Page 1: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage GuidelinesDEPARTMENT OF INFRASTRUCTURE, TRANSPORT, CITIES AND REGIONAL DEVELOPMENT

Page 2: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

1 of 32

INFR

A3405_0

919 V

1

BACKGROUND

This document sets out the guidelines for signage relating to projects funded through the Department of Infrastructure, Transport, Cities and Regional Development.

These guidelines do not override the signage and public recognition requirements set out in the Agreements, Funding Conditions and/or Notes on Administration governing individual projects or programs.

Under some components of the Infrastructure Investment Program funding recipients will be required to submit a signage plan setting out proposed temporary and permanent signage for a project when approval for construction is sought. The funding recipient may also be required to certify in the annual financial statement and audit report that required signage has been erected in accordance with relevant agreements and signage plans.

For all enquiries regarding signage please liaise with the relevant project officer within the Department of Infrastructure, Transport, Cities and Regional Development.

CONTENTS

BACKGROUND 1

SIGN REQUIREMENTS 2

SIZE 3

DIGITAL FILE TEMPLATES 3

COLOUR 4

FONTS 4

MAPS 5

INVESTMENT PROGRAM: FULLY FUNDED BY THE AUSTRALIAN GOVERNMENT 6

INVESTMENT PROGRAM: MAJORITY (80–99 PER CENT) AUSTRALIAN GOVERNMENT FUNDED 7

INVESTMENT PROGRAM JOINTLY FUNDED AUSTRALIAN GOVERNMENT (UP TO 79 PER CENT)

ROADS TO RECOVERY PROGRAM 9

BLACK SPOTS PROGRAM 10

BUILDING BETTER REGIONS FUND 12

HEAVY VEHICLE SAFETY AND PRODUCTIVITY PROGRAM 13

BRIDGES RENEWAL PROGRAM 14

NATIONAL STRONGER REGIONS FUND 15

COMMUNITY DEVELOPMENT GRANTS 16

TASMANIAN JOBS AND GROWTH PACKAGE 18

SMART CITIES PLAN 20

NATIONAL WATER INFRASTRUCTURE DEVELOPMENT FUND 22

DROUGHT COMMUNITIES PROGRAMME 24

REGIONAL JOBS AND INVESTMENT PACKAGES 26

REGIONAL GROWTH FUND 28

MULTIPLE LOGO APPLICATION 30

COMMEMORATIVE PLAQUE 31

MANUFACTURING SPECIFICATIONS 32

Page 3: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

2 of 32

INFR

A3405_0

919 V

1

SIGN REQUIREMENTS

The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities and Regional Development. For other components of project funding, recipients should refer to the relevant agreement, conditions and/or guidelines. On major road and rail construction projects, a project specific sign is to be placed prior to construction commencing at each end of the physical work, facing oncoming traffic. Please ensure consideration is given to safety issues surrounding the placement of signs.

Signs are not to be obscured, including by any other information signs and must be maintained for 12 months beyond the opening of the project.

The Australian Government Crest and ‘BUILDING OUR FUTURE’ tag line, should always take prominence over all other logos.

Where a project is fully funded by the Australian Government, there are to be no signs giving public recognition to the relevant state/territory government or authority other than an auxiliary sign affixed below the main project sign. See the auxiliary sign page for specifications.

Where a project is majority funded (80 per cent or more Australian Government funded), the Australian Government Crest is to take the prominent position, with the relevant state/territory government or authority logo affixed below the Project name on the sign.

Where a project is jointly funded, the Australian Government Crest is to take the prominent position with the relevant state/territory government or authority logo on the adjacent side.

The requirements are set out in the templates in this document.

The funding recipient will be required to submit final proofs of signs and commemorative plaques to the relevant project officer within the Department of Infrastructure, Transport, Cities and Regional Development for clearance prior to production. Sign sizes, text sizes, style, colour and materials should be in accordance with the examples outlined in this document. A package of templates is available via request through your departmental project officer.

Note: All pre-existing signage remains in place.

Funding recipients are not required to submit proofs of signs for Black Spot Program and Roads to Recovery projects, however they are required to submit proofs of any commemorative plaques.

Page 4: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

3 of 32

INFR

A3405_0

919 V

1

SIZE

For national road and rail projects the main sign may be one of two sizes according to the visibility requirements of the site:

• 3000mm wide by 1600mm high for major projects in open road locations; and

• 2000mm wide by 1400mm high for locations where physical space is limited.

