Smt. SWARNA AKKAMMA Lime stone mine SURVEY NO. 855/61, PIDUGURALLA VILLAGE & MANDAL, GUNTUR DISTRICT, ANDHRA PRADESH PRE - FEASIBILITY REPORT OPENCAST LIME STONE MINE – 184.07 acres (74.49 ha) SUBMITTED TO MINISTRY OF ENVIRONMENT AND FORESTS & CLIMATE CHANGE, GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, ALIGANJ, JOR BAGH, LODHI COLONY, NEW DELHI Submitted by: Smt. Swarna Akkamma D.No.7-337, swrna pitchayas street, Piduguralla Village & Mandal, Guntur District- 522413 Mobile: +91 94408 78620

Upload: vuquynh

Post on 10-Aug-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

 Smt. SWARNA AKKAMMA 

 Lime stone mine

SURVEY NO. 855/61, PIDUGURALLA VILLAGE & MANDAL,  GUNTUR DISTRICT, ANDHRA PRADESH  

PRE - FEASIBILITY REPORT OPENCAST LIME STONE MINE – 184.07 acres (74.49 ha)

 

   

 

 

SUBMITTED TO MINISTRY OF ENVIRONMENT AND FORESTS & CLIMATE CHANGE,  

GOVERNMENT OF INDIA  INDIRA PARYAVARAN BHAWAN, ALIGANJ, JOR BAGH,  

LODHI COLONY, NEW DELHI

Submitted by: Smt. Swarna Akkamma D.No.7-337, swrna pitchayas street, Piduguralla Village & Mandal, Guntur District- 522413 Mobile: +91 94408 78620

Smt. SWARNA AKKAMMA  Lime stone mine

SURVEY NO. 855/61, PIDUGURALLA VILLAGE & MANDAL,  GUNTUR DISTRICT, ANDHRA PRADESH  

Pre‐Feasibility Report                                                                         Smt. Swarna Akkamma – Lime Stone 

1 | P a g e  

Pre – Feasibility Report  

Smt. Swarna Akkamma Piduguralla Village & Mandal, Guntur District Mobile: +91 94408 78620  1. Executive Summary Smt.  Swarna Akkamma  proposes  to  conduct  opencast method  quarrying  for  Lime  stone extraction in an area of 74.49ha in Survey No. 855/61, Piduguralla Village& Mandal, Guntur District, Andhra Pradesh. 3rd Renewal of quarry lease for Lime stone was sanctioned orders issued  by  Industries  and  Commerce  (M.II)  Department, Government  of  Andhra  Pradesh vide G.O.Ms. No. 144 dated 30.4.2005. The Mining plan has been approved by the Regional Controller of Mines,  Indian Bureau of Mines, Hyderabad vide Letter No. AP/GNR/MP/LST‐20‐HYD dated 10‐12‐2014.Total project cost proposed for the project is Rs. 60 Lakhs.  2. Introduction of the Project / Background Information: i) Identification of Project and project Proponent Smt. Swarna Akkamma has authorized Sri Subramanyam Akkamma of  the company, who has experience in mining operations and mining business.   ii) Brief description of nature of the project It  is proposed  to work  the pit by open cast mining method. Loosening of stratum will be done by  jack hammer drilling and blasting. Bench Parameters will be designed to suit the way of working. Height of the bench will be 3m width of the bench will be at least 5m. Road will be  taken  to  the working bench.  It  is proposed  to cut  top 3m  slice of  the  stratum  to achieve annual production. Need for the project and its importance to the country and or region Lime stone mined is supplied to local kilns, as local cement plants have captive mines. The quality to limestone required for the kilns is Cao‐46 to 48% and SiO2 6‐7%. iii) Demand ‐ Supply Gap The  limestone  is  suitable  for  lime  industries. There are number of  lime kilns  in  the area, providing ready market for the mineral.  Imports Vs. Indigenous Production Limestone is supplied to local kilns. iv) Export possibility The mineral is used mainly by local lime kilns. v) Domestic/export Markets: Limestone is supplied to local kilns.    

Pre‐Feasibility Report                                                                         Smt. Swarna Akkamma – Lime Stone 

2 | P a g e  

vi) Employment Generation (Direct and Indirect) due to the project: The following employees are required for the proposed mining project/activity. 

