s.k.h. li ping secondary schoolliping.edu.hk/custompage/28/1112schoolplan.pdf · appendix a s.k.h....

98
S.K.H. Li Ping Secondary School 聖公會李炳中學 二零一一至二零一二年度 校務計劃書

Upload: truongque

Post on 08-Jul-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

  • S.K.H. Li Ping Secondary School

  • -------------------------------------------------------------------------------- P.1

    -------------------------------------------------------------------------------------- P.2 - 17

    ------------------ ------------------------------------------- P.18 - 22 --------- ------------------------- P.23 - 27 --------- ------------------------------------------- P.28 - 32 ----------------- ------------------------------------------- P.33 ----------------- ------------------------------------------- P.34 - 39 ----------------------- ------------------------------------------- P.40 - 42 -------------- ------------------------------------------- P.43 ------------ ---------------------------------------- P.44 - 45 ----------------- -------------------------------------------- P.46 - 48

    -------------- -------------------------------------------- P.49 - 51 -------------- -------------------------------------------- P.52 - 55 -------------------------- -------------------------------------------- P.56 - 57 -------------------------- -------------------------------------------- P.58 - 60

    -------------------- ----------------------------------------- P.61 - 62 - -------------------------------------------------------------- P.63 - 64 - ----------------------------------------------------------------- P.65

    - ----------------------------------------------------------------- P.66 - ----------------------------------------------------------- P.67

    --- -------------------------------------------- P.68 - 69 - ----------------------------------------------------------- P.70 - ---------------------- -------------------------------------------- P.71 - ---------------------- -------------------------------------------- P.72

    - ---------------- -------------------------------------------- P.73 - ----------------------------------------------------------------- P.74 - 76 - -------------------------------------------------------- P.77 - ---------------------- -------------------------------------------- P.78 - 79

    ---------------------- -------------------------------------------- P.80 - 81

    - ----------------------------------------------------------------- P.82 - --------------------------------------------- P.83 - ------------------------------------------------------------------ P.84 - 85 - ------------------------------------------------------ P.86

    ---------------------- -------------------------------------------- P.87 - 88

    - ------------------------------------------------------------ P.89 - 90 - ------------------------------------------------------------------ P.91 - 92 ---------------------------- ------------------------------------------- P.93 - 95

  • 1

    (2009-2012)

    09/10 10/11 11/12

    1.

    (

    )

    2.

    (

    )

    /

    /

  • S.K.H. LI PING SECONDARY SCHOOL

    GOVERNMENT FUNDS ACCOUNTS

    A. INCOME 2011-2012 2010-2011

    a. Teaching Staff Salaries Grant

    b Laboratory Technicians' Salaries Grant Income of items "a-d" contra to

    c. Grant for non-teaching staff Provident Fund Contribution expenditure items "a-d"

    d. Government Rent & Rates

    e. Operation Expenses Block Grant:

    i.) General Domain $5,064,593.60 $4,703,896.00

    ii.) Special Domain 505,824.00 477,801.00

    f Composite F & E Grant $474,870.00 $419,720.00

    g. Supply Teacher Grant $50,000.00 $50,000.00

    TOTAL $6,095,287.60 $5,651,417.00

    B. EXPENDITURE

    a. Teaching Staff Salaries

    b. Laboratory Technicians' Salaries contra to income items "a-d"

    c. Non-teaching staff Provident Fund Contributions

    d. Government Rent & Rates

    e. Administration Staff & Janitor's Salaries $2,100,000.00 $2,100,000.00

    f. Cleaning contract (Cleaning of school premises) 396,000.00 264,000.00

    g. Security contract 200,000.00 132,000.00

    h. Clerical Support Salaries 157,044.00 148,716.00

    i. Consolidated Subject grants 189,627.60 (Appendix A I) 171,829.17 j. Rec. English Language Grant 18,563.00 18,204.00 k. SBM Supplementary Grant 176,366.00 167,013.00

    l. Traning & Development Grant 7,287.00 6,901.00

    m. Noise Abatement R/G (Maintance & Elect.) 356,646.00 337,734.00

    n. School & Class Grant 1,009,091.00 (Appendix A II) 744,351.00

    o. Enhancement Grant 6,630.00 5,852.00

    p. Lift Maintenance Grant 79,680.00 75,456.00

    q. Composite IT Grant 363,999.00 344,696.00

    r. Guidance program fund 7,639.00 6,030.00

    s. Capacity Enhancement grant 498,185.00 471,771.00

    t. Composit F & E Grant $474,870.00 (Appendix A III) $419,720.00

    u. Substitue Teacher 40,000.00 40,000.00Surplus Retained / (Deficit) 13,660.00 197,143.83

    TOTAL $6,095,287.60 $5,651,417.00

    SCHOOL FUNDS ACCOUNT

    A. INCOME

    a. Tuckshop Rental $220,000.00 $220,000.00

    b. Tong Fai 160,080.00 136,880.00

    c. Profit on trading operations (Sales of exercise books & etc.) 5,500.00 5,500.00

