Shelters and Evacuation Centres Sub Plan
Last Updated: 24th
November 2016
Page | 1
Contents
CONSULTATION LIST ........................................................................................................................ 7
DISTRIBUTION LIST ........................................................................................................................... 8
1.0 FOREWORD .................................................................................................................................. 9
2.1 INTRODUCTION ........................................................................................................................... 9
2.2 PURPOSE ............................................................................................................................... 10
2.3 SCOPE ..................................................................................................................................... 10
2.4 OBJECTIVES .......................................................................................................................... 10
2.5 VULNERABLE GROUPS ...................................................................................................... 10
2.6 AGREEMENT WITH ASSET OWNERS ............................................................................. 11
3.1 ACTIVATION ............................................................................................................................... 11
3.2 QDMA ESCALUATION MODEL ........................................................................................... 11
3.2.1 ALERT ............................................................................................................................... 12
3.2.2 LEAN FORWARD ............................................................................................................ 12
3.2.3 STAND UP ........................................................................................................................ 12
3.2.4 STAND DOWN ................................................................................................................ 12
3.3 ACTIVATION ........................................................................................................................... 12
3.4 TRIGGER POINTS FOR ACTIVATION ............................................................................... 13
3.6 ADDITIONAL ACTIVATION FACTORS .............................................................................. 13
3.7 DECISION TREE .................................................................................................................... 14
3.8 TIMEFRAME MODEL ............................................................................................................ 15
3.8.1 SHELTERS ....................................................................................................................... 16
3.8.2 EVACUATION CENTRES .............................................................................................. 16
4.1 ROLES AND RESPONSIBILITIES ........................................................................................... 17
4.2 COORDINATION AND CONTROL ...................................................................................... 17
4.3 SHELTERS AND EVACUATION CENTRES GROUP (SECG) ....................................... 18
4.4 SHELTER AND EVACUATION CENTRE MANAGEMENT TEAM ................................. 19
4.4.1 PUBILC CYCLONE SHELTER ...................................................................................... 19
4.4.2 PLACES OF REFUGE .................................................................................................... 20
4.4.3 EVACUATION CENTRES .............................................................................................. 20
4.4.4 SHELTER/EVACUATION CENTRE MANAGERS ..................................................... 20
4.4.5 ROTATION OF PERSONNEL ....................................................................................... 21
4.5 MAGNETIC ISLAND ARRANGEMENTS ............................................................................ 21
Page | 2
5.1 PUBLIC CYCLONE SHELTERS .............................................................................................. 21
5.2 PURPOSE ............................................................................................................................... 21
5.3 DESIGN .................................................................................................................................... 22
5.4 OCCUPANCY LEVEL ............................................................................................................ 22
5.5 OCCUPANCY DURATION .................................................................................................... 22
5.6 CYCLONE SHELTER LOCATIONS .................................................................................... 23
5.7 SERVICES ............................................................................................................................... 23
5.8 MAINTENANCE ...................................................................................................................... 23
6.1 PLACES OF REFUGE ............................................................................................................... 24
6.2 PURPOSE ............................................................................................................................... 24
6.3 DESIGN .................................................................................................................................... 24
6.4 OCCUPANCY LEVEL ............................................................................................................ 24
6.5 OCCUPANCY DURATION .................................................................................................... 24
6.6 PLACE OF REFUGE LOCATIONS ...................................................................................... 25
6.7 SERVICES ............................................................................................................................... 26
6.8 MAINTENANCE ...................................................................................................................... 26
7.1 EVACUATION CENTRES ......................................................................................................... 26
7.2 PURPOSE ............................................................................................................................... 26
7.3 DESIGN .................................................................................................................................... 26
7.4 OCCUPANCY LEVEL ............................................................................................................ 26
7.5 OCCUPANCY DURATION .................................................................................................... 27
7.6 EVACUATION CENTRE LOCATIONS ................................................................................ 28
7.7 SERVICES ............................................................................................................................... 36
7.8 MAINTENANCE ...................................................................................................................... 36
8.0 UNAUTHORISED SHELTERS AND EVACUATION CENTRES ......................................... 36
9.0 PRE-READY- MADE KITS ........................................................................................................ 36
10.0 SHELTER AND EVACUATION CENTRE SIGNAGE .......................................................... 37
11.0 PROCUREMENT ARRANGEMENTS ................................................................................... 38
12.1 COMMUNICATIONS ................................................................................................................ 38
12.2 INTERNAL COMMUNICATIONS ....................................................................................... 38
12.3 COMMUNITY AWARENESS .............................................................................................. 38
12.3.1 LEAN FORWARD ......................................................................................................... 38
12.3.2 STAND UP ..................................................................................................................... 39
12.3.3 STAND DOWN .............................................................................................................. 39
Page | 3
12.4 MEDIA .................................................................................................................................... 39
12.5 DOCUMENTATION .............................................................................................................. 40
12.5.1 SITREPS ........................................................................................................................ 40
12.5.2 RECORDING DECISIONS .......................................................................................... 40
13.1 TRAINING AND EXERCISES ................................................................................................. 40
13.2 TRAINING .............................................................................................................................. 40
13.3 EXERCISES .......................................................................................................................... 40
14.0 REVIEW AND EVALUATION ................................................................................................. 41
15.0 RELATED DOCUMENTS ........................................................................................................ 41
APPENDIX 1 – SUPPORT AGENCY CONTACT LIST ............................................................... 42
APPENDIX 2 – ROLES AND RESPONSIBILITIES OF SUPPORT AGENCIES ..................... 47
APPENDIX 3 – AGENCIES CAPACITY TO RESPOND ............................................................. 52
APPENDIX 4 –SUPPORT AGENCY PRESENCE AT EACH FACILITY .................................. 57
APPENDIX 5 – ROLE OF THE SECC ........................................................................................... 58
APPENDIX 6 – SECG TERMS OF REFERANCE ....................................................................... 60
APPENDIX 7 – MEMORAMDUM OF AGREEMENTS ................................................................ 63
APPENDIX 8 – FUTURE IMPROVEMENTS / ACTIONS ............................................................ 64
Page | 4
Version control
Version Author Amendments Date
1.0 Darren Alsemgeest Endorsed at STWG Meeting 14/12/2011 – for signatures
15/12/2011
2.0 Angela Lawson Annual review 8/10/2012
3.0 Gavin Hammond Melissa McKeown Angela Lawson
This plan replaces the Short Term Welfare Plan Annual review and inclusion of public cyclone shelter requirements
13/09/2013
4.0 Angela Lawson Annual Review 1/09/2014
5.0 Shannon Jenkins Annual Review 11/11/2015
6.0 Melissa McKeown Update Contact Details 16/05/2016
7.0 Lana Smith & Shannon Jenkins
Annual Review Sept 2016
8.0 Melissa McKeown Review Checks/Approvals Oct 2016
9.0 Melissa McKeown Update to details Nov 2016
This plan will be reviewed annually by Regulatory Services Department on behalf of and in consultation with the Shelters and Evacuation Centres Working Group (SECWG) for approval by the Chair of the TLDMG by 1st November each year.
Page | 5
Abbreviations ACF Aged Care Facilities CSM Cyclone Shelter Manager CSMT Cyclone Shelters Management Team DHPW Department of Housing and Public Works GMRS General Manager Regulatory Services ERMG Emergency Response Management Group (TCC) EHO Environmental Health Officer LDCC Local Disaster Coordination Centre LDC Local Disaster Coordinator (TLDMG) TMEH Team Manager Environmental Health PCS Public Cyclone Shelter QAS Queensland Ambulance Service QPS Queensland Police Service QFES Queensland Fire and Emergency Services RSD Regulatory Services Department SES State Emergency Service, Townsville Unit SITREP Situation Report SECC Shelters and Evacuation Centres Coordinator SECG Shelters and Evacuation Centres Group SECMT Shelters and Evacuation Centres Management Team TAIHS Townsville Aboriginal & Islanders Health Services TCC Townsville City Council TLDMG Townsville Local Disaster Management Group
Page | 6
Approval of Plan
This plan is recommended for distribution by the Townsville Local Disaster
Management Group (TLDMG).
Gavin Hammond Local Disaster Coordinator Townsville Local Disaster Management Group
Dated:
Endorsed by the Townsville City Council.