For the Roads to Recovery, Black Spot Program, Building Stronger Regions Fund, Bridges Renewal Program, National Stronger Regions Fund, Community Development Grants, Tasmanian Jobs and Growth Package and Heavy Vehicle Safety and Productivity Program projects, the main sign should be:

• 900mm wide by 1200mm high.

A smaller sign can also be used for the Roads to Recovery and the Black Spot Program projects when the usual speed limit is less than 80km per hour:

• 600mm wide by 900mm high.

The proportions of the standard sign must be maintained when using a smaller sign.

DIGITAL FILE TEMPLATES

The following digital files are available from the Department of Infrastructure, Transport, Cities and Regional Development via [email protected].

• 3000mm x 1600mm (indesign, eps and pdf)

• 2000mm x 1400mm (indesign, eps and pdf)

• 900mm x 1200mm (indesign, eps and pdf)

• 600mm x 900mm (indesign, eps and pdf)

Page 5: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

4 of 32

INFR

A3405_0

919 V

1

COLOUR

Colour for all reproduction methods must be matched as closely as possible to the Pantone standards. Allowances should be made for variations between materials.

FONTS

ABCabc123Primary sans serif typeface – Arial Black

ABCabc123Primary sans serif typeface – Arial Bold

PMS 285

C 85%M 52%Y 10%K 0% Black

C 0%M 0%Y 0%K 100%

Page 6: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

5 of 32

INFR

A3405_0

919 V

1

MAPS

It is expected that road users will be made aware of the project work underway in the area through each stage of travel. Diagrams depicting the works should be simplified line art as per example.

LEGEND

The proportions of the standard signs and font use must be maintained when using a smaller sign.

Upgraded route

Original route

Location of interchange

Location of town

FONTS

ABCabc123Primary sans serif typeface – Arial Bold

Project signs should not be overcrowded.

The name of the Location should be shown in black upper case letters on a white panel, see (A).

The start and finish of works should be shown in sentence case white on black, see (B).

Upgrade length must be indicated on top left, as per (C).

Example of application

(B)

(A)

(C)

(B)

Upgrade length: X.Xkm

LOCATION

Location

Location

Page 7: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

6 of 32

INFR

A3405_0

919 V

1

www.infrastructure.gov.au

FULLY FUNDED BY THE AUSTRALIAN GOVERNMENT

Project NameStage 1

Stage 2

Stage 3Stage 4

Completion date: Year

PROGRAM: INVESTMENTPROJECTS FULLY FUNDED BY THE AUSTRALIAN GOVERNMENT

Excludes: Roads to Recovery, Black Spots Program, Bridges Renewal Program and Heavy Vehicle Safety and Productivity Program

Sign: Fully Australian Government funded

Font: Arial Black, Arial Bold

Colour specifications:

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

3000mm

1600m

m

500m

m905m

m

35mm White border

35m

m

125mm Blue strip

1515mm

100mm

100m

m

50mm

1115mm

Note: See page 5 for map symbols

100m

m

100m

m

100m

m

35mm White border

100m

m

35m

m50mm

100mm

36mm AG Funding

* For locations where physical space is limited this sign is available in 2000mm wide by 1400mm high–refer page 3.

Page 8: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

7 of 32

INFR

A3405_0

919 V

1

www.infrastructure.gov.au

Project NameStage 1

Stage 2

Stage 3Stage 4

State or TerritoryLogo

Completion date: Year

PROGRAM: INVESTMENTMAJORITY (80–99 PER CENT) AUSTRALIAN GOVERNMENT FUNDED

Excludes: Roads to Recovery, Black Spots Program, Bridges Renewal Program and Heavy Vehicle Safety and Productivity Program

Sign: Majority Australian Government funded

Font: Arial Black, Arial Bold

Colour specifications:

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

3000mm

1600m

m

3000mm

500m

m905m

m

35mm White border

35m

m

125mm Blue strip

1515mm

100mm

153mm

1115mm

Note: See page 5 for map symbols

100m

m

100m

m

100m

m

35mm White border

100m

m

35m

m

50mm

* For locations where physical space is limited this sign is available in 2000mm wide by 1400mm high–refer page 3.

