director (operation) - powergrid 25th wr... · 2017-11-02 · shri ashutosh gautam sr manager...
TRANSCRIPT
1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 :May kindly chair the meeting
2. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri East, Mumbai 400 093
3. 3.
Chief Engineer (PSP&A - I) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066
4. 4.
Director (Operation) Maharashtra State Electricity Transmission Co. Ltd., 4th Floor, “Prakashganga”, Plot No. C-19, E-Block, Bandra – Kurla Complex, Bandra(East), Mumbai- 400051
5. 5.
Managing Director Gujarat Energy Transmission Corp. Ltd, Sardar Patel Vidyut Bhawan, Race Course, Vadodara -390 007
6. 6.
Chairman & Managing Director Madhya Pradesh Power Transmission Co. Ltd., Block No. 3, Shakti Bhawan, Rampur, Jabalpur-482 008
7. 7.
Managing Director Chhattisgarh State Power Transmission Co. Ltd., Dangania, Raipur- 492 013
8. 8.
The Chief Engineer Electricity Department The Government of Goa, Panaji
9. 9.
Executive Engineer Administration of Daman & Diu (U.T.) Department of Electricity Moti Daman – 396220
10. 10.
Executive Engineer Electricity Department UT of Dadra & Nagar Havelli, Post Naroli-396 235, Silvassa
11. 11.
Chief Executive Officer POSOCO B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110 016
12. 12.
General Manager Western Regional Load Despatch Centre F-3, M.I.D.C. Area, Marol, Andheri East, Mumbai-400 093
13. Executive Director (Engg.) NTPC Ltd., Engg. Office Complex, Plot no. A-8A, Sector-24, Post Box. 13, Noida 201 301 (U.P)
14. 14.
Chief Engineer (Transmission) Nuclear Power Corporation of India Ltd., 12th Floor, North wing, Vikram Sarabhai Bhawan, Anushakti Nagar, Mumbai-400 094
15. Shri Ashish Shukla Senior Manager Gamesa Renewable Pvt. Ltd. , Ghat Pimpri Renewable Private Limited, Bapuram Renewable Private Limited Beed, Nellore Renewable Private Limited Beed, Jodhpur Windfarms Private Ltd., Bhuj Renewable Private Limited, Gadag Renewable Energy Private Ltd. & Sankanur Renewable Energy Private Ltd. Future IT Park, B-Block, 8th Flr, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Tamil Nadu [email protected] Mob. 07869913518
16. Shri Lalit Birla AGM Orange Rajkot Wind Power Pvt. Ltd., Orange Ashok North Wind Power Pvt. Ltd & Orange Kenora Wind Power Prlvate Limited 301B, 3rd Floor, D21 Corporate Park, Sector-21 Dwarka, New Delhi – 110075 [email protected] Mob. 09650015982
17. Shri Alok Gupta General Manager-P.E. Inox Wind Infrastructure Services Ltd. Inox Towers, Plot No. 17, Sector 16A, Film City, Noida – 201301, Uttar Pradesh [email protected] Mob. 09717364276
18. Shri M.R. Krishna Rao Vice President Adani Green Energy Ltd. Achalraj, Opposite Mayor Bungalow, Law Garden, Ahmedabad – 380006, Gujarat [email protected] Mob. 09099005556
19. Sh. Manu Srivastava Chairperson Rewa Ultra Mega Solar Ltd. “Urja Bhawan”, Link Road No. 2, Shivaji Nagar, Bhopal 462016 [email protected] Mob. 9425003666
20. Shri Ujjwal Surana Sr. Manager, Srijan Energy System Pvt. Ltd. 102, EL TARA Building, Orchard Avenue, Hiranandani, Powai, Mumbai, 400076 [email protected] Mob. 9974552425
21. Shri Rakesh Garg AVP-Project Development Renew Power Ventures Pvt. Ltd. 10th Floor, DLF Square, Jacranda Marg, DLF Phase-2, Sector 25, Gurgaon, Haryana [email protected] Mob. 09711486060
22. Shri Pratik Poddar Head, Project Development Ostro Kutch Wind Pvt. Ltd. Unit No. G-0, Ground Floor, Mira Corporate Suites, 1&2, Ishwar Industrial Estate, Mathura Road, New Delhi-110065 [email protected] Mob. 09810200736
23. Shri. K Kalaivendan Chief Development Officer Suvidha Renewable Energy Pvt. Ltd. No. 34, 1st Floor, Defence Officer Colony, Ekkattuthangal, Chennai -32, Tamil Nadu. [email protected] Mob. 9444815386
24. Shri S Venkata Krishnan Sr. Manager BLP Vayu (Project 2) Pvt. Ltd., Avikiran Solar India Pvt. Ltd., 12th Floor, Crescent 1, Prestige Shantiniketan, ITPL Main Road, Hoodi, Whitefield, Bengaluru – 560048, Karnataka.
