SITE INSTRUCTION Project : Pertamina Hulu Energi Building Premises at : Contractor : PT. Omega Moverindo Sukses Contractor Package : Fitting Out Office PHE Ref No : Date : 12 Novemb Subject : Instruction : Page : 1/1 Pekerjaan Tambah Penggadaan dan pemasangan kabel data Cat 6A ex simon untuk lantai D9 di arkadia sebanya Supplay & Install Kabel Data Cat 6A ex simon untuk lantai 21 di PHE Tower sebanyak 82 t CONTRACTOR / PM : Consultan to Verify : Signature : Approved by : Signature : 1. Approximate cost X Additional Deducation 2. Reason for Issuing SI Contractors rectificatio Coordinatio Design Clarification PM Requirem X Client Request Others This instruction does not of it self constitute a cost variaton to the contract unless stated otherwise

Upload: dbicrs

Post on 03-Oct-2015

219 views

Category:

Documents


6 download

DESCRIPTION

ghj

TRANSCRIPT

SI (3)SITE INSTRUCTIONProject: Pertamina Hulu EnergiBuilding Premises at: Contractor: PT. Omega Moverindo SuksesContractor Package: Fitting Out Office PHE

Ref No:Date: 12 November 2014Subject: Instruction:Page: 1/1

Pekerjaan TambahPenggadaan dan pemasangan kabel data Cat 6A ex simon untuk lantai D9 di arkadia sebanya 78 titik Supplay & Install Kabel Data Cat 6A ex simon untuk lantai 21 di PHE Tower sebanyak 82 titik.

CONTRACTOR / PM:

Consultan to Verify :Signature:

Approved by:Signature:

1. Approximate costX Additional Deducation2. Reason for Issuing SI Contractors rectification Coordination Design Clarification PM RequirementX Client Request OthersThis instruction does not of it self constitute a cost variaton to the contract unless stated otherwise