Improving the Hiring Process for

High Volume Production

ISE 250 Project

Professor Steele

May 2016

Compiled by:

Melanie Gameng

Navathej Gobi

Gautam Singh

Solomon Arun Kumar Thangaraj

Page 2: SJSU_SixSigmaGreenBelltProject_GautamSingh

2

Contents

Abstract ........................................................................................................................................... 3

Background ..................................................................................................................................... 3

Scope ............................................................................................................................................... 4

DMAIC ........................................................................................................................................... 5

Improvement Opportunity: Define Phase ................................................................................... 5

Hiring Process Flow Chart ...................................................................................................... 5

SIPOC Diagram ....................................................................................................................... 6

Current State of the Process: Measure Phase .............................................................................. 7

Pareto Charts: Major causes of failure .................................................................................... 9

Histogram .............................................................................................................................. 10

Project Metric: Z-Score (Sigma score) .................................................................................. 13

Value Stream Map ................................................................................................................. 15

Analysis and Findings: Analyze Phase ..................................................................................... 16

Ishikawa/Fishbone Diagram .................................................................................................. 16

5 Whys Diagram .................................................................................................................... 17

Recommendations: Improve Phase ........................................................................................... 18

Z-test ...................................................................................................................................... 18

Monitoring and Control: Control Phase .................................................................................... 19

Improvement Methods ........................................................................................................... 19

Summary/Conclusion .................................................................................................................... 20

Appendix ....................................................................................................................................... 21

Page 3: SJSU_SixSigmaGreenBelltProject_GautamSingh

3

Abstract

An energy/car manufacturing company growing rapidly with an increasing demand for its vehicles.

Several departments across the company play an integral role in delivering the cars such as

engineering, production, etc. This project is focused on production – direct/indirect labor. The

purpose of this project is to improve the time and quantity in the hiring process for contingent

workers to satisfy the production shops requirements. Upon applying the 6-Sigma DMAIC

problem solving process, we suggest that the hiring process could be improved in terms of time

taken and quantity, by implementing weekend open houses and on the spot testing/interviews.

Background

The energy/automobile company’s manufacturing site is located in Fremont, California since May

2011. The CEO’s plan was to introduce a car model that was well-designed from an aesthetic

stand-point, technology driven and most importantly all-electric to prove to the world, an electric

car does not have to be ugly, as well as the first step to advancing the sustainable transportation.

Part 2 was to release a luxury sedan $65K and a family CUV $120K and to have the profits be

invested into the research and development into the part 3. Part 3, is to release a more economical

vehicle for the masses with a base price of $35k. In order to achieve the company’s goals, cars

need to be delivered to the customers as fast as possible.

Our project is supporting the Staffing team in reducing the time it takes to get contingent workers

out to the production floor to build the vehicles. The assembly line is less than 5 years old and

fairly complex in its nature and having many capabilities. The largest volume of employees at the

company consists of the direct and indirect labor employees. These are the people who are

physically putting the vehicle together and warehouse personnel. As the different departments

Page 4: SJSU_SixSigmaGreenBelltProject_GautamSingh

4

from the line need temporary work force to achieve vehicle output goals, they often issue short

time notice (usually days) and the requests can be 100+ quality people a week.

The Staffing department is using 3 agencies to provide the temporary staff. All 3 agencies use the

same hiring process from pre-screening the candidates to testing to interviews to orientation.

Currently the agencies are requested to provide the workforce of 120 qualified persons/week.

However, these agencies were not able to achieve the target and leading to inadequate labor.

Any direct labor workforce gaps can be costly to the company. This project identifies several areas

of improvement to the contingent worker hiring process to increase the number of temporary

employees in the pipeline (ready-to-go) as requested by the business and reduce the time it takes

to identify these new skilled temporary employees. Ultimately, the process can be scaled to any

future direct labor needs.

