Page 1: SIM and RBI recent developments - Amazon Web Services

G. Abdel Ghoneim, Ph.D., P.E.08 December 2009

Structural Integrity Management and Risk Based Inspection – Recent DevelopmentsSNAME Texas Section Meeting

Page 2: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

2

Agenda

Introduction

Gulf of Mexico Activity

SIM and RBI Fundamentals

Recent Standards

Challenges

Summary

Page 3: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

309 December 2009

GOM Platform Activity

Source: MMS0

100

200

300

400

500

600

700

800

900

<50 51‐100 101‐150 151‐200 201‐250 251‐300 301‐350 351‐400 >400

Water Depth (ft)

No. of S

tructures

1945‐1972

1973‐1982

1983‐2009

Source: MMS, B.J. Kruse, III

Page 4: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

4

GOM Platform Decommissioning

GoM Platform Vintage (Years)

15%

25%

30%

30%

<5 5-15 15-30 >30

Total ~ 3,900 Platforms

Average Removal Age ~ 16 years

Source: MMS, B.J. Kruse, III, K. S. Patterson, WISTA Oct 2008

Page 5: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

5

The Issues

Source: O'Connor, BP, M. Lalani, June 2007

Page 6: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

6

API RP’s and GuidelinesAPI 2A-WSD, “Recommended Practice for Planning Designing and Constructing Fixed Offshore Platforms – Working Stress Design.”

API 2A-LRFD, “Recommended Practice for Planning Designing and Constructing Fixed Offshore Platforms – Load and Resistance Factor Design.”

API Bulletin 2TD, “Guidelines for Tie-downs on Offshore Production Structures for Hurricane Season”.

API 2T, “Recommended Practice for Planning Designing and Constructing Tension Leg Platforms.”

API 2FPS, “Recommended Practice for Planning Designing and Constructing Floating Production Systems.”

API 2SK, “Recommended Practice “Design and Analysis of Stationkeeping Systems for Floating Structures.”

API 2RD, “Recommended Practice “Design of Risers for Floating Production Systems (FPSs) and Tension-Leg Platforms (TLPs)”.

API 2I, Recommended Practice “In-Service Inspection of Mooring Hardware for Floating Drilling Units”.

Page 7: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

7

API 2HINS Inspection Initiator Process

Page 8: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

8

Destroyed GoM Platforms

2 3

148

3 2 3 3

40

7 7

47

69

2

60

0

10

20

30

40

50

60

70

80

1948 1961 1964 1965 1969 1974 1979 1985 1992 2002 2004 2005 2005 2008 2008

Year

Num

ber o

f Pla

tform

sDes

troy

ed

2.00E-04

1.00E-03

5.00E-04

1.00E-03

5.00E-044.00E-04

1.00E-050.00E+00

2.00E-04

4.00E-04

6.00E-04

8.00E-04

1.00E-03

1.20E-03

Stiff, 2009 Stiff, 2009 Stahl, et.al.,2000

THIC, 1992 Stahl, 1986 ISO 19901-2,2004

ISO 19902,2008

Source

Annu

al F

ailu

re P

roba

bilit

y

SRRSR =

100SRRSR =

Page 9: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009 9

Platform Structural AnalysisLoad exposure

Page 10: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

10

Safety format (LRFD vs. WSD)

FactorResistance

Load and Resistance

Prob

abili

ty D

ensi

ty

MeanLoad

MeanResistance

FactorLoad

CharacteristicResistanceLoad

Characteristic

Requirement Rd<SdDesignLoad (Ld)

DesignResistance (Rd)

Page 11: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

11

SIM Process

Management of Change

CompanyPolicy

Reporting and Communication

InformationManagement

Organization andPersonnel

Audits andReviews

ContingencyPlans

SIM Process

Develop Integrity Management Plan (IMP) forStructure / System

Implement IMP for theStructure / System

Learning and Improvement

Hazard Evaluation andRisk Assessment

Page 12: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009 Slide 12

Principles of Asset Integrity Management Integrity management life cycle activities

Evaluate Risk

Maintain

Inspect

Monitor Integrity

Plan survey

InspectRecordfindings

Evaluate findings

Filter findings

Assess risk(incl. SRS)

Update risk status Update overall

inspection plan

Plan follow upactions

Do follow-up actions

Integrity

FindingsActions

Inspection plan

12

Page 13: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

13WCT

Seminar April 26,

Why SIM - Ageing Problem?The contribution of structural failure to the total number of historic accidents is less than 10% based on worldwide data (Kvitrud, et. al., 2001).

