End of Term Coop Presentation. Ben Magstadt May 9 th , 2011 – August 17 th , 2011. What I Accomplished/Learned While at Texas Instruments. FBB Analysis for OMAP4430 & OMAP4460 Continuity Test Time Reduction for OMAP4430 Smart Reflex & Vmin Analysis for OMAP4460 TDL Debug for OMAP4460. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: End of Term Coop Presentation

End of Term Coop Presentation

Ben Magstadt

May 9th, 2011 – August 17th, 2011

Page 2: End of Term Coop Presentation

What I Accomplished/Learned While at Texas Instruments

• FBB Analysis for OMAP4430 & OMAP4460

• Continuity Test Time Reduction for OMAP4430

• Smart Reflex & Vmin Analysis for OMAP4460

• TDL Debug for OMAP4460

Page 3: End of Term Coop Presentation

FBB Analysis• Body Biasing Effect

– A voltage difference between the body and source in a transistor causes a change in the threshold voltage

– In other words, it is just a difference between the Voltage on the domain and the VBB level

– Forward Body Bias• Lowers the threshold voltage• Higher performance & higher power

– Reverse Body Bias• Increases the threshold voltage• Lowers performance & power

Page 4: End of Term Coop Presentation

FBB Analysis for OMAP4• Problem

– Many patterns at speed corners need some extra help to pass at the spec Voltages

• Solution– Increase in Forward Body Bias gives that extra help

and reduces the Vmin level for the patterns– Implement FBB versions for the speed corner

patterns for them to pass at spec Voltages– For 4460, both IVA and MPU patterns that run at

speed corners need FBB– For 4430, only MPU domain that run at speed corners

need FBB

Sirish
Edited
Page 5: End of Term Coop Presentation

FBB Analysis for OMAP4460Vmin(Volts) vs. Temperature(C)

1.16

1.17

1.18

1.19

1.2

1.21

1.22

0 20 40 60 80 100 120

Temperature(C)

Vm

in(V

olt

s)

VMIN_VC_VSPEEDBIN_PMT_LED_N_ST_BST_FB

VMIN_VC_VSPEEDBIN_PMT_LED_N_ST_BST

SPEEDBIN SPEC

Page 6: End of Term Coop Presentation

FBB Analysis for OMAP4• Yield problems with introducing FBB

– Can’t implement globally across all units– Variation among die (N2P)

• Hotter Material– Needs no help to pass Voltage Specs

– With FBB it exceeds Current Specs

– Vmin changes little with change to N2P

• Colder Material– Needs help to pass Voltage Specs

– With FBB it is passes Current Specs

– Vmin changes more drastically with change to N2P

Page 7: End of Term Coop Presentation

FBB Analysis for OMAP4430• Problem

– Find the amount of FBB needed to have a good trade-off between Power/Vmin

– Need a dynamic implementation w.r.t the die parametrics (N2P)

• Project– Sweep the amount of FBB applied and collect

Vmin/IDDQ data– Analyze

• Change in Vmins• Change in Power

Page 8: End of Term Coop Presentation

FBB Analysis for OMAP4430:MPU: 1.3V VBB: 1.05V FBB: 250mV

Page 9: End of Term Coop Presentation

FBB Analysis for OMAP4430:MPU: 1.3V VBB: 1.35V RBB: 50mV

Page 10: End of Term Coop Presentation

FBB Analysis for OMAP4

• Future– Large Data collection currently going on to

find these ‘sweet spots’ for OMAP4430– This process will be repeated for OMAP4460

once this is finished– Implement FBB on a chip to chip difference to

optimize performance and power

Sirish
Add more
Page 11: End of Term Coop Presentation

Continuity Test Time Reduction

• Problem– Time is money– Generic wait time used for all analog pins

during continuity tests

• Project– Used oscilloscope to find the specific rise time

for each analog pin in continuity test– Optimized the wait time based on the rise time

for each pin

Sirish
Edited
Page 12: End of Term Coop Presentation

Continuity Test Time Reduction

• End Result– Saved 1.8s on Single Site– Saved 1.9s on Octal Site

• Implemented a feedback procedure that waits more on certain devices that fail to rise in the specified time

Sirish
Page 13: End of Term Coop Presentation

Smart Reflex & Vmin Analysis

• Problem– OMAP4430 & OMAP4460 are creating larger

power needs– Need a way to run different units at different

voltages to save power

• Project– Collect & analyze data on the Vmins for

OMAP4460

Page 14: End of Term Coop Presentation

Smart Reflex & Vmin Analysis

Page 15: End of Term Coop Presentation

Smart Reflex & Vmin Analysis

• Project (continued)– Used the data collected to find the worst case stable

patterns for Vmins– Units then trimmed to these SR Fuse Values

• Future– Smart Reflex process being revamped so it searches

thru all patterns to find worst case Vmins– Needs more stability in patterns to be more effective

Page 16: End of Term Coop Presentation

TDL Debug

• Problem– Failing and instable patterns that need to be tested for

customer coverage

• Ongoing Project– Take fail logs, shmoos, perform experiments, & talk

with designers to find solutions

• Future– More debug to be done to reach more stability in

patterns

Page 17: End of Term Coop Presentation

THANK YOU!