    d. Interest received 200.00 200.00

    e. School Hall Air-cond. Charge 118,416.00 95,260.00

    f. IT maintenance fees --- 58,500.00

    g. Printing fees 111,100.00 87,750.00

    TOTAL $615,296.00 $604,090.00

    B. EXPENDITURE

    a. Audit Fees & etc. 6,000.00 6,000.00

    b. Insurance 50,000.00 46,340.00

    c. Souvenir ( teachers and hon.guests) 7,000.00 7,000.00

    d. Electricity ( School Hall Air-conditioning ) 45,000.00 45,000.00

    e. IT maintenance fees 85,000.00 58,500.00

    f. Printing fees 111,100.00 87,750.00

    g. Others 8,000.00 8,000.00

    h. Disbursement for overseas studies and excursion 10,000.00 10,000.00

    Surplus for the year 293,196.00 335,500.00

    TOTAL $615,296.00 $604,090.00

    BUDGET FOR THE YEAR 2011-2012

    2

  • 2

  • APPENDIX A

    S.K.H. LI PING SECONDARY SCHOOLBUDGET FOR 2011 - 2012

    I. CONSOLIDATED SUBJECT GRANTS

    A. INCOME 2011 - 2012 2010 - 2011

    Grants Received 189,627.60 171,829.17

    B. EXPENDITURE1. Visual Arts 8,000.00 8,000.00

    2. Computer Lit. 4,116.00 4,116.00

    3. C.S. / I.T. 7,410.00 7,410.00

    4. D.T. 60,530.00 51,530.00

    5. H.E. 24,874.60 24,874.17

    6. I.S. 16,066.00 16,066.00

    7. Putunghua 1,671.00 1,671.00

    8. ASL Chin. Lang. & Culture 2,672.00 2,672.00

    9. ASL Use of English 2,624.00 2,624.00

    10. Biology TAS 3,602.00 3,602.00

    11. Chemistry TAS 9,816.00 5,456.00

    12. Moral Civic Education 12,460.00 12,460.00

    13. Chin. Ext. Reading Scheme 13,893.00 13,893.00

    14. Eng. Ext. Reading Scheme 13,893.00 13,893.00

    15. Chemistry ASL 8,000.00 3,562.00

    TOTAL : 189,627.60 171,829.17

    II. SCHOOL & CLASS GRANTS

    A. INCOME 2011 - 2012 2010 - 2011

    Grants Received (incl. Lift maintenance, Electricity for Preparation room of Labs. & Interest)

    (incl. Electricity for Preparation room of Labs. & Interest) 732,047.00 653,391.00

    B. EXPENDITURE1. Postage & Stamp duty 8,000.00 4,000.00

    2. Newspaper, Library magazines & Advertisement 17,000.00 10,000.00

    3. Telephone & Fax line 10,000.00 12,000.00

    4. Celebration & entertainment 26,000.00 15,000.00

    5. Audit fees 24,000.00 17,000.00

    6. Wreaths flower-baskets & similar tributes 1,900.00 900.00

    7. Travelling allowance for guest speakers 17,000.00 3,000.00

    8. Supplementary Teaching Staff 2,000.00 1,500.00

    9. Staff training 2,000.00 1,500.00

    10. Repairs 112,000.00 60,000.00

    11. Transport & Travelling expenses 26,000.00 11,000.00

    12. Other minor items 14,000.00 10,000.00

    13. Teacher' textbooks, maps, etc (APPENDIX B III) 21,640.00 15,640.00

    14. Consumable stores 112,000.00 80,000.00

    15. Fuel, light and power 336,000.00 300,000.00

    16. Cleaning materials 19,000.00 12,000.00

    17. Prizes 9,000.00 4,620.00

    18. Water 14,000.00 12,000.00

    19. First-aid facilities 2,200.00 1,200.00

    20. Sports 13,000.00 9,240.00

    21. Extra-curricular activities (APPENDIX B I) 71,351.00 61,351.00

    22. Printing & Stationary 110,000.00 70,000.00

    23. Library Books for students 40,000.00 32,000.00

    24. Bank charge 1,000.00 400.00

    (277,044.00) (90,960.00)

    TOTAL : 732,047.00 744,351.00

    III. COMPOSIT F&E GRANTS

    A. INCOME 2011 - 2012 2010 - 2011Grants Received 474,870.00 419,720.00

    B. EXPENDITURE1. IT & AV 20,000.00 21,000.00

    2. Visual Arts 20,000.00 20,000.00

    3. Biology 22,000.00 44,000.00

    4. Chemistry 22,000.00 22,000.00

    5. Design & Technology 30,500.00 35,000.00

    6. Geography 6,500.00 17,500.00

    7. Home Economics 18,000.00 22,000.00

    8. Integrated Science 22,800.00 24,000.00

    9. Library 5,000.00 13,000.00

    10. Music 19,000.00 18,540.00

    11. Physical Education 24,700.00 22,824.00

    12. Physics 22,000.00 22,000.00

    13.Computer 20,000.00 20,040.00

    14. General 222,370.00 117,816.00

    TOTAL : 474,870.00 419,720.00

    3

  • APPENDIX B

    BUDGET FOR 2011 - 2012

    2011 - 2012 2010 - 2011

    I. Extra-curricular Activities Recurrent Recurrent

    School

    Inter School $3,707.00 $3,707.00

    Summer programmes 930.00 930.00

    Contest 15,000.00 15,000.00

    General 5,316.00 2,316.00

    $24,953 $21,953

    House

    Inter House $2,781.00 $2,781.00

    Red House 1,391.00 1,391.00

    Yellow House 1,391.00 1,391.00

    Blue House 1,391.00 1,391.00

    Green House 1,391.00 1,391.00

    General 930.00 930.00

    SA 4,391.00 1,391.00

    $13,666 $10,666

    Clubs & Society

    Academic $1,855.00 $1,855.00

    Art 1,855.00 1,855.00

    Sports 3,706.00 3,706.00

    Interest 2,781.00 2,781.00

    Service 1,855.00 1,855.00

    General 5,855.00 1,855.00

    $17,907 $13,907

    Miscellaneous

    Religion Activities $4,300.00 $4,300.00

    Careers 960.00 960.00

    School Social Service 2,870.00 2,870.00

    Prefects 2,870.00 2,870.00

    Scout 3,825.00 3,825.00

    $14,825 $14,825

    Total : $71,351 Total : $61,351

    S.K.H. LI PING SECONDARY SCHOOL

    4

  • APPENDIX B (con't)

    II. Curriculum Development Subsidy 2011 - 2012 2010 - 2011

    (Including consumable store and approved minor repairs)

    Recurrent Recurrent

    Resources $3,327.00 $3,327.00

    P.E. 2,662.00 2,662.00

    Music 1,855.00 1,855.00

    Visual Art 1,855.00 1,855.00

    D & T 1,855.00 1,855.00

    Home Economics 1,855.00 1,855.00

    Physics 4,167.00 4,167.00

    Chemistry 4,167.00 4,167.00

    Biology 5,097.00 5,097.00

    Library 2,000.00 2,000.00

    School computerization & SAMS 4,632.00 4,632.00

    $33,472.00 $33,472.00

    III. Teacher' Textbooks, maps etc.Additional Mathematics $420.00 $420.00Visual Art 420.00 420.00Biology 420.00 420.00Chemistry 420.00 420.00Chinese 420.00 420.00Chinese History 420.00 420.00Commerce / B.S. 420.00 420.00Computer Studies 420.00 420.00D & T 420.00 420.00Economics 420.00 420.00English 420.00 420.00General 420.00 420.00Geography 420.00 420.00H.E. 420.00 420.00History 420.00 420.00I. H. 420.00 420.00I.S. 420.00 420.00L.S. 420.00 420.00Life Education 420.00 420.00Mathematics 420.00 420.00Music 420.00 420.00P.E. 420.00 420.00Physic 420.00 420.00Putonghua 420.00 420.00Principle of Accounts 420.00 420.00Religious Studies 420.00 420.00Travel & Tourism 420.00 420.00Past Paper & etc. 4,300.00 4,300.00General 6,000.00 0.00

    $21,640.00 $15,640.00

    IV. MiscellaneousLibrary (including past paper $2,500.00) $40,000.00 $32,000.00Academic Committee Activities (newsletter & reading award) 15,020.00 15,020.00E-learning 10,000.00 10,000.00

    $65,020.00 $57,020.00

    S.K.H. LI PING SECONDARY SCHOOL

    BUDGET FOR 2011 - 2012

    5

  • 6

    ~ 2011 2012

    2011-2012 $18 x 500

    $9,000.00

    KHC ()

    2010-2011 $ 10,000.00 - $250.00(40 ) THN

    1. 2. 1. 2. 3. 4.