The reliability of a structure against environmental loads may become unacceptable in extended lifetime. Subsidence, degradation and changes to the original design may occur at a higher rate in extended platform life.

Lack of data on the structure (e.g. drawings, steel type, welding procedures, inspection results and details about earlier repairs etc.) may result in higher uncertainty.

Using a systematic approach for evaluating whether a structure is safe for use beyond its initial design life, taking the above mentioned issues into account, is the objective of SIMS.

The SIM system has proven invaluable even for relatively newer structures both fixed and floating.

Ersdal, G. Ph.D. Thesis, U of Stavanger, October 2005

Page 14: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

14

Ageing & Need for SIM & RBI

Page 15: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

15

What is Risk-Based Inspection (RBI)?

Strategic process for lowering risk and lowering cost

An integrated, data-based methodology that factors risk into inspection decision making

Risk analysis includes not only probability of failure (PoF) but also consequence of failure (CoF)

A qualitative and quantitative process for managing structurres/equipment based on risk analysis

A systematic process that establishes and prioritises risk levels for each component in the structure

RBI is an important element in the SIM system.

Page 16: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

16

Input data

Condition Evaluation

Action plans

Observations

Events / History

Inspection results

MonitoringAnalyses / (re-)design

Condition evaluations(sections and components)

Activities plan Inspection plan

Inspections

Monitoring results

Operating req. & limits

ORBIT : Main principles

Page 17: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

17

TerminologyRobustness

RSR

Push-over/Time-domain

Assessment/Re-assesment

Risk/Reliability

RBI

Design Life

Standards/Regulations

Limit States

WSD/ASD and LRFD

Design Criteria

Joint Flexibility

SRS

Load Factor

Fatigue/Fracture

Failure

Safety Category

Consequence of Failure Category

Strength

Hazards

Acceptability Criteria

Air Gap – Wave-in-Deck

Probabilistic Methods

Bayesian Approach

Degradation

Fitness-for-purpose

SIMS

Bias

Page 18: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

18

The Two Main Steps of RBI

Expected RISK Cost

0

1

2

3

4

5

6

1.0E-04 1.0E-03 1.0E-02 1.0E-01Target Failure Probability Level

Nor

mal

ised

Exp

ecte

d C

ost

Expected Inspection CostExpected Failure Cost

Expected Repair CostTotal Expected Risk Cost

Page 19: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

19

Key Concepts

The Key Concepts of RBI

RISK = Probability of Failure XConsequence of

FailureGFF Item DFX

Age

Damagetype/rate

Insp.effective.

Damage areaItem repair

Other repairsInjury

Business int.Env. clean up

Page 20: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

20

Consequence models estimate:

- Heat radiation levels from fires- Gas dispersion distances- Durations of fires- Explosion pressures- Number of fatalities per accident- Environmental effect

Page 21: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

21

Reducing Risk

Inspection frequencies

Inspection scope / thoroughness

Inspection tools / techniques

Inspection practices (internal vs. external)

Building more Redundancies

Maintenance

Proper use/understanding the limitations

Emergency response

Trained crew

Effective communication lines

Local knowledge

Page 22: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

22

Marine Safety Regulations

Classification Societies

Rules

Rules

Classification of Mobile Offshore Units

Formal Safety Assessment

Step 1 HazardIdentification

Step 2Risk

Assessment

Step 5Decision Making

Recommendations

Step 3Risk Control Options

Step 4Cost Benefit Assessment

International Maritime

Organization

MODU Code

Page 23: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

23

Risk AssessmentHazard review

Hazard checklist

HAZOP (hazard and operability study)

FMECA (failure modes, effects and criticality analysis)

SWIFT (structured what-if analysis)

