skku lab - meeting

7
SKKU Lab - Meeting SKKU LAB-MEETING, 19.MARCH.2014 DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA 1

Upload: damian-lott

Post on 01-Jan-2016

59 views

Category:

Documents


5 download

DESCRIPTION

SKKU Lab - Meeting. SKKU Lab-meeting, 19.March.2014 Dong- hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea. Content. 1. Status of Korea-Chambers 2. Plan 3. Status of Data-analysis. Status of Korea-Chambers. Schedule. ( ~ 14.April) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SKKU Lab - Meeting

1

SKKULab - MeetingSKKU LAB-MEETING, 19.MARCH.2014

DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM

DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA

Page 2: SKKU Lab - Meeting

2Content

1. Status of Korea-Chambers

2. Plan

3. Status of Data-analysis

Page 3: SKKU Lab - Meeting

31. Status of Korea-Chambers Schedule

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1. KCMS Project Total Schdule

1) Project Ready 2014-02-10 2014-02-19 0

2) START 2014-02-10

3) DEAD LINE 2014-04-14

2. Mechanical Prepare

1) Frame Clean & Insulate 2014-02-10 2014-03-14 32

2) Frame Mylar Paste 2014-02-10 2014-03-14 32

3) Cooler & Electronic Set-up 2014-02-17 2014-03-21 32

4) Signal Strip Prepare 2014-02-20 2014-02-21 1

5) Signal Cable Prepare 2014-02-21 2014-02-21 0

3. Gap Prepare

1) Visual Test 2014-02-24 2014-02-28 4

2) Leak Test 2014-02-25 2014-02-28 3

3) Dark Current Test 2014-03-03 2014-03-28 25

4. Chamber Construction

1) 1st Build 2014-02-10 2014-02-20 10

2) 2nd Build 2014-03-05 2014-03-07 2

3) 3rd Build 2014-03-10 2014-03-11 1

4) 4th Build 2014-03-12 2014-03-13 1

5) 5th Build 2014-03-14 2014-03-17 3

6) 6th Build 2014-03-18 2014-03-19 1

7) 7th Build 2014-03-20 2014-03-21 1

8) 8th Build 2014-03-24 2014-03-25 1

9) 9th Build 2014-03-26 2014-03-27 1

10) 10th Build 2014-03-28 2014-03-31 3

02 Month 03 Month 04 MonthP A R T START END DAYS

Frame Clean & InsulateFrame Mylar Paste

Cooler & Electronic Set- up← Signal Strip Prepare← Signal Cable Prepare

← 1 st← 2 nd

← 3 rd← 4 th

← 5 th← 6 th

← 7 th← 8 th

← 9 th← 10 th

← Visual Test← Leak Test

Dark Current Test

( ~ 14.April) DEAD-LINE

Today( 19.March )

Delay

Page 4: SKKU Lab - Meeting

4 1. Status of Korea-Chambers

Complete Build 2nd & 3rd Chamber ( Cosmic-ray test ongoing )

Page 5: SKKU Lab - Meeting

5 1. Status of Korea-Chambers

Ongoing build to 4th & 5th & 6th Chambers

Page 6: SKKU Lab - Meeting

62. Plan & Backup

Ongoing build to 5th & 6th RE4/2 Chambers

Korea-CMS 1st RE4/2 type Chamber

Page 7: SKKU Lab - Meeting

73. Status of Data-Analysis Compare Pythia 6 MC data with Pythia 8

- MC Data sample

: /WToMuNu_TuneZ2star_13TeV-pythia6/Summer13dr53X-PU25bx25_START53_V19D-v1

: /WToMuNu_Tune4C_13TeV-pythia8/Fall13dr-tsg_PU20bx25_POSTLS162_V2-v1

- Process status

: CMSSW Release version For Pythia 8 : 6_2_5 (Developer version, No recipe)

6_2_4 version has Pat Release Note -> Try use this version.

Problem : compile error while compiling analysis program

Compile error : cc1plus: some warnings being treated as errors

‘Werror’ must be disabled

Request to Hyper-news