S. No  Employee  Quantity 1  Mines Manager/Mining Engineer  1 2  Supervisory Staff  1 3  Geologist  1 4  Foreman  1 5  Mate  1 6  Driller  2 7  Helpers  10 8  Blaster  1 9  Driver  2 10  Supervisor  1 11  Breaker / Loader 70 12  Clerk  1   Total  92 

    3. Project Description i) Type of Project including interlinked and interdependent projects, if any:  

There  are  no  interlinked  projects. Mining will  be  carried  out  by  opencast  benching method. There will be single large box type pit. This will be an extension of the existing pit. There is one bench on the western side. 

ii) Location  (maps showing general  location, specific  location, and project boundary & project site layout with coordinates). Smt. Swarna Akkamma proposes to conduct opencast method quarrying for Lime stone extraction  in an area of 74.49ha  in Survey No. 855/61, Piduguralla Village, Piduguralla Mandal, Guntur District, Andhra Pradesh. The quarry  lease area  falls  in the Survey of India topo sheet no. 56 P10, P11, P14 & P15 with GPS (WGS‐84 datum) co‐ordinates of Latitude  16°30'15.38"Nand  Longitude    79°53'3.76"Ewith  an  elevation  of  99m.  The nearest  village  Chendripalem  located  at  a  distance  of  1.4km  from  the  QL  area  in Southeast direction. The nearest town is Piduguralla located at a distance of 3.0kms in South  direction. Railway  station  is  Piduguralla  at  a  distance  of  2.9kms  in  Southwest direction.  The  road  access  is  Piduguralla  to  Pillutla  road  is  passing  at  a  distance  of 2.0km  from the QL area  in East direction. The  lease area can be accessible through a cart track. Konanki Reserved forest is at a distance of 5.4km in NE direction. Janapadu Reserved  forest  is  at  a distance of 5.0km  in  SE direction.  Seasonal Erra Vagu  is at a distance of 3.2km  in Southeast direction.   Akurajupalli Major Canal  is at a distance of 3.6km in West direction. There is no national park, wildlife/bird sanctuary and critically polluted areas within 10km radius from the quarry lease area.Location map of the mine lease area is presented in figure 1.   

Pre‐Feasibility Report                                                                         Smt. Swarna Akkamma – Lime Stone 

3 | P a g e  

iii) Details  of  alternate  sites  considered  and  the  basis  of  selecting  the  proposed  site, particularly the environmental considerations gone into should be highlighted.  No alternative sites considered, the proposal is mining project and it is site specific. 

iv) Size or magnitude of operation:  It  is proposed to produce Lime Stone with an average production of 50000 TPA using mechanized open cast method of mining.  

v) Project description with process details (a schematic diagram/flow chart showing the project layout, components of the project etc. should be given) It is proposed to work the pit by open cast mining method. Loosening of stratum will be done by  jack hammer drilling and blasting. Bench Parameters will be designed  to suit the way of working. Height of the bench will be 3m width of the bench will be at least 5m. Road will be taken to the working bench. It is proposed to cut top 3m slice of the stratum to achieve the yearly production.  

vi) Raw material required along with estimated quantity likely source, marketing area of final product/s, mode of transport of raw material and finished product No raw material is required. Project is for mining lime stone.  The extracted lime stone is used in captive consumption. 

 Figure – 1 Quarry lease location map 

Pre‐Feasibility Report                                                                         Smt. Swarna Akkamma – Lime Stone 

4 | P a g e  

vii) Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined. The overburden waste in the form of boulder murram, shale, may get generated during the course of mining. It is separated while producing the ore and stored separately. 

viii) Availability  of water  its  source,  energy/power  requirement  and  source  should  be given Water Requirement Water  is  required  for domestic purposes, dust suppression, wetting  the drill surfaces and  green  belt.    The  water  requirement  is  presented  in  the  following  table.    The required water shall be drawn from within the site from bore well. 

Total Water requirement S. No.  Purpose  Total KLD 1  Dust suppression 10 2  Wetting drill surface  5 3  Green belt  5 4  Domestic  4 

Total 24  

Electricity:  Transformer is located at a distance of 100m from the QL area. 

 ix) Quantity  of  wastes  to  be  generated  (liquid  and  solid)  and  scheme  for  their 

Management/disposal During the plan period the total quantity of waste likely to be generated is 23580 tons. 

No sub grade material will be generated during the course of mining. There  is no top 

soil in the traditional sense. Overburden consists of agricultural soil having thickness of 

about 0.5m to 1m. 