Jenny Hill Chair Townsville Local Disaster Management Group
Dated: Date of LDMG Meeting:
Page | 7
CONSULTATION LIST
Organisation Name of Consulted Date
Distributed
Comments Received
Page | 8
DISTRIBUTION LIST
Copies of this plan are distributed to the following personnel/agencies:
Agency Position
Townsville City Council Local Disaster Coordinator
Director Planning & Community Engagement
General Manager Regulatory Services
Team Manager Environmental Health
Team Manager Emergency Management
Australia Red Cross Regional Manager (North Qld)
Emergency Services Regional Coordinator
Centacare Team Leader
Qld Police Service Inspector Patrol Services North- Townsville District
Officer in Charge Mundingburra Police Station
Qld Fire & Emergency Services Inspector (Fire)
Area Director (Emergency Services)
Qld Ambulance Service Special Operations Coordinator
St John’s Ambulance Qld Assistant Commissioner Northern Region
St Vincent De Paul Society Area Manager
Assistant Area Manager
The Salvation Army Corps Officer
Corps Coordinator
Save the Children Organisation Regional Manager
State Emergency Service Local Controller
Deputy Controller
Townsville Aboriginal & Islanders Health Services Ltd (TAIHS)
Chief Executive Officer
District Disaster Management Group District Disaster Coordinator
Local Disaster Controller Magnetic Island Disaster Management Group
Page | 9
1.0 FOREWORD The Disaster Management Act 2003 outlines the framework for the State’s disaster management arrangements and the functions of LDMGs. LDMGs are responsible for the operation of public cyclone shelters, places of refuge and evacuation centres in their areas.
Part of the function of disaster operations by the LDMG, is the management of evacuations and to ensure the community has the ability to relocate, seek emergency assistance and ideally return to their homes once it is safe to do so.
LDMGs must have plans in place to commit resources to support evacuations that may include the provision of shelter. While the TLDMG encourages people to move from the danger zones to safer areas well away from the hazard or to friends and family in safer areas, it is accepted that some people may not have anywhere to go or have left their actions too late and will need to be provided with a place to shelter. Council’s Regulatory Services Department (RSD) of council are tasked with the management and resourcing of this Sub-plan.
2.0 INTRODUCTION In the event of a threat of a disaster and/or following a disaster event there may be a need to provide shelters and evacuation centres to vulnerable groups:
(1) SHELTERS: There are two types of shelters:
Public Cyclone Shelter is activated when there is a threat from an impending severe tropical cyclone.
Public cyclone shelters are purpose built facilities that provide shelter for people during a severe tropical cyclone, who have been evacuated from storm tide evacuation zones or wind vulnerable accommodation, and who have not been able to leave the cyclone warning zone or shelter with friends or family in modern houses (built since 1982) outside the evacuation zone.
They are designed to be in operation for a short period of time (up to 36 hours or when the cyclone threat has passed.
Places of Refuge is activated when there is a threat from an impending severe tropical cyclone.
Although not purpose built, places of refuge are facilities capable of providing protection for people from an impending disaster (usually a tropical cyclone), who have been evacuated from storm tide evacuation zones or wind vulnerable accommodation, and who have not been able to leave the cyclone warning zone or shelter with friends or family in modern houses (built since 1982) outside the evacuation zone.
Page | 10
They are designed to be in operating for a short period of time (up to 36 hours or when the cyclone threat has passed.
(2) EVACUATION CENTRES Are activated after a disaster event and are capable of providing people with accommodation that have been adversely affected by the disaster and are unable to reside in their normal place of residence after the disaster.
Evacuation centres may be in operation for a considerable period of time until people are returned or relocated and as such require additional resourcing and support.
Although the overall management of these three (3) types of facilities are very similar, the operation and provisions within the facilities are very different. The understanding of these differences is fundamental to the successful implementation of their management and operation.
2.1 PURPOSE
The purpose of this Shelters and Evacuation Centres Sub-Plan is to provide an effective and well-coordinated management of a shelters and evacuation centres before, during and after the impact of a disaster event.
2.2 SCOPE
This Shelters and Evacuation Centres Sub-Plan forms part of the TLDMGs Townsville Local Disaster Management Plan. This Sub-Plan specifically addresses the process that will be used in managing the operations of shelters and evacuation centres before, during and after disaster event and should be read and applied in conjunction with the TLDMGs Evacuation Sub-Plan. Operating Procedures have been developed for:
Public Cyclone Shelter;
Places of Refuge;
Evacuation Centres; and
Magnetic Island. 2.3 OBJECTIVES
The objectives of this Sub-Plan are to:
To detail the arrangements for the activation, set-up, management and closure of shelters and evacuation centres.
Enable council’s RSD to effectively manage the shelter and evacuation centre process in association with key support agencies.
Provide shelters and evacuation centres for vulnerable groups in a disaster situation.
2.4 VULNERABLE GROUPS
Vulnerable groups for the purposes of this Sub-plan include the following members of the community –
Page | 11
the homeless
persons living in wind vulnerable accommodation (i.e. boats, vessels, in marinas and caravan parks)
persons issued with an evacuation order
travellers with caravans and the like
travellers unable to return to their homes
persons that have not been able to leave the storm-tide evacuation zone
persons that have been unable to shelter with friends or family in modern homes (built since 1982) outside the storm-tide evacuation zone
residents unable to return to their homes following a disaster event
Vulnerable groups should be given priority for placement at shelters and evacuation centres where possible.
The Aged Care Facilities at highest risk of storm tide inundation include –
Garden Settlement Retirement Village
Townsville RSL Retirement Village
In the threat of a flood or storm surge, residents of these aged care facilities may be relocated to the following Place of Refuge:
Ignatius Park Assembly Hall
This shelter will be managed under the TLDMG’s Aged Care Facilities Standard Operating Procedure.
2.5 AGREEMENT WITH ASSET OWNERS
A Memorandum of Agreement (MoA) has been developed between the Department of Education & Training (DET) and the TLDMG for those shelters and evacuation centres located at State Government educational facilities. Refer to the relevant Operating Procedure for details. Informal arrangements exist with other facilities (i.e. JCU, Suncorp, Commonwealth, Ignatius Park College etc.) that are not owned by state government agencies which will need to be formalised in the future.
3.0 ACTIVATION
3.1 QDMA ESCALUATION MODEL
Activation will follow the same model of escalation outlined in the Queensland Disaster Management Arrangements:
Alert A heightened level of vigilance due to the possibility of an
event in the local area. No further action is required; however the situation should be monitored by someone capable of assessing the potential of the threat.
Lean Forward An operational state characterised by a heightened level of situational awareness of a disaster event (either
Page | 12
current or impending) and a state of operational readiness. Disaster coordination centres are on stand by and prepared but not activated.
Stand Up An operational state where resources are mobilised, personnel are activated and operational activities commenced. Disaster coordination centres are activated.
Stand Down Transition from responding to an event back to normal core business and/or continuance of recovery operations. There is no longer a requirement to respond to the event and the threat is no longer present.
The movement through these escalation phases is not sequential, rather based on flexibility and adaptability to the location and event.
3.1.1 ALERT
This Sub-plan will be at an Alert level of activation when the TLDMG is at an Alert level. The LDC will advise GMRS that the TLDMG is at an Alert level. The GMRS will appoint a Shelters and Evacuation Centres Coordinator (SECC). The SECC will notify the SECMT and support agencies.
3.1.2 LEAN FORWARD
This Sub-plan will be at a Lean Forward level of activation when the TLDMG decides that an evacuation is being considered. This may be when a cyclone watch is issued or when the evacuation timeline dictates preparatory actions are to commence. Shelter preparations may occur during this time.
3.1.3 STAND UP
This Sub-plan will be at a Stand Up level of activation when the TLDMG has advised that emergency sheltering will be required. The LDC and GMRS will ensure that the TLDMG considers the timeframe required to set up shelters or evacuation centres before information is released to the community. Refer to Section 3.8 of this plan for more information about required timeframes to set up shelters and evacuation centres. Advice to the community will be undertaken as per the Community Information and Warnings Sub-plan. The SECC must commence preparations of shelters or evacuation centres to receive evacuees immediately if not already done so.
3.1.4 STAND DOWN
This Sub-plan will be at a Stand Down level of activation when the TLDMG is at a Stand Down level. At this stage, all shelters and/or evacuation centres should be restored back for normal use.
3.2 ACTIVATION
Activation will follow the direction of the TLDMG.
Page | 13
The General Manager Regulatory Services (GMRS) will be responsible for implementing this Sub-Plan following activation.
