Page 2: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

List of Participants:

15.

Shri Ashish Shukla Senior Manager Gamesa Renewable Pvt. Ltd. (Mathak, Gagodar, Latur, Ghat Pimpri, Tuljapur/Deosingh & Kod Wind Power Projects) Future IT Prk, B-Block, 8th Flr, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Tamil Nadu [email protected] Mob. 07869913518

16. Shri Lalit Birla AGM Orange Rajkot Wind Power Pvt. Ltd. & Orange Ashok North Wind Power Pvt. Ltd. (Gagodar, Hajapar & Lohara Wind Projects) 301B, 3rd Floor, D21 Corporate Park, Sector-21 Dwarka, New Delhi – 110075 [email protected] Mob. 09650015982

17. Shri Alok Gupta General Manager-P.E. Inox Wind Infrastructure Services Ltd. (Bhachau, Dayapar & Bhuj Wind Farms) Inox Towers, Plot No. 17, Sector 16A, Film City, Noida – 201301, Uttar Pradesh [email protected] Mob. 09717364276

18. Shri M.R. Krishna Rao Vice President Adani Green Energy Ltd. (Khavda Wind Farm) Achalraj, Opposite Mayor Bungalow, Law Garden, Ahmedabad – 380006, Gujarat [email protected] Mob. 09099005556

19. Shri Naresh Panchal Senior GM & Head PE Suzlon Power Infrastructure Ltd. (Jevli, Baranda & Fulra Wind Farms) Level 1, Left Wing, Tree Suzlon, One Earth, Opposite Magarpatta, Pune-411028, Maharashtra [email protected] Mob. 09850829701

20. Shri Ujjwal Surana Sr. Manager, Srijan Energy System Pvt. Ltd. 102, EL TARA Building, Orchard Avenue, Hiranandani, Powai, Mumbai, 400076 [email protected] Mob. 9974552425

21. Shri Rakesh Garg AVP-Project Development Renew Power Ventures Pvt. Ltd. (Bhuvad & Osmanabad Wind Farm) 10th Floor, DLF Square, Jacranda Marg, DLF Phase-2, Sector 25, Gurgaon, Haryana [email protected] Mob. 09711486060

22. Shri Pratik Poddar Head, Project Development Ostro Kutch Wind Pvt. Ltd. Unit No. G-0, Ground Floor, Mira Corporate Suites, 1&2, Ishwar Industrial Estate, Mathura Road, New Delhi-110065 [email protected] Mob. 09810200736

23. Shri Dheeraj Jain AGM –Regulatory Affairs Regen Wind Farm (Vagarai) Pvt. Ltd. C/4, No. 22, Vaidya Rama Iyer Street, T Nagar, Chennai –600 017 [email protected] Mob. 09910778484

24. Shri Rakesh Garg AVP-Project Development Renew Power Ventures Pvt. Ltd. (Pugalur Wind Park) 10th Floor, DLF Square, Jacaranada Marg, Sector 25, DLF Phase-2, Gurgaon, Haryana [email protected] Mob. 09711486060

Page 3: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

25. Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP [email protected] Mob. 09891795111

26. Shri S R Singhal Sr. GM Wind World (India) Ltd., A-9, Veera Desai Road, Laxmi Industrial Estate, Wind World Tower, Andheri West, Mumbai – 53 [email protected]; [email protected] Mob. 7506342370 / 9820298218

27. Shri. K Kalaivendan Chief Development Officer Kshema Power and Infrastructure Company Pvt. Ltd., No. 34, 1st Floor, Defence Officer Colony, Ekkattuthangal, Chennai -32, Tamil Nadu. [email protected] Mob. 9444815386

28. Shri S Venkata Krishnan Sr. Manager BLP Vayu (Project 2) Pvt. Ltd., Avikiran Solar India Pvt. Ltd., 12th Floor, Crescent 1, Prestige Shantiniketan, ITPL Main Road, Hoodi, Whitefield, Bengaluru – 560048, Karnataka. [email protected] Mob. 9900085766

Page 4: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 1 of 30

Minutes for 24th Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region held on

21.12.2016

List of participants is enclosed as Annexure A.

COO (CTU-PLG), POWERGRID welcomed all the participants. Thereafter, agenda-

wise deliberations commenced and the details of deliberations are as given below.

1.0 Confirmation of the minutes of 23rd Meeting of WR Constituents regarding

Connectivity & Long-term Access applications in Western Region held on 01-

06-2016 at NRPC, New Delhi

CTU informed that minutes of 23rd Meeting of WR Constituents regarding

Connectivity & Long-term Access applications in Western Region held on

01.06.2016 were circulated vide their letter ref C/CTU/W/01/OA-23/MOM dated

22.06.2016. As no comments were received, the minutes were confirmed as

circulated.

2.0 Connectivity Applications from RE Generation Developers in Western Region.

2. 1 CTU stated that a total twenty five nos. of connectivity applications of about 8768

MW quantum of power have been received for ISTS connectivity at Bhachau, Bhuj

Pool, Parli, Solapur, Kolhapur and Rajgarh Substations from various RE generation

developers in WR. Details of these connectivity applications are given in Table 1.

2. 2 CTU mentioned that as per the Connectivity Regulations, the Grant of Connectivity

shall not entitle an applicant to inter-change any power with the grid unless it obtains

LTA, MTOA or STOA. Since MTOA & STOA are granted on the basis of margins

available in the grid and firm transfer of power is granted only with the LTA. If margin

is not available in existing system to grant LTA then new system is planned and

developed accordingly for the LTA applicants. As development of the new

transmission system may take few years and LTA is granted on the basis of First

Come First Serve basis, therefore, the applicants are advised to apply for the LTA to

ensure power evacuation & transfer to its beneficiaries under LTA on firm basis.

2. 3 Details of the connectivity applications in WR received are given below.

Page 5: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 2 of 30

Table 1: Connectivity Applications

Sl. No.

Name of Applicant (Organization)

Date of receipt of Application

Date from which connectivity required

Distance from Nearest PS (km)

Name of the Power Plant

S/s for which Connectivity Requested

Installed capacity of Plant (in MW)

Application No

Application Status

Generation Projects in vicinity of Bhachau, Gujarat

1

Gamesa Renewable Pvt. Ltd. (GRPL-Mathak)

22-Jul-2016

31-Mar-2017 30.00

Mathak Wind Power Project

Bhachau S/s 100 1200000444 Under Process

2

Orange Rajkot Wind Power Pvt. Ltd. (ORWPPL-Gagodhar)

25-Jul-2016

30-Jun-2018 55.00 Gagodar Bhachau S/s 100 1200000447

Under Process

3

Inox Wind Infrastructure Services Ltd. (IWISL-Bhachau)

1-Aug-2016

1-Jul-2017 45.00

Bhachau wind farm

Bhachau S/s 500 1200000457 Under Process

4

Gamesha Renewables Pvt. Ltd. (GRPL-Gagodhar)

3-Aug-2016

31-Mar-2018 60.00 Gagodhar Bhachau S/s 300 1200000459

Under Process

Subtotal 1000

Generation Projects in vicinity of Bhuj PS, Gujarat

5

Inox Wind Infrastructure Services Ltd. (IWISL-Dayapar)

1-Jun-2016

30-Jul-2017 70.00

Dayapar wind farm

Bhuj PS 500 1200000390 Under Process

6 Adani Green Energy Ltd. (AGEL-Khavda)

2-Jun-2016

31-Mar-2019 72.00

Khavda Wind Farm

Bhuj PS 500 1200000378 Under Process

7

Suzlon Power Infrastructure Ltd. (SPIL-Baranda)

6-Jul-2016

31-Jan-2019 65.00

Baranda Wind Farm

Bhuj PS 250 1200000395 Under Process

8 Suzlon Power Infrastructure Ltd. (SPIL-Fulra)

8-Jul-2016

31-Jan-2019 25.00 Fulra Bhuj PS 250 1200000394

Under Process

9

Orange Rajkot Wind Power Pvt (ORWPPL-Hajapar)

25-Jul-2016

31-Oct-2018 40.00 Hajapar

Bhuj PS / Bhachau

100 1200000432 Under Process

10

Inox Wind Infrastructure Services Ltd. (IWISL-Kotda)

1-Aug-

2016 31-Dec-2018 42.00 Bhuj wind farm (Kotda)

Bhuj PS 500 1200000458 Under Process

11 Ostro Kutch Wind Pvt. Ltd. (OKWPL-Bhuj)

30-Sep-

2016 31-Mar-2019 40.00 Kutch 2 Bhuj PS 300 1200000493 Under Process

12 Adani Green Energy Ltd. (AGEL-Khavda)

27-Oct-

2016 31-Dec-2018 72.00 Khavda Wind Farm

Bhuj PS 1000 1200000514 Under Process

13 Adani Green Energy Ltd. (AGEL-Khavda)

27-Oct-

2016 31-Dec-2018 72.00 Khavda Solar Park

Bhuj PS 750 1200000516 Under Process

Page 6: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 3 of 30

Sl. No.

