working in single rib k1 p1 work 6rows.7th row: Using yellow and continuing in stripe sequence throughout, ss4 rows.11th row: *k4 k2tog** repeat from * to ** to end (50sts).

    http://www.serverlogic3.com/lm/rtl3.asp?si=0&k=make%20uphttp://www.serverlogic3.com/lm/rtl3.asp?si=0&k=make%20up
  • 7/28/2019 Snowman Hat

    8/13

    ss5 rows.17th row: *k3 k2tog** repeat from * to ** to end (40sts).ss 5 rows.23rd row: *k2 k2tog** repeat from * to ** to end (30sts).ss 5 rows.

    28th row: *k1 k2tog** repeat from * to ** to end (20sts).ss 5 rows.34th row: k2tog to end (10sts).Bobble: is knitted in with the hat and using red yarn k and inc. inevery stitch (20sts). ss8 rows.Next row: k2tog to end (10sts) and break off yarn and thread throughstitches loosely.Sew up side seams and stuff the bobble and pull stitches up tightly.Stuff hat lightly and sew to head.

    Neck ruffle:

    Using yellow yarn cast on 120 sts and k 6 rows. Next row: k2tog to end(60sts). Next row: k2tog to end (30sts). Cast off and sew side seamsand attach to neck.

    Wrist ruffles: (make 2)Using yellow yarn cast on 56sts and k 2 rows. Next row: k2tog to end(28sts). Next row: k2tog to end (14sts). Cast off and sew side seamsand attach to wrist.

    Ankle ruffles: (make 2)Using yellow yarn cast on 64sts and k 2 rows. Next row: k2tog to end

    (32sts). Next row: k2tog to end (16sts). Cast off and sew side seamsand attach to ankle.

    Bobbles for front (make 2) Cast on 4 sts. k and increase in everystitch (8sts). ss 7 rows. Next row: Break off yarn and thread through stsloosely. Sew sides and stuff and then pull up stitches and attach tobody.

    Note: This pattern may be printed for your personal use only and notcopied or resold.

  • 7/28/2019 Snowman Hat

    9/13

    Duck Shelf Doll

    Materials: In 8ply/DK/WW oddments of yellow, orange, green andblack. No.11 (3mm)(USA2) knitting needles; child safe toy stuffing.

    Tension & Size: Worked at a tension of 26 stitches and 36 rows to 10x 10cm over stocking stitch, using No.11(3mm)(USA2) needles

    throughout. Height: From base to top of hat 15cms (6") not includinglegs. Head: 19cms (7.1/2") around center; Waist: 19cms (7.1/2")around center

    Abbreviations:K, knit; p, purl; st (sts), stitch, stitches; sl, slip; tog, together; inc,increase (by working twice into same st); dec, decrease (by taking 2sts tog); ss, stocking stitch (k on right side and p on wrong side); psso,

    http://www.serverlogic3.com/lm/rtl3.asp?si=0&k=knitting%20needleshttp://www.serverlogic3.com/lm/rtl3.asp?si=0&k=knitting%20needles
  • 7/28/2019 Snowman Hat

    10/13

    pass sl st over; skpo, (sl1, k, psso); ytb, yarn to back of work.

    BODY: (make 1 piece)Starting at base edge and using orange yarn, cast on 40sts. Placing acolored marker in 18th and 23rd sts in the first row, ss6 rows.

    Join in green yarn and ss2 rows.Ss2 rows orange.Repeat last 4 rows twice.Ss2 rows Green.Shape for shoulders: Break off green and using orange yarn, K4,(k2tog) six times, k8, (k2tog) six times, k4 (28sts).NR: P4, (p2tog) three times, p8, (p2tog) three times, P4 (22sts).Ss3 rows.Break off orange and join in yellow yarn and purl one row.

    HEAD: (make 1 piece)

    Using yellow yarn and starting at neck edge, cast on 22sts and ss2rows.NR: K2, inc, in each st to last two sts, k2 (40sts).Ss17 rows.Shape for top of head:1st dec, row: (K3, k2tog) to end of row (32sts). Purl every alternaterow.2nd dec, row: (K2, k2tog) to end of row (24sts).3rd dec, row: (K1, k2tog) to end of row (16sts).4th dec, row: (K2tog) to end of row (8sts). Leaving a long end, breakoff yarn and thread through sts and put aside.