Risk matrices

Risk ranking

Structured judgement

Page 24: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

24

Risk Assessment

Major accident

Controls

THREATS CONSEQUENCES

Accident Scenario

Management System

Fault trees

Event trees

Bow tie diagrams

Rules and standards

Engineering judgement

Risk criteria

Cost-benefit analysis

Company values

Unacceptableregion

Incr

easi

ng in

divi

dual

risk

s and

soci

etal

con

cern

s

Tolerableregion

Broadly acceptableregion

Page 25: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

25

Quantitative Methods

Weather Outcome

Severe 50% fatalities0.01

Rough 30% fatalities0.09

Evacuation1.0E-04 Moderate 10% fatalitiesper year 0.4

Calm 5% fatalities0.5

Severe5%

Rough28%

Moderate41%

Calm26%

Historical data analysis

Fault tree analysis

Event tree analysis

Consequence modelling

Evacuation modelling

Risks and uncertainties

Page 26: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

26

Influences on Technique Selection

Decision context

Lifecycle stage

Major hazard potential

Novelty/non-standard

Uncertainty

Views/perceptions

Techniques

Practicality

Strengths and weaknesses

Good practice

Efficiency

Page 27: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

27

Traditional Inspection Planning vs. RBI Planning

Traditional

Inspection based on experience (usually by previous failures/breakdowns)

Inspection effort driven by “likelihood of failure”

Reactive “fire fighting”, running behind the ball

Use of appropriate / Inappropriate NDT techniques

RBI

Inspection based on experience andsystematic (risk) review

Inspection effort driven by “risk”, i.e. likelihood of failure and consequences of failure

Pro-active planning and execution of inspections

Systematic identification of appropriate NDT techniques

Page 28: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

28

Suitable and Sufficient Inspection Planning

Suitable – techniques appropriate for the assessment being made

Sufficient – adequate to show the risks are ALARP, without requiring further elaboration

S in g le co m p o n e n t co n sid d e re d ; D e sig n l ive = 20 y r

1 .0E-06

1 .0E-05

1 .0E-04

1 .0E-03

1 .0E-02

0 2 4 6 8 10 12 14 16 18 20S e rv ic e tim e in y e a rs

Failu

re p

roba

bilit

y

Page 29: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

29

RBI Investment and Savings

$400,000

$65,000$85,000$50,000

$500,000

$675,000

$250,000

$550,000$600,000

$0$100,000$200,000$300,000$400,000$500,000$600,000$700,000$800,000

Total $ Savings = $1.1MROI = 22:1

RBIStudyInvest

Inspect& MaintSavings

ProdCost

Savings

RBIStudyInvest

Inspect& MaintSavings

ProdCost

Savings

RBIStudyInvest

Inspect& MaintSavings

ProdCost

Savings

Total $ Savings = $650,000ROI = 8:1

Total $ Savings = $1.25MROI = 19:1

Chemical Plant Chemical Plant -- 200200Pressure VesselsPressure Vessels

Refinery Refinery -- 3535Pressure VesselsPressure Vessels

Refinery Refinery -- 5050Pressure VesselsPressure Vessels

Page 30: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

30

$100,000$200,000$300,000$400,000$500,000$600,000$700,000$800,000

$65,000$50,000

$500,000

$675,000

$75,000

$550,000$600,000

$0

Total $ Savings = $1.1MROI = 22:1

RBIStudyInvest

Inspect& MaintSavings

ProdCost

Savings

RBIStudyInvest

Inspect& MaintSavings

ProdCost

Savings

RBIStudyInvest

Inspect& MaintSavings

ProdCost

Savings

Total $ Savings = $1.52MROI = 20:1

Total $ Savings = $1.25MROI = 19:1

Chemical Plant Chemical Plant -- 200200Pressure VesselsPressure Vessels

Offshore InstallationOffshore InstallationPiping & VesselsPiping & Vessels

Refinery Refinery -- 5050Pressure VesselsPressure Vessels

$1,520,000

rbi invesment & savings

Typical ROI = 8:1

Page 31: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

31

ORBIT Structure

Page 32: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

32

RBI Detailed Assessment

Page 33: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

33

RBI Detailed Assessment

Page 34: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

34

Inspection PlanningChallenges: No general standard, guideline or common industry practice available

for inspection planning for structures

SIMS

RBI analysis

ORBIT/Profast

RBI analysis report

Member condition

Inspection historyUpdated “Master RBI Table”- RBI Input and results

Inspection plan (FIP’s)