    5. ) 1. 2. 3.

    2011-2012 1. 250 10 $250 x 10 =$2,500.00

    2. 3 () 15 $250x 3x15 =$11,250.00 ____________ $13,750.00

    80%

    80%

    ()

    WCL THN FSC SMT CYN WKH JT

    $32,750.00

  • 7

    ~ 2011 2012

    -

    - (Mobile Lab)

    -

    -

    -

    2011 11 16-18

    $22000 ()

    - -

    () -

    - - WWFWho wants to be an Oceanographer? - :

    - ()

    - -

    2012 2 7

    $3800 - $3800

    40 $1500 () - () -

    - 2 a. b.

    - 2012 7 8 $10000 $250x 2x20

    - - WWF 2012 3 22 $500 250 2 MWL SMT $36,300.00

  • 8

    - 1.2011915() 2.2011921()

    ( 4 - 6) $840 () -

    "" -

    - 2011 11 21 ( 5-6)

    $640

    - " 2012 2 ( 3 - 6) $800 - 2011 11 $2,000 - "" 2012 6 () $6,000 - - () 2012 2() $9,000 -

    $9,000( 60) - $1,500()

    $19,280.00

  • 9

    -

    NSS SBA 2011-2012 250 10 $250x10 =$2,500 :$2,500

    - -- 4 4 2011 11 23910 4 $250 2 4 $2,000 -- -- - 5 5 () 2012 3 19212326 4 $250 2 4 $2,000 -- --

    - () - A. B. - C. D. E.

    2011 92012 8 $5,500 1

    2 1. 2.

    -- -- -- 1. 2.

    3.

    2011 9 2012 8 $250.0 20 $5000.0 BYT

    $17,000.00

  • 10

    -

    - - -

    -

    6-7/2012

    - 6 6x$250=$1500 -

    - - MFL

    1. /-- ( 1)

    () ( 2) ()

    ( 3) () ( 4) () ( 5) () 2. 2 /

    1.

    2.

    (1) 20119 2012 7 (2) 201110 2012 7 3

    (1) ( 1) 1 $1680.0 ( 2) $275X6 $1650.0 ( 3) $360X4 $1440.0 ( 4) $280X8 $2240.0 ( 5) $265X7 $1855.0 (2) $250.00 23 $1500.0

    MYT

    -- -- --

    1. 2. 3.

    2011 9 2012 8 $250.0 8 $2000.0 MYT

    $13,865.00

  • 11

    ()

    (1) (2) (3)

    2011 9 2012 8

    $10,000.00

    (5%MPF) $252,000.00

    WCL () 2011 1 6 $8,000.00 THN

    --- 1. 1, 2. ----

    3 4

    2011 9 2012 6

    $250x3 =$750.00 $__750________

    1. 2.

    YSL,MH,GH,YNT

    1. 6/2012 $250 x10= $2500.00 1. $263,250.00

  • 12

    - 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.

    -

    -

    -

    -

    20112012 1.

    $3,780+$189

    (MPF)x12=$47,628

    2. =$40,000

    3. $800x50=$40,000

    4. $500x35=$17,500

    5. $6,000

    6. $5,000

    7. $18,200

    8. $12,000

    9. $5,000

    10. $11,000

    11. $10,000

    12. $1,5000

    _________________

    $227,328

    -

    -

    -

    -

    -

    -

    -

    -

    1. (KST) 2. (KST) 3. (KST) 4. (MYT) 5. (MYT) 6. (MYT) 7. (MYT) 8. (YKW) 9. (YKW) 10. (MYT) 11. (KST) 12. (SML)

    $227,328.00

  • 13

    1.(F.1-3)

    2. (F.4)

    --- 1.(F.1-3) 2. (F.4) 2011 1 2012 6

    $250x4 x2 =$2000 $2000

    (F.1-3) 50% 70% 1-6 20% 70% 1-6

    1. 2.

    HPP, PLF

    --- 1. 2. 3.

    2012 7 $250 x3

    =$750 $750

    PLF

    2011 $1,000 $750 $1750 $4,500.00

  • 14

    2011 10 24 26 $160,000 1. 90% 2. 60% TYL

    1. 2. 3.

    2011-2012 $250 20 $5,000 TYL IT&AV IT IT 4() IT/ 2011 9 2012 8 $6160x12 ( 5%MPF) $77,616

    IT KML

    $242,616.00

    $856,889.00

    Surplus carried forward to 2011 - 2012 $393,762.65 2011 2012 EDB grant $498,185.00 Total $891,947.65 Total expenditure 2011 2012 ($856,889.00) Expected surplus $35,058.65

  • 1) YSL 1,000.00$

    2) WHC 15,000.00$

    3) CMN/SS 1,000.00$

    4) SYC 1,000.00$

    5) FY 7,000.00$

    6) YSL 10,000.00$

    7) SML 10,000.00$

    8) TYL 30,000.00$

    9) TYL 30,000.00$

    10) TYL 40,000.00$

    11) CYT 2,000.00$

    12 KST 3,000.00$

    13 PKW 5,700.00$

    14 KC 5,000.00$

    160,700.00160,700.00160,700.00160,700.00$ $ $ $

    2011201120112011----2012201220122012

    122580.00

    15

  • $148,800.00

    1) KST 7,000.00$

    2) SMT 500.00$

    3) SMT 500.00$

    4) SMT 500.00$

    5) MYT 1,500.00$

    6) TYL 15,000.00$

    7) KC 5,000.00$

    30,000.0030,000.0030,000.0030,000.00$ $ $ $

    2011201120112011----2012201220122012

    16

  • 17

    2011-2012

    /$ /$

    2010-2011 313,181.60

    2/2012 2011-2012 890,000.00

    $1,203,181.60

    9/11-8/12 SpLD

    $24,360 x 12 months (MPF)

    292,320.00

    9/11-8/12

    $17,325 x 12 months (MPF)

    207,900.00

    9/11-8/12

    --

    298,000.00

    9/11-8/12

    $11,130 x 12 months (MPF)

    133,560.00

    $931,780.00

    10/11-6/12 68-- 49,800.00

    10/11-6/12 () 20,000.00

    2-5/2012 9,000.00

    10/2011 43 8,600.00

    2-5/2012 20,000.00

    6/2012 10,000.00

    9/11-6/12 10,000.00

    $127,400.00

    10/2011 09-10 $24,000.00

    10/2011 10-11 $8,400.00

    $1,091,580.00

    $111,601.60

  • 18

    2011-2012

    (1)

    1.