A request may be put to the GMRS to activate this plan for events outside of the activation of the TLDMG, examples of when this might occur include:
Under the Aerodrome Emergency Plan; and
evacuation of persons from communities outside of Townsville
3.3 TRIGGER POINTS FOR ACTIVATION
The following triggers points will guide the TLDMG in determining whether to activate this Sub-plan:
Facility Trigger Points
Public Cyclone Shelter The TLDMG is at Lean Forward stage of activation; and/or
There is an imminent event (i.e. severe tropical cyclone) likely to cause significant damage from a storm surge; and/or
Voluntary or directed evacuation order has been issued or likely to be issued.
Places of Refuge The TLDMG is at Learn Forward stage of activation; and/or
There is an imminent event (i.e. severe tropical cyclone) likely to cause significant damage from a storm surge; and/or
Voluntary or directed evacuation order has been issued or likely to be issued.
Evacuation Centres The TLDMG is at Stand Up operational phase of activation; and/or
Significant damage has been sustained to residential housing or an event occurs requiring people to seek alternative accommodation within the Townsville area
3.6 ADDITIONAL ACTIVATION FACTORS
When activating this Sub-plan there are many factors that can influence the process described in the Learn Forward and Stand Up levels of activation. These can include:
how long it takes to have the shelter or evacuation centre handed over and
prepared for operational use;
the day and time will indicate the capacity of the evacuation routes and access to facilities;
current and previous weather and its impact on evacuation routes;
the predicted time of arrival of 80k/h winds (for severe tropical cyclones); and
the availability of facilities to use as shelters or evacuation centres.
Page | 14
3.7 DECISION TREE The following decision tree is to assist in determining whether a shelter should be opened:
Page | 15
The following decision tree is to assist in determining whether an evacuation centre should be opened:
3.8 TIMEFRAME MODEL The following guide will be used by the TLDMG when making a decision to activate this Sub-plan to ensure there is sufficient time for RSD to get shelters operational and ready to accept evacuees safely before the disaster event.
Page | 16
3.8.1 SHELTERS
3.8.2 EVACUATION CENTRES
Page | 17
4.0 ROLES AND RESPONSIBILITIES 4.1 COORDINATION AND CONTROL
The Regulatory Services Department (RSD) department of council is responsible for the coordination, control and implementation of this Sub-Plan including annual reviews, amendments, exercises and chairing of the Shelters and Evacuation Centres Group (SECG).
Upon activation the GMRS will appoint a representative from RSD to act as the Shelters & Evacuation Centres Coordinator (SECC) to manage the response and implementation of this Sub-plan. Refer to Appendix 4 for more details on the role of the SECC.
The SECC will need to determine the necessary staffing and resources required to respond to the disaster situation and coordinate the response with the support agencies including the Shelter and Evacuation Centre Management Team (SECMT).
Page | 18
4.2 SHELTERS AND EVACUATION CENTRES GROUP (SECG) The Shelters and Evacuation Centres Group (SECG) includes representatives from the support agencies that provide assistance in the management of shelters and evacuation centres during a disaster situation. The purpose of the SECG is to provide a forum for a collaborative approach between council and supporting agencies in implementing the Sub-plan.
The SECG includes representatives from the following support agencies:
Australian Red Cross
Centacare
Queensland Police Service (QPS)
Queensland Fire & Emergency Service (QFES)
Queensland Ambulance Service (QAS) / St John Ambulance Queensland
Page | 19
St Vincent De Paul Society
The Salvation Army
Save The Children Organisation
SES
Townsville Aboriginal and Islanders Health Services Ltd (TAIHS)
Townsville City Council The SECC may appoint other agencies to the committee or invite other agencies to attend meetings if deemed necessary. A list of agency representative and contact details are located in Appendix 1.
The roles and responsibilities of the support agencies are provided in Appendix 2. The SECG will meet at least twice (2) per year and will be chaired by the Team Manager Environmental Health (TMEH). The Terms of Reference for the Shelter and Evacuation Committee is provided in Appendix 5.
4.3 SHELTER AND EVACUATION CENTRE MANAGEMENT TEAM During the activation of the Sub-plan and the consideration for emergency sheltering or evacuation by the TLDMG, the SECC is to ensure the appropriate staffing of shelters and/or evacuation centres sourced from support agencies and council staff. The recommended Shelter and Evacuation Centre Management Team (SECMT) to effectively manage a shelter or evacuation centre ideally consists of the following:
4.3.1 PUBILC CYCLONE SHELTER
Note: one person may be required to fulfil one or more of these positions depending on availability. Refer to the Public Cyclone Shelter Operating Procedure for more detail about key positions including position descriptions.
Page | 20
4.3.2 PLACES OF REFUGE
Note: one person may be required to fulfil one or more of these positions depending on availability. Refer to the Places of Refuge Operating Procedure for more detail about key positions including position descriptions.
4.3.3 EVACUATION CENTRES
Note: this is based on the Red Cross Evacuation Centre Field Guide. Refer to the Evacuation Centres Operating Procedure for more detail about key positions including position descriptions.
4.3.4 SHELTER/EVACUATION CENTRE MANAGERS
The Shelter and/or Evacuation Centre Manager will be sourced from the following agencies:
Facility Agency
Public cyclone shelter TCC
Place of refuge SES
Evacuation Centres Red Cross or SES (which will depend on availability)
Support will be provided by QPS, QFRS and QAS where possible.
Page | 21
Consideration should be given to aligning an officer’s shelter/evacuation centre management role with their normal core business role.
Any person who chooses to make themselves available to work in the shelter or evacuation centre needs to be made aware that this role will require a commitment and willingness to leave their normal place of residence and their family and friends during a time of activation.
It will be the responsibility of the Shelter or Evacuation Centre Manager, in consultation with the SECC, to determine when the support agencies may be required. Under no circumstances should any agency be permitted to set up in a shelter or evacuation centre without the approval of the SECC.
4.3.5 ROTATION OF PERSONNEL
The time that the shelter or evacuation centre may be operating could easily exceed the hours that one shift of personnel could work. Therefore it is necessary to develop a roster for the rotation of staff into a number of shifts. Consideration will be required to ensure that there are sufficient staff to meet both shifts and debriefs are to occur at the handover of each shift. It should be noted that personnel at shelters will be required to stay during the expected event (i.e. severe tropical cyclone).
4.4 MAGNETIC ISLAND ARRANGEMENTS
For Magnetic Island, the Magnetic Island Disaster Management Group (MIDMG) will manage and coordinate the opening and closing of evacuation centres as well as source staff to run the centres until Red Cross are available to take over as the CMT. MIDMG will also make the determination of whether to open an evacuation centre in consultation with the SECC.
Upon activation, the MIDMG will provide regular information and update to the SECC regarding emergency sheltering operations. Note: there are no public cyclone shelters or places of refuge on Magnetic Island. Refer to the Magnetic Island Operation Procedure Evacuation Centres for more information.
5.0 PUBLIC CYCLONE SHELTERS 5.1 PURPOSE
The primary purpose of the Heatley Public Cyclone Shelter is to provide shelter for people evacuated from storm tide evacuation zones or wind vulnerable accommodation who have not been able to leave the cyclone warning zone or shelter with friends or family in modern houses (built since 1982) outside the evacuation zone.
The Public Cyclone Shelter is not intended to store property, or accommodate pets or personal property/bedding during a cyclone event.
Page | 22
The expectation of the TLDMG is that the Public Cyclone Shelter will be opened in time for the community to evacuate or be evacuated to the shelter and remain in use as a shelter until the severe tropical cyclone has passed.
Animals (except assistance animals) will not be accepted into a public cyclone shelter. Animals at the PCS will be managed as per RSD Animal Management Sub- plan.
5.2 DESIGN
Public Cyclone Shelters in Queensland are constructed in accordance with the Queensland Government, Department of Housing and Public Works “Design Guidelines for Queensland Public Cyclone Shelters”.
Public Cyclone Shelters are located on high ground outside the storm tide evacuation zone and above the flood flow levels of a 1 in 500 year event (Q500) for creek and river flood levels. The shelter is engineered to withstand wind gusts of up to 306km/hr and associated windborne debris.
Note: Category 5 cyclones are cyclones with wind speeds of 280 km/hr or greater. The shelter was not designed to provide temporary accommodation or services after the cyclone has passed (i.e. evacuation or recovery centre).
