  • West Q

    urna I 000 509 0000

    Contract N

    o: W3Q

    R

    21 Apr 11Project Location: Basra, Iraq

    Page 1 of 2

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    TAB

    LE OF C

    ON

    TENTS / D

    ATE R

    EVISION

    PAG

    E

    Adm

    inistrativeProcedure N

    o.Title

    RevisionD

    ate

    000 509 0000 Table of C

    ontents / Date R

    evision Page

    15 Apr 11

    000 509 0010 Forew

    ord 15 A

    pr 11000 509 0020

    Manual P

    reparation and Maintenance

    15 Apr 11

    000 509 0040 O

    rganization and Responsibilities

    15 Apr 11

    000 509 0050 D

    ocument C

    ontrol 15 A

    pr 11000 509 0090

    Process C

    ontrol 15 A

    pr 11000 509 0110

    Inspection, Measuring and Test Equipm

    ent 15 A

    pr 11000 509 0130

    Control of N

    onconformances

    15 Apr 11

    000 509 0140 C

    orrective Action 15 A

    pr 11000 509 0150

    Preventive Action 15 A

    pr 11000 509 0160

    Quality R

    ecords

    15 Apr 11

    000 509 0170 Q

    uality Audits 15 A

    pr 11000 509 0180

    Personnel Training and Qualification

    15 Apr 11

    000 509 0220 Surveillance of C

    onstruction Activities 21 A

    pr 11000 509 0240

    Turnover 15 A

    pr 11000 509 0250

    Material & Equipm

    ent Storage & Maintenance

    15 Apr 11

    000 509 5100 Activity Plan for C

    onstruction 15 A

    pr 11

    Refer to the Project Procedures M

    anual for Site Construction Execution,

    Contracts, M

    aterial Managem

    ent, and other Adm

    inistrative Procedures not covered in this m

    anual.

    Inspection and Test Procedure

    No.

    TitleR

    evisionD

    ate000 509 7000

    Inspection and Testing 15 A

    pr 11000 509 7010

    Soils 15 A

    pr 11000 509 7020

    Bituminous C

    oncrete Paving 15 A

    pr 11000 509 7030

    Pilling - Steel H - Piles

    15 Apr 11

    000 509 7040 Piling Pre-C

    ast Concrete Piles

    15 Apr 11

    000 509 7060 Piling - C

    losed End Concrete Filled Pipe Piles

    15 Apr 11

    000 509 7070 Piling - C

    oncrete Filled Thin Shell Pipe Piles 15 A

    pr 11000 509 7080

    Drilled C

    aissons 15 A

    pr 11000 509 7090

    Augered Cast-In-Place Piles

    15 Apr 11

    000 509 7100 C

    oncrete and Grout

    15 Apr 11

    000 509 7200 Structural Steel

    15 Apr 11

    000 509 7300 Buildings

    15 Apr 11

    000 509 7310 H

    eating Ventilating and Air Conditioning

    15 Apr 11

  • West Q

    urna I 000 509 0000

    Contract N

    o: W3Q

    R

    21 Apr 11Project Location: Basra, Iraq

    Page 2 of 2

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    Inspection and Test Procedure

    No.

    TitleR

    evisionD

    ate000 509 7320

    Roofing Inspection

    15 Apr 11

    000 509 7400 Equipm

    ent 15 A

    pr 11000 509 7410

    Field Fabricated Tanks 15 A

    pr 11000 509 7430

    Refractory C

    oncrete 15 A

    pr 11000 509 7500

    Underground Piping

    15 Apr 11

    000 509 7510 Aboveground Piping

    15 Apr 11

    000 509 7520 Pressure Testing

    15 Apr 11

    000 509 7560 C

    hemical C

    leaning of Pipe 15 A

    pr 11000 509 7600

    Electrical Inspection 15 A

    pr 11000 509 7610

    Electrical Testing 15 A

    pr 11000 509 7620

    Electrical Equipment

    15 Apr 11

    000 509 7640 Electrical H

    eat Tracing 15 A

    pr 11000 509 7700

    Control System

    s Instrumentation

    15 Apr 11

    000 509 7710 C

    ontrol System C

    alibration 15 A

    pr 11000 509 7800

    Coatings and Linings

    15 Apr 11

    000 509 7810 Insulation

    15 Apr 11

    000 509 7820 Fireproofing Inspection

    15 Apr 11

    000 509 7830 C

    athodic Protection 15 A

    pr 11000 509 7850

    Telecomm

    unication Inspection 15 A

    pr 11000 509 7910

    Welding Inspection

    15 Apr 11

    000 509 7920 N

    ondestructive Examination

    15 Apr 11

    000 509 7930 Positive M

    aterial Identification 15 A

    pr 11000 509 7950

    Hardness Testing

    15 Apr 11

    000 509 F0000 Q

    uality Control Form

    s 15 A

    pr 11

    The Fluor Site Quality Program

    for this Project is described and documented in this Site

    Quality M

    anual.

  • West Q

    urna I 000 509 0010

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 1 of 2

    Fluor Corporation C

    ompany C

    onfidential Site Q

    uality Manual

    FOR

    EWO

    RD

    The objective of the site quality program for this project is to ensure that construction is perform

    ed in accordance w

    ith the drawings, specifications, applicable local law

    s, and standards. A further objective is to provide docum

    ented evidence that confirms that the prim

    ary objective has been m

    et. The site quality control program as delineated in this m

    anual is tailored to meet the quality

    surveillance, inspection, testing, and documentation requirem

    ents for construction/installation perform

    ed by subcontractors of Fluor (Morning Star).

    The site quality program is based upon the principals stated in the O

    perating System

    Requirem

    ents (OSR

    ) and any applicable Operating System

    Implem

    entation Plan (OSIP). It is

    designed to cover quality aspects related to construction, construction managem

    ent and m

    aintenance activities.

    The Site Quality M

    anager will coordinate the construction quality surveillance, inspection, testing,

    and documentation activities. H

    e will m

    onitor construction and quality activities to the extent necessary to provide construction m

    anagement w

    ith adequate confidence that appropriate m

    easures are being taken to control and achieve quality. The quality activity will em

    phasize preventing nonconform

    ance to drawings and specifications but detecting and correcting it if it

    occurs.

    If Fluor performs construction activities using our ow

    n labor force, the quality control responsibility rem

    ains with Fluor. The Fluor construction supervision and construction engineering staffs are

    primarily responsible for the attainm

    ent of the quality requirements established by the draw

    ings, specifications and contract. The supervisory, construction engineering and quality staffs w

    ill perform

    quality control inspection, testing, surveillance and documentation activities as outlined in

    this manual. The prim

    ary responsibility for performing quality w

    orkmanship rests w

    ith those actually perform

    ing the work under the supervision of the Fluor construction staff.

    When construction is subcontracted, the quality control responsibilities governing the

    subcontractor's work are usually delegated to the subcontractor. The overall responsibility for

    verifying quality in construction remains w

    ith Fluor. This is done by surveillance and audits when

    the responsibility for quality activities has been delegated to the subcontractor. The subcontractors are to provide the m

    easures required to achieve the contract quality requirements.

    The subcontractor's quality control responsibility is established by procedure 000 509 0210 and is stated in their contract. Both Fluor inspection form

    s and ExxonMobil M

    echanicalCom

    pletion R

    ecords will be used to docum

    ent required inspections and testing. Specific contractor inspection and testing form

    s may also be used w

    ith prior approval.

    This site specific Quality M

    anual is the governing document for the Fluor quality system

    and will

    be maintained current to achieve project quality objectives.

    This Manual is not applicable to ASM

    E Boiler and Pressure Vessel Code w

    ork. The Fluor "Quality

    Control System

    Manual for Boiler and Pressure Vessel C

    ode Work" w

    ill be applied to ASME and

    National Board Inspection C

    ode Work certified by Fluor.

  • West Q

    urna I 000 509 0010

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 2 of 2

    Fluor Corporation C

    ompany C

    onfidential Site Q

    uality Manual

    The Project Procedures Manual (PPM

    ), used in conjunction with the Site Q

    uality Manual,

    contains approved procedures used to identify, document, and verify the appropriate review

    s and approvals of changes to design docum

    ents that are requested by field organizations and provides requirem

    ents for document control.