4. Site Analysis 4.1 Mine Location The mine  lease  of  opencast method  quarrying  for  Lime  stone  extraction  in  an  area  of 74.49ha  is  located at Survey No. 855/61, Piduguralla Village, Piduguralla Mandal, Guntur District, Andhra Pradesh. The quarry lease area falls in the Survey of India topo sheet no. 56 P10, P11, P14 & P15 with GPS (WGS‐84 datum) co‐ordinates of Latitude 16°30'15.38"Nand Longitude  79°53'3.76"Ewith an elevation of 99m. The nearest village Chendripalem located at  a  distance  of  1.4km  from  the  QL  area  in  Southeast  direction.  The  nearest  town  is Piduguralla located at a distance of 3.0kms in South direction. Railway station is Piduguralla at a distance of 2.9kms  in  Southwest direction. The  road access  is Piduguralla  to Pillutla road is passing at a distance of 2.0km from the QL area in East direction. Konanki Reserved forest is at a distance of 5.4km in NE direction. Janapadu Reserved forest is at a distance of 5.0km  in SE direction. Seasonal Erra Vagu  is at a distance of 3.2km  in Southeast direction.  

Pre‐Feasibility Report                                                                         Smt. Swarna Akkamma – Lime Stone 

5 | P a g e  

Akurajupalli Major Canal  is at a distance of 3.6km  in West direction. There  is no national park,  wildlife/bird  sanctuary  and  critically  polluted  areas  within  10km  radius  from  the quarry lease area. 5. Planning Brief The project  is envisaged  to be put  in production/mining by  this year, and  the production shall be  initiated thereon. Geologists and Mining engineer are  identified for preparing the detailed project report. 6. Proposed Infrastructure The  nearest  village  Chendripalem  is  located  at  a distance of  1.4km  from  the QL  area  in Southeast  direction.  The  nearest  town  is  Piduguralla  located  at  a  distance  of  3.0kms  in South  direction.  Railway  station  is  Piduguralla  at  a  distance  of  2.9kms  in  Southwest direction. The  road access  is Piduguralla  to Pillutla  road  is passing at a distance of 2.0km from the QL area in East direction. The lease area accessible by an unpaved road.  6.2 Utilities Proponent  has decided  to undertake mechanized mining operations;  the  following mine machinery will be deployed. 

S. No  Type of Machine No. of Units 1  Compressor   2 2  Jack Hammer driller   2 3  Hydraulic Excavator  1 4 Dumper 2 5 Explosive Van 1 6  Water Tanker  2 7  Jeep  1 

 6.3 Waste management Liquid Effluents There is no effluent generated from the mine operations. The effluent generated from the domestic  source  is sent  to septic  tank  followed by  soak pit. The water draining  from  the dump will be sent through a single point siltation tank. Silt carried from the quarry face will be  deposited  in  the  siltation  tank  and  silt  free  water  will  be  reused  for  greenery development.  Air Pollution The dust anticipated during drilling will be suppressed by putting cloth around the hole and the dust would be generated during blasting, drilling and mining and also during handling and transportation of the material. The suggested control measures are Dust suppression systems (water spraying) to be adopted at Faces/sites before and after blasting, Faces/sites while  loading;  and Use of  sharp drill bits  for drilling holes  and drills with water  flushing systems (wet drilling) to reduce dust generation. Regular water spraying on haulage roads during  transportation  of  mineral.  Dust  masks  will  be  provided  to  the  workers  in  the dressing section and dust collector in the drilling section.  

Pre‐Feasibility Report                                                                         Smt. Swarna Akkamma – Lime Stone 

6 | P a g e  

Solid waste During  the plan period  the  total quantity of waste  likely  to be generated  is 23580  tones. The  waste  generated  during  the  plan  period  may  be  dumped  in  the  zone  separately reserved for dumping in the quarry lease area covering an area of 4.3ha. 7. Rehabilitation and Resettlement (R&R) Plan No Rehabilitation and Resettlement (R&R) as the proposed mine lease area does not have any habitation. 8. Project Schedule & Cost Estimates i) Likely date of  start of construction and  likely date of completion  (Time  schedule  for 

the project to be given) Construction activity  involves mine office  cum  rest  shelter and  toilets with  temporary structures. The  roof will be of  asbestos  sheets  covered by hay  to  keep  it  cool during summer.  A  first  aid  certificate  holder  will  be  the  in‐charge  of  the  first  aid  room. Protected drinking water will be provided and stored in earthen pots. The operations will begin  immediately  after  obtaining  all  statutory  clearances.    The  estimated  date  of completion is March 2016.  

Estimated project cost along with analysis in terms of economic viability of the project The estimated cost of the project is approximately Rs. 60.0Lakhs. 

Purpose  Cost Rs. In Lakhs Civil buildings  4 Machinery  49 Occupational health and Safety equipments 3 Contingencies & pre‐operative expenses 4 Total Project cost    60