short term amendments training - questar pipeline

19
Short Term Amendments Training 1

Upload: others

Post on 03-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Short Term Amendments

Training

1

Outline

• Online Reports

• Short Term Amendments – Process

• Short Term Amendments – Best Practices

Online Reports

February 9, 20213

Unsubscribed Capacity Reports

• Unsubscribed Capacity Reports show the available firm transport capacity for

purchase between two MAPs

• Available capacity refreshes every night

• As soon as there is a change to the system (shipper amends a contract, new bid is

submitted, etc.), the capacity shown online is not necessarily accurate anymore

• Even if the reports were refreshed constantly, the capacity shown online would

not be up to date during the Short Term Amendment process

• We’ll explain why in more detail in the next section

Operationally Available Reports

• The Operationally

Available Report shows:

• Nominated and

scheduled firm and

interruptible quantities

at MAPs

• Operationally available

capacity for

nominations at MAPs

• This report can be used

to plan nominations

Map of Available Capacity

• Static map of capacity

available on a long-term

basis

• Updated once a month

• Shows capacity available

along different segments

• Need to consider the

minimum available along

the path of interest

• This map can be used to

understand capacity

available for purchase on a

long-term basis

Short Term Amendments -Process

February 9, 20217

Short Term Amendments

• Shippers can begin submitting amendments for the next month at 11am, 4

business days before the end of the month

• We receive amendments throughout the month for the current month, but we

receive multiple amendments requests by various shippers at 11am for

amendments affecting the following month

• We analyze all the amendments submitted together in a batch process because it

helps us give shippers the most capacity. Unfortunately, this approval process is

time consuming and can take several hours to complete.

• We follow tariff guidelines of First Come, First Serve

• Note, the focus of this training is for the day that amendments open for the next

month

How We Review Amendments

• We start with the available capacity

• If there have been no new contracts prior to 11am, then this is the same capacity

posted online

• We begin by analyzing the first RFS submitted (highest priority) and work our

way through the queue to the last RFS submitted (lowest priority)

• If there is enough available capacity, we accept the RFS

• If there is no available capacity, we reject the RFS

• If there is some available capacity, we provide shippers with their options so they

can submit a Copy Forward

February 9, 202110

LEGEND

Delivery Point Meter Station

Main Line Compressor Station

Storage FacilitiesS

M

C

Little

Mountain

XO16

Altamont

White

River Hub

MFidlar

Oak

Spring

Dragon

Trail

Thistle

Blind

Canyon

C

C

MM M

C

C

M

Dripping

Rock

Atmos

Energy

Myton

MM

M

M

M

S

Clay

Basin

S

S

S

M

M

M

M

M

C

C CC

Wamsutter

Southern

Star

Hyrum Gate

Sunset Gate

Porters Lane

Goshen

Payson Gate

Nephi City

Chalk Creek

Coalville

Whitney

Canyon

Opal

Roberson

Leroy

M

Bluebell

M

M

Dominion Energy Questar Pipeline

Dominion Energy Overthrust Pipeline

Constraint: 0 Dth available at beginning of day

Constraint Point

Unsubscribed Capacity Report says there is no capacity available from

Clay Basin to Fidlar

Short Term Amendment Example

February 9, 202111

LEGEND

Delivery Point Meter Station

Main Line Compressor Station

Storage FacilitiesS

M

C

Little

Mountain

XO16

Altamont

White

River Hub

MFidlar

Oak

Spring

Dragon

Trail

Thistle

Blind

Canyon

C

C

MM M

C

C

M

Dripping

Rock

Atmos

Energy

Myton

MM

M

M

M

S

Clay

Basin

S

S

S

M

M

M

M

M

C

C CC

Wamsutter

Southern

Star

Hyrum Gate

Sunset Gate

Porters Lane

Goshen

Payson Gate

Nephi City

Chalk Creek

Coalville

Whitney

Canyon

Opal

Roberson

Leroy

M

Bluebell

M

M

Dominion Energy Questar Pipeline

Dominion Energy Overthrust Pipeline

Shipper A Contract Path

Shipper B Contract Path

Constraint Point

-Shipper A has 50,000 Dthfrom the CB to WRH -Shipper B has 25,000 Dthfrom Fidlar to Goshen

Short Term Amendment Example

Constraint: 0 Dth available at beginning of day

February 9, 202112

LEGEND

Delivery Point Meter Station

Main Line Compressor Station

Storage FacilitiesS

M

C

Little

Mountain

XO16

Altamont

White

River Hub

MFidlar

Oak

Spring

Dragon

Trail

Thistle

Blind

Canyon

C

C

MM M

C

C

M

Dripping

Rock

Atmos

Energy

Myton

MM

M

M

M

S

Clay

Basin

S

S

S

M

M

M

M

M

C

C CC

Wamsutter

Southern

Star

Hyrum Gate

Sunset Gate

Porters Lane

Goshen

Payson Gate

Nephi City

Chalk Creek

Coalville

Whitney

Canyon

Opal

Roberson

Leroy

M

Bluebell

M

M

Dominion Energy Questar Pipeline

Dominion Energy Overthrust Pipeline

Shipper A Contract Path

Shipper A Amended Path

Constraint Point

-Shipper A wants to shorten their path and receive gas at Fidlar, instead of Clay Basin-Shipper B wants to extend their path and amend their receipt back to Clay Basin