    The Fluor Construction Technology staff w

    ill conduct independent audits of project compliance to

    this manual. The audits are conducted to provide the Project M

    anager, Site Manager, and C

    lient w

    ith a project independent evaluation of the site quality program status and adequacy. The initial

    audit will be conducted at approxim

    ately 10% m

    echanical completion and additional audits on a

    periodic basis throughout construction.

  • West Q

    urna I 000 509 0020

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 1 of 2

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    MA

    NU

    AL PR

    EPAR

    ATIO

    N A

    ND

    MA

    INTEN

    AN

    CE

    SCO

    PE

    This procedure provides guidance for converting the 509 series of Corporate Site Q

    uality procedures from

    Knowledge O

    nLine to a Site Quality M

    anual for a specific project. It is applicable to C

    onstruction, Construction M

    anagement, M

    aintenance, or projects with any

    of these combinations.

    GEN

    ERA

    L

    The initial draft of the project specific Site Quality M

    anual is initiated by Construction Technology's

    Corporate Q

    uality Manager. It is to be based on reference procedures of the 509 series of Site

    Quality procedures from

    the Construction Know

    ledge Com

    munity that are listed in the Table of

    Contents section 000 509 0000. These reference procedures have been prepared to m

    eet the requirem

    ents of International Standard ISO-9000. The bracket sym

    bols ([::---::]) seen throughout these procedures identify changes or additions that are to be m

    ade in converting them to project

    specific procedures. Other changes are to be m

    ade as needed to be compatible w

    ith the project requirem

    ents and scope. The set of procedures in the 509 series represents the accumulated

    knowledge and experience gained from

    many construction projects. U

    se of these reference procedures as baseline docum

    ents will result in im

    proved consistency between projects and

    entities, thus fulfilling the goal of consistency in execution. Proposed changes to these reference procedures should be com

    municated to C

    onstruction Technology's Corporate Q

    uality Manager.

    Upon assignm

    ent of the Site Quality M

    anager, he/she begins development of the draft Site Q

    uality M

    anual (SQM

    ) to assure conformance to the site-specific requirem

    ents. The completed and

    approved project specific SQM

    should be in place for usage as soon after contract award as

    possible. As a minim

    um, parts of the m

    anual should be developed for control of construction activities before the activities are perform

    ed. These activities usually begin with qualifying and

    issuing RFQ

    's to bidders for work to be subcontracted (see 000 509 0200 and 0210). If these

    activities begin prior to assignment of the Site Q

    uality Manager, C

    onstruction Technology's C

    orporate of Quality M

    anager will function as the Site Q

    uality Manager until the assignm

    ent is m

    ade.

    Developm

    ent of the Site Quality M

    anual

    Each section/procedure identified by 000 509 0000 is reviewed for consistency and applicability

    with project scope. C

    hanges or additions will be required of the follow

    ing sections as noted:

    - Inspection and Test Procedures (7000 7999)

    - Table of C

    ontents / Date R

    evision Page (0000)

    Under "R

    evision Date."

  • West Q

    urna I 000 509 0020

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 2 of 2

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    Revision dates for all pages of all procedures in the Site Q

    uality Manual should

    match the dates in this Table of C

    ontents.

    Revisions to the Site Q

    uality Manual shall not w

    aiver or negate OSR

    requirements

    or mandatory construction codes.

    Revision of Site Specific M

    anual

    The Site Quality M

    anager controls the site issue and revision of the Site Quality M

    anual. The m

    anual is to be revised by procedure. A vertical line in the margin shall identify the revised

    portions. The revision status shall be shown on the Title page of the m

    anual. The Table of C

    ontents shall show the revision date of each revised procedure and shall be reissued for each

    revision.

    The Corporate Q

    uality Control M

    anager in each of the respective offices shall review and approve

    the Issued for Construction Site Q

    uality Manual prior to the approval signatures being obtained.

    Each subsequent revision to the Site Quality M

    anual shall also be approved by the Corporate

    Quality C

    ontrol Manager.

    The Site Q

    uality Manager, C

    onstruction Engineering Manager, and Site M

    anager should approve each revision by signing the Approval Page. The C

    lient should also be given the opportunity for approval of the Site Q

    uality Manual.

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 1 of 2

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    OR

    GA

    NIZA

    TION

    AN

    D R

    ESPON

    SIBILITIES

    This section describes the site quality organization for performing activities described by this

    manual. It also provides a general description of responsibilities. Specific responsibilities are

    described in the individual procedures of this manual.

    The Site Manager is responsible for the execution of the project construction activities w

    hich includes construction quality. The delegation of authority to the Site Q

    uality Manager for the

    direction and coordination of quality activities is made w

    ith the objective of maintaining the

    effectiveness of this quality program.

    The Site Manager shall provide adequate resources and assign sufficient trained personnel to

    manage the w

    ork and effectively carry out these verification activities, including internal quality audits. The personnel assigned to these verification activities shall be independent of those having direct responsibility for the w

    ork being performed.

    OR

    GA

    NIZA

    TION

    The project organization for site quality personnel are shown on the Site O

    rganizational Chart

    maintained by the Site M

    anager. Contractors m

    ay also have their own Q

    uality Organizations

    which w

    ill provide for their first line of inspection responsibilities.

    RESPO

    NSIB

    ILITIES

    Quality related activities are conducted by Site Q

    uality and other groups. The activities and persons conducting them

    will be under the functional control of the Site Q

    uality Manager for the

    execution of the activity. Attachment 1- Q

    uality Responsibility M

    atrix summ

    arizes the activities and the persons responsible for execution. Prim

    ary responsibility for execution and verification of quality-related activities w

    ill be established on the Inspection/Test Plan or procedures.

    Site Quality M

    anager

    The Site Quality M

    anager has the responsibility, authority, and organizational freedom to audit,

    inspect and witness construction activities and to verify com

    pliance to contract quality requirem

    ents. This responsibility includes actions such as assist the construction staff in prevention of quality problem

    s, identification of quality-related problems should they occur,

    initiation or recomm

    endation of solutions and verification of corrective action. In addition, he/she is responsible for coordination of quality-related activities w

    ithin the Construction staff and w

    ith the site C

    lient quality representatives. He/she m

    aintains the construction quality control procedures and provides technical assistance and training to construction supervision. H

    e/she will have an

    active role in assisting with the prevention of quality problem

    s.

    The Site Quality M

    anager reports directly to the Site Manager w

    ith a technical supervision channel to C

    onstruction Technology's Corporate Q

    uality Manager.

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 2 of 2

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    The Construction staff includes a C

    onstruction Engineering organization to ensure prompt

    engineering interpretations and decisions, review of draw

    ings, certificates and other data to be subm

    itted to the Client, and to actively participate in the surveillance of field construction, and to

    verify compliance to design/engineer requirem

    ents. Construction Engineering w

    ill provide assistance to the Site Q

    uality Manager as necessary to assist in achieving quality objectives.

    NO

    TE: C

    onstruction Engineers report to the Site Quality M

    anager when they are

    executing inspection/surveillance activities.

    Subcontractors

    The subcontractor quality organization will be in accordance w

    ith the contract requirements and

    described in their approved equivalent Site Quality M

    anual.

    ATTA

    CH

    MEN

    TS

    Attachments 1 -

    Quality R

    esponsibility Matrix

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 1 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    Quality R

    esponsibility Matrix

    Section 1 - CIVIL

    1.1 Construction Surveying

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Review

    the construction surveying methods used by the C

    ontractor. X

    Check established reference points .

    XC

    heck control points established for construction layout on a periodic basis. X

    Check the construction layout of the contractor's w

    ork. X

    Review

    and file completed survey notes prepared by the contractor.

    X

    P

    erform periodic surveillance on survey activities and docum

    entation.

    X

    1.2 Soils R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CM

    onitor in-process soils work, including cut and fill elevations, spoil and fill m

    aterial, compaction

    methods and equipm

    ent. X

    Perform

    formal audit of S

    oils Testing Laboratory X

    Monitor C

    ontractor's work to verify conform

    ance to requirements.

    X

    S

    Monitor S

    oil Testing Laboratory activities for soils testing frequency, test identification and com

    pleteness. X

    Verify the docum

    entation of deficiencies and test failure and follow up to assure corrective action

    is taken and documented.