    2.

    1. ()

    2. ()

    /

    //

    //

    3. -

    ()

    -

    /

    4. ()

    (

    )

    5.

    6.

    (

    )

  • 19

    (2)

    i. (Faith & Spiritual))

    /

    1)

    () 2)

    3)

    4)

    5)

    6)

    1) 16/8/2011 ()

    2) 1/9/2011

    3) 11/9/2011

    4) 19/12/2011

    5) 3/4/2012

    6) 16/7/2012

    YSL KL,YCC 1) YSL

    2) FSC

    4) WHC

    5) SCC

    6) YMC

    1)

    2)

    3)

    4)

    5)

    ()

    6)

    ()

    CWHCYLSSL 7:50-8:05

    ()

    7/12/2011 ()

    6/6/2012 ()

    YSL KL

    YSL

    GH

    (2-4/11/2011)

    fit

    ()

    () ()

    (21-23/3/2012)

    Fun

    ()

    (-)

    ()

    2/11/2011

    4/11/2011

    ()

    3-4/11/2011

    1/3/2012

    23/3/2012

    ()

    22-23/3/2012

    SFSCWH

    SFS

    MH

    HPP

    SFS,CWH

    CYL, SSL

    SFSCWH

    CWH

    GH

    Colon

    LKY

    KL

    (: GH, LKY, MH)

  • 20

    //

    1)

    2)

    3)

    Raymond

    104A

    -

    -(

    )

    ()

    ()

    YSLKL

    KL

    ()

    SSL, HPP, SFS, LKY

    1.

    2.

    3.

    4./

    5.

    6.

    6

    1. 9

    2. 11

    3. 12

    4. 2

    5. 3

    6. 5

    CWHCYLSSL

    ///

    CWHCYLSSL 104A

    1.

    2.

    1.

    2.

    C CWHCYLSSL

    ii. (Health Education)

    /

    16/9-22/9

    F.2-5

    (6-7)

    YSLGHMHMCH

    (14)

    (/)

    YSLGHMHMCH

    3/10-21/10GH

  • 21

    14/11-2/12MCH

    1/3-16/3YSL

    14/5-1/6MH

    3

    YSLGHMHMCH

    1

    3 4

    11 9 12

    6

    YSLGHMHMCH

    YSL

    iii. (Community Care)

    /

    WYC

    12/2011

    CYT

    PYL

    SLL

    YSL

  • 22

    - (

    )

    - 8/10/2011()

    5

    10

    YSL

    YSL*,SSL,SFS,LKY,HPP,CWH,KL,CYL,MCH,YCC

    SSL*SFSLKYHPP

    SFS*CWHMCH

    YSL*KLYCCYSLCWH

    CWH*CYLSSL

    YSL*,MH,GH,MCH

    CYT*, WYC, PYL, SLL,YSL *

  • 23

    2011-12 (1) 1.

    2.

    3.

    4. ( )

    -

    - 1. -() -12-16/3

    - -

    -

    - -

    2. 3.

    10 11 2 4 5

  • 24

    4. -/ -

    - Sing along programme -()

    -

    - -

    5. - - -

    (2) - ()8 17-25 845 945 10 00 11 00 1115 1215

    1A1 1A2 1B1 1B2 1C1 1C2 1D1 1D2 ()

    - - TSA 9/511/514/516/518/521/523/525/5( 8

    - 2 7 -2 1617 - - - - - -

  • 25

    2011 2011 2011 2011 2012201220122012

    1. 1.1 1.2 1.3 1.4 11 9 12 11 - 12 $280*40=$11200 $500

    2. 2.1 2.2 A11 912 5 B11 9 12 5 C11 9 12 5

    07 - 12 A B C $280 * 100= $28000 $1000 $6069 3. 3.1 3.2 3.3 3.4

    2011 9 2012 6(10 ) 07-12 $280 * 10 *3 =$8400

    4. 4.1 4.2 4.3 4.4 4.5 $280*10=$2800

    = $57969= $57969= $57969= $57969

  • 26

    2011201120112011----2012201220122012

    (1)

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    9.

    1.

    5

    2.

    2.1

    3.

    3.1

    3.2

    1.

    2.

    3. ()

    4.

    4.1

    4.2

  • 27

    5.

    5.1

    5.2

    6.

    7.

    8.

    (2)

    1.

    1.1 1.2--- SBA 1.3

    2.

    3.

    4.

  • 28

    2011-2012

    (1)

    (1) (2) (3) (4) (5)

    ()

    (6)

    (7) (8) (9)

    APASO

    ()

    (10) (11) (12) (13)

    (14)

    (15)

    (16) SLP

    (17) (18) (19) (20) (21) (22)

    ()

    (23)

    (24) (25) (26) (27)

    (2)

  • 29

    (3)

    - -

    1. 2. () 3. 4. ()

    16/8/2011 26/8/2011 10/2/2011 2/11, 16/11,1/2, 22/2

    1. () 2.

    2/11, 16/11,1/2, 22/2 8/2/2011

    1. a.(Parentsevening) b. c. VTC (DVE) d.(I) e.(II)

    4/11/2011 1/3/2012 () 8/8/2012 () 15/5/2012( 5-6) 16/5/2012 ( 1 )

    2. (VTC + ) 22/2/2012

    3. 4. a. () b. () b. c. () () d. () () e.*

    9/2011 () 2/11, 16/11, 22/2, 16/5 6/2 7/2 2-5/2012 5/2012 23/5/2012

    5. a. b.

    1/2012 5-6/2012

    6. a. b. c. SLP d.