Name of Applicant (Organization)

Date of receipt of Application

Date from which connectivity required

Distance from Nearest PS (km)

Name of the Power Plant

S/s for which Connectivity Requested

Installed capacity of Plant (in MW)

Application No

Application Status

14

Wind World (India) Ltd. Mumbai (WWIL-Walka Mota)

28-Nov-

2016 31-Mar-2019 62.00 Wind World Bhuj PS 500 1200000553

Under Process

Subtotal 4650

Generation Projects in vicinity of Parli, Maharashtra

15

Gamesa Renewable Pvt. Ltd. (GRPL-Latur)

22-Jul-2016

30-Sep-2018 40.00

Latur wind power project

Parli (PG) S/s 400 1200000441 Under Process

16

Gamesha Renewables Pvt Ltd. (GRPL-Ghat Pimpri)

3-Aug-2016

30-Sep-2018 45.00

Ghat Pimpri

Parli (PG) S/s 500 1200000460 Under Process

17

Gamesha Renewables Pvt Ltd. (GRPL-Ghat Pimpri)

4-Aug-2016

30-Sep-2018 45.00

Ghat Pimpri

Parli (PG) S/s 100 1200000465 Under Process

Subtotal 1000

Generation Projects in vicinity of Solapur, Maharashtra

18

Gamesa Renewable Pvt. Ltd. (GRPL-Tuljapur)

22-Jul-2016

30-Sep-2018 60.00

Tuljapur & Deosingh Wind Power Project

Solapur 765/400kV

400 1200000440 Under Process

19

Orange Ashok North Wind Power Pvt. Ltd. (OANWPPL-Lohara)

25-Jul-2016

31-Mar-2020 43.00

Lohara Wind Farm

Solapur 765/400kV

200 1200000433 Under Process

Subtotal 600

Generation Projects in vicinity of Osmanabad, Maharashtra

20

Renew Wind Energy (AP2) Private Limited (RWEPL-Osmanabad)

03-Oct-2016

30-Jun-2019

40.00 Osmanabad Solapur (PG) 400 1200000496 Under Process

21

Kshema Power & Infrastructure Company Pvt Ltd. (KPICPL-Morda)

12-Nov-

2016

30-Mar-2018

40.00 Wind Power Solapur (PG) 250 1200000532 Under Process

22

Suzlon Power Infrastructure Limited (SPIL-Jevli)

23-Nov-

2016

31-Mar-2018

45.00 Jevli WGS Solapur (PG) 300 1200000550 Under Process

23

Avikiran Solar India Private Limited (ASIPL-Tuljapur)

6-Dec-2016 31-Dec-2018

45 Avikiran Solar India Pvt Ltd

Solapur (PG) 250 1200000555 Under Process

Page 7: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 4 of 30

Sl. No.

Name of Applicant (Organization)

Date of receipt of Application

Date from which connectivity required

Distance from Nearest PS (km)

Name of the Power Plant

S/s for which Connectivity Requested

Installed capacity of Plant (in MW)

Application No

Application Status

Subtotal 1200

Generation Projects in vicinity of Kolhapur, Maharashtra

24

BLP Vayu (Project 2) Pvt. Ltd. (BLPVPL-Bololi)

31-Oct-

2016

31-Jul-2018 17.00 BLP Vapu (Project 2) Pvt. Ltd.

Kolhapur 765/400kV

100 1200000509 Under Process

Subtotal 100

Generation Project in vicinity of Rajgarh, Madhya Pradesh

25

Gamesa Renewable Pvt. Ltd. (GRPL-Khod)

22-Jul-

2016

31-Mar-2017 40.00 Khod wind power project

Rajgarh S/s 218 1200000445 Under Process

Subtotal 218

Total 8768

2. 4 It was informed that CERC in its order dated 05.01.2016 in Petition No: 420/MP/2014

has directed that wind developers should comply with the provision of LVRT (Low

Voltage Ride Through). Further, clause no 16.4 of the CEA Manual on Transmission

Planning Criteria (January, 2013) notifies that the wind and solar farms shall

maintain a power factor of 0.98 (absorbing) at their grid inter-connection point for all

dispatch scenarios by providing adequate reactive compensation and the same shall

be assumed for system studies.

2. 5 It was also informed that as per the CEA Manual on Transmission Planning Criteria,

the ‘N-1’ criteria may not be applied to the immediate connectivity of wind / solar

farms with the ISTS / Intra-STS grid i.e. the line connecting the farm to the grid and

the step-up transformers at the grid station.

3.0 Connectivity Applications received in the vicinity of Bhachau:

3. 1 CTU stated that three nos. of applicants have already been granted connectivity at

Bhachau substation. Details of these connectivity applications are as given below:

Page 8: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 5 of 30

Table 2

3. 2 CTU stated that four nos. of new connectivity applications as mentioned in Table 1

have been received at Bhachau S/s. Due to the severe ROW issues in the vicinity of

Bhachau and space constraints in Bhachau S/s as well as high RE potential in

vicinity of Bhachau, it is proposed to develop a new 400/220kV pooling station at

Lakadia in Bhachau Taluka, Kutch district, Gujarat (Lakadia PS).

3. 3 It was informed that Gujarat Fluorochemicals Ltd. (GFL) was granted connectivity at

Bhachau S/s in 13th WR Connectivity / LTA meeting held on 27.12.2010 through

220kV D/c line (twin conductor) for their 300MW wind farm at Malia, Rajkot, Gujarat.

The intimation for grant of connectivity was issued on 07.02.2011. It is understood

that the line, which was agreed to be constructed by GFL has not yet been taken up

by them. Accordingly, looking into severe ROW issues in termination of lines at

Bhachau and space constraints for terminating bays at Bhachau S/s, it was

proposed to revise the connectivity earlier granted to GFL to new proposed pooling

station at Lakadia.

3. 4 The following Common Transmission System for Connectivity for renewable

generations in Bhachau area (viz GRPL- Mathak, ORWPPL - Gagodhar, IWISL -

Bhachau, GRPL - Gagodhar, GFL - Malia) was proposed:

LILO of both circuits of Essar Power Gujarat Ltd. (EPGL) – Bhachau 400kV D/c

(Triple) line at Lakadia PS

Establishment of 1x500MVA, 400/220kV Lakadia PS.

1x125MVAR, 420kV Bus Reactor at Lakadia PS.

3. 5 CEA as well as constituents were of the view that considering the large number of

RE generations proposed to be pooled at Lakadia PS, 2x500MVA, 400/220kV

transformers be installed at the new proposed Lakadia PS for ensuring reliability of

power evacuation from various RE projects.

Sl. No.

Name of Applicant Name of the Power Plant

S/s at which Connectivity Requested

Distance from Connected S/s (km)

Installed capacity of Plant (in MW)

Application No Connectivity Status

1 Ostro Kutch Wind Pvt. Ltd. (OKWPL-Kutch)

Kutch, Gujarat

Bhachau 5 300 1200000409 Granted

2 Renew Power Ventures Pvt. Ltd. (RPVPL-Bhuvad)

Bhuvad Wind Power

Bhachau 45 400 1200000326 Granted

3 Gujarat Fluorochemicals Ltd (GFL-Malia)

Malia, Rajkot, Gujarat

Bhachau 45 300 - Granted

Total 1000

Page 9: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 6 of 30

3. 6 In view of harsh / saline landscape in Kutch region of Gujarat GETCO proposed

that, the new pooling stations at Lakadia should be constructed as gas insulated s/s

(GIS).

3. 7 Subsequently, GFL vide its letter ref: GFL/WPP/PGCIL/201-17/03 dated 31.12.2016,

has requested for surrender of the connectivity for their 300MW wind power project

in Rajkot, Gujarat. Accordingly, grant of connectivity to GFL for its project has been

cancelled vide POWERGRID letter dated 11.01.2017.

3. 8 In view of the above, following transmission system was agreed: :

Common Transmission System for Connectivity of renewable generations in

Bhachau area (viz. GRPL-Mathak, ORWPPL-Gagodhar, IWISL-Bhachau, GRPL-

Gagodhar):

LILO of both circuits of EPGL – Bhachau 400kV D/c (Triple) line at Lakadia PS

(GIS)

Establishment of 2x500MVA, 400/220kV Lakadia PS (GIS)

1x125MVAR, 420kV Bus Reactor at Lakadia PS (GIS)

3. 9 The immediate transmission system for connectivity for each of the RE applicants

along with the implementing agency was discussed and the following was agreed:

Connectivity system for RE applicants in Bhachau area: Table 3

S.N Name of Applicant Connectivity

Quantum (MW)

Connectivity System Implementing Agency

1.

Gamesha Renewables

Pvt Ltd. (Gagodhar)

(GRPL-Gagodhar)

300

GRPL (Gagodhar) – Lakadia PS (GIS) 220kV S/c (twin ACSR zebra equivalent conductor) line along with associated line bays at both ends

GRPL Applicant

2.

Gamesha Renewable

Pvt. Ltd. (Mathak)

(GRPL-Mathak)

100

GRPL (Mathak) – Lakadia PS (GIS) 220kV S/c line along with associated line bays at both ends

GRPL Applicant

3.

Orange Rajkot Wind

Power Pvt. Ltd.

(ORWPL-Gagodhar)

100

ORWPL(Gagodhar) – Lakadia PS (GIS) 220kV S/c line along with associated line bays at both ends

ORWPL Applicant

4.

Inox Wind

Infrastructure Services

Ltd. (IWISL-Bhachau)

500

IWISL (Bhachau) – Lakadia PS (GIS) 220kV D/c (twin ACSR moose equivalent conductor) line along with associated line bays at both ends

IWISL Applicant

Total 1000

The schematic is shown in figure 1.

Page 10: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 7 of 30

Figure 1: Connectivity to RE generations in the vicinity of Bhachau and Bhuj

3. 10 Based on the information given in the connectivity application it is noted that

connectivity required by the above applicants are from Mar’17 to June’18; effectively

meaning that only about 1.5 years are left for the development of the required

transmission system. As per the tariff policy in vogue, the new ISTS scheme is to be

implemented through TBCB route, which have a minimum implementation period.