    X

    Audit the soils docum

    entation to verify correctness, completeness of coverage, retrievability as

    filed and inspection results. X

    Perform

    and document soils testing

    TES

    T LAB

    S

    Inspect excavations for unstable and unsuitable soils TE

    ST LA

    B

    SV

    erify the insitu soils are suitable to support foundation loads TE

    ST LA

    B

    SV

    erify backfill material is satisfactory

    TEST LA

    B

    SV

    erify placement of the fill com

    plies with contract specifications

    TES

    T LAB

    S

    1.3 Contracted Piling

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Qualify Pile Supplier

    XR

    eview and approve concrete m

    ix design and mix trials

    X (1) Technically m

    onitor the indicator pile testing program

    XC

    heck final pile locations. X

    S

    Monitor in-process pile driving.

    XS

    M

    onitor and test pile concreting activities. X

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 2 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    1.4 Asphalt

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Review

    asphalt mix designs

    X (1)

    Monitor in-process asphalt construction including preparation of subgrade or previous course,

    asphaltic materials, spreading equipm

    ent, compaction equipm

    ent, materials and testing.

    XS

    Perform

    formal audit using A

    sphalt Test Laboratory Evaluation R

    ecord X

    Monitor C

    ontractor's quality control activities to verify conformance to requirem

    ents for asphalt testing frequency, test identification and traceability and the docum

    entation of inspection and testing

    X

    Review

    the documentation of the asphalt inspection and testing activities for accuracy and

    completeness.

    X

    Verify the docum

    entation of deficiencies and test failures and follow up to assure corrective

    action is taken and documented.

    X

    Audit the asphalt docum

    entation to verify correctness, completeness of coverage, review

    ability as filed and inspection results.

    X

    Conduct asphalt testing and asphalt m

    aterials testing TE

    ST LA

    B

    S

    1.5 Structural Concrete

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Review

    and approve mix designs

    X (1)

    S

    Perform

    formal audit of C

    oncrete Testing Laboratory. X

    Audit batch plant facilities.

    XInspect form

    work, reinforcing steel and im

    pediments prior to concrete placem

    ent. X

    S

    Monitor in process concreting activities.

    XS

    Monitor C

    ontractor's quality control activities to verify conformance to requirem

    ents for concrete testing frequency, test identification and traceability, and the docum

    entation of inspection and testing.

    X

    Monitor post-concreting activities such as concrete curing, stripping, visual exam

    ination for line, form

    and surface defects and checks for anchor bolt locations. Verify that 28-day strength tests

    are acceptable. X

    S

    Conduct concrete testing at the point of placem

    ent TE

    ST LA

    B

    S

    1.6 Grouting of M

    achinery and Structural Steel Base Plates

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Review

    and approve mix design. C

    heck materials prior to start of w

    ork to verify that the m

    aterials have not deteriorated or that shelf life has not been exceeded. X (1)

    S

    Monitor in-process grouting. The inspections shall include base preparation,m

    aterials, forming,

    placing, curing and hamm

    er void test. X

    S

    Witness grout testing by C

    ontractor. X

    Monitor the C

    ontractor's quality control activities to verify conformance to placem

    ent procedures and docum

    entation requirement.

    X

    Conduct grout testing at site

    TEST LA

    B

    S

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 3 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval Section 2 - STR

    UC

    TUR

    AL STEEL

    2.1 Structural Steel R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CM

    onitor in process steel erection to verify fabrication is correct and erection is in accordance w

    ith drawings. D

    ocument fabrication errors on a N

    CR

    . X

    S

    Witness bolting procedure including calibration of torque w

    renches and load indicating washers.

    XS

    Maintain docum

    entation X

    Inspect the erected steel structure. X

    Ensure that erected steel structures have coatings installed i.a.w

    . drawings

    X

    S

    Monitor the C

    ontractor's quality activities to verify conformance to requirem

    ents for bolt tensioning procedures.

    X

    Schedule final acceptance inspection activities betw

    een Contractor and Field E

    ngineering or construction.

    XS

    Audit the structural steel docum

    entation to verify correctness of data.

    X

    Section 3 - BU

    ILDIN

    GS

    3.1 Buildings

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Review

    all Contractor proposed building m

    aterials prior to use. X

    (1)

    Verify that the building location level and position are correct prior to construction.

    XInspect the entire building upon com

    pletion and document deficiencies.

    X S

    Docum

    ent building acceptance X

    Monitor the in process construction to verify that the w

    ork is i.a.w. draw

    ings. X

    SS

    chedule final acceptance activities X

    SM

    onitor the Contractor's quality control activities to verify test frequency, identification and

    traceability X

    Audit building docum

    entation X

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 4 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    Section 4 - EQU

    IPMEN

    T 4.1 Equipm

    ent R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CInspect installed equipm

    ent for acceptance upon completion, including attachm

    ents to the equipm

    ent, e.g. foundations, sheds, buildings, auxiliaries, etc. which com

    prise the entire assem

    bled unit. X

    Initiate action to acquire vendor representative as required. P

    MC

    oordinate with engineering for participation of m

    echanical discipline engineers, if required. P

    MM

    onitor the in-process installation of each equipment unit.

    XS

    Coordinate w

    ith vendor representative who technically supervises equipm

    ent installation. X

    Verify vendor representative's checklists and acceptance records are signed and attached to

    appropriate construction documents.

    XS

    Verify the equipm

    ent requirements are being satisfied by the C

    ontractor. X

    S

    M

    onitor equipment preservation i.a.w

    . Site requirem

    ents. X

    Monitor the C

    ontractor's quality control activities to verify conformance to inspection, testing and

    documentation requirem

    ents. X

    4.2 Field Fabricated Tanks R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CM

    onitor the foundation construction including soils, asphalt and concrete work.

    X

    S

    Check elevation dim

    ensions of tank shells. X

    Check the erected dim

    ensions of tank shells. X

    S

    Inspect fabricated tank structure upon com

    pletion. X

    S

    C

    heck the settlement and rebound of the foundation during and after hydrotest.

    XS

    Verify w

    elder performance qualifications.

    SX

    Verify welding procedure testing has been accom

    plished and procedures are acceptable.

    X M

    onitor in-process welding

    XS

    Witness in-process exam

    ination as performed by the N

    DE

    contractor, including reviewing

    radiographs, witnessing P

    T, MT, vacuum

    box and leak testing X

    Verify that equipm

    ent and components associated w

    ith tankage have been correctly installed, adjusted, tested, confirm

    ed for proper function and inspected. X

    S

    Inspect the tested tank prior to closing, including final clean-up. X

    SV

    erify that the Contractor has affixed a nam

    eplate listing the required data. X

    S

    V

    erify that the Contractor has subm

    itted the required certification. X

    S

    Monitor the C

    ontractor's quality control activities to verify conformance inspection, testing and

    documentation requirem

    ents. X

    Witness hydrostatic testing

    SX

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 5 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    Section 5 - PIPING

    5.1 U

    nderground Piping R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CM

    onitor in-process excavation and backfill. X

    SInspect installed underground pipelines for acceptance.

    X S

    Color code the lines, indicated as punched and accepted, on a copy of the underground piping

    plan. X

    Verify that the Testing Lab is perform

    ing the required soils testing of backfill. X

    S

    M

    onitor in-process coating and wrapping, including surface preparation, coating and w

    rapping m

    ethods and materials and arrangem

    ent for intermediate storage and stockpiling of coasted

    pipes.X

    S

    Inspect in-process pipe fabrication and installation i.a.w. draw

    ings. X

    SP

    erform a final inspection of the line, w

    hen the underground piping is complete, but prior to the

    coating and wrapping of joints and fittings.

    XS

    Verify the C

    ontractor has completed coating and w

    rapping of joints and fittings on tested line. X

    S

    W

    itness holiday testing of the coating and wrapping. C

    ontractor shall document tests.

    XS

    Verify that required N

    DE

    is complete on the lines to be inspected.

    XW

    itness the pressure test. S

    X Inspect the tested system

    to ensure that all items have been properly com

    pleted (restoration). X

    S

    M

    onitor the Contractor's quality control activities to verify conform

    ance to testing and docum

    entation requirements.

    X

    5.2 Site Shop Fabrication R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CS

    egregate and store pipe fittings, upon receipt, according to size and material. Identify storage

    location with com

    modity code num

    ber. M

    M

    Pipe w

    ill be marked full length w

    ith comm

    odity code number.