    BASE: (make 1 piece)Using orange yarn, cast on 18sts and ss12 rows. Cast off all sts.

    ARMS: (make 2 pieces)Using green yarn and starting at top of sleeve cast on 12sts and ss2rows.Join in orange yarn and ss2 rows.Ss2 rows green.Knit one row orange.NR: Purl inc, one st each end of row (14sts).

    Break off orange and join in green yarn and ss2 rows.Break off green and join in yellow yarn and ss10 rows.NR: K1, (k1, k2tog) to last st, k1 (10sts). NR: P.NR: K2tog, to end of row (5sts). Cast off all stitches.

    LEGS: (make 2 pieces)Using green yarn and starting at the foot, cast on 12sts and purl onerow.

  • 7/28/2019 Snowman Hat

    11/13

    NR: K1, (inc) in next 10sts, k1 (22sts).Starting with a purl row, ss7 rows.NR: K5, (k2tog) six times, K5 (16sts). NR: P.NR: K5, (k2tog) three times, K5 (13sts). NR: P.Break off green and join in yellow yarn and ss18 rows.

    Break off yellow and join in orange yarn and ss6 rows.Cast off all sts.

    BEAK: (make 1 piece)Using orange yarn, cast on 22sts and ss2 rows.1st dec row: K4, k2tog, skpo, k6, k2tog, skpo, k4 (18sts). NR: P.2nd dec row: K3, k2tog, skpo, k4, k2tog, skpo, k2 (14sts). NR: P.3rd dec row: K2, k2tog, skpo, k2, k2tog, skpo, k2 (10sts). NR: P.Cast off all sts.

    HAT: (make 1 piece)

    Using green yarn, cast on 42sts and placing colored yarn in 13th and30th st of first row, knit two rows.Starting with a knit row, ss5 rows.1st dec row: K1, (k3, k2tog) to last st, k1 (34sts). NR: P.2nd dec row: K1, (k2, k2tog) to last st, k1 (26sts). NR: P.3rd dec row: K1, (k1, k2tog) to last st, k1 (18sts). NR: P.4th dec row: k1, (k2tog) to last st, k1 (10sts).Leaving a long end, break off yarn and thread through sts.Peak: pick up and knit 16sts between the colored markers and purlone row. NR: Dec 1st at beg, of next 6 rows (10sts). NR: Dec 1st eachend of next 2 rows (6sts). Cast off all sts.

    MAKING UP:Legs: Sew row ends together from cast on edge to cast off edge. Foldthe cast on edge in half to form foot seam and sew together. Turn legto right side. Stuff foot firmly, stuff boot lightly and leave rest of legempty.Body: Sew row ends together. Turn so that right side of work is facingyou. Pin the legs to base either side of markers, leaving a 4 st gap inthe middle and the front of legs facing the body. Boots should befacing the neck line with the back seam of legs now facing outwards.(See photo 2 for placement) Pin cast on edge of base to legs with one

    st overhanging each side of legs. Turn body and legs to wrong side andcontinue to pin base to cast on edge of body. Sew base to body. Turnbody right side out and stuff firmly (see measurements for correctwaist size).

  • 7/28/2019 Snowman Hat

    12/13

    Head: Pull up sts tightly and sew row ends together. Turn head rightside out and stuff firmly (see measurements for correct head size). andattach to body at neck opening.Arms: Pull stitches up tightly and sew side seams together. Stuffhands and 2cms(1") of arm, leaving the rest of arm empty. Fold arm sothat side seam is in the center and facing body. Sew arm to body onfirst row of shoulder decreasings through the first cast on row of arm.

    Hat: Sew row ends together. Threading a needle with a length ofgreen yarn, work a row of overstitches round the peak edge. Stuff hatlightly and sew to head (See photo 1 for placement).Facial features: (See photo 1 for placement). Beak: Sew row endstogether. Fold beak in half so that the dec sts are at side of beak andthe row ends seam is now underneath and in the center of mouth. Sewcast off edge seam together. Turn work to right side and work a row ofbackstitches one row in from edge of beak around the outside but notincluding cast on edge. Stuff beak lightly and sew to head. Using blackyarn, work one long stitch either side of center of beak to form nostrils.Eyes: Leaving a gap of 3sts between eyes and using black yarn work a

    daisy st in one st and work a second daisy st around the first st.

  • 7/28/2019 Snowman Hat

    13/13