smed forms for lean projects

11
Kaizen SMED Forms FORMS

Upload: civanus

Post on 12-Sep-2015

220 views

Category:

Documents


0 download

DESCRIPTION

Forms for running lean projects

TRANSCRIPT

CI CHARTSPROCESS ACTIVITY:
-
-
-
-
-
&LFile name = &F, sheet = &A&CPage &P of &N&RDate printed = &D &T
FLOW
PROCESS FLOW CHART
&LFile name = &F, sheet = &A&CPage &P of &N&RDate printed = &D &T
WASTE
WASTE
OBSERVED
CAUSE
OVERPRODUCTION
WAITING
TRANSPORT
DEFECTS
&LFile name = &F, sheet = &A&CPage &P of &N&RDate printed = &D &T
Date:
IMPLEMENTATION REF
Description:
Circulation:
No.
Concern
Date
Countermeasure
Resp.
Target
% Complete
Complete
Confirm
OK
Raised
Date
25%
50%
75%
100%
Date
Date
&LFile Name = &F&CPage &P of &N&RDate Printed = &D &T
MBD0007238A.unknown
Date:
Key Terms: ASSEMBLE, DISMANTLE, USE, TRANSPORT (EMPTY), TAKE, TRANSPORT (FULL),
PUT DOWN, FIND, CHOOSE, INSPECT, DEPLACE (REPOSITION), HOLD, WAIT, LOOK FOR.
&A
Available M/C Time
Alternatives: Performance Rate = (Op Time - Perf. loss)/OpT
Quality Rate = (Productive time - Defect time)/Prod Time
TOTAL PRODUCTIVE EFFECTIVENESS
Parts Count
Operating Time
X
X
Job begins
on the
Job ends
on the
Time Before
Time After
Key Terms: ASSEMBLE, DISMANTLE, USE, TRANSPORT (EMPTY), TAKE, TRANSPORT (FULL),
PUT DOWN, FIND, CHOOSE, INSPECT, DEPLACE (REPOSITION), HOLD, WAIT, LOOK FOR.
CURRENT TIMEPROPOSED TIME