RBI Analysis Process

SIMS FIP’s Upload

“Orbit Workflow Manager”“Orbit Workflow Manager”

New fatigue analysis results

Updated FIP’s

(input and results)

“Master RBI Table” (2004)- Fatigue point identification - fatigue damage rates - “Analysis Method Fatigue”- “Analysis Method Collapse”- consequence of member failure- preferred inspection method- etc.

Only done ones

New RBI Analysis results (Profast jnl files & database

New fatigue analysis

“Fatigue Master Table”

Page 35: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

35

Relevant DNV PublicationsRP-F107 Pipeline Risk Assessment

RP-G101 RBI of Topsides Equipment

OS-E304 Offshore Mooring Steel Wire Ropes

OSS-121 Class base on Risk Assessment

OSS-303 Risk Based Verification

OSS-304 Risk Based Verification of Offshore Structures

Available online: webshop.dnv.com

Page 36: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

36

DNV RP-F107 Pipeline Risk AssessmentCost Benefit Analysis Risk Matrix

Page 37: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

37

DNV RP-G101 RBI of Topsides Equipment

Maintenance Management System

Page 38: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

38

DNV RP-G101 RBI of Topsides Equipment

Page 39: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

39

DNV RP-G101 RBI of Topsides Equipment

ISO 17776 (2000)

Page 40: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

40

Push-over Analysis

Page 41: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

41

SIM System

Page 42: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

42

Decision Time

Page 43: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

43

To document safe use until end of production

Date for change in platform operation(from manned to unmanned)

Cost and scheduling of structural mitigation

Objective – Reassessment of Jacket Platforms:

Structural Operational Challenges

To document safe use until end of production

Date for change in platform operation(from manned to unmanned)

Establish evacuation criteria

Cost and scheduling of structural mitigation

Inspection planning

Objective – Reassessment of Jacket Platforms:

Wave diffraction Earthquake / Accidental Loads

COG

Structural modifications/ Weight Management

Subsidence of seabed/Possible WiD

Foundationcapacity

DeckStrength

Platform strength

New Env.Criteria

Fatigue strength &Inspection planning

Large amount of

information

Page 44: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

44

Some Challenges

Wave-in-deck-load (WiD) and load on jacket (WoJ) and variation with time

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

2.2 2.7 3.2 3.7 4.2 4.7 5.2 5.7 6.2 6.7 7.2 7.7 8.2 8.7 9.2 9.7

Time (sec)

Fx (M

N)

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

Fz (M

N)

Fx - Total (inc. "jet" effect)Fx - WoJ (incl. "jet" effect)Fx - WoJ (without "jet" effect)Fx - WiD (Comflow)Fz - WoJ Fz - WiD (Comflow)

Page 45: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

45

Challenges (cont’d)

Determination of failure criteria

P

delta

Excessive deformation

P

Axial joint deformation, delta

Elasticflexibility

Dynamic behavior- Rise time for wave-in-deck load coincide with one quarter of platform

lowest eigenperiod

Page 46: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

46

New vs. Old

Page 47: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

47

NORSOK STANDARD N-006, March 2009

Page 48: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

48

NORSOK Assessment PrinciplesRequirements to in-service inspection planning and structural integrity management of jacket structures in general may be found in ISO 19902, Clause 23.

Requirements to inspection and condition monitoring are given in ISO 19903, Chapter 14.

Requirements to in-service inspection, monitoring and maintenance are given in ISO 19904-1, Chapter 18.

Shut-down and unmanning procedure shall be implemented in order to ensure that there is less than 5x10-4 annual probability of the facility being exposed to environmental actions exceeding the structural capacity determined according to the ALS, with personnel onboard.

In cases of pollution risk or main safety function impairment it should be shown that the combined probability of a structural failure and leakage that could lead to significant pollution is less than 1x10-4 per year.