    9/2012 3/2012 3-5/2012 3-5/2012 ()

    1. a. (+APL) b. c. d.

    3/9/2011 22/2/2012 () 22/2/2012 19/4/2012 ( 6 )

    2. a. IVE/ b. ()

    2-5/2012() 2-3/2012()

    3. a. () b. JA(Goal ) (F.4-5 40 ) c. JA(F.4-F.7 40 )

    29/2, 7/3, 21/3, 18/4 29/10/2011 5/11/2011 5/5/2012

    4. a. VT(DVE) b. ApL Tasters c. ApL

    11-12/2011 2/2012 3-5/2012 ()

  • 30

    1. a. HKDSE(I)() b. HKDSE(II) () c.

    2/12/2011( 6 /) 19/4/2012( 5-6 /) 5/7 6/7

    2.

    a. b. IVE

    9-12/2011

    2-4/2012

    3. a. () b. JA(Goal ) c. JA(F.4-F.7 40 ) d. e.

    7/3, 21/3, 18/4, 2/5

    29/10/2011

    5/11/2011 5/5/2012

    4. () 2-3/2012

    1. a. F.7 (JUPAS) b. F.6 (JUPAS) c. F.7 IVE d. F.6 IVE e. f.

    30/9/2011( 5-6 ) 28/10/2011( 5-6 ) 21/11/2011( 5 ) 21/11/2011( 6 ) 2/2/2012 ( 6 ) 18/7/2012

    2. a. F.67 b. F.67

    17/9/2011

    9-12/2011

    3. a. JUPAS b. IVE c. HKIED

    9/2011-3/2012

    11-12/2011

    1-3/2012

    4. a. b. RIASEC () c. d. e. F.6 () JUPAS f. F.7 () g. JUPAS h. JA(F.5-F.6 40 ) i.

    15-16/10/2011

    10-12/2012 () 29/6/2012

    20/7/2012

    21/9, 28/9, 26/10, 16/11

    21/9, 28/9, 26/10, 16/11

    17/8/2012

    19/2/2010 5/3/2010 7-8/2010

    5. a. b.

    10/2011

    11/2011

    6. a.

    3-5/2012

  • 31

    (3)

    (2011-2012) () 21/9, 28/9, 26/10, 16/11 21/9, 28/9, 26/10, 16/11 7/3, 21/3, 18/4, 2/5 22/2, 7/3, 21/3, 18/4 2/11, 16/11, 22/2, 16/5 2/11, 16/11,1/2, 22/2 2/11, 16/11,1/2, 22/2

    (

    )

    9-12/2011

    () - 17/1/2011

    () 26/2/2011

    a.

    b.

    c.

    5/7/2012()

    7-8/2012

    7-8/2012

    15-16/10/2011

    10/12/2011

    9-10/2011

    9-10/2011

    Careers Room

    9/2011

    9-12/2011

    (

    )

  • 32

    2011-2012

    1. (F.5-7) F.3

    8/2 F.1-2 22/2F.3 IVE Visit

    F.4-5 IVE

    17/9 F.5-7

    HKUST

    2. 16/8 F.1 30/9 F.7

    28/10 F.6

    4/11 F.3 21/11 F.6-7 IVE 2/12 F.5HKDSE(I)() 17/1 F.4-F.7 2/2 22/2 F.4

    19/4 F.5HKDSE(II)

    () 15/5F.316/5F.3 5/7,6/7 F.5 JUPAS Workshop 18/7 F.6 3. 23/5 F.3 () 4. 15-16/10 10/12 5. F.3

    6. F.6-F.7 JUPAS F.6-F.7 IVE F.3-F.5 IVE (DVE) F.4

    F.6- F.7 7. 29/6 20/7

    F.7 JUPAS

    17/8 F.6 JUPAS

    8.

    F.7 F.6 9

    10. 10. 11.

    FY

    CYN

    JY

    CYN

    TWY

    12 . 26/8 F.1F.3 3/9 F.4 29/10 F.4-5 HKJA(Goal) 55/11 F.4-5 HKLA 6/2-7/2/ F.3 22/2 F.4 F.3 F.3() 5/5 F.4-5 HKLA

    13. () 26/2 5/7 DVE 19/3 or 26/3 HKJA

    19/2 or 5/3 F.5-F.6 HKJA F.2-F.5 SLP

  • 33

    2011-2012

    (1)

    -

    - - - - -

    -

    -

    - -

    (2)

    -

    -

    -

    -

    -

    -

    -

    - - - -

    -

    -

    -

    - - - -

    -

    -

    -

  • 34

    2011 - 2012

    (1)

    1

    2

    3

    (2)

    i.

    ii.

    iii. ,

    iv.

  • 35

    v.

    vi.

    vii.

    - /

    (3)(3)(3)(3)

    12/7/2011 F.1 SCC

    PLF

    16/8/2011

    F.1 SCCPLFHPP

    CWH

    2/9/2011 F.4 KHC

    7-8/11/2011

    7/11 8/11

    12 1A 1B 34 1C 1D F.1 SCC, YCL

    30/11/2011 KHC

    6/12/2011 F.2 SCC, YCL

    14/12/2011 F.5, F.6, F.7 SLL

    26/2/2012 SCC

    4/2012 F.2 KLSLL

    29/6/2012 F.7 PLF

    20/7/2012 F.6 PLF

    2012

  • 36

    CWHMH PLF

    KLC

    KLC

    KLSLL

    /

    YHL

    1. (F.1-3)

    2. (F.4)

    HPPPLF

    50%

    70% 1-6

    20%

    70% 1-6

    PLF

  • 37

    (4)

    PLF

    ()

    HPP

    CWH

    KLC

    KHC

    SCC

    SLL

    KL

    MH

    YCL

    *YHL LSG

    *RW

    *

  • 38

    2011-2012

    2011-2012

    2011-2012

    YSL SFS ,

    2011-2012

    /

    /

    HPP CWH KLC KHC SCC PLF

    * PLF SLL * KL * MH * YCL *

    SCC KLC CWH KHC PLF

    HPP CWH KLC KHC SCC PLF

    * (YSL) SLL* KL * (SFS * ) MH * YCL *

    HPP CWH KLC KHC SCC PLF

    1C 2D 3C 4C 5D 6E

  • 39

    2011-2012

    (PLF/SCC)

    (PLF)

    (SCC)

    /

    (RW)

    ()

    (RW

    ,)

    ()

    (PLF,

    TYL)

    (CWH,

    MH, PLF,

    YHL)

    (HPP)

    .