    MM

    Maintain docum

    entation M

    MIssue piping m

    aterials to Contractors

    MM

    Inspect special flange faces for correct finish and face protection. X

    SM

    onitor in-process pipe fabrication activities. X

    SV

    erify latest edition of piping drawings is being used.

    XS

    Random

    check on base material ID

    on pipe, fittings and spools. Spools shall be clearly

    identified in two locations.

    XS

    Monitor storage of com

    pleted spools at pipe shop including preservations. X

    S

    M

    onitor pipe identification, documentation and tim

    ely performance of N

    DE

    . X

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 6 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    5.3 Aboveground Piping Erection R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CP

    ipe will be m

    arked full length with com

    modity code num

    ber. Alloy pipe and fittings shall be

    additionally color coded. Alloy storage areas shall be clearly identified.

    MM

    Maintain piping spool identity m

    arkings of piping spools fabricated off site. M

    MV

    erify MTR

    's are received and that heat numbers correspond. M

    aintain documentation

    MM

    Verify P

    MI requirem

    ents are satisfied prior to placement in stock.

    MM

    SV

    erify correct pipe is issued to Contractor.

    MM

    Monitor in-process erection I.a.w

    . drawings. C

    lassify and record spool fit problems.

    X

    S

    Ensure face flange protection is m

    aintained. X

    SM

    onitor proper bolt tensioning. X

    S

    Monitor correct gasket installed.

    XS

    M

    onitor erection to ensure that pipe installations are not subjected to undesirable stress. X

    SC

    heck pipe drawings to assure latest revision in the field.

    XS

    Assist C

    ontractor to maintain current piping test status.

    S

    X

    Monitor C

    ontractor's activities to established quality control practices.

    X

    Monitor in process pipe erection and transfer of heat num

    bers. Verify that N

    DE

    is performed in

    a timely m

    anner. Monitor pipe and w

    elding traceability including PW

    HT, P

    MI and H

    ardness Testing.

    X

    5.4 Piping Inspection - Punching R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CFlag deficiencies w

    hen not visually obvious. X

    E

    nter punch lists into data base. X

    Check w

    ork, noted as complete, on punch lists to assure item

    s were corrected.

    XInitiate action w

    ith Contractor on punching results. A

    dd additional discrepancies to punch list. Initial and date punch list for each item

    corrected. X

    Monitor the C

    ontractor's punching activities. X

    Verify that punching deficiencies are identified, docum

    ented and follow up to verify corrective

    action is taken. X

    Verify that m

    easures are taken to assure ND

    E, P

    WH

    T, PM

    I and traceability is completed prior to

    pressure testing. X

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 7 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    5.5 Pressure Testing of Piping R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CM

    onitor pressure testing performed by C

    ontractor. X

    SR

    eview draw

    ings and specifications to verify pressure test package limits, equipm

    ent to be included or excluded, valves opened or closed and test blind locations.

    XS

    Verify that the m

    aximum

    allowable test pressure of the w

    eakest component w

    ithin the system is

    not exceeded. X

    S

    Verify (through N

    EW

    S) that all N

    DE

    is complete prior to testing.

    S

    X V

    erify that shop spool/cut sheets are included in test packages and all ND

    E, P

    WH

    T and welder

    info is recorded. S

    X

    Review

    Contractor's pressure test package, including m

    arked up isometric draw

    ings indicating test blind locations, valve position (open/closed) and other inform

    ation relating to test. X

    S

    Monitor preparation of test system

    against test package. X

    Monitor restoration of the tested system

    . X

    Monitor C

    ontractor's pressure testing and documentation activities.

    S

    X

    Review

    test package for completion

    SX

    Inspect the system prior to testing notifying C

    ontractor of deficiencies. Mark P

    ressure Test R

    ecord, "Ready to Test". N

    otify client when acceptable for test. G

    ive permission to proceed

    with test.

    XS

    Inspect system under pressure. V

    erify test pressure and duration of test. Procure test

    acceptance signatures from C

    ontractor and QIB

    . S

    X

    When equipm

    ent is included in the test, verify that pressure test does not exceed nameplate.

    X

    S

    5.6 Piping Internal Cleaning

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Review

    and approve the cleaning and preservation procedures and the limits agree w

    ith draw

    ings. X

    Establish hold points for w

    itnessing tests. X

    Monitor preparatory and in-process cleaning activities for com

    pliance with procedures and

    specs.X

    S

    Coordinate the m

    onitoring of Contractor inspection and testing activities.

    XS

    Verify the C

    ontractor is preparing documentation as inspections and tests are being perform

    ed. X

    S

    V

    erify that internal cleaning has been accomplished.

    XM

    onitor the Contractor's quality control activities.

    X

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 8 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    Section 6 - ELECTR

    ICA

    L 6.1 U

    nderground Electrical R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    C

    Monitor in-process installation of the grounding system

    including, grounding rod installation, backfilling. C

    olor coding of drawings to track progress.

    XS

    Witness resistance to earth tests.

    X S

    M

    onitor in-process duct bank and electrical manhole installations.

    X

    Witness initial testing of shielded cable, i.e,. insulation resistance test of pow

    er cable on reels, continuity test of reeled instrum

    ent cable. X

    S

    Inspect cable trench prior to installation of cable. X

    Monitor in-process installation of underground cable. Inspect in-process cable pulling.

    X

    S

    Inspect in-process cable splicing. X

    S

    Witness random

    testing of installed underground cable, i.e. insulation resistance test (megger)

    cables and DC

    hypot medium

    and high voltage cables prior to termination.

    XS

    Inspect installation of cables upon completion of each layer to ensure spacing, labeling, etc. is

    correct.X

    S

    Inspect sand backfill per lift for quality of materials, depth and com

    paction. X

    SV

    erify the Contractor final as-built draw

    ings are in conformance.

    X

    S

    Verify that the C

    ontractor is preparing documentation concurrent w

    ith construction as inspection and testing are perform

    ed. X

    S

    Monitor the C

    ontractors' quality control activities.

    X

    6.2 Aboveground Electrical R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CM

    onitor in-process installation of electrical conduit and cable tray, including welding of supports.

    X

    Witness initial testing of shielded cable, i.e., insulation resistance test of pow

    er cable on reels, continuity test of reeled instrum

    ent cable and resistance and continuity on electrical heat tracing cables.

    XS

    Monitor in-process cable pulling and installation.

    XW

    itness random testing of installed cable, i.e., insulation resistance test on pow

    er and instrum

    entation cables, continuity and insulation resistance testing on heat tracing and hypot of m

    edium and high voltage cables.

    XS

    Verify client is being notified in advance of tests that require w

    itness. X

    S

    V

    erify terminal to term

    inal checks to ensure continuity and correctness of installation. X

    S

    Verify conduit seals have been poured.

    XS

    Inspect installation upon completion.

    XS

    Verify that the C

    ontractor is preparing documentation concurrent w

    ith construction as inspection and testing are perform

    ed. X

    S

    Monitor the C

    ontractor's quality control activities.

    X

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 9 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    6.3 Electrical Equipment

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Monitor in-process installation of equipm

    ent. X

    S

    M

    onitor equipment preservation activities

    XS

    Witness testing of installed equipm

    ent. X

    SC

    oordinate with vendor representative w

    ho will technically supervise installation. E

    nsure docum

    entation is complete.

    XS

    Verify Q

    IB is being notified in advance of tests requiring w

    itnessing. X

    SInspect electrical installation w

    hen complete.

    XS

    Verify that the C

    ontractor is preparing documentation concurrent w

    ith construction as inspection and testing are perform

    ed. X

    S

    Monitor the C

    ontractor's quality control activities.

    X

    Section 7-CO

    NTR

    OL SYSTEM

    S 7.1 C

    ontrol Systems Site Shop O

    perations R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CN

    otify construction upon receipt of each instrument shipm

    ent for inspection. M

    M

    For nonconform

    ing items, issue a D

    amage R

    eport or NC

    R.

    MM

    Issue instruments to C

    ontractor. M

    MInspect each instrum

    ent shipment. D

    eficiencies shall be reported to the Material M

    anager. X

    Inspect instrument m

    aterials i.a.w.sec.10 &

    project procedures X

    Docum

    ent the receiving inspection. X

    7.2 Control System

    s Field Operations

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Monitor the C

    ontractor's in-process instrument installation including racks, panels, consoles,

    locations,mounting,process pipe connections, Instrum

    ent air tubing,pneumatic signal tubing,heat

    tracing and instrument w

    iring X

    S

    Witness pressure testing of the instrum

    ent piping and tubing documentation.