Page 49: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

49

API RP 2SIM (Draft) ToC

Page 50: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

50

API RP 2SIM (Draft)

Data Evaluation Strategy Program

Managed systemfor archive andretrieval of SIMdata and other

pertinent records

Evaluation ofstructural integrity

and fitness forpurpose;

development ofremedial actions

Overall inspectionphilosophy &strategy andcriteria for in-

service inspection

Detailed workscopes forinspection

activities andoffshore execution

to obtain qualitydata

SIM Process and Document Organization

Data Evaluation Strategy ProgramInitiatorTriggered

Assessment

Yes

No

Source: Draft API RP 2SIM

Page 51: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

51

API RP 2SIM (Draft) RBI Intervals

RiskCategory Inspection Interval Ranges

High 3-years to 5-years

Medium 6-years to 10-years

Low 11-years or greater

Notes:a) The timing for the first underwater periodic inspection should be determined

from the date of platform installation or when the baseline inspection was completed.

b) Risk-based intervals should be adjusted to verify uninterrupted cathodic protection of the platform. This should be based on data evaluation from prior inspections.

Assessment Initiator(See 4.3.5)

Assessment Category(See 4.3.4.4)

Assessment Information(See 7.3)

InadequateDeck Height?(see 4.3.5.1)

Simple Method(see 7.5)

Design Level Method

(see 7.6)

Ultimate Strength Method

(see 7.7)

Alternative Methods(see 7.8)

YES

Assessment MethodsSection 7

Assessment Criteria

- Design Level- Ultimate Strength- Environmental Load

Assessment CriteriaSections 8, 9

- Assessment Type- Assessment Category

- Assessment Criteria- Load Approach

RSR Criteria

- Assessment Category

- Minimum RSR

Pass Assessment? Mitigation and Risk Reduction Section 9

Document(see 4.2)

Consequence of Platform Failure (see 4.3.4)

MitigationAnd Risk

Assessment

AssessmentMethod

Assessment Category

and Assessment Information

Source: Draft API RP 2SIM

Page 52: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

52

API 2A 20th and 21st Ed. RSR’s

Assessment Category Reserve Strength Ratio (RSR)

A-1 High 1.21

A-2 Medium 0.8

A-3 Low 0.62

1. This RSR is applicable only for continued use of the platform for its present purpose. Not applicable for Change-of Use conditions.

2. Not to be used for water depth greater than 400 ft.

Assessment Category Reserve Strength Ratio (RSR)

API RP2A 19th

Edition and Earlier

API RP2A 20th Edition and Later

A-1 High 1.6 2.0

Assessment Category Reserve Strength Ratio (RSR)

GoM L-1 (High) 1.6 for Central Region1

1.2 for Other Regions

GoM L-2 (Medium) 1.2

GoM L-3 (Low) 1.0

Other U.S. Offshore Areas

2.0

1. Includes platforms located in the associated Transition Regions. The 100-year return period metocean conditions as defined in API RP2 MET should be used to compute the RSR.

20th Ed. GOM

20th Ed. Other U.S. Offshore Areas

21st Ed. GOM

Page 53: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

53

Summary

Structural Integrity Management (SIM) and Risk based inspection planning (RBI) are tools employed to develop bases for asset management and in-service inspection in order to extend the useful life of the structure and increase its reliability level.

SIM is geared towards managing the asset data and communicating status to corporate management in a systematic manner.

RBI entails: - A risk screening process in order to identify critical areas and summarize the failure

modes. - The consequences of possible failures and repair strategy are established in close

co-operation with the operator. - The costs of inspection and repair for failures are established.- Probabilistic progressive collapse analyses are performed for a number of

representative mechanisms in the structures. - A cost optimal inspection strategy is established.

Finally, a user friendly tailor made software is developed to to perform the life cycle management of the Assets.

Page 54: SIM and RBI recent developments - Amazon Web Services

© Det Norske Veritas AS. All rights reserved.

SIM and RBI – Recent Developments

SNAME Texas Section Meeting, 08 December 2009

54

Safeguarding life, property and the environment

www.dnv.com