Therefore, the generation developer needs to closely coordinate with the prospective

TSP to avoid mismatch in the implementation of the generation project, dedicated

transmission line and the planned ISTS system. Applicants were also advised to

apply for the LTA at the earliest to evolve transmission system strengthening

required for evacuation of power on firm basis.

4.0 Connectivity Applications received in the vicinity of Bhuj:

4. 1 CTU stated that 11 nos. of connectivity applications were received at Bhuj P.S. for a

quantum of 4950MW till now {Connectivity Granted: 1 No. (For 300MW); connectivity

Under Process: 10 Nos. (for 4650MW)}.

4. 2 Considering project capacity and proximity of the RE generations to Bhuj PS,

following transmission system along with implementing agency was discussed and

agreed for providing connectivity to RE applications in the vicinity of Bhuj.:

Page 11: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 8 of 30

Table 4

Sl.

No.

Name of Applicant Connectivity

Quantum

(MW)

Connectivity System* Implementing

Agency

1

Orange Rajkot Wind

Power Pvt. Ltd.

(ORWPL-Hajapar)

100 ORWPL(Hajapar) – Bhuj PS 220kV S/c

line along with associated line bays at both ends

ORWPL Applicant

2.

Suzlon Power

Infrastructure Ltd

(SPIL-Fulra)

250

SPIL (Fulra) – Bhuj PS 220kV S/c (single ACSR moose equivalent conductor) line along with associated line bays at both ends

SPIL

Applicant

3

Suzlon Power

Infrastructure Ltd

(SPIL-Baranda)

250

SPIL (Baranda) – Bhuj PS 220kV S/c (single ACSR moose equivalent conductor) line along with associated line bays at both ends

SPIL Applicant

4

Inox Wind

Infrastructure

Services Ltd.

(IWISL-Kotda)

500

IWISL(Kotda) – Bhuj PS 220kV D/c (twin ACSR moose equivalent conductor) line along with associated line bays at both ends

IWISL Applicant

5

Inox Wind Infrastructure Services Ltd. (IWISL-Dayapar)

500

IWISL(Dayapar) – Bhuj PS 220kV D/c (twin ACSR moose equivalent conductor) line along with associated line bays at both ends

IWISL Applicant

6

Ostro Kutch Wind

Pvt. Ltd. (OKWPL-

Bhuj)

300

OKWPL(Bhuj) switchyard – Bhuj P.S. 220kV S/c (twin ACSR zebra equivalent conductor) along with associated line bays at both ends

OKWPL Applicant

7 Adani Green Energy Ltd. (AGEL-Khavda)

1000

AGEL Khavda (1000MW Wind farm) – Bhuj P.S. 400kV D/c line along with associated line bays at both ends

AGEL Applicant (Common stretch of the two 400kV single ckt lines from AGEL Khavda (750MW Solar farm) and AGEL Khavda (500MW Wind farm) upto Bhuj P.S. may be implemented by AGEL using Double circuit towers)

8 Adani Green Energy Ltd. (AGEL-Khavda)

750 AGEL Khavda (750MW Solar farm) –

Bhuj P.S. 400kV S/c line along with associated line bays at both ends

9 Adani Green Energy Ltd. (AGEL-Khavda)

500 AGEL Khavda (500MW Wind) – Bhuj

P.S. 4000kV S/c line along with associated line bays at both ends

10 Wind World (India) Ltd. Mumbai (WWIL-Walka Mota)

500

WWIL – Bhuj P.S. 220kV D/c (twin ACSR moose equivalent conductor) line along with associated line bays at both ends

WWIL-Walka Mota Applicant

*Connectivity of all ten applicants with the grid shall be established with the commissioning of above

mentioned connectivity system and Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Sankhari

(400kV) Corridor or Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Chittorgarh PS (765kV) –

Chittorgarh (RVPN) (400kV) corridor.

Page 12: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 9 of 30

The schematic is shown in figure 1 above.

4. 3 Based on the information given in the connectivity application, it is noted that

connectivity required by M/s AGEL for its solar / wind generation projects in Khavda

area is from Dec’18 to Mar’19; effectively meaning that only about 2 years are left for

the development of the required transmission system. As per the tariff policy in

vogue, the new ISTS scheme is to be implemented through TBCB route, which have

a minimum implementation period. Therefore, the generation developer needs to

closely coordinate with the prospective TSP to avoid mismatch in the implementation

of the generation project, dedicated transmission line and the planned ISTS system

Applicants were also advised to apply for the LTA at the earliest to evolve

transmission system strengthening. required for evacuation of power on firm basis

5.0 Connectivity Applications received in the vicinity of Parli & Solapur:

5. 1 CTU informed that three nos. of new connectivity applicants have desired

connectivity at Parli (PG) S/s & six nos. of connectivity applicants have desired

connectivity at Solapur (PG) S/s. The details of the connectivity applications are

mentioned in Table 5.

5. 2 CTU further informed that above generation projects are mainly located in the vicinity

of Latur area of Maharashtra. Hence, considering the large quantum of RE

generation, it was proposed to develop a new 400/220kV substation near Latur. The

pooling station was to be established for 9 nos. of RE generations as well as for

future RE generations that may come up in this area.

Figure 2: Connectivity to RE generations in the vicinity of Parli and Solapur

Page 13: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 10 of 30

5. 3 After detailed deliberations, following common transmission system was agreed for

connectivity:

Common Transmission System for Connectivity of renewable generations

around Latur area (for connectivity applicants mentioned in Table 5):

Establishment of 2x500MVA, 400/220kV Latur PS

Latur PS – Solapur (PG) 400kV D/c (Quad) line

1x125MVAR, 420kV Bus Reactor at Latur PS

5. 4 The immediate transmission system for connectivity for each of the RE applicants as

well as implementing agency of the connectivity line were discussed, and the

following was agreed.

Connectivity system for RE applicants proposed to be pooled at Latur PS:

Table 5

S.N Name of Applicant Connectivity

Quantum

(MW)

Connectivity System Implementing

Agency

1

Gamesha Renewables

Pvt. Ltd. (GRPL-Ghat

Pimpri)

100 GRPL(Ghat Pimpri) – Latur PS 220kV S/c

line along with associated line bays at both ends

GRPL Applicant

2

Gamesha Renewables

Pvt. Ltd. (GRPL-Ghat

Pimpri)

500

GRPL(Ghat Pimpri) – Latur PS 220kV D/c (twin ACSR moose equivalent conductor) line along with associated line bays at both ends

GRPL

Applicant

3 Gamesha Renewables

Pvt. Ltd. (GRPL-Latur) 400

GRPL (Latur) – Latur PS 220kV D/c (twin ACSR zebra equivalent conductor) line along with associated line bays at both ends

GRPL

Applicant

4 Gamesha Renewable Pvt. Ltd. (GRPL-Tuljapur-Desingh)

400

GRPL (Tuljapur-Deosingh) – Latur PS 220kV D/c (twin ACSR zebra equivalent conductor) line along with associated line bays at both ends

GRPL

Applicant

5 Orange Ashok North Wind Power Pvt. Ltd. (OANWPPL-Lohara)

200 OANWPPL (Lohara) – Latur PS 220kV

S/c line along with associated line bays at both ends

OANWPPL Applicant

6 Renew Wind Energy (AP2) Private Limited (RWEPL-Osmanabad)

400

RWEPL(Osmanabad) – Latur P.S. 220kV D/c (twin ACSR zebra equivalent conductor) line along with associated line bays at both ends

RWEPL

Applicant

7 Kshema Power & Infrastructure Company Pvt Ltd. (KPICPL-Morda)

250

KPICPL(Morda) – Latur P.S. 220kV S/c (single ACSR moose equivalent conductor) line along with associated line bays at both ends

KPICPL

Applicant

8 Suzlon Power Infrastructure Limited (SPIL-Jevli)

300

SPIL(Jevli) – Latur P.S. 220kV S/c (twin ACSR zebra equivalent conductor) line along with associated line bays at both ends

SPIL Applicant

Page 14: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 11 of 30

S.N Name of Applicant Connectivity

Quantum

(MW)

Connectivity System Implementing

Agency

9

Avikiran Solar India

Private Limited (ASIPL-

Tuljapur) 250

ASIPL(Tuljapur) – Latur P.S. 220kV S/c

(single ACSR moose equivalent

conductor) line along with associated line

bays at both ends

TBCB

The schematic is shown in figure 2.

5. 5 Based on the information given in the connectivity application, it was noted that

connectivity required by the above applicant is from Mar’18 to June’19; effectively

meaning that only about 1 to 2.5 years are left for the development of the required

transmission system. As per the tariff policy in vogue, the new ISTS scheme is to be

implemented through TBCB route, which have a minimum implementation period.

Therefore, the generation developer needs to closely coordinate with the prospective

TSP to avoid mismatch in the implementation of the generation project, dedicated

transmission line and the planned ISTS system. Applicants were also advised to

apply for the LTA at the earliest to evolve transmission system strengthening, if

required.

6.0 Connectivity Applications received in the vicinity of Kolhapur :

6. 1 CTU stated that only one developer (BLP Vayu (Project 2) Pvt. Ltd. (BLPVPL-Bololi),

located in the vicinity of Kolhapur S/s, has applied for connectivity for 100 MW as per

details given in Table: 1 above. In view of project capacity & proximity of generation,

following transmission system was proposed for connectivity: Table 6

Sl.

No

Name of

Applicant

Connectivity

Quantum (MW)

Proposed Connectivity System Implementing

Agency

1 BLP Vayu

(Project 2) Pvt.

