slide out basket€¦ · slide out basket installation instructions inspect all parts and read all...

2
Slide Out Basket Installation Instructions Inspect all parts and read all instructions prior to beginning assembly and installation. SP-MUB-11-W SP-MUB-14-W Place frame in cabinet as shown. Position front rail of frame back 1-3/4 inches from the front edge of the cabinet. Frame must be straight and square to ensure smooth operation of basket. Attach frame to cabinet with four screws. Place basket on frame so the bottom two horizontal wires are at the back. Tip basket slightly as shown and guide wire into front of frame. NOTE: Basket is reversible and can be placed with either short end in front. Lower front of basket to place second horizontal wire into slot on frame as shown, then slide basket completely into frame. 1 2 3 4 Tools Required • Phillips Head Screwdriver • Drill with 1/16" (1,5 mm) bit for drilling pilot holes Product Assemblies Parts Included 1 2 4 3 Basket (1) Frame (1) Screws (4) S-8-50TSM4 Grand Rapids, MI 800.253.1561 simplyputorganizers.com ©2019 Knape & Vogt. All rights reserved. Knape & Vogt ® reserves the right to change specifications without notice. 310669/REV B 1119 Front Horizontal wire Horizontal wire 1-3/4" Front

Upload: others

Post on 25-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Slide Out Basket€¦ · Slide Out Basket Installation Instructions Inspect all parts and read all instructions prior to beginning assembly and installation. SP-MUB-11-W SP-MUB-14-W

Slide Out BasketInstallation Instructions

Inspect all parts and read all instructions prior to beginning assembly and installation.

SP-MUB-11-WSP-MUB-14-W

Place frame in cabinet as shown. Position front rail of frame back 1-3/4 inches from the front edge of the cabinet. Frame must be straight and square to ensure smooth operation of basket.

Attach frame to cabinet with four screws.

Place basket on frame so the bottom two horizontal wires are at the back. Tip basket slightly as shown and guide wire into front of frame. NOTE: Basket is reversible and can be placed with either short end in front.

Lower front of basket to place second horizontal wire into slot on frame as shown, then slide basket completely into frame.

1 2

3 4

Tools Required• Phillips Head Screwdriver

• Drill with 1/16" (1,5 mm) bit for drilling pilot holes

Product Assemblies

Parts Included

1

2

4

3

Basket (1) Frame (1) Screws (4)S-8-50TSM4

Grand Rapids, MI 800.253.1561 simplyputorganizers.com

©2019 Knape & Vogt. All rights reserved. Knape & Vogt® reserves the right to change specifications without notice.

310669/REV B 1119

Front

Horizontal wire

Horizontal wire

1-3/4"

Front

Page 2: Slide Out Basket€¦ · Slide Out Basket Installation Instructions Inspect all parts and read all instructions prior to beginning assembly and installation. SP-MUB-11-W SP-MUB-14-W

Cesta DeslizableInstrucciones de Instalación

Inspeccione todas las piezas y lea todas las instruccionesantes de comenzar con el armado y la instalación.

Grand Rapids, MI 800.253.1561 simplyputorganizers.com

©2019 Knape & Vogt. Reservados todos los derechos.El Knape y Vogt® reservan el derecho de cambiar especificaciones sin el aviso. Hecho en los Estados Unidos.

310669/REV B 1119

Coloque el bastidor en el armario como se muestra. Coloque el riel frontal del bastidor de nuevo a 4,4 cm del borde frontal del armario. El bastidor debe ser recto y cuadrado para asegurar que la cesta se deslice correctamente.

Fije el bastidor al armario con cuatro tornillos.

Coloque la cesta en el bastidor de modo que los dos alambres horizontales inferiores queden en la parte posterior. Incline la cesta ligeramente como se muestra y coloque el alambre de guía en la parte delantera del bastidor. Nota: la canasta es reversible y puede colocarse con el extremo corto en la parte delantera.

Baje la parte delantera de la cesta para colocar el segundo alambre horizontal en la ranura del bastidor como se muestra, luego deslice la cesta completamente en el bastidor.

1 2

3 4

Herramientas necesarias• Destornillador de estrella

• Perfore con una broca de 1/16" (1,5 mm) para hacer agujeros guía

Assemblages Ensamblajede productosSP-MUB-11-W SP-MUB-14-W

Lista de partes

1

2

4

3

Cesta (1) Bastidor (1) Tornillos (4)S-8-50TSM4

Frente

Alambre horizontal

Alambre horizontal

4,4 cm

Frente