    (YHL,

    PLF,

    TYL)

    ()

    (KHC)

    (SCC,

    YCL)

    (KHC)

    ()

    (SCC, PLF,

    HPP, )

    (KHC, RW,

    )

    (/)

    ()

    (RW, KL,

    SLL,)

    (KLC,

    RW)

  • 40

    2011-2012

    (1) Main Concern of the Year

    ()

    a.

    1.

    2.

    3.

    (

    )

    4.

    b.

    90%

    1.

    2.

  • 41

    c.

    d.

    1.

    80%

    2.

    90%

    1.

    2.

    (2) Other Concerns

    a.

    b.

    (3) Members & Duty allocation

    Duty Teacher I/C

    a.

    b.

    c.

    d.

    e.

    f.

    CSC / TYL YKW / JT

    LCL

    PKW

    CLL YKW YKW

    CSC

    LCL LCL

    PKW / JT

    CLL TYL

    PKW / JT /

    CYT/ TYL/ CSC

    TYL /

    PKW /

  • 42

    g.

    h.

    CLL

    YKW

    (4) Programme

    Date Target I/C

    24/1024/10/2011

    14/09/11

    09/2011

    12/2011 7/2012

    09/201107/2012

    01/2011 06/2012

    --

    TYL

    PKW

    CSC / TYL

    TYL

    TYL/

    PKW

    TYL

  • 43

    2011-2012

    (1)

    ()

    IT

    (2)

    G03 5:30pm

    3/F 301-306

  • 44

    2011-2012

    (1)

    (2)

    a.

    1. 29-8-2011()

    2.

    3.()

    4.

    b. (NSS)

    c.

    d.

    1.

    1.

    2.

    3./

    1.

    SEN

    2.

    3.

    1.

    SEN

    2.

    3.

    1.

    2.

    3.

  • 45

    (3)

    1.

    29-8-2011

    2:00pm

    WCL, TPH, KHC

    2. I

    30-8-2011

    8:30-12:30

    WCL

    3.(

    )

    01-09-2011 WCL

    4. II

    27-10-2011

    8:00-16:00

    TPH, KHC

    5.

    ()

    20-03-2012

    10:00-13:30

    WCL

    6. III

    (

    )

    30-03-2012

    8:30-12:30

    FSC

    7.

    13-6-2012 TPH, KHC

    8.

    FSC

    9.

    WCL

    (4)

  • 46

    2011-2012

    (1)(1)(1)(1)

    1.

    2.

    3.

    4.

    5.

    (2)(2)(2)(2)

    ()

  • 47

    (3) (3) (3) (3)

    SEN

    SEN

    SEN

    SEN

    SEMIS

    *

    * LSG SENIEP

    * SEN

    *

    * SpLD

    (4) (4) (4) (4) 7/2011

    7-9/2011 SEN

    -

    -

    -

    SEN

    -

    -

    -

    19-23/9/2011 SEN

    9/2011 SEN

    9-10/2011 SEN

    11/2011 SEMIS EDB

    SEN SEN

  • 48

    F.1-F.3

    F.4-F.6

    F.1-F.2

    10/20116/2012

    10/20116/2012

    []

    SEN

    10/20116/2012 SEN

    9/2011 LSG-SEN

    LSG-SEN

    10/20116/2012 F.2-F.5

    SEN

    SEN SEN

    SEN SEN

    SEN SEN

    SEN

    9-10/2011 SEN

    11/2011 SEN

    SEN

    5-7/2012 SEN SEN

    6/2012

    SENEDB SEN

    6/2012 SENEDB

    2/2012

    6-7/2012

    SEN

    SEN

    7/2012 SENEDB

  • 49

    2011-2012

    1.

    ( )

    ---

  • 50

    2.2.2.2.

    2.1 ---

    1

    2.2

    2.3

    2.4

    2.5 ( TSA)

    2.6

    3.3.3.3.

    8

    9

    10 26 ---

    11

    12 16 ---

    1

    2

    3

    4 1825 ()

    5 29162330 ()

  • 51

    6

    7

    4.

    (1)

    (2)

    11 -12

    3 -4

    (3) (SEN)

    (SBA)

    (4)

    CMN(

    ) WYC() CMN

    CMN() WYC()

    20%

    (5) CMN 2011 12 16 2012 4 27

    CMN() WYC()

  • 52

    S.K.H. Li Ping Secondary School

    2011 2012 English Department Year Plan

    (1) Main Concern of the year: Objectives Major Concern

    addressed Strategies/Tasks Success Criteria Method of

    Evaluation Curriculum & assessment

    Teaching & learning

    Increase training on addressing argumentative, expository essays

    Enhance students argumentative and expository writing skills

    1. Continue to give students exposure to argumentative essays and help them learn from other writers.

    2. F.3- F.7

    Students are asked to read newspaper article online regularly. Junior form students are asked to find out the gist while students of F.3 or above are asked to give their personal response (written and/or oral) to the article or news read.

    3. Reinforce

    the argumentative, expository writing skills from Form 3 onwards.

    Positive feedback from teachers Students can handle the newspaper assignments well. F.3 Students or above can show their ability in writing argumentative, expository essays.

    Evaluation meeting within the panel and Academic Committee. Evaluation meeting within the panel Performance of writing assignments

  • 53

    (2) Other concerns of the year: Objectives Strategies/Tasks Target Group Time Scale 1. Establish a rich

    English learning environment

    1. Having weather forecast, school announcements and sharing on different topics in English by student English ambassadors on every Thursday morning assemblies.

    2. Conducting English Sing Along Program regularly to encourage students to read or sing along with the lead.

    3. Having an English

    reading week every month to establish students English reading habits and student Reading Ambassadors would be arranged to visit junior form classes to promote good books or watch video books.

    4. Conducting a Drama

    Show would help students aware the difference between Eastern and Western cultures. Different pre-watching and follow-up activities will be carried out in junior and senior forms.

    5. Complying with the

    instructions from the school to give support and arrange relevant learning activities for the Academic Week Low-carbon lifestyle, I can make it.

    6. Students are

    requested to take part in different language activities outside the classroom (e.g.

    Whole school Whole school Whole school Class visit by Reading ambassadors : F.3-F.5 Whole school Whole school Form 1-5

    Whole year October-May Whole year 2nd March 12th March- 16th March Whole year

  • 54

    viewing/reading texts) and keep a record in their Language Learning Portfolio which will be given part of their subject marks.