Ltd. (BLPVPL-

Bololi)

100

BLPVPL(Bololi) – Kolhapur GIS 220kV S/c line

along with associated line bays at both ends

Installation of 1x500MVA, 400/220kV ICT at

Kolhapur GIS@

@

220kV cables shall be required for the

interconnection of 400/220kV ICT to 220kV GIS

module.

BLPVPL

(Bololi)

6. 2 Representative of M/s BLVPL - Bololi informed that installation of ICT would add to

their total project cost and would make the project economically unviable as their

connectivity is only for 100MW.

Page 15: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 12 of 30

6. 3 CTU suggested that as no 220kV level is available at Kolhapur GIS substation, M/s

BLPVPL may instead apply for connectivity to Kolhapur (MSETCL) 400/220kV S/s.

6. 4 Representative of BLVPL - Bololi stated that if the connectivity is applied to Kolhapur

(MSETCL) S/s, they would have to pay transmission charges for state network as

well as ISTS network.

6. 5 In the meeting, MSETCL was requested to indicate their requirement of 220 kV bays

at Kolhapur (PG) switching station so that the implementation of the proposed 1X500

MVA, 400/220 kV ICT could be taken up under ISTS.

6. 6 MSETCL vide email dated 03.01.2017 informed that there are already three nos. of

400/220 kV substations in vicinity of Kolhapur (Kolhapur, Karad already existing and

Alkud under implementation). Therefore, there is no requirement of 220 kV bays /

any 220 kV outlets by MSETCL from the proposed 1X500 MVA, 400/220 kV ICT at

Kolhapur (PG) switching station for providing connectivity to M/s BLPVPL.

6. 7 In view of above, the following transmission system is agreed for providing

connectivity to M/s BLPVPL:

(i) BLPVPL(Bololi) – Kolhapur GIS 220kV S/c line along with associated line bays at both ends

(ii) Installation of 1x500MVA, 400/220kV ICT at Kolhapur GIS@

@ 220kV cables shall be required for the interconnection of 400/220kV ICT

to 220kV GIS module

The above connectivity system would be under the scope project developer.

7.0 Connectivity Applications received in the vicinity of Rajgarh:

7. 1 CTU stated that a new connectivity application from M/s GRPL-Khod has been

received at Rajgarh S/s as per details given in Table 1. In view of project capacity &

proximity of generation, following transmission system was proposed for

connectivity: Table 7

S.N Name of Applicant Connectivity

Quantum

(MW)

Proposed Connectivity System Implementing

Agency

1 Gamesha

Renewables Pvt.

Ltd. (GRPL-Khod)

218

GRPL (Khod) – Rajgarh (PG) 220kV

S/c line along with associated line

bays at both ends

GRPL

The schematic is shown in figure 3.

Page 16: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 13 of 30

Figure 3 : Connectivity to RE generations in the vicinity of Rajgarh

7. 2 During discussions MPPTCL informed that 218MW wind farm of M/s GRPL-Khod

has already granted connectivity to STU network by MPPTCL. CTU stated that the

applicant had not brought out this information while applying for connectivity to ISTS.

7. 3 CTU informed that as per CERC regulations, a generation developer cannot apply

for connectivity to the ISTS grid if it is already granted connectivity by the STU.

Accordingly, the subject application may not be processed and it was decided to

close the connectivity application. However, they may apply afresh after surrendering

its grant of connectivity from MPPTCL network and confirmation of the same from

MPPTCL, if applicable.

7. 4 Subsequently, GRPL vide its letter dated 22.12.2016 to CTU with copy to MPPTCL

submitted additional information in this regard stating that the generation project

referred above by MPPTCL is different than the generation project under discussion.

GRPL further requested to revise the project capacity from 218MW to 200MW and

commissioning schedule from 31.03.2017 to 31.03.2019. The scanned copy of the

letter was emailed by CTU to MPPTCL. MPPTCL vide email dated 20-01-2017 has

stated that they have no information regarding development of any other project of

GRPL at the same location except 218MW wind power project at village-Khod in

Dhar district of M.P.

Page 17: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 14 of 30

7. 5 In view of the above, the connectivity application of GRPL-Khod would be taken up

in the next meeting.

8.0 Revision in Grant of Connectivity & LTA to M/s Srijan Energy System Pvt Ltd.

(SESPL)

8. 1 CTU stated that in the 23rd meeting of WR Constituents regarding Connectivity /

Open Access Applications held at NRPC, New Delhi on 01.06.2016, Connectivity

(300MW) and LTA (300MW) application of Srijan Energy System Pvt. Ltd. (SESPL)

was discussed and following system was agreed for connectivity & LTA (WR, NR &

SR):

Transmission System for Connectivity

SESPL switchyard – Bhuj PS 220kV D/c line along with line bays at both ends (to

be constructed by SESPL)

Installation of 2x500MVA, 400/220kV ICT at Bhuj PS (to be implemented by

POWERGRID)

Transmission System for LTA – WR (90 MW)

Existing & under construction transmission system shall be sufficient to enable

dispersal of power within WR

Transmission System for LTA – NR (150 MW)

Bhuj PS - Banaskantha PS 765kV D/c line

Banaskantha PS - Chittorgarh PS 765kV D/c line

Chittorgarh PS - Chittorgarh (RVPN) 400kV D/c (quad) line

Transmission System for LTA – SR (60 MW)

Wardha – Nizamabad 765kV D/c line along with Nizamabad – Dichpally 400kV

D/c line (HTLS)

Nizamabad – Hyderabad (Maheshwaram) 765kV D/c line along with associated

400kV transmission system

8. 2 CTU stated that number of connectivity and LTA applications have been received

from RE generations for interconnection at Bhuj PS. For optimal utilization of

infrastructure, the earlier agreed scheme was reviewed and it was proposed to

provide connectivity to SESPL at 220kV level at Bhuj PS. Accordingly, the grant of

Connectivity / LTA to SESPL was proposed with following transmission system:

Transmission System for Connectivity:

SESPL switchyard – Bhuj PS 220kV D/c line along with line bays at both ends (to

be constructed by SESPL)@

Page 18: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 15 of 30

@Connectivity with the grid shall be established with the commissioning of above mentioned

dedicated line and Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Sankhari (400kV)

Corridor or Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Chittorgarh PS (765kV) –

Chittorgarh (RVPN) (400kV) corridor

Common Transmission System for LTA to WR, NR & SR

Installation of 2x500MVA, 400/220kV ICT at Bhuj PS

Transmission System for LTA to WR (90 MW)

Bhuj PS - Banaskantha PS 765kV D/c line

Banaskantha – Sankhari 400kV D/c line

Transmission System for LTA to NR (150 MW)

Bhuj PS - Banaskantha PS 765kV D/c line

Banaskantha PS - Chittorgarh PS 765kV D/c line

Chittorgarh PS - Chittorgarh (RVPN) 400kV D/c (quad) line

Transmission System for LTA to SR (60 MW)

Wardha – Nizamabad 765kV D/c line along with Nizamabad – Dichpally 400kV

D/c line (HTLS)

Nizamabad – Hyderabad (Maheshwaram) 765kV D/c line along with associated

400kV transmission system.

Members and applicant agreed with the above proposal.

9.0 LTA Applications from RE developers in Western Region & Southern Region

CTU stated total six nos. of applicants from generation projects in WR and five nos.

of applicants from generation projects in SR (seeking transfer of power to Northern

Region) who have applied for LTA are tabulated below:

Table 8: LTA Applications

Sl. No.

Name of the Applicant

Location of Generating

Station

Installed Capacity

(MW)

Connectivity

provided/proposed

at

Seeking LTA for (MW)

Type of

Fuel

Date of Receipt of App.

Date from which LTA required

Date upto which LTA required

Quantum allocated in the region

SR WR NR ER NER

A. LTA Applications in Western Region:

LTA Applications from RE developers in Bhachau area

1

Renew Power Ventures Pvt. Ltd. (RPVPL-Bhuvad)

WR (Bhuvad,

Kutch, Gujarat)

400 Bhachau

S/s 400 Wind

30-Jun-2016

15-Dec-2017

14-Dec-2042

- 50 200 150 -

2 Ostro Kutch Wind Pvt. Ltd. (OKWPL-Kutch)

WR (Kutch, Gujarat)

300 Bhachau

S/s 300 Wind

8-Jul-2016

31-Mar-2018

30-Mar-2043

- - 300 - -

LTA Applications from RE developers in Bhuj area

3 Adani Green Energy Ltd (AGEL-Khavda)

WR (Khavda,

Kutch, Gujarat)

500 Bhuj PS 500 Wind 2-Jun-2016

31-Mar-2019

30-Mar-2044

- - 400 100 -

4 Adani Green Energy Ltd

WR (Khavda,

1000 Bhuj PS 1000 Wind 31-Oct-

2016 31-Dec-

2018 30-Dec-

2043 - - 1000 - -

Page 19: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 16 of 30

(AGEL-Khavda) Kutch, Gujarat)

5 Adani Green Energy Ltd (AGEL-Khavda)

WR (Khavda,

Kutch, Gujarat)

750 Bhuj PS 750 Solar 31-Oct-

2016 31-Dec-

2018 30-Dec-

2043 - - 750 - -

6

Inox Wind Infrastructure Services Ltd. (IWISL-Dayapar)

WR (Dayapar,

Kutch, Gujarat)

500 Bhuj PS 500 Wind 05-Dec-

2016 30-Jun-

2018 Jun-30-

2043 400 100

Subtotal 3450 - 50 3050 350 -

B. LTA Applications in Southern Region:

7 Regen Wind farm Pvt. Ltd. (RWFPL-Vagari)

SR (Tamil Nadu)