5.3 OCCUPANCY LEVEL
The Public Cyclone Shelter occupancy level during a severe tropical cyclone is
based upon the available floor area with a space allocation of 1.2m2 for each person. The space allocation is based on the majority of people being are able to sit with occasional periods of standing.
A very limited number of beds are available for physical disability or other medical reason, which will require additional space.
Basic building services of amenities and ventilation are based upon the occupancy level.
5.4 OCCUPANCY DURATION
The Public Cyclone Shelter is designed for a total maximum occupancy period of 36 hours. This period comprises:
reception period of possibly 6 -12 hours when people are arriving at the
shelter;
lockdown period, of less than 18 hours, doors and windows bolted with no persons allowed/permitted to leave or enter the building, (this is when the winds are gale force or stronger); and
opening up period, the cyclone has passed and winds are less than gale force, initial assessments being conducted but no decision has been made as whether it is safe to leave the shelter.
Page | 23
Facility name Specific building identification
Asset Owner
Street address
Heatley Public Cyclone Shelter
Heatley Secondary College – school hall
DET 321 Fulham Road, Heatley
Public Cyclone Shelters are not intended to provide temporary short-term accommodation for people whose houses have been damaged or destroyed during the event.
5.6 CYCLONE SHELTER LOCATIONS
The following provides a summary of the Public Cyclone Shelter/s located within the Townsville Area.
Design occupancy capacity 800 people 640 chairs available
5.7 SERVICES
The services of the Public Cyclone Shelter include:
emergency power;
lighting;
ventilation;
amenities; and
water supply.
Features of the building and procedure for operating equipment can be found in the Public Cyclone Shelter Operating Procedure.
5.8 MAINTENANCE
Public Cyclone Shelters are to be maintained in accordance with the Queensland Public Cyclone Shelters Maintenance Guidelines which are developed and maintained by the DHPW in accordance with the Disaster Management Act 2003. These guidelines define the organisations responsible for programmed maintenance and maintenance funding, and require the building to be maintained in good condition. The DHPW is responsible for the programmed maintenance of State owned and managed Public Cyclone Shelters.
Annual inspection and testing is required to be undertaken by DHPW prior to June each year to identify maintenance required prior to the cyclone season. A pre- season test will also be undertaken by DHPW in October each year to confirm the shelter is suitable for use as a shelter. The DHPW Maintenance Program Manager is to provide the TLDMG with a copy of the pre-season inspection and test report by 1st November each year as per the Public Cyclone Shelter Maintenance Guidelines.
Building inspections after an event should be undertaken to determine what damage has occurred, if any. Damage should be reported to the DHPW Maintenance Program Manager. The Memorandum of Agreement (MoA) between the DET and
Page | 24
the TLDMG for use of the building as a Public Cyclone Shelter (refer to MoA provided in the Public Cyclone Shelter Operating Procedure), defines the responsibilities for the cost of rectification works for damage caused while the building is being utilised as a cyclone shelter.
6.0 PLACES OF REFUGE 6.1 PURPOSE
The purpose of these Places of Refuge is to provide shelter for people evacuated from storm tide evacuation zones or wind vulnerable accommodation who have not been able to leave the cyclone warning zone or shelter with friends and family in modern houses (built before 1982) outside the evacuation zone. Their occupation should only be required for up to around 36 hours or until the danger has passed i.e. immediately leading up to the disaster and during the disaster. As such, only the basic necessities are provided such as refuge, toilet and hand washing facilities, first aid and limited emergency potable water.
Evacuees seeking refuge are required to provide for their own personal needs such as provision of blankets, pillows, chairs, non-perishable food and potable water of sufficient supply for the duration of the event. At no time is cooking, naked flames or other activities that are likely to endanger the safety of others permitted within the refuge. Animals will not be accepted into a place of refuge, except for assistance animals.
TLDMG has an informal agreement with local SES who will manage and act as the Shelter Manager for places of refuge.
Animals (except assistance animals) will not be accepted at places of refuge. Animals will be managed as per RSD Animal Management Sub-plan.
6.2 DESIGN
Although not purpose built, places of refuge are facilities capable of providing protection for people and are generally solid buildings not expected to sustain any damage from a severe tropical cyclone. They are located outside of flood prone areas. The DHPW reviewed all designated Places of Refuge in December 2012 and approved their use for the purposes sheltering evacuees in tropical cyclones.
6.3 OCCUPANCY LEVEL
The occupancy level at Places of Refuge is based upon the available floor area with a space allocation of approximately 1.2m2 for each person.
6.4 OCCUPANCY DURATION They are designed to be in operating for a short period of time (up to 36 hours or when the cyclone threat has passed).
Page | 25
6.5 PLACE OF REFUGE LOCATIONS
The locations of designated Places of Refuge have been predetermined by the TLDMG and contained in the Places of Refuge Operating Procedure.
Designated Places of Refuge
Location Capacity Primary Use
Suncorp Building (Basement Car park)
61-73 Sturt St Townsville
875 General Community
State Government Building (Basement Car park)
187-209 Stanley St Townsville
350 Homeless
Townsville City Council Building (Basement Car park)
143-201 Walker St Townsville
305 General community
Ignatius Park (Assembly Hall)
Ignatius Park College, Ross River Rd, Cranbrook
250 Age Care Facilities
JCU Douglas Campus Building 045 Medical Lecture Theatre
250 General community
Building 026 Sir George Kneipp Auditorium
250 General community
Building 040 Padua Theatre. Rooms 103, 105 and 109
325 General community
Australian Institute Marine Science (AIMS) Administration Building
Cape Ferguson 50 General community
1300 SMILES Stadium Golf Links Drive Kirwan
150 General community
Tony Ireland Stadium 2 Sporting Drive Thuringowa
80 General community
TOTAL 2885
RSD will designate which Places of Refuge will be required given an impending disaster event. RSD will consult with the TLDMG to ascertain how many evacuees are expected to assist in making this determination. RSD will inform the TLDMG of which places of refuge will be opened.
The details and requirements of each Place of Refuge are contained in the Places of Refuge Operating Procedures.
Page | 26
6.6 SERVICES Place of Refuge provides limited services for evacuees:
toilets
hand washing facilities
basic hygiene supplies
water supply (likely bottled water) Features of the building and procedure for operating equipment can be found in the Places of Refuge Operating Procedure.
6.7 MAINTENANCE Regular maintenance of designated Places of Refuge is the responsibility of the building owner. Any damage sustained during the operation of the shelter will be repaired and paid for by TLDMG.
7.0 EVACUATION CENTRES 7.1 PURPOSE
The purpose of Evacuation Centres is to provide emergency accommodation for evacuees following disaster event which has caused significant damage or flooding of their usual place of residence.
TCC has a MoU with Red Cross who will manage and act as Centre Managers for evacuation centres. Refer to the Operating Procedure Evacuation Centres. Should Red Cross not be available or until they are available, SES will act as Centre Manager at evacuation centres.
TCC has a MoU with Salvation Army who will provide meals and refreshments to evacuees, staff and agency personnel at evacuation centres. Refer to the Operating Procedure Evacuation Centres
Animals (except assistance animals) will not be accepted at evacuation centres. Animals will be managed as per RSD Animal Management Sub-plan.
7.2 DESIGN
Pre-determined Evacuation Centres have been identified due to their capability to provide sufficient services to ensure evacuees are comfortable including space for sleeping, kitchen facilities, toilets, showers, waste facilities, storage and recreational areas.
7.3 OCCUPANCY LEVEL
The maximum occupancy at each Evacuation Centre has been pre-determined and is detailed in the Evacuation Centres Operating Procedures.
Page | 27
7.4 OCCUPANCY DURATION Evacuation Centres could be operational for an extended period (usually 3 to 7 days) of time depending on the level of destruction or flooding caused from the disaster, preventing the evacuees from returning to their normal place of residence.
Page | 28
Pri
ori
ty
7.5 EVACUATION CENTRE LOCATIONS A detailed assessment and review of all evacuation centres in the Townsville area were undertaken between late 2014 and early 2015. As a result of this review, evacuation centres have been prioritised into three categories - level A, B and C. Level A evacuation centres are considered the first priority for use where possible.