    2. Provide positive

    reinforcement in learning

    1. Setting different examination papers for different classes in Form 1 and Form 2 to motivate our students and provide them with successful learning experience.

    2. Setting different sections of Reading and Listening and Integrated Skills papers for F.5 and F.6 to familiarize students with the setting of HKDSE.

    3. More students can

    take part in the annual Speech Festival. All English teachers will provide coaching for students in either solo verse or choral speaking.

    Form 1-2 Form SS2-SS3

    Whole year SS2: 2nd Term Final Exam SS3: 1st Term Final Exam September - December

    3. Preparation for the NSS curriculum

    1. With the help of the EES, a core group will be set up to design the teaching and learning package for the school-based NSS elective module, namely Learning English through Popular Culture.

    2. An in-house 6-hour

    professional training course, Learning English through Social Issues, will be arranged for all English teachers.

    Four English teachers All English teachers

    Whole year Whole year

  • 55

    (3) Life-wide learning and make-up class arrangement

    Month Details Aug F.1 Bridging course Sept Oct Sing along programme (6/10)

    Talk on Social Coporate Responsibility by SGS (for F.6 and F.7) (11/10 p.m.).

    Nov Sing along programme (10/11) Dec Sing along programme (15/12) Jan Feb Sing along programme (9/2) Mar Sing along programme (1/3)

    Drama Show (2/3) Apr Sing along programme (19/4)

    F.3 TSA make-up class (Easter holiday) English Ambassador Camp (Tentative)

    May Sing along programme (24/5) Jun F.3-F.5 Post exam make-up class

    F.4 Day camp (Tentative) Jul

    (4) Integration and evaluation of curriculum Curriculum adaptation

    Form Details F.1 - F.3 1. Tailoring teaching and learning materials

    2. Setting different exam papers F.5 F.6 1. Setting different parts in exam papers

    (align with the HKDSE format) Lesson observation

    Month Details March New teachers (observed by Principal)

    (Exact date will be confirmed a month in advance) April March New teachers who joined the school from *2009 onwards

    (observed by SS) April *Remarks: Teachers who joined the school from 2009 onwards and had been observed by

    SS within the period are exempted. Book inspection

    Form Types of exercises to be inspected Date of inspection F.1 Composition files and G.E. files 10/2 F.2 Composition files and G.E. files 24/2 F.3 Composition files and G.E. files 2/3 F.4 Composition files and Listening integrated tasks 20/4 F.5 Composition files and Listening integrated tasks 27/4 F.6 Composition files and Listening integrated tasks 9/12 F.7 Composition files and Practical skills files 2/12

  • 56

    2011-2012 (1)

    (2)

    1.

    2.

    3.

    4.

    (3)

    8

    9

    10

    11

    12

    1

    2

    3

    4

    5 TSA

    6

    7

    (TSA

    HKDSE

    AL )

    (

    )

  • 57

    (4)

    -

    -

    11

    2

    -

    -(SEN)

    -

    10

    12

    4

    6

    -

    10

    11

    12

    1

    2

    3

    4

    5

  • 58

    2011-2012 (1)

    -

    -

    -(

    (

    )

    )

    (EDBIT@Limited )

    5 ( 12/8

    15/817/8 12

    -

    ()

    -

    - (

    )

    -

    (

    )

    - 11

    -

    -

    -

    AB

  • 59

    -

    -

    (

    )

    ()

    (

    )

    -

    -

    -

    -

    -

    -

    (2)

    - 3 31 4 3

    -

    / I R / R /

    -( Young Thinker)

  • 60

    (3)

    8 151719 AB

    9

    10

    11 14-18 ()

    12 AB ()

    1

    2

    3 3 5-9()

    3 31-4 4(40) 4

    5

    6

    7

    (4)

    -

    9

    11 -12 ()

    4 -5

    -

    11 -12

    4 -5

    -(SEN) SEN

  • 61

    2011-2012 (1)

    (2)

    //

    9-10

    ()

    (ECA)( )

    IS Club 29/9/11

    11 ()26/11/11

    ()7-12/11/11

    ()

    (1/1/11-31/7/12)

    IS Club 1/11/11

    (F4-6)16-18/11/11

    HKU Science Museum Night(

    )18-19/11/11

    2-3/119-10/11

    12 Open Day10/12/11

    17/12/11

    (F6)2/12/11

    IS Club 1/12/11

    1

    2 (F5)1/2/12

    (F4)7/2/12

    IS Club 9/2/12

    3 15/3/12

    (F4,5)22/3/12 IS Club 1/3/12

    IS Club 29/3/12

    4 (F1,F2)

    (F3,F5) 3/4/12

    5 IS Club 3/5/12

    (F3-F5)9/5/12

    Bio Club 11/5/12

    6

    7-8 (7 )

    (8 )

    -(Phy, Chem Bio, Math)

  • 62

    (3)

    ()

    -

    2011-2012

    I.S.

    -

    2011-2012

    Bio

    -

    2011-2012

    Phy

  • 63

    20112012

    (1)

    1.

    2.

    1.

    2.

    1.

    2.

    1.

    2.

    3.

    (2)

    (I)

    a.

    (i)

    (ii) 1 20

    (iii) TAS

    (iv)

    b.

    AL AS

  • 64

    c. Micro-scale Datalogging

    Linus

    d. 1.

    2.

    (II)

    a.

    b.

    c. (ANCQ)

    d.

    (i) 2011

    (ii)

    (iii)

    (iv)

    (III)

    a.

    b.

    c.

    d.

  • 65

    2011 2012 (1)

    (2)

    9/2011 (F.1-F.5)

    +

    2011 11 16-18

    (Mobile Lab)

    ()

    (

    III.

    f. IV.

    (7/2/12)

    (22/3/12)

    (2/12/11,

    1/2/12)

  • 66

    2011 2012 (1)

    (2)

    STAR

    4/2012 5-8/2012

    5-6 /2012

    7 /2012

    (

    )

    7 /2012

    7 /2012

    (

    )

    (

    )

    /

  • 67

    2011-2012

    (1) (1) (1) (1)

    1.

    2. (1) (2) 1. 2.

    (1) (2) (1) (2)

    (2) (2) (2) (2)

    (I)

    1.

    2.

    web-cam

    3.

    a.

    b. /

    (II)

    1.

    a.

    b.

    c.