600 Pugalur

400/230kV S/s

40 Wind 30-May-

2016 01-May-

2017 30-Apr-

2042 - - 40 - -

8 Regen Wind farm Pvt. Ltd. (RWFPL-Vagari)

SR (Tamil Nadu)

600 Pugalur

400/230kV S/s

80 Wind 30-May-

2016 01-Apr-

2018 31-Mar-

2043 - - 80 - -

9 Regen Wind farm Pvt. Ltd. (RWFPL-Vagari)

SR (Tamil Nadu)

600 Pugalur

400/230kV S/s

80 Wind 30-May-

2016 01-June-

2018 31-May-

2043 - - 80 - -

10 Regen Wind farm Pvt. Ltd. (RWFPL-Vagari)

SR (Tamil Nadu)

600 Pugalur

400/230kV S/s

40 Wind 30-May-

2016 1-Sep-2017

31-Aug-2042

- - 40 - -

11

Renew Power Ventures Pvt. Ltd. (RPVPL-Karur)

SR (Karur, Tamil Nadu)

400 Pugalur

400/230kV S/s

400 Wind 30-

June-2016

31-03-2018

30-03-2043

50 - 250 100 -

Subtotal 640 50 - 490 100 -

9. 1 Transmission system for LTA for Renew Power Ventures Pvt. Ltd. (Bhuvad

Wind Park, Gandhidham) (RPVPL- Bhuvad)

CTU informed that the wind generation project of RPVPL is located at Bhuvad in

Kutch area of Gujarat. The applicant has sought LTA of 400 MW with target

beneficiaries as NR-200 MW, WR-50MW and ER -150MW. It was further informed

that in the 23rd meeting of WR constituents held on 01.06.2016, the grant of

connectivity was agreed to RPVPL (Bhuvad) project at Bhachau through 220kV D/c

line

CTU further stated that it is observed from system studies that no additional

transmission system strengthening is required for power transfer under LTA within

WR (50MW) and to ER (150MW). Further, for transfer of power to beneficiaries in

NR following transmission system is required which is under implementation as a

part of various schemes.

Green Energy Corridor – ISTS (part system):

Bhuj PS – Banaskantha 765kV D/c line

Banaskantha PS – Chittorgarh 765kV D/c line

Chittorgarh – Chittorgarh (RVPN) 400kV D/c (quad) line

Transmission System Strengthening associated with Mundra UMPP (Part B):

Mundra UMPP – Bhuj PS 400kV D/c (Triple) line

Page 20: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 17 of 30

Members agreed with the above proposal.

9. 2 Transmission system for LTA for Ostro Kutch Wind Pvt. Ltd. (Kutch Wind

Park) (OKWPL-Kutch)

CTU informed that the wind generation project of OKWPL is located in Kutch area of

Gujarat. The applicant has sought LTA of 300MW with target beneficiary as NR. It

was further informed that in the 23rd meeting of WR constituents held on 01.06.2016,

the grant of connectivity was agreed to OKWPL-Kutch project at Bhachau through

220kV D/c line.

CTU further stated that it is observed from system studies that for transfer of power

to beneficiaries in NR (300 MW), following transmission system is required which is

under implementation as a part of various schemes.

Green Energy Corridor – ISTS (part system):

Bhuj PS – Banaskantha 765kV D/c line

Banaskantha PS – Chittorgarh 765kV D/c line

Chittorgarh – Chittorgarh (RVPN) 400kV D/c (quad) line

Transmission System Strengthening associated with Mundra UMPP (Part B):

Mundra UMPP – Bhuj PS 400kV D/c (Triple) line

Members agreed with the proposal.

9. 3 Transmission System for LTA for Regen Wind farm Pvt Ltd. (RWFPL-Vagari)

CTU stated that Regen Wind Farm Pvt Ltd. applied for LTA for transfer of 240MW

from Southern Region to Northern Region. The details of the application are given in

Table 8 (Sl. 7 to 10). The LTA applications were discussed & agreed in 20th meeting

of Southern Region constituents regarding Connectivity / LTA applications of IPPs in

SR held on 13.07.2016 at Gurgaon.

For transfer of power through WR to NR, following transmission system was

proposed which is under implementation as part of various schemes:

Inter-Regional System Strengthening Scheme in WR and NR Part-B

Jabalpur PS - Orai 765kV D/C line

Orai - Aligarh 765kV D/C line

Orai - Orai 400kV D/C (Quad) line

LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai

LILO of Agra - Meerut 765kV S/C at Aligarh

LILO of Kanpur - Jhatikara 765kV S/C at Aligarh

Page 21: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 18 of 30

Transmission System Strengthening in WR-NR Transmission Corridor for IPPs

in Chhattisgarh

Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS –

Kurukshetra (NR) to 6000MW

Kurukshetra (NR) – Jind 400kV D/c (Quad) line

In the meeting, it was agreed that the enhancement in ATC between WR-NR corridor

with the progressive commissioning of above transmission system shall be required

for transfer of 240MW to NR beneficiaries.

CTU informed that the above LTA applications shall also be discussed in the

meeting of NR constituents for Connectivity / LTA applications.

Members agreed for the grant of LTA for transfer of power to NR to M/s Regen Wind

farm Pvt. Ltd. (RWFPL-Vagari) with the transmission system mentioned above.

9. 4 Transmission System for LTA for Renew Power Ventures Pvt. Ltd. (RPVPL-

Karur)

CTU stated that the details of the application are given in Table 8 above (Sl. 11).

CTU informed that M/s Renew Power Ventures Pvt. Ltd. has applied for LTA for

transfer of 400MW with the target beneficiaries as: SR- 50MW, NR-250MW & ER –

100MW. The LTA applications were discussed and agreed in 21st meeting of

Southern Region constituents regarding Connectivity / LTA applications of IPPs in

SR held on 19.11.2016 at Hyderabad. In the meeting, it was agreed that the

enhancement in ATC between WR-NR corridor with the progressive commissioning

of following transmission system shall be required for transfer of 250MW to NR

beneficiaries.

Inter-Regional System Strengthening Scheme in WR and NR Part-B

Jabalpur PS - Orai 765kV D/C line

Orai - Aligarh 765kV D/C line

Orai - Orai 400kV D/C (Quad) line

LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai

LILO of Agra - Meerut 765kV S/C at Aligarh

LILO of Kanpur - Jhatikara 765kV S/C at Aligarh

Transmission System Strengthening in WR-NR Transmission Corridor for IPPs

in Chhattisgarh

Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS –

Kurukshetra (NR) to 6000MW

Page 22: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 19 of 30

Kurukshetra (NR) – Jind 400kV D/c (Quad)

CTU informed that the above LTA applications shall also be discussed in the

meeting of ER & NR constituents for Connectivity / LTA applications.

Members agreed for the grant of LTA for transfer of power to NR to M/s Renew

Power Ventures Pvt. Ltd. (RPVPL-Karur) with the transmission system mentioned

above.

9. 5 LTA Applications from RE developers in Bhuj area

CTU informed that the details of the application are given in Table 8 above (Sl. 3 to

6).

CTU stated that the total LTA quantum of 2750MW [2550MW Target to NR and

200MW Target to ER] will be injected at Bhuj P.S. The high capacity Green Energy

Corridor starting from Bhuj PS (WR) to Moga (NR) is already under implementation

by POWERGRID for evacuation and dispersal of power from renewable generations

coming up in Gujarat (especially Kutch complex) and Rajasthan. Further, Bhuj PS

shall also being connected to Mundra UMPP through 400kV D/c (triple) line which is

under implementation.

System studies for the above transfer of power to NR & ER considering realistic

dispatches from RE generations (under high RE scenario) indicate that all line

loadings are in order. System studies are attached at Annexure-1.

In view of the above, transmission system for LTA of each of the above applicants is

as below:

Common Transmission System for LTA to ER & NR for IWISL- Dayapar

(500MW) wind farm and AGEL - Khavda generation projects (500MW &

1000MW wind farms and 750MW solar park):

i) Bhuj PS - Banaskantha PS 765kV D/c line#

ii) Banaskantha – Sankhari 400kV D/c line#

iii) Banaskantha PS - Chittorgarh PS 765kV D/c line#

iv) Chittorgarh PS - Chittorgarh (RVPN) 400kV D/c (quad) line#

#under implementation as part of Green Energy Corridors

Additional Transmission System for LTA to ER & NR for IWISL- Dayapar

(500MW) wind farm:

Installation of 2x500MVA, 400/220kV ICT at Bhuj P.S.*

*The ICTs are also required under Common Transmission System for LTA of M/s SESPL to WR, NR & SR

Page 23: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 20 of 30

CTU informed that the above LTA applications seeking power transfer to ER & NR

shall also be discussed in the meeting of NR & ER constituents for Connectivity /

LTA applications.

This item has also been discussed in the 41st meeting of Standing Committee in WR.

Accordingly, the same may be read in conjunction with recording in the MoM of 41st

meeting of Standing Committee in WR.

10.0 Revision in the LTA quantum of Chhattisgarh State Power Trading Company

Ltd. (CSPTrCL)

10. 1 CTU stated CSPTrCL through petition No. 84/MP/2016 to CERC, has prayed for

relinquishment of transmission capacity to the extent of 4699MW contracted under

the BPTA dated 24.02.2010 and 4985MW under the TSA dated 07.12.2010. The

details of LTA quantum requested to be surrendered by CSPTrCL from the

respective IPPs are mentioned in the Annexure - 2.