Assessment Criteria Buildings
LEVEL A Outside the storm tide zones
Back-up power with generator on site or building wired to have generator plugged in
Suitable ventilation for use in summer without air-conditioning
Kitchen or food preparation area
Adequate toilets and showers
If not all of the above but in a location where an evacuation centre will be needed (such as Alligator Creek Bowls Club with no power and not good ventilation but all other requirements) and (Rupertswood Community Centre with no power but good ventilation and all other requirements) and (Bluewater Community Centre with no power but all other requirements)
LEVEL B Outside the storm tide zones
No back-up power and building not wired for generator
Suitable ventilation for use during summer without air- conditioning
Kitchen or food preparation area
Adequate toilets and showers or
Space to place additional ablutions
LEVEL C Outside the storm tide zones
No back-up power and building not wired for generator
Not good ventilation
Kitchenette or limited food preparation area
Inadequate toilets and showers
1. 1300 Smiles Stadium 2. Australian Institute of Marine Science (AIMS) 3. Apex Camps 4. Bluewater Community Centre 5. Calvary Christian College 6. Heatley State High School 7. Ignatius Park College 8. Island Palms Resort 9. Magnetic Island Community Care Centre 10. Paluma Community Centre 11. Rollingstone Community Centre 12. Rupertswood Community Centre 13. Seven Day Adventist Riverside Convention Centre 14. Tony Ireland Stadium 15. Townsville Show Grounds 16. Wulguru State School
1. Alligator Creek Bowls Club 2. Annandale State School 3. Belgian Gardens State School 4. Bohlevale State School 5. Crystal Creek Sports & Recreation Centre 6. JCU Rotary International House 7. JCU Saints Catholic College 8. JCU St Marks College 9. JCU University Hall
10. Kelso State School 11. Men’s Shed Magnetic Island 12. Northern Beaches State School 13. Pimlico State High School 14. QCWA Denham Street Units 15. Rasmussen State School 16. Reid Park Pits & Grandstand 17. Riverside Gardens Community Centre 18. Riverway Arts Centre 19. Salvation Army Riverway Centre 20. Surf Lifesaving Club Magnetic Island 21. TAFE – Queensland North – Bohle Campus 22. TAFE – Queensland North – Pimlico Campus 23. Thuringowa State High School 24. Townsville Grammar School 25. Willows State School
1. Church of Jesus Christ of Latter Day Saints 2. Uniting Church 3. Bluewater State School 4. Railway Estate Community Centre 5. Annandale Community Centre 6. Heatley Community Centre 7. Oonoonba Community Centre 8. Wulguru Community Centre
Page | 29
No
Site Name
Full report & details
Site Address
Contact
Building/s
Storm Tide Zone
Area m2
Capacity
Toilets
Showers
Cooking Facility
Emergency Power
Remarks
1 1300 SMILES Stadium
1300 SMILES
Stadium Report docx.
Golf Links Drive Kirwan
Venue Manager Western Grandstand
White 272 40 16 14 2 Commercial kitchens
Yes – generator on site
Open space, kitchens, ample amenities, backup power, large parking space.
2 Australian Institute of Marine Science (AIMS)
AIMS Report .docx
Cape Ferguson
Townsville Operations & Infrastructure Manager
Library & 2
Conference Rooms
White 720 95 14 6 Commercial
Kitchen & 2 kitchenettes
Yes – 3
generators Has potable water, backup power,
kitchens, canteen, amenities, large open space.
3 Apex Camps
Apex Camps
Magnetic Island Repo
Wansfell Street Picnic Bay, Magnetic Island
Camp Manager Hall plus cabins
White 162 plus cabins
24
98
10 9 Commercial kitchen & dining room
No Cabins for families, hall has open space, stand-alone kitchen and dining room, ablutions blocks.
4 Bluewater Community Centre
Bluewater
Community Centre Re
Forestry Road, Bluewater
Treasurer Community Centre
White 256 34 7 3 Commercial kitchen
No Large kitchen with gas stoves and refrigeration, large open hall.
5 Calvary Christian College
Calvary Christian
College Report.docx
Bayswater Road Mt. Louisa
Business Manager School Auditorium
White 816 104 7 NIL Kitchen & Canteen
Wired but no generator
Portable showers are necessary.
6 Heatley State School
Heatley High School
Report.docx
Fulham Road Heatley
Business Services Manager Cyclone Shelter
White 842 120 15 5 Kitchenette yes Large generator Potable water 40000 litres.
7 Ignatius Park College
Ignatius Park College
Report.docx
364 Ross River Road Cranbrook
Property Services Manager Edmond Rice Hall
White 992 140 20 8 Commercial Kitchen
Wired but no generator
Also used as Place of Refuge.
8 Island Palms Resort
Island Palms Resort report docx.docx
13 The Esplanade
Nelly Bay Magnetic Island
Manager Self-contained
apartments Yellow 12 Units 66 2 in each
unit 2 in each
unit Kitchen in
each unit Buildings are wired for generator connection
Units will be offered on a commercial basis only.
9 Magnetic Island Community Care Centre
Magnetic Island
Community Care Cen
7 Apjohn Street Horseshoe Bay Magnetic Island
Manager Community Centre
Blue 107 14 2 1 Kitchen with gas stove, refrigerator, freezer
Building is wired for generator.
Generator held on site
Small space but has generator and emergency water, food, linen. Very large well equipped kitchen.
Page | 31
10 Paluma Community Centre
Paluma Community
Centre Report docx.d
Mt. Spec Road Paluma
President
Community Centre
N/A 126 18 3 2 (in SES/RFS area)
Kitchen Gas stove
Refrigerator Freezer
No Open space and amenities, kitchen. Only place in Paluma.
11 Rollingstone Community Centre
Rollingstone
Community Hall Repo
Mystic Avenue Rollingstone
Centre Manager
Community Hall
White 225 32 6 2 1 kitchen in Hall - gas 1 kitchen in
Lions Club building
Yes Gas stoves in Lions Club Building Commercial kitchen in Lions Club Building with dining area and outside servery.
12 Rupertswood Community Centre
Rupertswood
Community Centre Re
Progress Road Rupertswood
President
Community Hall
White 153 22 3 2 Commercial kitchen –
Gas Refrigerator & freezer
No Gas kitchen and refrigerator allow full catering. NO emergency power. Large open hall space.
13 Seven Day Adventist
Seven Day Adventist Riverside Convention
35 Leopold Street Halls White 318 plus 45 plus 34 32 Small Yes Very large separate commercial Riverside Convention Aitkenvale Pastor Units cabins 26 in units kitchen in 2 generators kitchen. Centre Cabins
Motel units motel
20 in cbns 11 in Mtl.
Hall plus commercial kitchen
on site Potable water.
14 Tony Ireland Stadium
Tony Ireland Stadium.docx
2 Sporting Drive Thuringowa
Manager Sports Facilities Tony Ireland Stadium
White 259 37 50 36 2 commercial kitchens - gas
Yes – solar powered batteries
Solar power will recharge batteries that power lightning and some other outlets.
15 Townsville Show Grounds
Townsville Show
Ground Report .docx
72 Ingham Road Townsville
Manager
Grandstand Pavilion Ron Richardson Pavilion
Yellow 1380 177 32 9 Commercial Kitchen
Yes generator will power entire building
Parking is a problem. Caravan Park residences will move to Grandstand Pavilion.
16 Wulguru State School
Wulguru State
School Report.docx
Edison Street Wulguru
Groundsman / Facilities
Multi-Purpose Hall
White 300 42 12 4 Kitchen plus Kitchen in Tuck Shop
No Kitchen in Tuck Shop is large with serving counters.
Page | 32
LEVEL B EVACUATION CENTRES
NO Site Name Full Report &
Details Site Address Contact Building/s Storm Tide Zone Area m2 Capacity Toilets Showers Cooking
Facility Emergency
Power Remarks
1 Alligator Creek Bowls Club
Alligator Creek Bowls Club Report.docx 1.d
Parkland Road, Alligator Creek
President Bowls Club House
White 200 30 10 1 Commercial Kitchen
No Needs power for refrigeration. Evac. Centre necessary for this location
2 Annandale State school
Annandale State
School Report docx.d
Oleander Street, Annandale
Business Services Manager U Block & Multi-Purpose Building
White 273 40 23 3 Kitchen in U Block Kitchenette in MPB
No Ideal centre if emergency power is provided.
3 Belgian Gardens State School
Belgian Gardens
State School report .
Potts Street, Belgian Gardens
Business Services Manager Multi-Purpose Hall
White 322 45 6 1 Kitchen has electric stove & equipment
No 1 shower limits this facility.