    X

    S

    Witness calibration of test guages.

    XS

    Monitor continuity tests of instrum

    ent cables.Verify that cable term

    inations are correct. X

    SW

    itness checks of control system loops. E

    stablish notification system for IM

    T. X

    S

    W

    itness all loop checks X

    S

    Assure all instrum

    ent installation inspections and meggar tests are com

    plete X

    S

    Inspect instrum

    ent installations upon completion.

    XS

    Monitor the C

    ontractor's quality control activities. S

    X

    Verify docum

    entation procedures are being followed.

    XS

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 10 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    Section 8 - CO

    ATIN

    GS, LIN

    ING

    S, INSU

    LATIO

    N A

    ND

    CA

    THO

    DIC

    PRO

    TECTIO

    N

    8.1 Coatings

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Ensure that the paint system

    is i.a.w. specifications.

    X

    S

    Monitor perform

    ance of materials preservation activities.

    XS

    Monitor surface preparation.V

    erify inspection documentation.

    XS

    Monitor in-process coatings applications.

    XS

    Check dry film

    thickness of applied coatings. X

    SInspect the w

    orkmanship of com

    pleted finishes. X

    SM

    onitor the Contractor's quality control activities.

    S

    X

    Verify the C

    ontractor has prepared the QC

    documentation.

    S

    X

    Audit coating docum

    entation. X

    8.2 Insulation R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CM

    onitor performance of m

    aterial preservation activities. X

    Monitor in-process installation of the insulation m

    aterials. X

    SV

    erify the Contractor has prepared the quality control docum

    entation X

    S

    Inspect the com

    pleted work.

    XS

    D

    ocument acceptance.

    SX

    8.3 Linings R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CM

    onitor performance of m

    aterial preservation activities. X

    S

    M

    onitor surface preparation. X

    S

    Verify C

    ontractor is performing tem

    perature and humidity checks for tank linings.

    X S

    Monitor in-process lining application.

    XS

    Test applied linings to verify proper surface profile, thickness, and lining continuity. X

    SM

    onitor Contractor's tank lining holiday inspections.

    XS

    Observe tank lining curing activities.

    X S

    Inspect the w

    orkmanship of the com

    pleted lining. X

    S

    M

    onitor the Contractor's quality control activities.

    S

    X

    Audit coating docum

    entation. X

    Verify that lining m

    aterials comply w

    ith specs. Ensure that m

    anufacture test certificates correspond w

    ith filed batch number records.

    XS

    Monitor storage facilities.

    XE

    nsure refractory applicators are experienced and qualified. X

    SM

    onitor to ensure materials are properly m

    ixed. X

    SM

    onitor surface preparation to ensure mounting studs and reinforcem

    ents are correctly installed. X

    S

    E

    nsure that test plates,cubes,etc,from refractory applications are taken at the required

    frequencies X

    S

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 11 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    8.4 Cathodic Protection - U

    nderground Structures. R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CSubm

    it data to Engineering for determination of anode spacing

    X (1) E

    stablish a procedure to assure work is not started prior to acceptance of previous w

    ork. X

    Monitor the survey after each cathodic protection system

    is energized. X

    SV

    erify materials being installed.

    XM

    onitor installation activities. X

    S

    Monitor deep w

    ell preparation activities including data logs. X

    Monitor anode backfill operation.

    XW

    itness hamm

    er testing of thermite w

    elds X

    SW

    itness electrical test used to determine current flow

    when the anode is backfilled w

    ith coke breeze.

    XS

    Monitor testing and com

    missioning activities.

    XS

    Inspect the completed w

    ork. X

    S

    Audit cathodic protection docum

    entation.

    X

    8.5 Cathodic Protection - Tanks and Vessels

    RESPO

    NSIB

    ILITY A

    CTIVITY

    Construction

    QA

    /QC

    Verify m

    aterials are within specification and are properly protected from

    damage.

    X

    V

    erify the vessel cathodic protection materials w

    ere installed. X

    Monitor installation activities

    XS

    V

    erify personnel use of protective clothing (when reg's)

    XInspect the com

    pleted workm

    anship. X

    SM

    onitor testing and comm

    issioning activities. X

    SA

    udit cathodic protection documentation.

    X

    Section 9 - WELD

    ING

    9.1 Pipe W

    elding R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CV

    erify the WP

    S's have been approved by the W

    elding Engineer.

    X (1)

    S

    Monitor qualification tests of C

    ontractor's welders.

    X

    E

    nsure that welder ID

    badges have been issued and displayed. X

    SC

    heck Contractors control of w

    elder symbols.

    XS

    Check C

    ontractor's control of welding consum

    ables. X

    SM

    onitor in-process welding including consum

    ables, joint preparation,fit-up preheat, interpass heat, W

    PS

    variables and final visual X

    S

    Verify C

    ontractor is documenting w

    elds on the Daily W

    elding Report.

    XS

    Verify completed w

    elds are being documented on piping draw

    ings. X

    SM

    onitor in-process post weld heart treatm

    ent. X

    SA

    udit welding docum

    entation. X

    Verify transfer of piping m

    aterial heat numbers.

    XS

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 12 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    9.2 Structural and Reinforcing Steel W

    elding R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CV

    erify the WP

    S's have been approved by the W

    elding Engineer.

    X

    (1) M

    onitor qualification tests of welders.

    X

    Monitor in-process w

    elding including consumables, joint preparation and final visual inspection.

    XS

    Audit w

    elding documentation.

    X

    9.3 Piping Nondestructive Exam

    ination (ND

    E) R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CPre-qualify N

    DE C

    ontractor X

    Verify that the N

    DE

    Contractor has established procedures that com

    ply with project

    specifications. X

    Daily entry of w

    eld data to NE

    WS

    program.

    SX

    Establish and maintain N

    DE docum

    entation files.

    X R

    eview C

    ontractor ND

    E personnel certifications.

    X

    V

    erify approval of ND

    E C

    ontractor and procedures. X

    Verify N

    DE

    Contractor's procedure to provide visual status of w

    elds requiring ND

    E.

    X

    S

    elect welds for exam

    ination S

    X

    Perform

    Nondestructive exam

    inations N

    DE

    CO

    NTR

    AC

    TOR

    S

    Review

    radiographic film, C

    ontractor's interpretation and reports. X

    Verify code com

    pliance for rejected welds.

    XM

    aintain a tickler file of rejected welds.

    XV

    erify, through audit, welding and N

    DE

    records are traceable to the weld.

    XV

    erify through NE

    WS

    that ND

    E is com

    pleted prior to pressure testing.

    X

    Audit the N

    DE

    lab X

    Monitor the N

    DE

    Contractor's production to verify that w

    elds are examined w

    ithin 48 hours of notification.

    X

    Verify all field welds are num

    bered and identified on drawings.

    XE

    nsure that weld num

    ber and welder's sym

    bols are low stress stam

    ped or otherwise m

    arked on pipe.

    XS

    Ensure that an accurate D

    aily Welding R

    eport is maintained.

    SX

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 13 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    9.4 Pipe hardness Testing R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CM

    onitor the Contractor to verify w

    eld identity system and com

    pliance to specification.

    X

    Establish confidence that tests are being preform

    ed i.a.w. test equipm

    ent instructions.

    X

    Verify the C

    ontractor's compliance w

    ith hardness testing and documentation.

    X

    V

    erify Contractor's procedure for visual identification of rejected w

    elds.

    X

    Maintain a P

    WH

    T tickler file for rejected welds.

    XV

    erify hardness testing is complete prior to pressure testing.

    XW

    itness tests required by the specifications as performed by C

    ontractor.

    X

    Schedule final acceptance inspection activities betw

    een the Contractor and the Field E

    ngineer.

    X

    Monitor the C

    ontractor's quality control activities to verify conformance to requirem

    ents for test frequency, identification and traceability.