[email protected] Mob. 9900085766
25. Shri Pankaj Sharma Manager Kadapa Wind Farms Pvt. Ltd. Future IT Prk, B-Block, 8th Flr, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Tamil Nadu [email protected] Mob. 8238031324
26. Shri Rakesh Chandra General Manager Tirupur Renewable Energy Pvt. Ltd., Jalore Wind Park Pvt. Ltd. Future IT Prk, B-Block, 8th Flr, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Tamil Nadu [email protected] Mob. 7358316465
27. Shri V. Kiran Deputy General Manager Mytrah Energy (India) Pvt. Ltd. 8001, Q-City, S. No. 109, Gachibowli, Hyderabad – 500032 Telangana [email protected] Mob. 9900066530
28. Shri Ashutosh Gautam Sr Manager Fascinating Power Solutions Pvt. Ltd, Impeccable Power Solutions Pvt. Ltd. 507-508, Ashoka Estate, 24, Barakhamba Road, New Delhi-110001 [email protected] Mob. 9958400664
29. Shri Rakesh Rathore Deputy General Manager Green Infra Wind Energy Ltd. 5th Floor, Tower C, Building No. 8, DLF Cyber City, Gurgaon-122002, Haryana [email protected] Mob. 7738091123
30. Shri Ghanshyam Patel Chief Executive Kintech (Gujarat) Windpark Pvt. Ltd. Kintech House, 8, Shivalik Plaza, opp. AMA, IIM Road, Ahmedabad-380015, Gujarat [email protected] Mob. 9825097719
31. Shri Sreenivasulu N Chief Manager Clean Wind Power (Bhavnagar) Pvt. Ltd. 212, Ground Floor, Okhla Industrial Estate, Phase-III, New Delhi-110020 [email protected] Mob. 9999887709
32. Shri Suryanarayan R Sr. Advisor Sri Maruti Wind Park (Mendigiri) Pvt. Ltd. Lundkad Sky Vista, Office No. 507, 5th Flr, Sl No. 230 A/3, Lohegaon Road, Viman Nagar, Pune 411014, Maharashtra [email protected] Mob. 9840582218
33. Shri Sambuvarayan Sr General Manager Gala energy Private Limited Distinguished Consultancy Solutions Private Limited C/o Sitac Group, 507-508, Ashoka Estate, 24, Barakhamba Road, New Delhi-110001 [email protected] Mob. 9843777899
34. Shri Nilesh Dhanani Director Aspan Infrastructure Limited Godrej Millenium, 5th Floor, 9, Koregaon Park, Pune, Maharashtra [email protected] Mob. 9822058601
35. Shri Ashish Mithani CEO KP Energy Limited A-1/2, Firdous Tower, Near Fazal Shopping Center, Adajan Patia, Surat, Gujarat -395009 [email protected] Mob. 9925082899
36. Shri Rajesh Kumar Gupta Sr. Manager Adani Green Energy MP Limited 5th Floor, Sambhav House Judges Bungalow Road,Bodakdev, Ahmedabad Gujarat -380009, [email protected] Mob. 9099055681
37. Shri Norberto Cuenca Candel Head-Business Development Avikiran Solar India Pvt. Ltd. 12th Floor, Crescent 1 , Prestige Shantiniketan, lTPL Main Road, Hoodi Bengaluru- 560048, Karnataka Norberto.cuencacandel@enelcom
Mob. 7899730301
38. Shri Saroj Sahoo Manager, Carbon and Energy POWERICA LIMITED 9th Floor, Godrej Coliseum, C Wing,Sion-Trombay Road, Sion (East), Mumbai -400022, Maharashtra [email protected] Mob. 7506167848
Main Agenda of 25th Meeting of WR constituents for Connectivity & LTA applications – Revised
Page 1 of 3
Revised Agenda for 25th Meeting of WR Constituents regarding
Connectivity & Long-term Access applications in Western Region
----------------------------------------------------------------------------------------------------------------
1. Confirmation of the minutes of 24th Meeting of WR Constituents regarding
Connectivity & Long-term Access applications in Western Region held on 21-
12-2016 at NRPC, New Delhi
The minutes of the 24th meeting of WR Constituents regarding Connectivity / Open
Access Applications held at New Delhi on 21.12.2016 was circulated vide our letter
dated 22.02.2017. IWISL vide letter no IWISL/Dayapar/PGCIL dated 02.03.2017
informed that they are not foreseeing any capacity expansion in above mentioned
project. Accordingly, IWISL requested for Single Moose equivalent conductor instead
of Twin ACSR Moose equivalent conductor mentioned in the MOM for their
dedicated connectivity line. Accordingly, Corrigendum to the Minutes were issued
vide letter dated 16.03.2017. No other comments were received. Members may
confirm the minutes of the 24th Meeting of WR Constituents regarding Connectivity &
Long-term Access applications in Western Region held on 21.12.2016.