Scope

Having learned that the problem faced by an industry is inadequate workforce in production, the

main scope of this project will be developing an improved method and implementing it efficiently

to achieve the target of hiring the required number of persons in a timely manner. We analyzed the

existing process and found some root causes. Then, we designed few improvements like

conducting interviews on the same day, creating a database pool (pipeline), etc. (will be explained

in the later sections) to the existing process and measured the efficiency of improvement using x-

y graph, histograms, box plot, and pareto charts. These processes will be discussed in detail in the

following sections.

Page 5: SJSU_SixSigmaGreenBelltProject_GautamSingh

5

DMAIC

Improvement Opportunity: Define Phase

Hiring Process Flow Chart (Swim Lane Diagram)

Figure 1. Above is the hiring process flow. A larger chart can be found in the appendix.

Currently, the temporary workers are hired through the three primary staffing agencies. The

production shops in factory site raise a notice to HR department that the ‘x’ number of persons are

required to accomplish the job on time. Upon reviewing, HR requests these staffing agencies to

hire them a specified number of persons. Then, the staffing agencies advertise the job opening

through different mediums such as posting on their job board, flyers, word of mouth, email, job

fair and events. Then, the candidates are pre-screened to evaluate their eligibility. After clearing,

the candidates are asked to take skills assessment test, where they will be tested on their abilities

specific to job. After, the candidates who pass the test undergo a face-to-face interview and

evaluated further. If the candidates were selected after interviewing, background checks get

Page 6: SJSU_SixSigmaGreenBelltProject_GautamSingh

6

initiated and reviewed. Once the candidates meet hiring the hiring criteria, the next step for the

candidate is to participate in a pre-employment physical to ensure safety at the workplace, such as

proper lifting, able to stand for long hours, etc. The successful candidates are then given a start

date and assigned to specific department. If the candidates fail in any of the above steps, they are

able to reapply after 6 months. The overall process flow is depicted in Figure 1.

SIPOC Diagram

The SIPOC diagram maps the scope of the project and helps to identify the potential gaps between

the supplier, input specifications, between the output specifications, and the customer’s

expectations that helps to identify the scope of process improvement. It analyses the feedback and

feedforward process flow between the Supplier, Inputs, Process, Output, and Customers.

In the current hiring process before the implementation of process improvements, it included

significant delays in the pre-screen process to identify potential employees taking approximately

4 to 5 days before a candidate is invited for taking the assessment test and interview.

Figure 2. SIPOC before improvement process

Page 7: SJSU_SixSigmaGreenBelltProject_GautamSingh

7

After the SIPOC mapping and analysis, the following improvement methods were implemented in

the respective categories.

Supplier- Lay more emphasis on employee referrals, conducting open house events frequently

and thus encouraging more on-the-spot interviews and targeting associate level students at

community colleges who are flexible in work schedule and have passion for Tesla.

Process- Improving more number of testing stations and recruiters to accommodate more

candidates in less time.

Figure 3. SIPOC after improvement process

Current State of the Process: Measure Phase

Control chart helps us to monitor the process changes over time. Control charts are of two types:

(A) Control chart for continuous data and (B) Control chart for discrete data.

Page 8: SJSU_SixSigmaGreenBelltProject_GautamSingh

8

In our study, the process change over time was the number of employees hired per week. The

employees which were qualified but failed to show up (i.e. join manufacturing team) were

considered as defects. Also, the number of employees hired every week could be considered to be

variable set of data as different number of employees were hired every week. Therefore, the data

set contains discrete and variable data and as a result, P-chart was plotted (refer to figure 4 below).

Using P-chart, we can count the total number of defects.

From the Figure 4 (A), we can see that the control limits (UCL and LCL) are not the straight line

which is due to the fact that the sample size (total people who appeared for interview) that we

chose was varying over time. It can be noted that the sample 2 and sample 5 are outside control

limits and other samples show a lot of variability. Therefore, the data set is not a good fit.

Figure 4 (A): Control Chart (P-Chart) for hiring process (before improvement process)

By applying the improvement phase, we can see that the values lie within control limits as shown

in Figure 4 (B). In addition, there are less overall variations among the data points

comparatively.

