shepherd of the prairie - static1.squarespace.com · dave lamb groth design partner/architect steve...

3
WHAT’S HAPPENING NOW? Building is fully enclosed! Dry wall hanging complete mid March Administration offices work has begun Interior painting has started Organ coordination has begun Flooring preparation underway Interior finishes materials to begin arriving in March CONSTRUCTION ADMINISTRATION UPDATE Shepherd of the Prairie New Worship & Gathering Space 10805 Main Street Huntley, IL SHEPHERD OF THE PRAIRIE SCOPE New Worship & Gathering Space COMPLETION 2018 SQ FT 14,300 CONSTRUCTION MANAGER Shales McNutt Construction Issued 02/23/18 ARCHITECT Dan Konczal, RA PROJECT DESIGNER Jessica Boyung CONSTRUCTION ADMIN. Mike McGraw, CDT CONSTRUCTION SUPPORT Caitlin Duerr

Upload: nguyencong

Post on 23-Apr-2018

225 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: sHepHerd oF tHe prAirie - static1.squarespace.com · Dave Lamb GROTH DESIGN PARTNER/ARCHITECT Steve Petitt, AIA GROTH DESIGN PROJECT MANAGER Nathan Pamperin ... Sister Charlotte w/GROTH

WHAT’S HAPPENING NOW?• Building is fully enclosed!

• Dry wall hanging complete mid March

• Administration offices work has begun

• Interior painting has started

• Organ coordination has begun

• Flooring preparation underway

• Interior finishes materials to begin arriving in March

ConstruCtion AdministrAtion updAte

Shepherd of the Prairie New Worship & Gathering Space10805 Main StreetHuntley, IL

sHepHerd oF tHe prAirie

SCOPE New Worship & Gathering Space

COMPLETION2018

SQ FT14,300

CONSTRUCTION MANAGER Shales McNutt Construction

Issued 02/23/18

ARCHITECT Dan Konczal, RA

PROJECT DESIGNER Jessica Boyung

CONSTRUCTION ADMIN. Mike McGraw, CDT

CONSTRUCTION SUPPORT Caitlin Duerr

Page 2: sHepHerd oF tHe prAirie - static1.squarespace.com · Dave Lamb GROTH DESIGN PARTNER/ARCHITECT Steve Petitt, AIA GROTH DESIGN PROJECT MANAGER Nathan Pamperin ... Sister Charlotte w/GROTH

WHAT’S HAPPENING NOW?Building 1:

• Precast erection complete• Underground plumbing and electrical ongoing• Steel erection starting early March

Building 2:• Footing work at the deep basement area nearly finished• Deep foundation walls ongoing• Precast erection in early March

Building 3:• Frost wall work complete• Underground plumbing and electrical nearly complete• Installation of pre-fabricated walls plans starting mid-March

ConstruCtion AdministrAtion updAte

Sisters of St. Francis of Assisi New Convent3221 South Lake Drive, St. Francis, WI

NEW CONVENT COMPLETION2019

SQUARE FEET130,000

VJS PRINCIPAL IN CHARGE Chris Sauve’

SENIOR PROJECT MANAGER Ben Baenen

PROJECT MANAGER Chad Kucik

ASSISTANT PROJECT MANAGER Samuel Martinez

SITE SUPERINTENDENT Dave Lamb

GROTH DESIGN PARTNER/ARCHITECT Steve Petitt, AIA

GROTH DESIGN PROJECT MANAGER Nathan Pamperin

CONSTRUCTION ADMINISTRATION Mike McGraw, CDT

CONSTRUCTION SUPPORT Caitlin Duerr

Issued 02/23/18

Sister Charlotte w/GROTH Design Group

BLDG 1 Elevator Shaft

VJS Constructing BLDG 1 Basement Foundation VJS Crews Preparing BLDG 3 Frost Walls

Page 3: sHepHerd oF tHe prAirie - static1.squarespace.com · Dave Lamb GROTH DESIGN PARTNER/ARCHITECT Steve Petitt, AIA GROTH DESIGN PROJECT MANAGER Nathan Pamperin ... Sister Charlotte w/GROTH

WHAT’S HAPPENING NOW?• Footings and foundations poured

• Pre-cast wall erection complete

• Structural steel erection starts the week of February 19

• Erection of steel joists will start soon

• Mechanical / electrical / plumbing rough-ins will follow

• Audio/visual coordination

• Preparation for concrete slab pours

• Final color selections for exterior finishes

• Final color selections for interior finishes

ConstruCtion AdministrAtion updAte

Lakeland Community Church New Worship & Gathering RemodelN3181 State Road 67 Lake Geneva, WI

Footings and foundations being poured SCOPE

New Worship & Gathering Space Remodel

COMPLETION2018

SQ FT30,722

CONSTRUCTION MANAGER Catalyst Construction

Issued 02/21/18

OWNER’S REPRESENTATIVEPastor Richard

ARCHITECT Pete Schneider, AIA

PROJECT DESIGNER Ehan Whitney

CONSTRUCTION ADMIN Mike McGraw, CDT