•INTRODUCTION
•Concept of “Track Vacancy Detection”
•Track Circuits
•How they work
•Some problems arising
•Addressing these problems
•Axle Counters
•How they work
•Problems
•New developments
•OHTE
BACK TO THE FUTURE – Biennial
Symposium
3
Track Vacancy Detection Equipment
• Track Circuits
• Axle Counters
Train Authorisation Technology
3 BACK TO THE FUTURE – Biennial
Symposium
4
Track Circuits
Track Vacancy Detection
Train Authorisation Technology
4 BACK TO THE FUTURE – Biennial
Symposium
5
Track Circuits
Basic Principles : Relays
N
a
b
c
a
b
c
Train Authorisation Technology
5 BACK TO THE FUTURE – Biennial
Symposium
6
Track Circuits
i
A
Basic Principles
Train Authorisation Technology
6 BACK TO THE FUTURE – Biennial
Symposium
7
Track Circuits
i
A
Basic Principles
Train Authorisation Technology
7 BACK TO THE FUTURE – Biennial
Symposium
8
Track Circuits
i
A
Basic Principles
Train Authorisation Technology
8 BACK TO THE FUTURE – Biennial
Symposium
9
Track Circuits
• Insulated Rail Joints used in Signal leg
• Traction return leg solid
• Rails insulated from ballast
• Sleeper insulated from rails.
Train Authorisation Technology
9 BACK TO THE FUTURE – Biennial
Symposium
10
Insulating Track Circuits
1 TR 2TR
i1 i2
Insulated Rail Joints
Train Authorisation Technology
10 BACK TO THE FUTURE – Biennial
Symposium
11
Insulated Rail Joints (Block Joint)
Train Authorisation Technology
11 BACK TO THE FUTURE – Biennial
Symposium
13
Ballast stone & Track Circuits
• Ballast resistance > 2,1 Ohm/km
• Contaminated ballast increases leakage currents
• Ballast MUST not touch rails.
Train Authorisation Technology
13 BACK TO THE FUTURE – Biennial
Symposium
14
TR
i1 i2 i3 i4
iB
Ballast stone & Track Circuits
Train Authorisation Technology
14 BACK TO THE FUTURE – Biennial
Symposium
15
Track Circuit Requirements
• Must shunt with 0,5 Ohm
• Operate safely and reliably
• Should not drop with ballast resistance of 2,1
Ohm/km
• Immune to environmental conditions
• Long as possible
• Cost effective.
Train Authorisation Technology
15 BACK TO THE FUTURE – Biennial
Symposium
16
Types of Track Circuits
• Jointed Track Circuits o Block Joints (Insulated Rail Joint)
required
o One Traction return leg
• Jointless Track Circuits o Simulated Block Joints
o Both rails available for traction return
d.c. (Old)
d.c. a.c.- Immune
a.c. 50 Hz
Jeumont
M.L.TI21
Train Authorisation Technology
16 BACK TO THE FUTURE – Biennial
Symposium
18
a.c. Track circuit
• 50 Hz Power supply
• Diesel and d.c. Traction areas
• No longer Purchased
50 hZ
Train Authorisation Technology
18 BACK TO THE FUTURE – Biennial
Symposium
19
Jeumont Track Circuit
• Specially shaped high voltage pulses
• Special receiver and relay
• Immune to 50 Hz interference
Train Authorisation Technology
19 BACK TO THE FUTURE – Biennial
Symposium
24
Points
TURNOUTS
Train Authorisation Technology
24
Straight
+
-
-
+
-
+
BACK TO THE FUTURE – Biennial
Symposium
25
Track Circuit Failures
Block Joints
Ballast stone
Train Authorisation Technology
25 BACK TO THE FUTURE – Biennial
Symposium
28
Train Detection
• Axle Counters
o Used instead of Track circuits
o Detects Completeness of trains
o Counts Wheels and
o Determines direction
28 BACK TO THE FUTURE – Biennial
Symposium
29
Axle Counters
Axle counter Heads
“Insert” “Insert” Evaluator
Communication Cable
29 BACK TO THE FUTURE – Biennial
Symposium
30
Axle Counter Heads
• Position is Critical
• Replacement requires Adjustments
• Two Frequencies to Heads
• Supervision Frequency
• Heads Detected in Position
• Presence of Wheel Changes Magnetic field &
Phase
• Pulses Correspond to Wheels.
30 BACK TO THE FUTURE – Biennial
Symposium
40
Results of the ballast and earth
returns not according to rules
BACK TO THE FUTURE – Biennial
Symposium
41
How a mast should be
installed
New ballast still
touching the rail
BACK TO THE FUTURE – Biennial
Symposium