Page 9: SJSU_SixSigmaGreenBelltProject_GautamSingh

9

Figure 4 (B): Control Chart (P-Chart) for hiring process (after improvement process)

Pareto Charts: Major causes of failure

As shown in figure 5, the Pareto chart shows time required by different categories of hiring process.

As we can see from the graph that the first two regions i.e. Third party and Agency together

constitute more than 90% of the total hiring time.

Figure 5: Pareto Chart of causes of low hiring process

Page 10: SJSU_SixSigmaGreenBelltProject_GautamSingh

10

One of our suggestions for the improvement in hiring time was to organize the pre-screening and

skills assessment test in addition to job fair on weekends. Through this method, agency would be

able to attract more people. Also, by conducting the pre-screening and skills assessment test on

the same day as open house, the agency could expedite the hiring process and send the results to

the company at the earliest. Based on these results, the company can invite the successful

candidates for the interview on the following weekday. Through this improved process, the time

taken for hiring a person could be reduced considerably. The Pareto chart was developed after the

improvement phase as shown in figure 6 and it can be noticed that the time taken by the agency to

conduct open house, pre-screening test, and skills assessment has been reduced from 34.9 % to

21.2 %.

Figure 6: Pareto Chart after improvement process

Histogram

To study the improvement of the hiring process, the number of persons hired per week was

monitored across eight weeks i.e. 3/4/2016 – 5/2/2016. We introduced the improvement methods

to hiring process as stated earlier at end of week 4 i.e. 3/28/2016. Table 1 shows the number of

persons hired across the eight weeks.

Page 11: SJSU_SixSigmaGreenBelltProject_GautamSingh

11

Table 1. Number of persons hired over the monitoring period (3/4/2016 – 5/2/2016).

Week

Number of persons

hired

1 61

2 85

3 112

4 78

5 97

6 136

7 145

8 202

To understand the distribution and the pattern of hiring process, the histogram was plotted for 8

weeks as shown in Figure 7. It can be seen that 3 weeks resulted in hiring of 80 – 100 persons per

week, 2 weeks each for 40 – 80 persons per week and 120 – 160 persons per week, and 1 week

yielded 200 – 240 persons per week.

Figure 7. The distribution of number of persons hired per week.

Page 12: SJSU_SixSigmaGreenBelltProject_GautamSingh

12

To get better insight on the improvement process, the number of persons hired was plotted against

the weeks as shown in Figure 8. It was observed that the after the changes in process, we were able

to see the improvement in the hiring process. The mean of number of persons hired before the

improve phase was 84 with the standard deviation of 21.21. After the improvement phase, the

mean and standard deviation was found to be 145 and 43.33 respectively. The efficiency of our

improvement process was estimated by calculating the percent increase in the number of persons

hired and was found to be 72.62 %.

Figure 8. Plot of number of persons hired versus the respective weeks.

Like the X-Y graph, the bar graph was drawn to see study the impact of improvement process. As

shown in figure, the increase in the hiring process can be noticed. The first four weeks yielded the

output fewer than the target set at 120. Although we could not notice the immediate improvement

in number of persons hired, the subsequent increase in the process was evident from the figure 9.

Page 13: SJSU_SixSigmaGreenBelltProject_GautamSingh

13

Figure 9. Bar graph of number of persons hired over the period of eight weeks.

Project Metric: Z-Score (Sigma score)

With the help of Z-score, we can measure the statistics of the hiring process. By calculating the Z-

score for hiring process before and after the improvement phase, we can evaluate the effectiveness

of improvement on the hiring process.

We can determine whether the number of people hired during first four weeks were below mean

or above mean or equal to mean through the Z-test. Similarly, we can use Z-score to determine the

number of people hired during the improvement phase. Refer to table 7 in appendix for more Z-

score details.

Since the target value to hire total employee every week was 120. Considering before and after

improvement phase, (Refer to Table 5 (a, b, c), we can calculate the Z-score.