10. 2 In this regard, the Hon’ble commission in terms of the ROP of this petition dated

28.06.2016; has directed CTU to utilize the relinquished capacity for grant of LTA to

the pending LTA applications so that capacity does not remain unutilized. The

exercise for the utilisation of same had been carried out in the 23rd meeting of WR

constituents regarding connectivity / open access applications dated 01.06.2016.

10. 3 CTU further informed that Commission in the referred ROP has further directed that

the liability for relinquishment charges of the petitioner will be decided in terms of the

order of the Petition No. 92/MP/2015 for assessment / determination of stranded

transmission capacity with regard to relinquishment of LTA right by a long term

customer and relinquishment charges in terms of the provisions of the Connectivity

Regulations.

10. 4 The revised allocation of LTA to CSPTrCL after considering the relinquishment of

LTA as per the referred petition from various IPPs in Chhattisgarh is as below: Table 9

Sl. No.

Generation Project Revised LTA requirement of CSPTrCL (Petition) with Target

beneficiary in WR

A. IPPs associated with HCTPC-V

1 RKM Powergen Ltd (4X360) 66

2 Athena Chhattisgarh Power Ltd. (2X600) 55

3 Jindal Power Ltd. (4X600) 110

4 SKS Power Gen. (Ch.) Ltd. (4X300) 55

5 Korba West Power Co. Ltd. (1X600) 27

6 DB Power Ltd. (2X600) 55

7 KSK Mahanadi Power Co. Ltd. (6X600) 82

8 Bharat Aluminium Co. Ltd. (4X300) 55

Page 24: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 21 of 30

9 Vandana Vidyut Ltd. (2X135 + 1X270) 25

10 Lanco Amarkantak Power Pvt. Ltd. (2X660) 60

11 Visa Power Ltd. (1X600+1X660) 55

12 GMR Chhattisgarh Energy Pvt. Ltd. (2X685) 63

Total 708

B. IPPs associated with HCTPC-IV & Part System of HCTPC-I

1 Maruti Clean Coal & Power Ltd. (1x300 MW) 14

Total 14

Grand Total 722

10. 5 CTU stated that while granting LTA to TRN Energy Pvt. Ltd. (associated with HCPTC

– V) and M/s Karnataka Power Corporation Ltd., (associated with Champa –

Kurukshetra HVDC Bi-pole Phase 2 corridor) LTA quantum of 210MW (WR: 126MW

& NR:84MW) and 515MW (WR: 309MW & NR: 206MW) respectively to CSPTrCL

was mentioned in the intimation. However, CSPTrCL had neither submitted

separate application for this quantum nor has signed BPTA for this quantum. Also

CSPTrCL did not mention about this quantum in the above mentioned Petition. In

view of the above, 725MW (210+515) shall not be considered against LTA to

CSPTrCL.

10. 6 Accordingly, it was agreed that the revised LTA intimation for the quantum as

mentioned above shall be issued to CSPTrCL and CSPTrCL would have to sign

revised LTA agreement / BPTA. The relinquishment charges shall be governed by

the outcome of the Petition No. 92/MP/2015.

Members agreed with the proposal.

11.0 LTA application for 450MW from Jaypee Nigrie Super Thermal Power Plant

(JNSTPP) of Jaiprakash Power Ventures Ltd. (JPVL)

11. 1 CTU stated that M/s Jaiprakash Power Ventures Ltd. had applied for Long-term

Access of 450MW from their 2x660MW Jaypee Nigrie Super Thermal Power Plant

(JNSTPP) located in Dist. Nigrie, Madhya Pradesh. Details of Application are as

under- Table 10

Sl. Particulars Application Details

1. Installed Capacity 2x660MW (1320MW)

2. Quantum for which LTA required 450MW

3. Date from which LTA required 30-10-2016

4. Date upto which LTA required 29-10-2031

5. Location of Generating Station Dist. Nigrie, Madhya Pradesh

6. Drawl of Power NR: 450MW (Target)

Page 25: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 22 of 30

11. 2 CTU informed that earlier M/s JPVL was granted LTA for 1240.8MW [MPPMCL:

465.3MW (firm), WR – 388.2MW (target) & NR – 387.3MW (target)] from their

2x660MW JNSTPP with the commissioning of HCPTC IV and part system of HCPTC

I. Later on M/s JPVL had approached CERC vide petition no. 293/MP/2015 for

relinquishment of 775.5 MW leaving balance of 465.3MW LTA to MPPMCL. This

LTA of 465.3MW is already operational.

11. 3 M/s JPVL has submitted the new LTA application for 450MW from its JNSTPP to NR

(target) from 30.10.2016. Studies have been carried out and following transmission

system is required for transfer of 450MW from the generation project to NR, which is

under implementation as part of different transmission schemes. From the studies, it

was observed that the enhancement of ATC between WR & NR corridor with the

progressive commissioning of following transmission system shall be required for

transfer of 450MW to NR beneficiaries.

Inter-Regional System Strengthening Scheme in WR and NR Part-B

i) Jabalpur PS - Orai 765kV D/C line

ii) Orai - Aligarh 765kV D/C line

iii) Orai - Orai 400kV D/C (Quad) line

iv) LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai

v) LILO of Agra - Meerut 765kV S/C at Aligarh

vi) LILO of Kanpur - Jhatikara 765kV S/C at Aligarh

Transmission System Strengthening in WR-NR Transmission Corridor for IPPs

in Chhattisgarh

i) Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS –

Kurukshetra (NR) to 6000MW

ii) Kurukshetra (NR) – Jind 400kV D/c (Quad)

Members agreed with the proposal.

12.0 Termination of Dedicated connectivity lines at ISTS substation using Multi-

circuit towers

12. 1 CTU stated that the Bhuj, Lakadia & Latur S/s have been planned for pooling of

power from large no of RE projects in the vicinity of respective substations. More no.

of connectivity applications are also expected to be received at above mentioned

pooling stations. Accordingly, for optimisation of ROW, it was proposed that

7. Connectivity with the Grid JNSTPP – Satna 400kV D/c (quad) line (commissioned)

8. Generation commissioning

schedule

U1: Commissioned in Sep’14

U2: Commissioned in Feb’15

Page 26: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 23 of 30

transmission towers, up to 2 KM periphery from the entry of the pooling stations may

be of multi-circuit type. The following generation developers associated with different

pooling stations may coordinate amongst themselves for implementation of the

dedicated connectivity lines with M/C towers:

A. RE generations proposed to be pooled at Bhuj P.S.

Table 11

Sl.

No.

Name of

Applicant

Connectivity

Quantum

(MW)

Proposed Dedicated Connectivity

Line

Implementin

g Agency

1 Srijan Energy System Pvt Ltd. (SESPL)

300 SESPL switchyard – Bhuj PS 220kV D/c line along with line bays at both ends

SESPL

Applicant

2. Suzlon Power

Infrastructure Ltd

(SPIL-Fulra)

250 SPIL (Fulra) – Bhuj PS 220kV S/c

(single ACSR moose equivalent

conductor) line along with associated

line bays at both ends

SPIL

Applicant

3 Suzlon Power

Infrastructure Ltd

(SPIL-Baranda)

250 SPIL (Baranda) – Bhuj PS 220kV S/c

(single ACSR moose equivalent

conductor) line along with associated

line bays at both ends

SPIL

Applicant

4 Ostro Kutch Wind Pvt. Ltd. (OKWPL-Bhuj)

300 OKWPL(Bhuj) switchyard – Bhuj P.S. 220kV S/c (twin ACSR zebra equivalent conductor) along with associated line bays at both ends

OKWPL

Applicant

5 Inox Wind

Infrastructure

Services Ltd.

(IWISL-Kotda)

500 IWISL(Kotda) – Bhuj PS 220kV D/c

(twin ACSR moose equivalent

conductor) line along with associated

line bays at both ends

IWISL

6 Orange Rajkot Wind Power Pvt. Ltd. (ORWPL-Hajapar)

100 ORWPL(Hajapar) – Bhuj PS 220kV S/c line along with associated line bays at both ends

ORWPL

7 Inox Wind Infrastructure Services Ltd. (IWISL-Dayapar)

500 IWISL(Dayapar) – Bhuj PS 220kV D/c (twin ACSR moose equivalent conductor) line along with associated line bays at both ends

IWISL

8 Wind World (India) Ltd. Mumbai (WWIL-Walka Mota)

500 WWIL – Bhuj P.S. 220kV D/c (twin ACSR moose equivalent conductor) line along with associated line bays at both ends

WWIL

Page 27: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 24 of 30

B. RE generations proposed to be pooled at Lakadia P.S.

Table 12

Sl.

No.

Name of

Applicant

Connectivity

Quantum

(MW)

Proposed Connectivity Line Implementing

Agency

1. Gamesha

Renewables Pvt

Ltd. (Gagodhar)

(GRPL-

Gagodhar)

300

GRPL (Gagodhar) – Lakadia PS (GIS) 220kV S/c (twin ACSR zebra equivalent conductor) line along with associated line bays at both ends

GRPL

Applicant

2. Gamesha

Renewable Pvt.

Ltd. (Mathak)

(GRPL-Mathak)

100

GRPL (Mathak) – Lakadia PS 220kV S/c line along with associated line bays at both ends

GRPL

Applicant

3. Orange Rajkot

Wind Power Pvt.