Page 9: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

8 of 32

INFR

A3405_0

919 V

1

PROGRAM: INVESTMENT Excludes: Roads to Recovery, Black Spots Program, Bridges Renewal Program and Heavy Vehicle Safety and Productivity Program

Sign: Jointly funded (Up to 79% Australian Government Funding)

Font: Arial Black, Arial Bold

Colour specifications:

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Note: To use appropriate state or territory logo (reversed only)

BUILDING OUR FUTURE

www.infrastructure.gov.au

Project NameStage 1

Stage 2

Stage 3Stage 4

Completion date: Month Year

3000mm

1600m

m

730m

m680m

m

35mm White border

35m

m

120mm Blue strip

1495mm

80mm

100m

m

50mm

1135mm

Note: See page 5 for map symbols

100m

m

100m

m

100m

m

35mm White border

100m

m

35m

m

* For locations where physical space is limited this sign is available in 2000mm wide by 1400mm high–refer page 3.

Page 10: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

9 of 32

INFR

A3405_0

919 V

1

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

PROGRAM: ROADS TO RECOVERY

Sign: Fully Australian Government funded

Colour specifications:

PMS 144

C 0%M 48%Y 100%K 0%

PMS 361

C 69%M 0%Y 100%K 0%

www.infrastructure.gov.au

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

Logo centred

1200m

m

17.5mm White border

17.5mm White border

Page 11: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

10 of 32

INFR

A3405_0

919 V

1

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

PROGRAM: BLACK SPOTS PROGRAM

Sign: Fully Australian Government funded

Colour specifications:

Note: See page 3 for sign specifications. See page 10 for Auxiliary sign.

PMS 144

C 0%M 48%Y 100%K 0%

Black Spot Program

www.infrastructure.gov.au

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

Logo centred

1200m

m

17.5mm White border

17.5mm White border

Page 12: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

11 of 32

INFR

A3405_0

919 V

1

Title here

900mm

110mm

20mm White border

15m

m20m

m

15mm Blue border

Text centred250m

m

PROGRAM: ROADS TO RECOVERY/BLACK SPOT PROGRAM

Sign: Auxiliary sign

Font: Arial Black, Arial Bold

Colour specifications:

PMS 285

C 85%M 52%Y 10%K 0% Black

C 0%M 0%Y 0%K 100%

Roads to Recovery and Black Spot Program project signages are not to be dual branded.

The relevant state/territory government or local council can produce an auxiliary sign which should be affixed below the main Australian Government Project sign.

The auxiliary sign will be of the same width and approximately ⅓ height of the main panel.

Text should read “Project managed by the <state/territory government or local council>” and only contain text.

85mm

Note: To indicate <state/territory government or road authority>

www.infrastructure.gov.au

Black Spot Program

www.infrastructure.gov.au

Title here Title here

Example of application

20mm White border

Page 13: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

12 of 32

INFR

A3405_0

919 V

1

PROGRAM: BUILDING BETTER REGIONS FUND

Sign: Jointly funded

Font: Arial Bold

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

www.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

PMS 361

C 69%M 0%Y 100%K 0%

Page 14: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

13 of 32

INFR

A3405_0

919 V

1

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

PROGRAM: HEAVY VEHICLE SAFETY AND PRODUCTIVITY PROGRAM

Project Type: Roads

Sign: Jointly Funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

Heavy Vehicle Safety and

Productivity Program

www.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

Logo centred

900mm

530m

m

17.5mm White border

1200m

m

17.5mm White border

17.5mm White border

Page 15: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

14 of 32

INFR

A3405_0

919 V

1

PROGRAM: BRIDGES RENEWAL PROGRAM

Project Type: Roads

Sign: Jointly Funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Bridges Renewal Program

www.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 16: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

15 of 32

INFR

A3405_0

919 V

1

PROGRAM: NATIONAL STRONGER REGIONS FUND

Sign: Jointly funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

National Stronger Regions

Fundwww.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 17: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

16 of 32

INFR

A3405_0

919 V

1

PROGRAM: COMMUNITY DEVELOPMENT GRANTS

Sign: Fully Australian Government funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Community Development

Grantwww.infrastructure.gov.au

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 18: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

17 of 32

INFR

A3405_0

919 V

1

PROGRAM: COMMUNITY DEVELOPMENT GRANTS

Sign: Jointly funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Community Development

Grantwww.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 19: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

18 of 32

INFR

A3405_0

919 V

1

PROGRAM: TASMANIAN JOBS AND GROWTH PACKAGE

Sign: Fully Australian Government funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

TasmanianJobs and Growth

Package

www.infrastructure.gov.au

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 20: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

19 of 32

INFR

A3405_0

919 V

1

PROGRAM: TASMANIAN JOBS AND GROWTH PACKAGE

Sign: Jointly funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

TasmanianJobs and Growth

Package

www.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 21: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

20 of 32

INFR

A3405_0

919 V

1

PROGRAM: SMART CITIES PLAN

Sign: Jointly funded

Font: EMBEDDED

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

www.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 22: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