4 Bohlevale State School
Bohlevale State
Primary School Repor
School Road Bohle
Business Services Manager School hall & Resource Centre
White 480 66 18 2 7 individual Kitchens
No Six kitchens are in resource centre. Limited showers.
5 Crystal Creek Sports & Recreation Centre
Crystal Creek Sport
& Recreation Centre
Bruce Highway Mutarnee
President Sport and Recreation Centre
White 225 36 7 1 Kitchen with gas stove
Yes 1 shower limits this facility.
6 JCU Rotary International House
JCU - Rotary
International House r
Angus Smith Drive Townsville
Residential Assistant
Blocks:
A, B, C, D, E, F
White 118
single rooms
118 36 36 18 kitchens No Only available limited time each year.
7 JCU Saints Catholic College
JCU - Saints Catholic College report docx.d
Angus Smith Drive Townsville
Assistant Principal St. Raphael St. Paul St Mary Mackillop
White 292 single 6 double
304 69 81 Commercial Kitchen
No Only available limited time each year.
8 JCU St. Marks College
JCU - St. Mark's
College report docx.d
Angus Smith Drive Townsville
Principal
McGregor Wind Clark Wing
White 154 rooms
163 32 32 Commercial Kitchen
No Only available limited time each year.
9 JCU University Hall
JCU - University Hall
report docx.docx
Angus Smith Drive Townville
Coordinator Residential Life Halls Town houses Flats
White 200 single
5 houses 2 flats
281 31 32 Commercial Kitchen
NO Only available limited time each year.
10 Kelso State School
Kelso State School
Report .docx
Yvette Street Kelso
Business Services Manager Multi-Purpose Hall
White 378 52 7 2 Kitchen No All electric kitchen and no emergency power
Page | 33
11 Men’s Shed Magnetic Island
Men's Shed Magnetic Island Report.docx
64-88 Horseshoe Bay Road Magnetic Island
Coordinator
Smart living centre
White 72 10 6 4 Kitchen NO Very small space but ample amenities. No stove but gas B-B-Q
12 Northern Beaches State School
Northern Beaches
State High School Re
Meranti Street Deeragun
Facilities Officer Common Recreation Centre
White 875 112 8 3 Kitchen No All electric kitchen and no emergency power
13 Pimlico State High School
Pimlico State High
School Report warrre
Cnr. Fulham Road and Hugh Street Townsville
Facilities Manager
Sports Centre Arts Centre
Blue 1124 140 11 4 Kitchenette NO No cooking facility.
14 QCWA Denham Street Units
QCWA Units report .
docx.docx
134 Denham Street Townsville
Facilities Officer
Hall White 224 29 5 9 Commercial Kitchen
No Ideal centre but no emergency power.
15 Rasmussen State School
Rasmussen State
School Report.docx
19 Allambie Road Rasmussen
Business Services Manager The Hall White 330 46 7 1 Kitchen No All electric kitchen and no emergency power. 1 shower limits this facility.
16
Reid Park Pits & Grandstand
Reid Park report final .docx
Boundary Street Townsville
Venues Officer Pits and Level 1
Red 2102 280 15 Nil Nil Yes – to parts of building
No showers and no kitchen limits this facility.
17 Riverside Gardens Community Centre
Riverside Gardens
Community Centre Re
55 Riverside Gardens Douglas
Venues Officer
Community Centre
White 110 16 8 2 Kitchen No Emergency power required.
18 Riverway Arts Centre
Riverway Arts
Centre Report .docx
Village Boulevard Thuringowa Central
Venues Officer Theatre White 260 35 6 2 Nil No No cooking facility No emergency power
19 Salvation Army Riverway Centre
Salvation Army
Riverway Centre Rep
49-61 Beck Drive North Condon
Team Leader & Northern Hub Strategic Team Leader
Riverway Centre
White 565 75 7 1 Small commercial kitchen
No I shower limits this facility.
20 Surf Lifesaving Club Magnetic Island
Surf Lifesaving Club Arcadia Report.docx
Cnr. Amand Way & Hayles Avenue Magnetic Island
Townsville Office Club House Red 155 22 5 5 Kitchen No 28 beds and mattresses on site. In RED zone for storm tide.
Page | 34
21 TAFE – Queensland North – Bohle Campus
TAFE Queensland North Bohle Report.d
763 Ingham Road Townsville
Facilities Manager
Trade Training Centre
Yellow 1660 212 15 2 2 kitchenettes
No No cooking facilities In storm tide area.
22 TAFE – Queensland North – Pimlico Campus
TAFE Queensland
North Pimlico Report.
Cnr. Fulham Road & Hugh Street. Pimlico
Facilities Manager Blocks A, B, C, D, E, F, H, R, T
Blue 1567 220 40 10 3
commercial kitchens
No Asbestos in most buildings. Locations are spread across campus.
23 Thuringowa State High School
Thuringowa State
High School Report .d
26-54 Vickers Road Condon
Building Services Manager Performing Arts Centre
White 162 24 17 12 Kitchen No All electric kitchen. No emergency power
24 Townsville Grammar School
Townsville Grammar Gymnasium Report.d
Paxton Street North Ward
Director of Boarding
School Gymnasium
612 84 4 6 Canteen No No stoves for cooking
25 Willows State School
Willows State School
Report.docx
Bilberry Street Kirwan
Groundsman / Facilities
Multi-Purpose Centre
White 800 112 19 2 Kitchen No Kitchen has 3 stoves. 3 portable gas B-B-Qs. 2 showers limit this facility.
Page | 35
LEVEL C EVAUCATION CENTRES
NO Site Name
Full Report & Details
Site Address
Contact
Building/s
Storm Tide Zone
Area m2
Capacity
Toilets
Showers
Cooking Facility
Emergency Power
Remarks
1 Church of Jesus Christ of Latter Day Saints
Level C Evacuation
Centres Reports .doc
188 Fulham Road Townsville
Church Coordinator Hall Class rooms
White 168 24 4 Nil Small commercial kitchen
No No showers but good space and cooking facilities.
2 Uniting Church Veales Road Bohle Townsville
Pastor
Church White 120 18 2 No No No No showers but good space. No cooking facilities.
3 Bluewater State School Buckby Street Bluewater Townsville
Principal Resource Centre
White 85 12 8 2 Kitchenette No Back up for Bluewater Community Centre nearby.
4 Railway Estate Community Centre
23 First Avenue Railway Estate Townsville
Venues Officer Community hall
Red 162 24 5 2 Kitchen No In RED zone but good facility.
5 Annandale Community Centre
67-101 MacArthur Drive, Annandale
Venues Officer Community hall
128 18 4 Nil Kitchen No No showers. No cooking facility. No emergency power.
6 Heatley Community Centre
Cnr. Fulham Road &
Lindeman Avenue Heatley
Venues Officer Community
hall 154 22 3 Nil Kitchen No Has asbestos. No showers.
Poor ventilation.
7 Oonoonba Community Centre
2 Shannon Street Oonoonba
Venues Officer Community hall
140 20 4 1 Kitchen No In the RED zone. No cooking facility.
8 Wulguru Community Centre
14 Edison Avenue Wulguru
Venues Officer Community hall
198 28 6 Nil Kitchen No No showers. No cooking facility. Close to better centre.
Page | 36
The SECC will determine which Evacuation Centres will be required following a
disaster event and notify TLDMG. RSD will consult with the TLDMG to ascertain
how many evacuees are expected to assist in making this determination.
7.6 SERVICES
The basic human necessities such as accommodation, toilet and hand washing facilities will be provided at Evacuation Centres in addition to food, clothing and bedding supplies, welfare and recovery services and general comforts where possible. Provision of such services will be provided by agencies or organisations which are members of the SECG or where council has a MoU in place with them to provide these services.
7.7 MAINTENANCE
Regular maintenance of designated Evacuation Centres is the responsibility of the building owner. Any damage sustained during the operation of the shelter will be repaired and paid for by TLDMG.
8.0 UNAUTHORISED SHELTERS AND EVACUATION CENTRES
In the event that an un-authorised shelter or evacuation is set up outside of the TLDMG authorised process, persons housed at these centres will be encouraged to relocate to an approved shelter or evacuation centre.
The SECC will note down the details of the unauthorised shelter or evacuation centre (i.e. centre name, address, no. of people, contact person, special needs or assistance required) for monitoring and follow-up.