Ltd. (ORWPL-

Gagodhar)

100

ORWPL (Gagodhar) – Lakadia PS

220kV S/c line alongwith associated

line bays at both ends

ORWPL

Applicant

Relative positioning of various RE projects getting pooled at Bhuj P.S. and Lakadia

P.S. in Gujarat can be seen from the diagram below:

Page 28: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 25 of 30

Figure 4: Connectivity system for RE developers in vicinity of Bhuj and Bhachau along-with

available GPS coordinates of RE Projects

C. RE generations proposed to be pooled at Latur P.S.

Table 13

Sl.

No.

Name of

Applicant

Connectivit

y Quantum

(MW)

Proposed Connectivity Line Implementing

Agency

1

Gamesha

Renewables Pvt.

Ltd. (GRPL-Ghat

Pimpri)

100

GRPL(Ghat Pimpri) – Latur PS 220kV

S/c line along with associated line bays

at both ends

GRPL

Applicant

2

Gamesha

Renewables Pvt.

Ltd. (GRPL-Ghat

Pimpri)

500

GRPL(Ghat Pimpri) – Latur PS 220kV

D/c (twin ACSR moose equivalent

conductor) line along with associated

line bays at both ends

GRPL

Applicant

3

Kshema Power &

Infrastructure

Company Pvt

Ltd. (KPICPL-

Morda)

250

KPICPL(Morda) – Latur P.S. 220kV S/c

(single ACSR moose equivalent

conductor) line along with associated

line bays at both ends

KPICPL

Applicant

4

Gamesha

Renewables Pvt.

Ltd. (GRPL-

Latur)

400

GRPL (Latur) – Latur PS 220kV D/c

(twin ACSR zebra equivalent conductor)

line along with associated line bays at

both ends

GRPL

Applicant

5 Gamesha Renewable Pvt.

400 GRPL (Tuljapur-Deosingh) – Latur PS

220kV D/c (twin ACSR zebra equivalent GRPL

Page 29: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 26 of 30

Ltd. (GRPL-Tuljapur-Desingh)

conductor) line along with associated

line bays at both ends

Applicant

6

Orange Ashok North Wind Power Pvt. Ltd. (OANWPPL-Lohara)

200 OANWPPL (Lohara) – Latur PS 220kV S/c line along with associated line bays at both ends

OANWPPL

Applicant

7

Renew Wind Energy (AP2) Private Limited (RWEPL-Osmanabad)

400

RWEPL(Osmanabad) – Latur P.S. 220kV D/c (twin ACSR zebra equivalent conductor) line along with associated line bays at both ends

RWEPL

Applicant

8

Suzlon Power Infrastructure Limited (SPIL-Jevli)

300

SPIL(Jevli) – Latur P.S. 220kV S/c (twin

ACSR zebra equivalent conductor) line

along with associated line bays at both

ends

SPIL Applicant

Relative positioning of various RE projects getting pooled at Latur P.S. in Maharashtra can

be seen from the diagrams below:

Page 30: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 27 of 30

Figure 5: Connectivity to RE generations in the vicinity of Parli and Solapur along-with

available GPS coordinates of RE Projects

12. 2 Regarding mode of implementation of the multi circuit towers up to the identified

proposed pooling station, it was decided that the applicants may mutually coordinate

among themselves and the build multi circuit towers at their own cost. Developers

were requested to provide the information regarding the other developers with whom

they would be executing the multi circuit section.

Members agreed with the proposal.

13.0 Reduction in LTA quantum granted to MP Power Management Company Ltd.

from DVC Generation Projects.

13.1 M/s MP Power Management Company Ltd. (MPPMCL) vide its letter dated

28.09.2016 has stated that MPPMCL had entered into PPAs for drawl of power from

following DVC Stations :

Name of Gen. Station Capacity (MW)

Share of MP (MW)

Remarks

MTPS Unit-5&6 2 x 250 200 40% of installed capacity

CTPS Unit-7&8 2 x 250 200 40% of installed capacity

DSTPS Unit-1&2 2 x 500 100 10% of installed capacity

Total 500

13.2 The power from these generating stations is being scheduled as above and the open

access charges for 500 MW are being billed to MP as per the Regional Transmission

Accounts (RTA) issued by WRPC for drawl of contracted power to MP from Mejia,

Chandrapur and Durgapur stations of DVC, without deducting auxiliary power

consumption of respective stations.

Page 31: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 28 of 30

13.3 In view of the same, MPPMCL has requested for reduction in LTOA from existing

500 MW to 450 MW (subtracting 50 MW on account of auxiliary power consumption

and DVC transmission losses) and MPPMCL has agreed to pay relinquishment

charges as per approval of the CERC in the Petition No. 92/MP/2015. The revised

share of MP by reducing the auxiliary electricity consumption is as below:

Sl.

No.

Name of DVC

power station

LTOA

sanctioned

in MW

Revised

LTOA in

MW

Reduction of LTOA in MW

Auxiliary

consumption

Transmission

loss

Total

01 Majeia TPS (Unit 5 & 6)

200 178 18 04 22

02 Chandrapur TPS (Unit 7 & 8)

200 178 18 04 22

03 Durgapur Steel

TPS

100 94 06 -- 06

TOTAL 50

Members agreed with the proposal.

14.0 Review of Transmission System for Banaskantha (Radhanesda) Ultra Mega

Solar Power Park in Dist. Banaskantha, Gujarat (700MW)

14.1 In the 40th SCM of WR and 23rd Connectivity / LTA meeting of WR held on

01.06.2016, following transmission system was agreed for interconnection of

Banaskantha (Radhanesda) Ultra Mega Solar Park (700MW) with ISTS network:

(i) Banaskantha (Radhanesda) Pooling Station – Bansakantha (PG) 400 kV D/c line along with 2 nos. 400 kV line bays at Bansakantha (PG) to be implemented by POWERGRID.

(ii) 2 nos. 400 kV line bays at Banaskantha (Radhanesda) for Banaskantha (Radhanesda) Pooling Station – Bansakantha (PG) 400 kV D/c line to be constructed by GPCL

14.2 In the 41st meeting of Standing Committee on Power System Planning in WR held on

21.12.2016 and subsequent meeting held on 17.01.17 in Gandhinagar, it was

decided that Banaskantha (Radhanesda) GIS 400/220kV PS shall also be developed

as a part of ISTS along with Banaskantha (Radhanesda) PS – Banaskantha (PG)

400 kV D/c line. Further, another solar park near Harsad (500MW) is also envisaged

which shall be connected to Banaskantha (Radhanesda) GIS 400/220kV PS in

future. Subsequently, GETCO vide email dated 20.01.2017 mentioned that they will

need 2 nos. of 220kV line bays at Banaskantha (Radhanesda) GIS 400/220kV PS to

feed their proposed 220kV substation (Rah or Mithi Paldi based on the location of

pooling station) in the 2020 time frame, however same may not be covered for

immediate implementation. In order to take care of future power transfer

requirement, it was decided that conductor for Banaskantha (Radhanesda) PS –

Page 32: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 29 of 30

Banaskantha (PG) 400 kV D/c line shall be considered with twin AL-59 conductor

which has about 30% more current carrying capacity than twin-moose ACSR

conductor whereas the incremental cost is only 5 to 10%.

14.3 Accordingly, based on the deliberation in the 41st SCM of WR / 24th Connectivity /

LTA meeting of WR held on 21.12.2016 and deliberations held in the meeting held

on 17.01.2017, following transmission system is agreed as evacuation system for

Banaskantha (Radhaneda) Solar Park:

i) Transmission system for 700 MW Banaskantha (Radhanesda) Ultra Mega Solar Park Project (UMSPP) a) Establishment of 2x500MVA, 400/220kV pooling station at Banaskantha

(Radhanesda) [GIS] along with 1x125MVAr bus reactor b) 4 nos. 220kV line bays at 400/220kV at Banaskantha (Radhanesda)

pooling station for Solar Park Interconnection. c) Banaskantha (Radhanesda) Pooling Station – Bansakantha S/s (PG) 400

kV D/c (twin AL59) line d) 2 Nos. of 400kV line bays each at Banaskantha (PG) S/s & Banaskantha

(Radhanesda) PS. e) Provision of space for 8 nos. 220 kV bays (4 nos. for solar injection and 4

nos. of GETCO drawl) f) Provision of space for future 400/220kV, 1X500 MVA ICT along with bays.

ii) GPCL confirmed to identify the land (of about 20 acres) between Radhanesda solar park and proposed Harshad solar park for setting up the 220/400 kV pooling station in a week’s time based on which decision for location of 220/400kV common pooling station shall be taken.

iii) GPCL assured that once the modified scheme is finalised and approved by SCM, the BG will be submitted latest by 28.02.2017.

iv) GETCO would require the two nos. of 220 kV bays at the 400/220 kV pooling station in 2020 time frame. Accordingly, provision may be kept for future but should not be covered for immediate implementation.

Meeting ended with vote of thanks.

- - - - - x x x x - - - - - x x x x - - - - -

Page 33: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

-Page 1-

Annexure -A

LIST OF PARTICIPANTS DURING THE 24TH

MEETING OF WR CONSTITUENTS REGARDING

CONNECTIVITY & LTA APPLICATIONS IN WR HELD ON 21/12/2016 AT NRPC, KATWARIA

SARAI, NEW DELHI

Sl. No.

Name Designation E-mail Address Contact

No.