21 of 32

INFR

A3405_0

919 V

1

PROGRAM: SMART CITIES PLAN

Sign: Fully Australian Government funded

Font: EMBEDDED

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

www.infrastructure.gov.au

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 23: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

22 of 32

INFR

A3405_0

919 V

1

PROGRAM: NATIONAL WATER INFRASTRUCTURE DEVELOPMENT FUND

Sign: Jointly funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

National Water Infrastructure Loan Facility

www.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 24: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

23 of 32

INFR

A3405_0

919 V

1

PROGRAM: NATIONAL WATER INFRASTRUCTURE DEVELOPMENT FUND

Sign: Fully Australian Government funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

National Water Infrastructure Development

Fundwww.infrastructure.gov.au

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 25: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

24 of 32

INFR

A3405_0

919 V

1

PROGRAM: DROUGHT COMMUNITIES PROGRAMME

Sign: Fully Australian Government funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Drought Communities Programme

www.infrastructure.gov.au

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 26: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

25 of 32

INFR

A3405_0

919 V

1

PROGRAM: DROUGHT COMMUNITIES PROGRAMME

Sign: Jointly fundedFont: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Drought Communities Programme

www.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 27: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

26 of 32

INFR

A3405_0

919 V

1

PROGRAM: REGIONAL JOBS AND INVESTMENT PACKAGES

Sign: Fully Australian Government funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Regional Jobs and

Investment Packageswww.infrastructure.gov.au

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 28: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

27 of 32

INFR

A3405_0

919 V

1

PROGRAM: REGIONAL JOBS AND INVESTMENT PACKAGES

Sign: Jointly funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Regional Jobs and

Investment Packageswww.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 29: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

28 of 32

INFR

A3405_0

919 V

1

PROGRAM: REGIONAL GROWTH FUND

Sign: Fully Australian Government funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Regional Growth Fund

www.infrastructure.gov.au

900mm

530m

m

17.5mm White border

90mm Blue strip

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 30: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

29 of 32

INFR

A3405_0

919 V

1

PROGRAM: REGIONAL GROWTH FUND

Sign: Jointly funded

Font: Arial Black

Colour specifications:

Note: See page 3 for sign specifications.

PMS 285

C 85%M 52%Y 10%K 0%

Black

C 0%M 0%Y 0%K 100%

Regional Growth Fund

www.infrastructure.gov.au

Logo positionState/Territory Government/

Local Government logo reversed

900mm

530m

m

17.5mm White border

545m

m

1200m

m

17.5mm White border

17.5mm White border

Page 31: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

30 of 32

INFR

A3405_0

919 V

1

www.infrastructure.gov.au

State Government Logo

Local Government/Council Logo

Private Company or Alliance

MULTIPLE LOGO APPLICATION

Signs using more than one logo are required to be branded with the following order:

1 Australian Government Crest /Building Our Future brand

2 State Government logo

3 Local Government/Council logo

4 Private company or alliance.

Page 32: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

31 of 32

INFR

A3405_0

919 V

1

Officially opened: Month Year, by

Project title

Minister’s NameTHE FEDERAL MINISTER

Minister’s NameTHE STATE MINISTER

BUILDING OUR FUTURE

Note: See page 3 for sign specifications.

COMMEMORATIVE PLAQUE

Program: All programs

Sign: Fully Australian Government funded

Font: Arial, Arial Black, Arial Bold

Colour specifications:

Black

C 0%M 0%Y 0%K 100%

297mm

210m

m

75m

m120m

m

5mm White border

5m

m5m

m

5mm border

150mm

Logo/s centred

Note: See page 3 for sign specifications.

Centred text

150mm

5mm White border

Page 33: Signage Guidelines - Infrastructure Investment · The following requirements relate to all signage for projects funded through the Department of Infrastructure, Transport, Cities

Signage Guidelines

32 of 32

INFR

A3405_0

919 V

1

MANUFACTURING SPECIFICATIONS

The below specifications have been developed to ensure signage lasts the life of the project and easily cleaned if vandalised. These specifications are a guide only. You may choose other options depending on advice given from your manufacturer.

Aluminium Thickness: 1.6mm Aluminium (standard for signage)

Mounting: RTA RIB (standard RTA mount)

Stock: NON REFLECTIVE – non reflective vinyl (does not take in any light)

Finishing: DIGITAL PRINT OVER LAMINATION – clear (durability)

ANTI-GRAFFITI Coating (Allows for graffitti to be removed with alcohol)