9.0 PRE-READY- MADE KITS
The following prepared kits are available and ready for use:
Kit Facility Quantity
Forms Kits Public Cyclone Shelter 1
Places of Refuge 2
Evacuation Centres 2
Stationary Kits Public Cyclone Shelter 1 (divided into 2 boxes)
Places of Refuge 2
Evacuation Centres 2
Equipment Kits Public Cyclone Shelter 1
Places of Refuge 2
Evacuation Centres 2
The kits are housed in Basement 3 labelled “Disaster Management” underneath `143 Walker Street, Townsville City. All kits are labelled accordingly. Access to the
Page | 37
basement is either by passcode or keys, both of which are supplied by Team Manager of Regulatory Services Department.
Equipment kits will be put together from council’s Stores before the beginning of the cyclone season (Oct). At the end of the cyclone season (June) each year, the kits are returned to Stores if not used and a refund is sought.
Note – these kits are only an initial supply and supplementary or additional supplies will be required. Additional kits will be sourced by the SECC after request from the Shelter or Centre Manager where possible.
10.0 SHELTER AND EVACUATION CENTRE SIGNAGE A-Frame signage is available with the Code of Conduct displayed on one side and the Conditions of Entry on the other. There are 10 x A-Frames in total which vary slightly depending shelter type.
They are located in Basement 3 labelled “Disaster Management” underneath `143 Walker Street, Townsville City. Access to the basement is either by passcode or keys, both of which are supplied by Team Manager of Regulatory Services Department.
It is the responsibility of the Shelter or Centre Manager to ensure that all evacuees have read and understood the Code of Conduct and Conditions of Entry prior to acceptance into the centre.
Page | 38
11.0 PROCUREMENT ARRANGEMENTS The SECC is responsible for purchasing of supplies and equipment for emergency sheltering purposes. Business support staff in Regulatory Services Department will be made available to assist with procurement during activations. Purchasing is to be undertaken in accordance with council’s procurement policies.
To find out if a council staff member has sufficient financial delegation and if they have a corporate purchase card, visit: https://inspire.townsville.qld.gov.au/tools-and- services/equipment-and-stores/purchasing/staff-financial-delegations
Unless there is a MoU in place permitting the purchase goods on behalf of the TLDMG, support agencies are to make arrangements with the SECC for purchasing.
Costs associated with an emergency sheltering activity are to be collated within council’s corporate system for inclusion in any Natural Disaster Relief and Recovery Arrangements (NDRRA) funding applications.
12.0 COMMUNICATIONS 12.1 INTERNAL COMMUNICATIONS
Communications between the SECC and Shelter or Evacuation Centre Managers will be via mobile phones. Should the need arise, the SECC will arrange through the LDC the use of UHF radios to be set up in shelters and evacuations centres and LDCC for communications between both parties.
The SECC will provide regular SITREPS and updates to the Operations Manager at the LDCC and the TLDMG regarding which shelters and evacuation centres are open or have been closed, how many people are being accommodated and any arising matters for consideration. The SECC will attend TLDMG meetings when they occur.
Telstra Integrated SMS System A Telstra Integrated SMS System has been set up to allow SMS alerts and notifications to SECG members.
Website: https://tim.telstra.com/sei/login.do?customerId=30
Townsville City Council will act as administrator of this system. 12.2 COMMUNITY AWARENESS
12.2.1 LEAN FORWARD
Council’s Emergency Management Team and Communications and Marketing team conduct regular education and media campaigns regarding preparedness during and
Page | 39
leading up to the cyclone season. Refer to council’s TLDMG Community Info and Warnings Sub-plan.
Key messages during the lean forward stage will be:
act early – be prepared for the event
seek alternative accommodation options e.g. relocate to family or friends, relocate out of Townsville
listen to regular updates
If you need to seek accommodation at a shelter, bring enough clothing, personal items and non-perishable food to last up to 36 hours (back-pack size)
Communicate who will be accepted into the public cyclone shelter
Communicate what will not be allowed at a shelter (pets, illicit drugs, alcohol etc.)
If you are to seek accommodation at a shelter, bring enough clothing, personal items and non-perishable food to last up to 36 hours
No food will be supplied at shelters
12.2.2 STAND UP
Any message or information released out the public will be done via the Media Team in the Local Disaster Coordination Centre (LDCC). Key messages during stand up stage will be:
don’t panic – try to stay calm
listen to regular updates that will be provided during the event (from shelter staff)
12.2.3 STAND DOWN
Any message or information released to the public will be done via the Media Team in the Local Disaster Coordination Centre (LDCC). Key messages during stand down stage will be:
listen to regular updates and follow instructions from the shelter staff
Some areas may not be safe to return to – listen to the updates 12.3 MEDIA
The Media Team in the Local Disaster Coordination Centre (LDCC) are responsible for responding to media enquiries and requests for interviews. Any requests should be directed to the Media Team.
Media should not be allowed to enter a shelter or evacuation centre without prior authority of the TLDMG. It is important that the privacy of personnel and evacuees at the shelter or evacuation centre are maintained. Permission must be given by personnel and evacuees before the use of film or photographic equipment.
Page | 40
Under no circumstances is information about persons who may or may not be in a shelter or evacuation centre is to be provided except to anyone except to QPS upon official request. The Register.Find.Reunite system is used to register evacuees at each shelter or evacuation centre. QPS are responsible for maintaining this register and responding to any inquiries about evacuees.
Approved interviews should be conducted away from operational areas. Should evacuees wish to speak to the media, they can at their own discretion; however these interviews are to take place outside of the centre.
12.4 DOCUMENTATION
12.4.1 SITREPS
During operations, the Shelter or Evacuation Centre Manager will be responsible for providing twice daily situational reports (SITREPS) to the Shelter and Evacuation Centres Coordinator (SECC). Further information and templates can be found in the Operating Procedures.
12.4.2 RECORDING DECISIONS
During operations, the Shelter or Evacuation Centre Manager(s) as well as the SECC will each be responsible for recording key decisions and actions they undertake in the performance of their duties. This can be recorded in the form of a diary or note book.
13.0 TRAINING AND EXERCISES 13.1 TRAINING
Training of personnel will occur through the following means:
Attendance of key personnel at the Qld Govt Public Cyclone Shelter training;
Attendance of key personnel at Qld Govt workshops and information sessions for public cyclone shelters and/or evacuation centres;
Internal training of RSD staff on Shelters and Evacuation Centres requirements; and
Attendance of key personnel at Evacuation Centre training delivered by Red Cross or SES where deemed necessary.
It is the responsibility of the TMEH to ensure key personnel in council have attended the relevant training.
SES and Red Cross are required to ensure that they have trained personnel to undertake key roles in public cyclone shelters, places of refuge and/or evacuation centres.
13.2 EXERCISES
Exercising of this Sub-plan will occur through the following means:
Page | 41
Table-top exercise each year; and
Field exercise every 2nd year. It is the responsibility of the TMEH to organise and deliver these exercises.
14.1 REVIEW AND EVALUATION This Sub-plan is to be reviewed annually, prior to the 1 November each year, by the TMEH in consultation with the SECG.
The review processes will include:
any changes from outcomes of associated plans and documents are included
updates to council’s available facilities and specifications are included
changes to the SECG and associated roles and responsibilities are included
amendments due to lessons learned from activations, exercises and training or statutory changes
On completion of each review, the sub plan is to be submitted to the TLDMG for approval.