    X

    Section 10 - Field Receiving

    10.1 Field Receiving (IM

    T) R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CC

    ontrol receiving operations including ID of item

    to purchase order, verification of quantity and size exam

    ination for shipping protection and damage, m

    aintenance of inspection docum

    entation. M

    M

    Issuance of periodic receiving reports to Construction S

    uperintendents when technical

    assistance is required. M

    M

    Inspect received material/equipm

    ent, providing technical assistance, when requested.

    S

    X

    10.2 Field Receiving -C

    ontractor R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CR

    eceive all contractor purchased equipment and m

    aterials M

    MR

    eview m

    aterial test reports against received materials and m

    aintain on file M

    M

    S

    Issue equipment and m

    aterials to the Contractor

    MM

    Inspect received material/equipm

    ent, providing technical assistance when requested

    X

    S

    Assure that the contractor perform

    s the equipment and m

    aterial protection as required by m

    anufacturers instruction or specification requirements

    XS

  • West Q

    urna I 000 509 0040

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1 . . . Page 14 of 14

    PM=Procurem

    ent Manager

    MM

    =Material M

    anager X

    =Primary R

    esponsibility S=Secondary R

    esponsibility (1) M

    ust obtain Engineering Approval

    10.3 Positive Material Identification (PM

    I) R

    ESPON

    SIBILITY

    AC

    TIVITY C

    onstruction Q

    A/Q

    CN

    otify QA

    of receipt of material requiring P

    MI.

    MM

    Maintain P

    MI test results w

    ith receiving documentation.

    MM

    Verify receipt of P

    MI reports from

    suppliers and fabricators, M

    MV

    erify Contractor has established a system

    to maintain m

    aterial ID through receiving, storage,

    issue, fabrication and election. X

    Implem

    ent procedures for PM

    I. X

    Monitor contractor's m

    aintenance of piping material identification.

    XS

    Perform

    PM

    I as required by specification. X

    Verify ID

    marking are accom

    plished per specification. X

    SV

    erify controls have been established to prevent the in advertent use of materials failing

    examination.

    SX

    Verify the filing, m

    aintenance and retention of documentation.

    XA

    ssure that PM

    I equipment is calibrated.

    X

    Section 11 - EQU

    IPMEN

    T AN

    D M

    ATER

    IAL PR

    OTEC

    TION

    11.1 Equipm

    ent and Material Protection

    RESPO

    NSIB

    ILITY A

    CTIVITY

    Construction

    QA

    /QC

    Monitor equipm

    ent and material preservation in storage and docum

    ent. M

    M

    S

    11.2 Equipment and M

    aterial Protection (Contractor)

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Monitor C

    ontractors in-process equipment and m

    aterial protection/preservation activities. X

    SC

    heck Contractors in-process equipm

    ent and material

    XS

    Audit the C

    ontractor Material and equipm

    ent protection activities. X

    Section 12 - Masterpiece Program

    12.1 M

    asterpiece Program

    RESPO

    NSIB

    ILITYA

    CTIVITY

    Construction

    QA

    /QC

    Develop M

    asterpiece List X

    S

    Ensure C

    ontractor is using correct materials, draw

    ings and specifications X

    S

    A

    dvise contractor when a M

    asterpiece is required X

    SInspect M

    asterpiece prior to QA

    notification X

    SR

    equest client's presence during inspection S

    XD

    ocument acceptance of the M

    asterpiece S

    X N

    otify client of accepted Masterpiece

    SX

    Maintain the M

    asterpiece log X

    Maintain M

    asterpiece model as reference standard

    XS

    Monitor the C

    ontractor's quality control activities to verify conformance to draw

    ings and specifications

    X

  • West Q

    urna I 000 509 0050

    Contract N

    o: W3Q

    R

    15 April 11Project Location: Basra, Iraq

    Page 1 of 3

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    DO

    CU

    MEN

    T CO

    NTR

    OL

    SCO

    PE

    The Project Procedures Manual describes the D

    ocument C

    ontrol system to be used by site

    construction personnel.

    GEN

    ERA

    L

    Engineering Docum

    ents

    - D

    esign Engineering documents such as specifications and draw

    ings that are issued to C

    onstruction are controlled and issued on site in accordance with this procedure.

    Construction Engineering m

    aintains an up-to-date register of drawings and

    specifications.

    - Please see the Project Procedures M

    anual, Sect. 15.4.4 Project Docum

    ent and Data

    Managem

    ent (PDD

    M) at the Site for specific details.

    Request For Inform

    ation

    - D

    esign documents, including draw

    ings and specifications, sometim

    es have discrepancies, conflicting inform

    ation, or missing inform

    ation. When field conditions

    dictate changes to the design specifications and/or drawings, a R

    equest For Inform

    ation (RFI), Form

    000 509 F00501, will be subm

    itted for approval to ensure proper control and docum

    entation. RFIs w

    ill be initiated by the Construction

    Engineering Manager w

    ho will m

    aintain a RFI Log, Form

    000 509 F00502.

    - Please see the Project Procedures M

    anual, Sect. 11.4.2 for specific detail for this procedure.

    Specification Deviation

    - If the R

    FI is written to request a deviation from

    a specification then a SpecificationD

    eviation Request (SD

    R) Form

    shall be initiated by the Fluor Field Engineer. This requires D

    esign Engineering and Client Approval before the deviation can be

    approved. Reference the Fluor Engineering Procedure, Section 8 of the Project

    Procedures Manual.

    As-B

    uilt Draw

    ings

    - Subcontractor prepared field sketches and "as-built" draw

    ings originating at the construction site shall be docum

    ented and controlled.

    - Please see the Project Procedures M

    anual, Sect 11.5 for specific details.

  • West Q

    urna I 000 509 0050

    Contract N

    o: W3Q

    R

    15 April 11Project Location: Basra, Iraq

    Page 2 of 3

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    Material/Equipm

    ent Docum

    ents

    - D

    ocuments related to m

    aterials, materials receiving and issue are controlled in

    accordance to procurement procedures.

    Quality C

    ontrol Docum

    ents

    -D

    ocuments and data identified as quality records are processed, retained and protected

    as described in 000 509 0160 "Quality R

    ecords". Primary responsibility for ensuring

    adequate control of quality related documents rests w

    ith the Site Quality M

    anager.

    DO

    CU

    MEN

    T AU

    DITS

    Construction Engineering M

    anager

    - D

    etermine docum

    ent audit plan and schedule audits. A minim

    um of 5%

    of documents

    issued to the document holder w

    ill be randomly selected for the audit sam

    ple. The num

    ber of document holders to be audited w

    ill be determined by the C

    onstruction Engineering M

    anager.

    Docum

    ent Control

    -U

    sing a printout or list of documents and current revisions, com

    pare documents and

    revisions held by document holders and note any discrepancies. N

    otify the C

    onstruction Engineering Manager of m

    ajor discrepancies.

    Construction Engineering M

    anager

    - For m

    ajor discrepancies identified by Docum

    ent Control audits of docum

    ents, investigate and provide recom

    mended resolution.

    Revision C

    ontrol of the Site Quality M

    anual

    - Site Q

    uality Manager

    - R

    evision dates for all pages of all procedures in the manual should m

    atch the dates in the Table of C

    ontents.

    - The Site Q

    uality Manager, C

    onstruction Engineering Manager, Site M

    anager and the C

    lient (optional) will approve each revision by signing the "Approval Page".

    - Forw

    ard the approved revision and affected documents to D

    ocument C

    ontrol for m

    aintenance and distribution to all manual holders.

  • West Q

    urna I 000 509 0050

    Contract N

    o: W3Q

    R

    15 April 11Project Location: Basra, Iraq

    Page 3 of 3

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    REFER

    ENC

    ES

    Project Procedures Manual - Sections 8,11, and 15 for PD

    DM

    Procedures

    Quality C

    ontrol Forms:

    000 509 F00501 R

    equest For Information

    000 509 F00502 - Request For Inform

    ation Log

    ATTA

    CH

    MEN

    TS

    Attachment 1 R

    equest For Information (R

    FI) Form Instructions

  • West Q

    urna I 000 509 0050

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Attachment 1 . . . Page 1 of 2

    Request for Inform

    ation (RFI) Form

    Instructions

    Project N

    ame:

    The P

    roject Nam

    e (i.e. West Q

    urna I)

    Project #:

    The P

    roject Num

    ber (i.e. W3Q

    R)

    Date:

    The date the R

    equest is originated.