Short Term Amendment Example

Shipper B Contract Path

Shipper B Amended Path

Constraint: 0 Dth available at beginning of day

February 9, 202113

LEGEND

Delivery Point Meter Station

Main Line Compressor Station

Storage FacilitiesS

M

C

Little

Mountain

XO16

Altamont

White

River Hub

MFidlar

Oak

Spring

Dragon

Trail

Thistle

Blind

Canyon

C

C

MM M

C

C

M

Dripping

Rock

Atmos

Energy

Myton

MM

M

M

M

S

Clay

Basin

S

S

S

M

M

M

M

M

C

C CC

Wamsutter

Southern

Star

Hyrum Gate

Sunset Gate

Porters Lane

Goshen

Payson Gate

Nephi City

Chalk Creek

Coalville

Whitney

Canyon

Opal

Roberson

Leroy

M

Bluebell

M

M

Dominion Energy Questar Pipeline

Dominion Energy Overthrust Pipeline

Shipper A Contract Path

Shipper A Amended Path

Constraint Point

Because Shipper A is shortening their path, they are opening up 50,000 Dthof capacity from Clay Basin to Fidlar. This eliminates the constraint point.

Short Term Amendment Example

Shipper B Contract Path

Shipper B Amended Path

Constraint: 0 Dth available at beginning of day

February 9, 202114

LEGEND

Delivery Point Meter Station

Main Line Compressor Station

Storage FacilitiesS

M

C

Little

Mountain

XO16

Altamont

White

River Hub

MFidlar

Oak

Spring

Dragon

Trail

Thistle

Blind

Canyon

C

C

MM M

C

C

M

Dripping

Rock

Atmos

Energy

Myton

MM

M

M

M

S

Clay

Basin

S

S

S

M

M

M

M

M

C

C CC

Wamsutter

Southern

Star

Hyrum Gate

Sunset Gate

Porters Lane

Goshen

Payson Gate

Nephi City

Chalk Creek

Coalville

Whitney

Canyon

Opal

Roberson

Leroy

M

Bluebell

M

M

Dominion Energy Questar Pipeline

Dominion Energy Overthrust Pipeline

Shipper A Amended Path

-Analyzing both requests together allows us to approve Shipper B’s request.-There is also 25,000 Dth left for other shippers to utilize

Short Term Amendment Example

Shipper B Amended Path

Short Term Amendment Process

• We analyze each request submitted together as a batch

• Shippers who submitted their requests first get higher priority – First Come, First Serve, per the tariff

• The whole system is in flux during this process, so we evaluate all RFSs submitted together and then approve the collection for award

• Even if the Unsubscribed Capacity Reports constantly refreshed, you wouldn’t see accurate capacity online until the process was complete

• We can’t always give shippers the capacity they request. Shippers can submit a Copy Forward and amend their request

• The entire process pauses until the Copy Forward has been submitted

• Shippers can help keep the process moving along by quickly responding to our communications

• Once a shipper submits their Copy Forward, we replace the initial request with the replacement request, keeping the same ranking in the queue, and resume analyzing

• Copy Forwards allow shippers to keep their position in the queue

Short Term Amendments –Best Practices

February 9, 202116

Best Practices

• Unless you are shortening your path, there is no way to guarantee that you will get

the capacity you’re requesting*

• *Assuming there is ample MAP capacity

• How can shippers improve their odds?

• Submit requests as soon as possible after 11am

• Prioritize the order in which you submit your requests

• Are you completely changing your path? If so, submit it first.

• Are you trying to extend your path through a constrained area? If so, submit it first.

• Are you just shortening your path on a contract? If so, submit it later.

• Are you amending an interruptible contract? If so, submit it last.

• Many shippers are submitting requests at the same time, so prioritizing the order

can make a big difference.

• Submitting a request even 1 second after another shipper can impact the

outcome for the request

Things to Keep in Mind

• Things change from month to month. Just because a shipper’s amendment is

approved one month, doesn’t mean it will be approved next month

• Starting capacity may be different

• Other shippers can change their amendments

• In the example, if Shipper A doesn’t amend their receipt, there is no capacity

for Shipper B to extend their path

• Other shippers may submit their requests faster

• No shippers can control any of the factors listed above

• The best thing each shipper can do is get their requests in quickly so that they are

as high in the queue as possible

• Remember, once amendments open for the next month, you can submit

amendments at any time

• If your request is not approved, you can always submit a new request the next day

Questions?

19