CEA

1. S.D.Dubey Member (P.S) [email protected] 011-26732301

2. Ravinder Gupta Chief Engineer (PSP & A-I) [email protected] 9818527857

3. Awdhesh Kr. Yadav

Director (PSP & A-I) [email protected] 9868664087

4. Shiva Suman Dy. Director (PSP & A-I) [email protected] 011-16732330

5. Manjari Chaturvedi

Dy. Director (PSP & A-I) [email protected] 011-26732329

6. Nitin Deswal Asst. Director (PSP & A-I) [email protected] 9717818349

7. Vikas Sachan Asst. Director (PSP & A-I) [email protected] 011-26732335

8. Jitesh Shrivas Asst. Director (PSP & A-I) [email protected] 9755217472

WRPC

9. Satyanarayan S SE [email protected] 9223399938

POWERGRID

10. Subir Sen COO (CTU-Plg) [email protected] 9650293185

11. Ashok Pal GM (CTU-Plg) [email protected] 9910378105

12. P. Saraswat DGM (Commercial) [email protected] 9873549081

13. Ramchandra DGM (CTU-Plg) [email protected] 9910378128

14. Jyoti Prasad DGM (CTU-Plg) [email protected] 9873549009

15. Abhinav Verma DGM (PESM) [email protected] 9428504062

16. Mohd. Mohsin Asst. GM (Commercial) [email protected] 9910379463

17. Kashish Bhambhani

Ch. Manager (Smartgrid) [email protected] 9971399117

18. Anil Kumar Meena

Ch. Manager (CTU-PLG) [email protected] 9971399120

19. Bhaskar Wagh Sr. Engineer (CTU- PLG) [email protected] 9560890352

20. Ajay Dahiya Sr. Engineer (CTU-PLG) [email protected] 7042499403

21. Shruti Tiwari Sr. Engineer (Asset Mgmt.) [email protected] 9560050252

22. Pratyush Singh Engineer (CTU-PLG) [email protected] 8826094863

23. Chinmay Sharma Engineer (Smartgrid) [email protected] 8826094869

24. Shashank Shekhar

Engineer (CTU-PLG) [email protected] 9205287434

POSOCO

25. P Mukhopadhyay GM (WRLDC) [email protected] 9869438073

26. S R Narsimhan Addl.GM (NLDC) [email protected] 9971117022

27. N. Nallarasan DGM (NLDC) [email protected] 852707722

28. Pushpa Seshadri Asst. GM (WRLDC) [email protected] 9869404482

RAILWAYS

29. S.K. Saxena CEO(REMCL) [email protected] 9910487330

30. J.C.S Bora GM(REMCL) [email protected] 9205060038

MSETCL

Page 34: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

- Page 2 -

Sl. No.

Name Designation E-mail Address Contact

No.

31. S. N. Bhopale CE (STU) [email protected] 9769006175

32. R. H. Satpute SE (STU) [email protected] 9930128535

GETCO, GPCL and GUVNL

33. S K Negi MD (GETCO) [email protected] 9879200622

34. P. H. Rana Director (GPCL) [email protected] 9925212250

35. Rajendra Mistry CPO (GPCL) [email protected] 9978407405

36. Dipak H Patel DE (STU) (GETCO) [email protected] 9925213273

37. S. K. Nair DE (STU) (GUVNL) [email protected] 9925208313

MPPTCL

38. R K Khandelwal SE (Planning & Design) [email protected] 9925805172

39. M M Dhoke SE (PSS) [email protected] 9425805237

40. Hitesh Tiwari AE [email protected] 9425806882

CSPTCL

41. Y Krishna Rao EE [email protected] 9826518820

D.N.H.P.D.C.L

42. H.C.Surma AE [email protected] 9824154044

NTPC Ltd.

43. Subhash Thakur Addl.GM (PE-E) [email protected] 9650991067

44. Vinod Kumar Jain DGM [email protected] 9650991726

45. Sachin Jain DGM [email protected] 9650990345

46. K Rahul Kumar DGM [email protected] 9440909149

BALCO

47. Devendra Patel GM (Power) [email protected] 9893122359

48. Khirod Kumar Barik

AGM (Power) [email protected] 9893566551

Essar Power M.P. Ltd.

49. Madan Gupta Director [email protected] 9819731319

50. Sachidanand Bhajade

E.D. [email protected] 9909993545

51. Kapil Sangar G.M. [email protected] 9999114216

Vandana Vidyut Ltd

52. R V Mathe VP (Comml) [email protected] 7024105902

Kshema Power & Infrastructure LTD

53. B Dhinakar Babu Dy. Manager [email protected] 9940197244

Orange Renewable

54. Ankush Rao Dhane

Asst Gen Manager [email protected] 9818218078

55. Lalit Birla DGM [email protected] 9650015982

Ostro Kutch Wind Pvt. Ltd.

56. Pratik Poddar Head (P.D) [email protected] 9810200736

Adani Green Energy Ltd

57. Abhishek Kaustubh

Manager [email protected] 9560600503

58. Narendra Kr. Ojha

Asst. Manager [email protected] 9979847639

Gamesa Renewable Pvt. Ltd.

59. Rakesh Chandra General Manager [email protected] 9873122743

60. Ashish Shukla Senior Manager [email protected] 7869913518

Page 35: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

- Page 3 -

Sl. No.

Name Designation E-mail Address Contact

No.

Wind World India

61. S.R. Singhal Sr. G.M. [email protected] 7506342370

Renew Power Ventures Pvt. Ltd.

62. Rakesh Garg AVP [email protected]

9711486060

63. Nagesh Sayam DGM [email protected] 9987128386

Regen Wind Farm Pvt. Ltd.

64. Dheeraj Jain Head - Regulatory Affairs [email protected] 9910778484

Suzlon Power Infrastructure Ltd.

65. Ravindra Kadam Dy. Manager [email protected] 9403107052

BLP Vayu Pvt. Ltd. / Avikiran Solar India Pvt. Ltd.

66. S Venkata Krishnan

Sr. Manager [email protected]

9900085766

67. Aman Bansal Dy. Manager [email protected] 9819231102

68. Kotha Naresh Grid Authorization Specialist [email protected] 8904287870

Srijan Energy System Pvt. Ltd.

69. Ujjwal Surana Sr. Manager(Regulatory & PD)

[email protected] 9974552425

70. Soumya Ranjan Parida

G.M (Regulatory & Sales) [email protected] 7718888167

Inox Wind Infrastructure Services Ltd.

71. B Juneja Director [email protected] 9891795111

72. Alok Gupta General Manager-P.E. [email protected] 9717364276

73. Awnish Pandey Dep Manager [email protected] 7752020437

ASPAN Infrastructure Ltd.

74. Kapil Sharma Dy. Manager [email protected] 9075001340

Page 36: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob
60002754
Text Box
Annexure - 1 With RE LTA (High RE Case)
Page 37: Shri - POWERGRID 24th...Shri V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP contact@gfl.co.in Mob

Minutes of 24

th Meeting of WR constituents for Connectivity & LTA applications held on 21.12.2016

Page 30 of 30

Annexure - 2

Sl. No.

Generation Project LTA Application by CSPTrCL for its share

Revised LTA requirement of CSPTrCL (Petition) with Target beneficiary in WR

TSA Signed by CSPTrCL (Petition) *

LTA quantum relinqushed by CSPTrCL

BPTA Quantum (MW)

Target/Firm Beneficiaries (MW) Total WR NR

WR NR

A. BPTA & TSA signed by CSPTrCL for IPPs associated with HCTPC-V

1 RKM Powergen Ltd (4X360) 497 298 199 66 502 431 232 199

2 Athena Chhattisgarh Power Ltd. (2X600)

421 253 168 55 421 366 198 168

3 Jindal Power Ltd. (4X600) 769 461 308 110 769 659 351 308

4 Jindal Power Ltd. (400 MW) 0 0 0 0 0 0

5 SKS Power Gen. (Ch) Ltd. (4X300)

384 231 153 55 384 329 176 153

6 Korba West Power Co. Ltd. (1X600)

192 115 77 27 192 165 88 77

7 DB Power Ltd. (2X600) 384 231 153 55 384 329 176 153

8 KSK Mahanadi Power Co. Ltd. (6X600)

1153 692 461 82 1153 1071 610 461

9 Bharat Aluminium Co. Ltd. (4X300)

384 231 153 55 384 329 176 153

10 Vandana Vidyut Ltd. (2X135 + 1X270)

173 104 69 25 173 148 79 69

11 Lanco Amarkantak Power Pvt. Ltd. (2X660)

423 254 169 60 423 363 194 169

12 Chhattisgarh Steel & Power Ltd. (1x35 + 1x250 MW) (LTOA cancelled vide POWERGRID letter dated 01.07.2011)

91 55 36 0 91 91 55 36

Total 4871 2925 1946 590 4876 4281* 2335 1946

B. Only BPTA signed by CSPTrCL for IPPs associated with HCTPC-IV & Part System of HCTPC-I

1 Maruti Clean Coal & Power Ltd. (1x300 MW)

96 58 38 14 0 82 44 38

2 Dheeru Powergen Ltd. (3x300 MW)

336 202 134 0 0 336 202 134

Total 432 260 172 14 0 418* 246 172

C. Only TSA signed by CSPTrCL for IPPs associated with HCTPC-V

1 Visa Power Ltd. (1X600+1X660)

384 231 153 55 384 329 176 153

2 GMR Chhattisgarh Energy Pvt. Ltd. (2X685)

438 263 175 63 432 375 200 175

Total 822 494 328 118 816 704* 376 328

Grand Total 6125 3679 2446 722 5692 5403 2957 2446

LTA quantum relinquished by CSPTrCL:

As per BPTA singed by CSPTrCL : 4281 (A) + 418 (B)= 4699MW

As per TSA singed by CSPTrCL : 4281 (A) + 704 (C) = 4985MW