    RFI #:

    U

    nique number given to each individual R

    FI Form.

    WB

    S:

    W

    ork Breakdow

    n Structure unique to the P

    roject, if applicable

    Work P

    ackage No.:

    C

    onstruction Work P

    ackage number, if applicable.

    Turnover/Startup S

    ystem N

    o.: Turnover/S

    tartup system num

    ber, if applicable.

    Discipline:

    P

    rimary discipline affected by the R

    equest (Civil, S

    tructural, Piping etc.)

    Request To:

    E

    nter Nam

    e of Individual submitted to (John D

    oe)

    Com

    pany/Location

    Enter N

    ame of C

    ompany and its location of the requested organization

    (Fluor-Houston)

    Phone N

    umber/E

    mail

    E

    nter phone number of the individual subm

    itted to and/or email address

    Subject

    E

    nter the subject of the request

    Specifications/D

    ocuments:

    List all issued drawings, docum

    ents, and specifications impacted by the

    request.

    Questions/D

    escription/Conflict:

    Detail the m

    issing information, discrepancies, questions or conflicts that

    must be resolved prior to construction activities continuing in the affected

    areas. Attach additional sheets, draw

    ings, or sketches, if further explanation is required.

    Recom

    mended S

    olution: Indicate the action that the requestor believes is required to provide an acceptable solution to resolve the discrepancies and conflicts indicated on the request. A

    dditional sheets, sketches, digital photos or drawings

    may be attached to provide a clear explanation of the intended

    resolution.

    Originated B

    y: The person originating the request and provided recom

    mended action.

    Title: List the current position of the originator on the project.

    Date:

    The date the request is submitted for approval.

    Originators C

    ompany N

    ame

    List Com

    pany name of the originator

    Approval For O

    riginator By

    List name of Fluor person approving the request for subm

    ission to the E

    ngineer of Record (G

    enerally, the Fluor Site E

    ngineering Manager w

    ill receive the request and approve its subm

    ission to the Design E

    ngineer.)

    Title: List the current position of the approver.

    Date:

    The date the request is approved for submission

  • West Q

    urna I 000 509 0050

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Attachment 1 . . . Page 2 of 2

    Date R

    eply Required:

    Enter the date in w

    hich the resolution of the request must be m

    ade in order not to delay the activities in question

    Response

    The respondents resolution (generally the Design Engineer, P

    roject E

    ngineering Manager, C

    M, or Fluors C

    onstruction Engineering

    Manager) to the question, inform

    ation, discrepancy, or conflict.

    Respondent:

    The signature of the person making the response. (Lead C

    onstruction D

    iscipline Engineer, C

    onstruction Engineering M

    anager or Design Lead

    Discipline E

    ngineer, etc.)

    Title: List the current position of the A

    pprover on the project.

    Date:

    The date the request is approved for transmittal to the D

    esign Engineer.

    Approval for R

    espondent: The signature of the person review

    ing and approving the request prior to im

    plementation. (This action m

    ight require Client approval. If the

    response changes the design (IFC D

    rawings or S

    pecifications) the E

    ngineer of Record m

    ust approve the resolution.)

    Title: List the current position of the A

    pprover on the project.

    Date:

    The date the request is approved for implem

    entation by the Client or

    Project E

    ngineering Manager or designee.

    Adequate C

    losure? Indicate using the checkbox if the R

    FI response is acceptable for closure of the R

    FI. Generally, the C

    onstruction Engineering M

    anage must

    respond to this question.

    Cost Im

    pact? Indicate using the checkbox if the R

    FI response has a cost impact that

    will require an estim

    ate or a request for contractor pricing. If the answer

    is yes, indicate the requirement for a S

    I to be issued to the Contractor.

    Schedule Im

    pact? Indicate using the checkbox if the R

    FI response has a schedule impact

    that will require an adjustm

    ent in the contract schedule or a request for contractor pricing. If the answ

    er is yes, indicate the requirement for a S

    I to be issued to the C

    ontractor

    Closed R

    FI and Date V

    erified: Inter the nam

    e and date the RFI w

    as closed and verified.

    Distribution:

    List all parties requiring a copy of the completed request once the

    response has been received.

  • West Q

    urna I 000 509 0090

    Contract N

    o: W3Q

    R

    15 Aug 10Project Location: Basra, Iraq

    Page 1 of 2

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    PRO

    CESS C

    ON

    TRO

    L

    SCO

    PE

    This procedure identifies construction work processes that require process control.

    GEN

    ERA

    L

    For most site production activities, the draw

    ings and specifications provide adequate work

    instruction. These may be supplem

    ented with additional instructions to control w

    ork sequencing, recording of installation data, m

    aterial selection, etc. How

    ever, certain construction work

    processes require special instructions to establish the controls necessary to achieve acceptable quality, of the com

    pleted work, for the follow

    ing reasons:

    Q

    uality results of the completed w

    ork cannot be fully verified by subsequent inspection and/or testing.

    Q

    uality deficiencies may only becom

    e apparent after the item has entered service or

    operation.

    Special Processes

    "Special processes" are highly dependent on the control of process parameters or the skill of the

    operator or both and are characterized by the need for one or more of the follow

    ing control m

    easures.

    x W

    ritten Method Statem

    ent or Procedure x

    Procedure Qualification

    x O

    perator Qualification

    x In-Process Inspection

    Special processes encountered on sites include, but m

    ay not be limited to:

    x W

    elding and Post Weld H

    eat Treatment

    x W

    elder Qualification

    x N

    ondestructive Examination (including radiography, m

    agnetic particle, liquid penetrant, ultrasonic, and positive m

    aterial identification VT, RT, M

    T, PT, UT, and PM

    I)

    Special processes identified m

    ust be accomplished and docum

    ented under controlled conditions by appropriately qualified personnel using approved procedures and equipm

    ent in accordance w

    ith the governing specifications and the associated referenced codes and standards.

  • West Q

    urna I 000 509 0090

    Contract N

    o: W3Q

    R

    15 Aug 10Project Location: Basra, Iraq

    Page 2 of 2

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    PRO

    CED

    UR

    E

    Site Quality M

    anager

    The Site Quality M

    anager shall coordinate with the C

    onstruction Engineering Manager, to

    research the project contract work scope and specifications in order to identify the special

    processes that will be utilized. If the processes are to be contracted, ensure that the

    required control mechanism

    s, i.e. procedures, qualifications, etc. are specified in the RFP

    and implem

    ented before the start of work. Process control m

    easures and responsibilities shall be identified on the applicable procedures or ITPs.

  • West Q

    urna I 000 509 0110

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 1 of 4

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    INSPEC

    TION

    , MEA

    SUR

    ING

    AN

    D TESTIN

    G EQ

    UIPM

    ENT

    SCO

    PE

    This procedure describes the methods to be used for the control, calibration, m

    aintenance and recall of inspection, m

    easuring and test equipment (IM

    TE) used to demonstrate conform

    ance of construction w

    ork activities to the specified requirements. It is not applicable to calibration of

    permanent plant devices.

    GEN

    ERA

    L

    Inspection, measuring and test equipm

    ent (IMTE), including test softw

    are, shall be selected, calibrated and controlled in a m

    anner which is consistent w

    ith the required inspection, testing and exam

    ination requirements.

    Environmental conditions shall be suitable for the calibrations, inspections, m

    easurements and

    tests being carried out.

    All IMTE shall be uniquely identified. This unique identification m

    ay consist of a manufacturer's

    unique serial number along w

    ith model num

    ber and/or the assignment and application of a unique

    Inventory Control N

    umber (IC

    N).

    The handling, preservation, and storage of inspection, measuring and test equipm

    ent shall be such that the accuracy and fitness for use is m

    aintained.

    All calibrations shall be performed using certified equipm

    ent having a known valid relationship to

    nationally recognized standards; where no such standards exist, the basis used for calibration

    shall be documented.

    "Conform

    ance check" means the operations required to ensure that an item

    of measuring

    equipment is in a state of com

    pliance with requirem

    ents for its intended use.

    Non-adjustable m

    easuring and test equipment is not considered as calibrated equipm

    ent. Equipm

    ent of this nature (e.g. cube and proctor molds, m

    easuring tapes, rulers, chains) is subject to a "conform

    ance check" to dimensional, volum

    etric or other requirements and does not require

    any further verification unless apparent damage or other factors require re-verification.