𝑍 =𝑋−�̅�

𝜎 - to calculate Z-score for entire population

𝑍 =𝑋−�̅�

𝑆 - to calculate for sample (subset of the population)

Page 14: SJSU_SixSigmaGreenBelltProject_GautamSingh

14

Using above equations we derive,

𝑍𝐵𝑒𝑓𝑜𝑟𝑒 =𝑋 − �̅�

𝑆𝜎 =

84 − 120

21.21𝜎 = −1.697𝜎

𝑍𝐴𝑓𝑡𝑒𝑟 =𝑋 − �̅�

𝑆𝜎 =

145 − 120

43.33𝜎 = 0.576𝜎

Figure 10: Z-Score (Sigma Score) Before Improvement Process

From figure 10, it can be seen that the Z-score is negative (Z= -1.697). This implies that the mean

of the number of people hired before the improvement is 1.697 times the standard deviation below

the target mean of 120. The probability of hiring (or the area) is equal to 44.85%

Page 15: SJSU_SixSigmaGreenBelltProject_GautamSingh

15

Figure 11: Z-Score (Sigma Score) After Improvement Process

From Figure 11, it can be seen that the Z-score is positive (Z=0.576). This implies that the mean

of the number of people hired after the improvement phase is 0.576 times the standard deviation

above the target mean of 120. The probability of hiring (or the area) is equal to 71.77% which was

comparatively better than the previous hiring process.

Value Stream Map

We have reduced the total non-value added as indicated from the table. Before and after value

stream map can be found in Appendix.

Table 2. Summary of Value Stream Mapping for before and after improvement phase.

Before After Difference

Total Non-Value-Added Time 433 hrs or

18 days

77% 386 hrs or

16 days

75% 48 hrs or

2 days

Total Value-Added Time 127 hrs or

6 days

23% 127 hrs or

6 days

25% 0

Total Lead Time 560 hrs or

24 days

513 hrs or

22 days

48 hrs or

2 days

Page 16: SJSU_SixSigmaGreenBelltProject_GautamSingh

16

Analysis and Findings: Analyze Phase

Ishikawa/Fishbone Diagram

Figure 12. Fish Bone Diagram to determine Root Cause analysis.

Fishbone diagram is used to determine the root causes for low hiring of employees.

Page 17: SJSU_SixSigmaGreenBelltProject_GautamSingh

17

5 Whys Diagram

The 5-WHY tool is used to find specific and systemic root causes of a problem. It can also be

used to estimate the various causes which lead to failure rate.

Figure 13: The 5-WHY Diagram to estimate the detection of various Root Causes

By applying 5-Why, the various causes of failure could be linked to the root causes, which were

estimated by Fishbone diagram in Figure 12.

Page 18: SJSU_SixSigmaGreenBelltProject_GautamSingh

18

Recommendations: Improve Phase

Table 3.1. The chronological table of different improvement suggestions over the time.

0-3 months 3-6 months 1 + years

Increase weekly meeting

Reduce Attrition

Improve Retention

Targeted Training for

Operators

Standardize

Process/Procedure

Improving

screening test

Computerized testing systems

Improve Forecasting model

Z-test

The Z-test was executed to evaluate the mean, standard deviation, and 95% confidence interval

of hiring process before and after the improvement phase. From the table 3.2, it can be stated the

implementation of improvements has increased the number of persons hired per week by 72.6 %.

Table 3.2. Summary of z-test showing the parameters before and after the implementation

of improvement process.

Parameter Before improvement

phase

After improvement

phase Mean 84 145

Standard Deviation 21.21 43.33

Lower 95% CI 50.24 76.04

Upper 95% CI 117.75 213.96

Page 19: SJSU_SixSigmaGreenBelltProject_GautamSingh

19

Monitoring and Control: Control Phase

Improvement Methods

To study the effect of improvement phase statistically, the box plot was plotted for before and after

the improvement. As seen in figure 14, the shift in the median, first quantile, and third quantile

suggests that the efficiency of hiring process has increased through the implement of the

improvement phase. In addition to shift in their quantiles, the efficiency of hiring process was well

below the target line and improved later. It is believed that the box plot could be plotted in the

upcoming weeks to study the variability.

Figure 14. Box plot providing the changes in hiring process statistically.

