Summer Co-opAssignment PresentationJeremy Smithes
Marion Metal Center
Area: MaintenanceMay 26th – August 20th
Supervisor: Mike Spohn
Mentor: Bryon Winters
![Page 2: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/2.jpg)
2
Background• Education:
• Purdue University• Electrical Engineering Technology• Graduation Date: May 2016
• Work Experience:• Controls Engineering Co-op
• May 13 – August 2, 2013• May 26 – December 19 , 2014
• Maintenance Supervisor Co-op• May 26 – August 20, 2015
![Page 3: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/3.jpg)
3
Project 1 IntroductionProblem:
-Crane Documentation
Description: ModelInspectPlan Evaluate
![Page 4: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/4.jpg)
4
Project 1 Responsibilities
1) Inspect 3) Model
2) Record
4) Integrate
![Page 5: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/5.jpg)
5
Project 1 InspectionMotor Controller
VFD or SS?VFD SS
Series 2 or 4? Old or New?
Fuse Size/Type?
Prints
![Page 6: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/6.jpg)
6
Project 1 AccomplishmentsComplete Prints
AutoCAD Experience
Crane Familiarity
A-BAA EastAA WestB&S NorthB&S SouthBB EastBB WestCC EastCC WestCoil offloadE-FG-HJ-K
L-MN-ONorth Bay WestP-Q Prep BuildingR-SS Bay EastS Bay WestT-UV-WY West Y East
![Page 7: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/7.jpg)
7
“Project 2” IntroductionMaintenance Supervisor
![Page 8: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/8.jpg)
8
Project 2 Responsibilities
![Page 9: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/9.jpg)
9
Project 2 Accomplishments
Interpersonal Skills
Leadership Experience
Location Familiarity
![Page 10: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/10.jpg)
10
Lessons Learned
Embrace Be Assertive Get Personal
![Page 11: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/11.jpg)
Future Plans
11
![Page 12: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/12.jpg)
12
Acknowledgements
• Bob Sprague, Maintenance Supervisor
• Bob Borland, Cool Electrician• Brad Eller, Manufacturing Engineer
Group Leader• Bryon Winters, Controls Engineer• Dave Hall, Controls Engineer• Don Natoli, Director of Engineering• Donnie Fields, Awesome Guy• Eric Gonzales, Plant Manager
• George Vandermeir, Quality Manager
• Glenn Sampson, Plant Finance Manager
• Gregory Stoebick, Area Manager• Mary Ellis, GMS GMP Support• Mike Spohn, Maintenance Planner• Nikki Minor, Personnel Director• Robin Yoder, Awesome Electrician• Sue Baber, Supervisor Salaried
Personnel• Toya Jackson, Manufacturing
Engineering Superintendent
![Page 13: Smithes - Coop Presentation 3](https://reader036.vdocuments.site/reader036/viewer/2022062400/5879208d1a28abf13a8b6f17/html5/thumbnails/13.jpg)
13
Q & A
Thank you! Any Questions?