s.l.lloydgridpp cb 29 oct 2002slide 1 agenda 1.introduction – steve lloyd 2.minutes of previous...

14
S.L.Lloyd GridPP CB 29 Oct 2002 Slide 1 Agenda 1. Introduction – Steve Lloyd 2. Minutes of Previous Meeting (23 Oct 2001) 3. Matters Arising 4. Project Leader's Status Report – Tony Doyle 5. Discussion 6. Tier-2 Centres –Steve Lloyd 7. EU Framework VI – Tony Doyle 8. GridPP 2004-2007 – Steve Lloyd 9. Any Other Business 10.Date of Next Meeting

Upload: conrad-patrick

Post on 17-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 1

Agenda

1. Introduction – Steve Lloyd2. Minutes of Previous Meeting (23 Oct 2001)3. Matters Arising4. Project Leader's Status Report – Tony

Doyle5. Discussion6. Tier-2 Centres –Steve Lloyd7. EU Framework VI – Tony Doyle8. GridPP 2004-2007 – Steve Lloyd9. Any Other Business10.Date of Next Meeting

Page 2: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 2

Matters Arising

• Project Management Board– Dave Britton appointed as Project Manager

(funded by GridPP)– Administrative Assistant (Barbara Scott)– CB Chair not funded by GridPP

• Experiments Board– Roger Barlow re-elected as Deputy Chair –

Takes over as Chair from Nick Brook next year• LTA to CERN

– Now possible through CERN LCG Money• PPARC Oversight Committee

– Met with us 3 times (Dec 01, May 02, Oct 02)– (Unhappy, Very Unhappy, Very Happy)

Page 3: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 3

Project Leader's Report

Project Leader's ReportTony Doyle

Page 4: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 4

Tier-2 Centres

• GridPP Currently funds:– Tier-1/A Hardware and Support Staff– Middleware Staff– Applications Staff– CERN Hardware and Staff

• GridPP proposed should be ~4 ‘Regional’ Tier-2s• GridPP does not fund Tier-2s• Potential Tier-2 hardware exists through

JIF/JREI/SRIF etc • Two recent surveys carried out:

– January 2002 Grants ‘Form G’– July 2002 GridPP Tier-2 Questionnaire

Page 5: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 5

Tier-2 Centres

• Many UK Institutes could be Tier-2s• All major UK Institutes want to be (or be part of)

Tier-2 centres.• Four obvious geographical groupings:• ScotGrid

– Edinburgh, Glasgow• Northern

– Lancaster, Liverpool, Manchester, Sheffield• Southern

– Birmingham, Bristol, Cambridge, Oxford, RAL-PPD

• London– Brunel, IC, QMUL, RHUL, UCL

Page 6: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 6

Tier-2 Centres

• ScotGrid– Well established as prototype Tier-2

• Northern– Have met once together, plan to meet again

soon– Very significant resources

• Southern– Bristol, Oxford, RAL-PPD have submitted EoI to

GridPP• London

– Informal discussions so far

Page 7: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 7

Tier-2 Centre Resources

Estimated resources at end of 2003 (from Institute returns)

Number of CPUs Amount of Disk (TB) Amount of Tape (TB)

London 1252 76 8

Northern 2015 113 33

Southern 392 29 20

ScotGrid 154 35 0

Number of CPUs Amount of Disk (TB)

BaBar 1108 29% 76 30%

CDF 453 12% 39 15%

D0 320 8% 8 3%

ATLAS 947 25% 72 28%

CMS 304 8% 9 4%

LHCb 543 14% 40 16%

Page 8: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 8

Tier-2 Planning

• Encourage these Institutes to formally get together

• Establish some sort of MoU between GridPP and the Institutes

• Request an additional 2 FTE of effort from PPARC to be matched from elsewhere to fund 1 FTE at 4 Regional Centres for last year of GridPP

• Try and minimise System Management effort required to run the centres (see Rollout Plan)

Page 9: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 9

EU Framework VI

EU Framework VITony Doyle

Page 10: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 10

The Future of GridPP

• GridPP is funded for 3 years from 1 Sept 2001 (1 Jan 2001 for EDG) i.e. ends by Oct 2004

• End effects till end of 2004• LHC starts > 2006• Need to have built a robust, production Grid

with sufficient capability and capacity by then

Page 11: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 11

The Future of GridPP

• GridPP is now well established with– PPARC, UK Core e-Science, Internationally

• Broadly based in UK HEP – CB - Group Leaders

• Has taken over much of CNAP's previous role– Running Central Facilities -> Proto Tier-1/A Centre

• Effective Management Structure

• Propose that GridPP continue beyond 2004• Need to decide priorities and prepare to bid against

new money.

Page 12: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 12

Future Priorities?

• Continue supporting Tier-1/A staff• Continue ramp up of Tier-1/A hardware• Support for Tier-2 staff

– Complimentary to University funding• Continued support for Applications development

– Through rolling grants?• Continued support for Middleware development

– Including Framework VI etc• Ramp up of Tier-2 hardware

– From University funding (SRIF etc)?• Continued support of CERN staff• Continued ramp up of CERN hardware

Page 13: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 13

Any Other Business

Any Other Business

Page 14: S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's

S.L.Lloyd GridPP CB 29 Oct 2002 Slide 14

Next Meeting

Date of Next Meeting