    It is the responsibility of the end-user to comply w

    ith the requirements of this section.

    IMTE shall be selected utilizing Attachm

    ent I "Criteria for the Selection of Inspection, M

    easuring and Testing Equipm

    ent" and Attachment II shall be used for guidance in procurem

    ent of calibration equipm

    ent and/or services.

    All IMTE calibration requirem

    ents shall be identified, on Attachment 3 IM

    & TE Calibration

    Requirem

    ents List. This attachment is used to list the various types of IM

    TE in use and their

  • West Q

    urna I 000 509 0110

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 2 of 4

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    associated calibration frequencies, calibration procedures and tolerances. Calibration procedures,

    frequencies, and tolerances may be obtained in conjunction w

    ith obtaining the services of an outside calibration vendor or from

    manufacturers. A procedure num

    ber shall be assigned. If the m

    anufacturer has an assigned number, this should be used. C

    alibration procedures are quality records and shall be m

    aintained in site files.

    Procedures such as published standards, practices (e.g., ASTM) or w

    ritten calibration instructions from

    the manufacturer m

    ay be used. In the absence of either a published standards practice or an adequate m

    anufacturer's procedure, a written procedure for the calibration m

    ethod shall be w

    ritten and approved for use.

    In addition to the above, calibration procedures should include at least the following basic

    information:

    x Identity of the item

    to be calibrated using the procedure.

    x C

    alibration comparison standards and calibration support equipm

    ent to be used.

    x Provisions to obtain and record "as-found" accuracy m

    easurement prior to any

    adjustments.

    x Sequence of operations.

    x C

    hecks, tests and measurem

    ents instructions.

    x C

    alibration acceptance tolerances.

    x C

    alibration adjustment instructions.

    x Safety considerations.

    x Special instructions (w

    hen applicable).

    x D

    ocumentation and labeling instructions related to the specific item

    to be calibrated.

    Perform and record (Form

    000 509 F01104) the calibration in accordance with the above

    established calibration procedures and/or contract the services of an outside calibration services vendor.

    Upon com

    pletion of initial calibration, enter the equipment in the C

    alibration Assignment Log

    (Form 000 509 F01101) and record other data required by this log.

  • West Q

    urna I 000 509 0110

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 3 of 4

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    History of U

    se

    The end user shall maintain a history of use for IM

    TE to enable an assessment of the validity of

    previous calibrations, inspections, measurem

    ents and test results when calibration as-found data

    reveals out-of-tolerance data points.

    The history shall be documented using IM

    TE Sign In/Out-H

    istory of Use Log (Form

    000 509 F01102) and keep current to record each usage of the IM

    TE.

    If out of tolerance conditions are found, a Nonconform

    ance Report shall be prepared in

    accordance with 000 509 0130.

    If out-of-tolerance conditions are found during recalibrations an evaluation shall be conducted to determ

    ine if inspection, measurem

    ent, test or calibration results obtained with the out-of-tolerance

    instrument are still valid.

    Evaluations shall be documented, and w

    here required, repetitions of readings shall be compared

    to original results.

    It is the responsibility of the end user to use calibrated equipment w

    ithin the environmental

    operating range(s) or restrictions/limitations specified by the instrum

    ent manufacturer.

    NO

    TE: Temperature or other com

    pensating calculations shall be applied to any inspection, m

    easurement, test or calibration results w

    hen such compensations are specified by the

    instrument m

    anufacturer and/or when they can affect the basis of the results obtained.

    Upon satisfactory com

    pletion of calibrations, and after the recalibration due date has been determ

    ined (calculated), the end user shall make entries on the "C

    alibrations Tickler File" (Form

    000 509 F01103) to aid in the tracking and recall of items for scheduled recalibration.

    DO

    CU

    MEN

    TATIO

    N

    Electronic recording of the information that is required by the docum

    entation in this procedure is perm

    issible. All documents (except labels) generated in accordance w

    ith this procedure should be m

    aintained in appropriate protected files throughout the construction phase of the project, and for the period of tim

    e there after specified (if any) or turned over to the Client if required.

  • West Q

    urna I 000 509 0110

    Contract N

    o: W3Q

    R

    15 Apr 11Project Location: Basra, Iraq

    Page 4 of 4

    Fluor Corporation C

    ompany C

    onfidentialSite Q

    uality Manual

    FOR

    MS

    Quality Support Form

    s:

    000 509 F01101 -

    Calibration Assignm

    ent Log and Record

    000 509 F01102 -

    IMTE Sign In/O

    ut-History of U

    se Log

    000 509 F01103 - C

    alibration Tickler File

    000 509 F01104 - C

    alibration Data Sheet

    Note: O

    r Com

    pany Approved Equivalent forms m

    ay be used to control IMTE.

    ATTA

    CH

    MEN

    TS

    Attachment 1

    - C

    riteria for the Selection of Inspection, Measuring and Test Equipm

    ent (IMTE)

    Attachment 2

    - C

    riteria for Procuring Calibration Services

    Attachment 3

    - IM

    & TE Calibration R

    equirements List

  • West Q

    urna I 000 509 0110

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 1. . . Page 1 of 1

    CR

    ITERIA

    FOR

    THE SELEC

    TION

    OF IN

    SPECTIO

    N,

    MEA

    SUR

    ING

    AN

    D TESTIN

    G EQ

    UIPM

    ENT (IM

    TE)

    1. IM

    TE includes inspection, measurem

    ent and/or testing equipment used to determ

    ine final acceptance.

    2. IM

    TE shall have a manufacturer's stated accuracy (and precision, w

    here applicable)

    that exceeds the construction installation inspection, measurem

    ent and/or testing tolerance(s).

    3. IM

    TE shall have the durability, stability and appropriate measurem

    ent ranges

    consistent with the intended use(s).

    4. C

    alibration standards that will be required for the initial and subsequent recalibrations

    shall be identified w

    hen selecting IMTE. Such calibration standards shall be

    requisitioned or the services of a calibration facility w

    ith the calibration standards shall be contracted.

    NO

    TE: Obtaining calibration standards or services can usually require m

    ore time to

    procure than the time required to select and procure the needed IM

    TE.

    5. Purchase requisitions for IM

    TE, calibration standards, and calibration facility services

    should clearly state the requirements for accuracy, precision (w

    here applicable), range, durability and/or stability, environm

    ental, handling, other applicable technical requirem

    ents.

  • West Q

    urna I 000 509 0110

    Contract N

    o: W3Q

    R

    15 Apr 2011Project Location: Basra, Iraq

    Attachment 2 . . . Page 1 of 1

    CR

    ITERIA

    FOR

    PRO

    CU

    RIN

    G C

    ALIB

    RA

    TION

    SERVIC

    ES

    The following are recom

    mended guidelines for preparing a purchase order for obtaining the

    services of a calibration supplier to calibrate Inspection, Measuring and Test Equipm

    ent (IM&TE).

    1. The follow

    ing information should be provided to the supplier:

    a)

    description and unique identification of each piece of IM&TE;

    b)

    assigned calibration interval;

    c) calibration accuracy required;

    d)

    any relevant environmental requirem

    ents of use or calibration.

    2. The calibration supplier m

    ust provide the following inform

    ation as part of their calibration records:

    a)

    source of calibration equipment used and current certificate(s) of traceability to a

    recognized national standard;

    b) identification of the calibration procedure(s) used (if the procedure is produced by the calibration supplier, a copy m

    ust be furnished, if a recognizable standard i.e. ASTM,

    ANSI/ASM

    E, is used no copy is needed).

    3. The calibration records supplied by the calibration supplier for each item

    of IM&TE calibrated

    must include:

    a)

    item identification num

    ber;

    b) date of calibration;

    c)

    the records of the "before", "as received" or "as found" condition including actual values and the "as calibrated" or "as left" values;

    d)

    identification of the calibration procedure used;

    e) lim

    its of permissible error;

    f)

    calibration standard used (including serial numbers and certificates) and traceability;

    g)

    details of any maintenance, servicing, adjustm

    ent, repairs or modifications carried out;

    h)

    identification of person performing the calibration;

    i)

    identification of person responsible for the correctness of the information provided.

    4. The calibration supplier shall seal, using a unique, tam

    per-resistant system, all adjustm

    ent access points after calibration, w

    here practical. The system