  • 68

    2011-2012

    (1)

    /

    - /

    - / /

    -

    / /

    - /

    -

    - / /

    - /

    -

    - /

    -

    -

    -

    -

    - / /

    -

    / /

    -

    (2)

    8 22/8-26/8

    9 15/921/9

    7A

    /

    10 -10-11/10

    11 2/113/119/1110/11

    21/11

    12

    1

    2

    3 19/321/323/326/3

    4

    5 A

    6

    7

    OLE

  • 69

    (3) ()

    -

    - /

    - /

    - 2/126/12

    (4) ()

    -

    -

    -

    2012 4-5 -

    -

    -

    -

    - (SEN)

    -

    2011 12

    2012 5

    -

    -

    -

    2012 4-5 -

    -

    -

    -

    - PSHE KLA

    KST LML MWL YNT YSL PYL PKW

    PYL JY FSC PKW

    YLC HCL SML YNT

    MCH SSL

    YCC WL

  • 70

    2011 2012 (1)

    (2)

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    1949

    -

    -

    -

    -

    -

    -

    -

  • 71

    2011 2012 (1)

    (2)

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    - 75%

    -

  • 72

    2011 2012 (1)

    (2)

    -

    /

    NSS SBA

    /

  • 73

    2011 2012 (1)

    (2)

    -

    - 2011/12

    - 2011/12

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

  • 74

    2011 2012

    (1)

    (2)

    (i)

    Raymond

    F.1

    1

    4

    10 F.4 () 3

    ( 90 )

    ,2:50-3:45

    F.4 () 3

    ( 90 )

    ,2:50-3:45

    (ii)

    -

    -$5500

    -

    -

    1.

    2.

    3.

    4.

    -

    -

    -

    1.

    /

    2.

  • 75

    A.

    B.

    C.

    D.

    E.

    (iii) /

    (

    150)/

    3D3E 9-10

    3B3C 11-12

    3A 3-4

    F.4 1F.5 1 10

    F.4 2F.5 2 11

    F.4 3F.5 3 12

    F.4 1F.5 1 3

    F.4 2F.5 2 4

    F.4 3F.5 3 5

    (iv)

    ( 1-3 12 )( 1-3 5 )

    ()

    (v)

    ()

    (

    )

    70%( +) 30%

    ()

    (Grade)

  • 76

    1. 1.

    2. 2.

    3.

    3.

    4. 4.-

    5 . 5.

    A) ----()

    ()

    1-3:00-5:30

    2-3:00-5:30

    3-3:00-5:30

    1-3:00-5:30

    2-3:00-5:30

    3-3:00-5:30

    B) F.5()

    (3)

    - , 2:50-3:45

    - , 2:50-3:45

    9:00 12:00

    (3)

    ()

    ()

    ()

    ()

  • 77

    2011 2012 (1)

    (2)

    -

    - 2014

    /

    /

    ;

    (

    )

    (

    )

  • 78

    2011 2012 (1)

    1.

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    2.

    -

    -

    -

    -

    -

    -

    -

    -

    -

  • 79

    (2)

    1.

    -

    -

    -

    -

    -

    -

    -

    -

    2.

    -

    -

    -

    -

    -

    -

    -

  • 80

    2011-2012 (1)

    ,

    ICT (SBA)

    (2)

    8 F6/

    9

    10 F6( 1 )

    11 F6( 1 )

    12 F6( 1 )

    1

    2 F6( 1 )

    3 F6( 1 )

    4

    5

    6

    7

    (3) ()

    , ,

  • 81

    (4) ()

    -

    2/12 DT

    -

    11/11

    -

    (5)

    -

    DT

    ()

    10

  • 82

    2011 2012 (1)

    (2)

    i.

    ii.

    ()

    ICT (SBA)

    SBA

    ICT

    ()

  • 83

    2011 2012 (1)

    (2)

  • 84

    2011 2012 (1)

    1.

    2.

    3.

    :

    ,

    ,

    ,

    ,

    ;

    ;

    ;

    ,

    ,

    ,

  • 85

    (2)

    2.1 , ,

    2.2 ,

    2.3 ,

    2.4

    2.5 ,

  • 86

    2011 2012 (1)

    (2)

    ~ OLE

    ~ /

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

  • 87

    2011-2012 (1)

    1.

    2.

    1.

    2.

    (2)

    8

    9

    10 (

    )

    ()

    ()

    11 OLE

    12

    OLE

    1

    2

    3

    ()

    OLE

    4 OLE

    5 OLE

    6

    7 /

  • 88

    (3)

    (4)

    -

    -

    -

    -

    -

  • 89

    2011 2012 (1)

    (2)

    1.

    2.

    3. 11-12

    4. 11-12

    5.

    (OLE)

    6.

    7. KLA

    -

  • 90

    8. CEG

    9.

    (

    )

    MFL

    MYT

    9-10

    MFL ( YSL)

    9

    MFL 12/10

    MFL

    01/11

    MFL ( SML)

    03/11

    MFL

    WCL

    OLE 11/10 / 04/11

    MFL (PLF)

    04/11

    MFL

    OLE

    MFL

  • 91

    2011 2012 (1)

    (2)

    s, m

    30%

    30%

    A.

    11 8

    11 9

    11 9

    11 9

    () 11-12 11 9

    1.

    2.

    1.

    2.

    3.

  • 92

    11 9

    11 9

    2011 12

    11 9

    11 10

    11 10

    11 10

    11 11

    11 11

    11 12

    11 12

    11 12

    11 12

    12 3

    12 5

    7

    12 5

    /

    12 7

  • 93

    2011-2012 (1)

    (2)

    1.

    --

    --

    --

    1.

    1.

    2.

    (

    )

    BMI

    1.1.

    SPORTACT

    1.2.

    2.

    1.1.

    1.2.

    2.

    BMI

    1.1-1.2.

    2.

    BMI

    BMI

    2.

    1.

    2.

    1.

    2.

    3.

    1.

    2.

    1.

    2.

    2.

  • 94

    (3)

    8

    9 27,29 ()

    19-23 SPORTACT

    26-30

    10 10-14 ()

    17-21

    ()

    11 23,24

    31/10-4

    12 13,15 ()

    7

    9,13,14

    1

    2 21, 23,25,28/2, 1,2/3 ()

    29

    3 12, 13, 16 ()

    8,9

    ()

    4

    5 3,8 ()

    6 PTA BEST IN P.E

    7 ()

    (4)

    -

    10 :

    2

    4

    -

    -(SEN)

  • 95

    -

    10 3

    -

    12 SPORTACT

    3

    -

    1.

    --

    --

    --

    2.

    --

    --

    -- 11