Page 20: SJSU_SixSigmaGreenBelltProject_GautamSingh

20

Summary/Conclusion

The hiring process of contingent employees has been significantly improved after the

implementation of the suggested process improvements. The reduction in time is taken from the

pre-screen interviews to the day a contingent work starts. The agencies are also able to manage a

larger candidate pool in the reduced time developing a steady pipeline of candidates who are on

standby as the businesses request additional headcount or backfills due to attrition. This improved

process gives the Staffing department the ability to scale the hiring process for future business

need ramp ups and deliver a higher quantity of manpower (if necessary) to the assembly line in a

shorter turnaround time. In the future the potential aspects to focus on are identified as improving

the forecasting methodology, increasing the frequency of weekly meeting to identify better the

need for employees, reduction of attrition rate and improving the retention rate.

Page 21: SJSU_SixSigmaGreenBelltProject_GautamSingh

21

Appendix

Figure 15

Page 22: SJSU_SixSigmaGreenBelltProject_GautamSingh

22

Figure 16. Before process improvement value stream map.

Page 23: SJSU_SixSigmaGreenBelltProject_GautamSingh

23

Figure 17. After process improvement value stream map.

Page 24: SJSU_SixSigmaGreenBelltProject_GautamSingh

24

Table 4:

Whole Data

Number of persons hired

N total 8

Mean 114.5

Standard Deviation 45.39666

Lower 95% CI of Mean 76.54748

Upper 95% CI of Mean 152.45252

Sum 916

Minimum 61

1st Quartile (Q1) 81.5

Median 104.5

3rd Quartile (Q3) 140.5

Maximum 202

Interquartile Range (Q3 - Q1) 59

Range (Maximum - Minimum) 141

Table 5 (A): Before Improvement Phase Table 5 (B): After Improvement Phase

Before Data: After Data:

N total 4 N total 4

Mean 84 Mean 145

Standard Deviation 21.2132 Standard Deviation 43.3359

Lower 95% CI of Mean 50.24503 Lower 95% CI of Mean 76.04286

Upper 95% CI of Mean 117.75497 Upper 95% CI of Mean 213.95714

Sum 336 Sum 580

Minimum 61 Minimum 97

1st Quartile (Q1) 69.5 1st Quartile (Q1) 116.5

Median 81.5 Median 140.5

3rd Quartile (Q3) 98.5 3rd Quartile (Q3) 173.5

Maximum 112 Maximum 202

Interquartile Range (Q3 - Q1) 29 Interquartile Range (Q3 - Q1) 57

Range (Maximum - Minimum) 51 Range (Maximum - Minimum) 105

Page 25: SJSU_SixSigmaGreenBelltProject_GautamSingh

25

Table 5 (C): Deduction from Table 5 (A) & 5 (B)

Before After Total Hiring

Target

Mean 84 145 120

Standard Deviation 21.21 43.33

Table 6:

Sub-group size (n)

Run Total People

Interview People Hired

No Show Up

(Defects)

Defects per Unit

(DPU)

1 49 43 6 0.12244898

2 25 18 7 0.28

3 55 49 6 0.109090909

4 39 36 3 0.076923077

5 48 48 0 0

6 80 64 16 0.2

7 40 39 1 0.025

8 40 39 1 0.025

9 31 28 3 0.096774194

10 83 69 14 0.168674699

11 57 49 8 0.140350877

12 90 87 3 0.033333333

13 60 59 1 0.016666667

14 86 80 6 0.069767442

15 164 135 29 0.176829268

16 92 85 7 0.076086957

Total 1039 928 111

Average DPU (Ū)=111/1039= 0.107=Centreline (CL)

Page 26: SJSU_SixSigmaGreenBelltProject_GautamSingh

26

Table 7: Z-Score Description

Z-Score Description

Values Explanation

0 it is equal to the group mean

Positive above the group mean

Negative below the group mean

1 it is 1 Standard Deviation above the mean

2 it is 2 Standard Deviations above the mean

-1 1 Standard Deviation below the mean

-2 it is 2 Standard Deviations below the mean