2 LTA Application of REWA Ultra Mega Solar (RUMS) Ltd. for partial change in
target region
REWA Ultra Mega Solar (RUMS) Ltd. has been granted LTA with the following target
beneficiaries: WR: 550MW and NR: 200MW vide intimation dated 29.07.16. As
informed by M/s RUMS Ltd., PPA has been signed among the developers,
MPPMCL/DMRC and RUMS Ltd. on 17th April, 2017 for supply of 651MW power to
MPPMCL(WR) and 99MW power to DMRC (NR). Accordingly, M/s RUMS Ltd. has
submitted a revised application (received on 29.06.2017) regarding change in target
region (from NR to WR) for transfer of 101MW power from the solar project to
MPPMCL (WR) so that the total power transfer requirement of MPPMCL(WR) for
651MW (550MW already granted+101MW requested) is met. In view of the above,
the revised beneficiaries (firm) of M/s RUMS Ltd. shall be:
WR (MPPMCL): 651MW ; NR (DMRC): 99MW
From system studies, it is observed that existing as well as under construction
transmission facilities shall be sufficient for transfer of 101MW additional power to
MPPMCL and no additional system strengthening is required. For power transfer to
NR (99MW), the enhancement in TTC in WR - NR corridor with progressive
commissioning of elements as listed below shall be required:
Transmission system for LTA:
Inter-regional System Strengthening Scheme for NR & WR:
Jabalpur Pooling station - Orai 765 KV D/c line
Main Agenda of 25th Meeting of WR constituents for Connectivity & LTA applications – Revised
Page 2 of 3
Orai – Aligarh 765kV D/c line
Orai – Orai(UPPTCL) 400kV D/c (Quad) line
LILO of one circuit of Satna-Gwalior 765 KV line at Orai S/s
2x1000MVA, 765/400KV substation at Orai S/s
LILO of Agra-Meerut 765 kV S/c line at Aligarh S/s
765KV Switching Station at Aligarh (GIS)
LILO of Kanpur – Jhatikara 765 kV S/c at Aligarh S/s
Transmission System Strengthening in WR-NR Transmission Corridor For
IPPs in Chhattisgarh
Up gradation of 800kV, 3000MW HVDC bipole between Champa Pooling
Station – Kurukshehtra (NR) to 6000MW
Kurukshetra (NR) – Jind 400kV D/c (Quad)
Regarding reduction in LTA quantum to NR from 200MW to 99MW, applicable
relinquishment charges in line with CERC regulations shall be incident on M/s RUMS
Ltd.
Members may deliberate please.
3 Operationalisation of 450MW LTOA for transfer of power from Essar Power
M.P. Ltd. (EPMPL) to Essar Steel India Limited, Hazira (WR)
Essar Power M.P. Ltd. (EPMPL) was granted Long Term Open Access vide letter
dated 01.11.2007 for transfer of 1200MW from its generation project at Mahan
(2x600MW). M/s EPMPL vide letter dated 22.12.2016 has intimated that it has
decided to relinquish a part of LTOA upto 750MW and has requested to
operationalise the balance LTOA of 450MW through existing LILO of Vindhyachal –
Korba 400kV S/c line at Essar Mahan. M/s EPMPL has further informed
POWERGRID vide letter dated 07.04.2017 that the beneficiary for availing LTOA for
450MW shall be M/s Essar Steel India Limited (ESIL), Hazira located in Gujarat
(WR) for which PPA has already been signed between M/s EPMPL and M/s ESIL.
A meeting was held under the Chairmanship of Member (Power System), CEA on
28.06.2017 at CEA, New Delhi to discuss the extension of LILO arrangement for
evacuation of power of M/s EPMPL Power Project (2x600 MW) at Mahan in Madhya
Pradesh. During the meeting, the following was decided:
The system studies indicate that the LILO of Vindhyachal–Korba STPP 400
kV S/C line at Mahan STPS would also be essential to take care of
contingency of outage of one ckt of Mahan SPTS–Bilaspur Pooling Station
400 kV D/C line for reliable evacuation of power from 2x600 MW units of
Mahan TPS.
M/s EPTCL has agreed to complete the remaining works of Mahan STPS–
Bilaspur Pooling Station 400 kV D/C line by December 2017.
Main Agenda of 25th Meeting of WR constituents for Connectivity & LTA applications – Revised
Page 3 of 3
The transmission system for evacuation of power from M/s EPMPL generation
plant at Mahan is now an ISTS system being implemented by M/s EPTCL
(ISTS Transmission Licensee) and not a dedicated transmission system of
generation developer. As such LILO of Vindhyachal–Korba STPP 400 kV S/C
would not be an interim arrangement.
In view of the above, it was decided in the above meeting that the LILO of
Vindhyachal–Korba STPP 400 kV S/c line at M/s EPMPL switchyard may be
continued as part of ISTS system and this change would be brought to the notice of
constituents in the next meeting of SCPSPWR. Further, from the studies discussed
during the meeting, it emerged that power from one unit of EPMPL can be reliably
evacuated through the LILO arrangement. Subsequently, in the 34th WRPC meeting
held on 28.07.2017, Gujarat had opined that the 450MW LTA from the generation
project to M/s ESIL, Hazira may be made operational.
Accordingly, it is proposed that LTOA for transfer of 450MW power from M/s EPMPL
generation project to M/s ESIL, Hazira may be operationalized. Regarding
relinquishment of a part of LTOA upto 750MW, applicable relinquishment charges in
line with CERC regulations shall be incident on M/s EPMPL.