15.1 RELATED DOCUMENTS
Townsville Local Disaster Management Plan
Evacuation Sub-Plan
Community Info and Warnings Sub-Plan
Operating Procedure Public Cyclone Shelter
Operating Procedure Places of Refuge
Operating Procedure Evacuation Centres
Operating Procedure Magnetic Island Evacuation Centres
Aged Care Facilities Standard Operating Procedure
Queensland Government: Queensland Public Cyclone Shelters Operations Guideline 2013
Queensland Evacuation Guidelines for Disaster Management Groups
RSD Animal Management Sub-plan
42
APPENDIX 1 – SUPPORT AGENCY CONTACT LIST
Agency Position Address DEPARTMENT
OF EDUCATION
TRAINING
(DET)
REGIONAL DIRECTOR
445 FLINDERS STREET TOWNSVILLE QLD 4810
PO BOX 5179 TOWNSVILLE QLD 4810
MANAGER FACILITIES
445 FLINDERS STREET TOWNSVILLE QLD 4810
PO BOX 5179 TOWNSVILLE QLD 4810
AUSTRALIAN
RED CROSS
CALL FOR ACTIVATION
DUTY OFFICER
REGIONAL MANAGER NQ
12 WICKHAM STREET TOWNSVILLE QLD 4810 PO BOX 670 TOWNSVILLE Q 4810
EMERGENCY SERVICES REGIONAL COORDINATOR
245 LAKE STREET CAIRNS QLD 4870
CENTACARE
NORTH QLD
TEAM LEADER PO BOX 1362 AITKENVALE 4814
43
QLD POLICE
SERVICE
SENIOR SERGEANT
OFFICER IN CHARGE MUNDINGBURRA POLICE STATION
DISTRICT INSPECTOR
INSPECTOR PATROL SERVICES – SOUTH TOWNSVILLE DISTRICT
QLD
AMBULANCE
SERVICE
OFFICER IN CHARGE – TOWNSVILLE
PO BOX 5246 TOWNSVILLE QLD 4810 225 HUGH STREET CURRAJONG
ST JOHN
AMBULANCE
QLD
STATE OPERATIONS COORDINATOR (NORTH)
QLD FIRE AND
EMERGENCY
DIRECTOR FIRE SERVICES EMERGENCY
PO BOX 5845
SERVICES MANAGEMENT COORDINATOR
TOWNSVILLE QLD 4810
ST VINCENT DE
PAUL SOCIETY
EXECUTIVE OFFICER/ RETAIL STORES COORDINATOR
PO BOX 5692 TOWNSVILLE 4810
DIOCESAN PRESIDENT
PO BOX 5692 TOWNSVILLE 4810
THE SALVATION MAJOR
TOWNSVILLE RIVERWAY
P O BOX1745 THURINGOWA CENTRAL 4817
44
ARMY
LIEUTENANT TOWNSVILLE P O BOX 25 FAITHWORKS AITKENVALE 4814 13 MADDEN STREET AITKENVALE
SAVE THE REGIONAL PO BOX 951
CHILDREN COORDINATOR THURINGOWA CENTRAL
ORGANISATION Q 4817
REGIONAL
COORDINATOR PO BOX 951 THURINGOWA CENTRAL Q 4817
STATE LOCAL PO BOX 5419
EMERGENCY CONTROLLER TOWNSVILLE Q 4810
SERVICE (SES)
TOWNSVILLE
ABORIGINAL
AND ISLANDERS
HEALTH
SERVICES LTD
(TAIHS)
INTERIM CHIEF EXECUTIVE OFFICER
PO BOX 7534 GBC TOWNSVILLE 4814 57-59 GORDEN STREET GARBUTT QLD 4814
CASE
COORDINATION
DEPARTMENT OF COMMUNITIES -
PO BOX 953 TOWNSVILLE QLD 4810
45
GROUP
(HOMELESS)
NORTHERN REGION
TOWNSVILLE
CITY COUNCIL
SES STAFF OFFICER
PO BOX 1268 TOWNSVILLE 4810
TEAM MANAGER ENVIRONMENTAL HEALTH
CHAIR – SHELTERS & EVACUATION CENTRES GROUP SHELTERS & EVACUATION CENTRE COORDINATOR (SECC)
PO BOX 1268 TOWNSVILLE 4810
PUBLIC CYCLONE SHELTER MANAGER
PO BOX 1268 TOWNSVILLE 4810
ACTING COORDINATOR ENVIRONMENTAL HEALTH
PO BOX 1268 TOWNSVILLE 4810
46
GENERAL PO BOX 1268 MANAGER TOWNSVILLE 4810 REGULATORY SERVICES
LOGISTICS OFFICER MAGNETIC ISLAND LOCAL DISASTER MANAGEMENT GROUP
PO BOX 1268 TOWNSVILLE 4810
ACTING TEAM PO BOX 1268 MANAGER, TOWNSVILLE 4810
EMERGENCY MANAGEMENT
47
APPENDIX 2 – ROLES AND RESPONSIBILITIES OF SUPPORT AGENCIES
ROLE AGENCY RESPONSIBILITY TASKS
Activation Townsville LDMG Activation of the Sub-plan Advise the General Manager Regulatory Services (GMRS) when the Plan has been activated and if a shelter or evacuation centre is required.
Coordination Regulatory Services Department (TCC)
Manage the Shelters & Evacuation Centres process
Implementation of this Sub-plan
Appoint an SECC
Notify and seek assistance from support agencies
Appoint a Shelter or Evacuation Centre Manager at each facility
Representation at TLDMG meetings
Activate Operating Procedures
Liaise with building owners to acquire facility when required
Activate participating agencies and maintain communication links
Coordinate the opening and closing of shelters and evacuation centres
Provide support and organise equipment and supplies for each facility
Monitor shelters and evacuation centre to ensure they are adequate resourced, equipped and managed
Communicate and provide regular updates to the TLDMG
Provide regular SITREPs to the TLDMG and be represented at TLDMG meetings
Regularly communicate with shelter and evacuation centre managers (SES/Red Cross) and support agencies
Shelters and Evacuation Centres Management
State Emergency Services (SES)
To act as centre manager for the evacuation centres until Red Cross become available.
Run and manage shelters and/or evacuation centres according to operational procedures
Completion of all Operational Forms
Provide minimum of 2 officers at each shelter or evacuation centre
Directly communicate with the SECC and provide regular SITREPS (as requested)
Liaise and coordinate with support agencies in the operation of shelters and evacuation centres
Supply of communication tools e.g. radios, mobile phone
Assist with registering and data collection on to Register, Find, Reunite Forms
48
Communicate and report to the SECC
Maintain an attendance register of support agency personnel
Provide and complete the required operational forms
Maintain shelter area and facilities in a clean and useable condition
Manage supplied stock and allocate supplies as necessary
Ensure appropriate signage/notices are displayed and information communicated to persons
Report any incidences to SECC
Evacuation Centre Management
Australian Red Cross
To act as centre manager at evacuation centres
Run and manage evacuation centres according to operational procedures
Provide for the safe welfare of people at each centre
Completion of all Operational Forms
Communicate and report to the SECC
Provide minimum of 2 officers at each centre
Directly communicate with the SECC and provide regular SITREPS (as requested)
Operation, establishment & co-ordination of each centre
Establishment of centre supplies and centre layout
Liaise and coordinate with support agencies in the operation of each evacuation centre
Provision of communication tools e.g. mobile phone
Manage the Register, Find, Reunite forms process (data collection and entry into system)
Maintain an attendance register of support agency personnel
Provide and complete required operational forms
Maintain centre area and facilities in a clean and useable condition
Maintain a secure stock area
Ensure appropriate signage/notices are displayed and information communicated to persons
Report any incidences to the SECC
Support Queensland Support SES in the Provide minimum of 2 officers at each shelter (including Ignatius Police Service operation of each place of Provide on-site support to SES Park Assembly (QPS) refuge Manage the Register, Find, Reunite forms process (data Hall) Support SES in the collection and entry into system)
operation of the public Manage missing persons report and enquiries cyclone shelter Maintain calm and good order within the shelter
49
Provide for the safe Manage traffic and parking control/s where possible welfare of people at each shelter
Manage the Register,
Find, Reunite process for all shelter and evacuation centres
Support Qld Fire & Fire safety and control at Provide min. 2 officers at the public cyclone shelter Emergency the public cyclone shelter Ensure safe access and passage ways are maintained
Services Ensure evacuees adhere to fire safety rules in place
Shelter Respective To implement their Assist in the transportation of their clients Management Retirement disaster management Provide sufficient qualified staff to care for their clients (Ignatius Park Village plans Provide the necessary supplies e.g. bedding, clothing, food, Assembly Hall only) Management medical, equipment
Provide client welfare services
Provide client medical needs
Report any incidences to the Centre Manager
Welfare Support (Homeless and Indigenous)
TAIHS Dept of Communities
Provide welfare support services at shelters and evacuation centres
Provide appropriate care to injured persons
Provide on-site support to QPS
Assist with registering and data collection on to Register, Find, Reunite forms
Assist with translation and relaying of information
Provide appropriate care to persons
Maintain accommodation area and facilities in a clean and useable condition
Report any incidences to the Centre Manager
Medical Support QAS Provide appropriate care Provide appropriate care to persons (excluding Ignatius to injured persons at Report any incidences to the Shelter or Centre Manager Park Hall unless an shelters and evacuation emergency) centres
Medical Support St John Provide appropriate care Provide support to QPS (excluding Ignatius Ambulance Qld to persons at the shelters Provide appropriate care to persons Park Hall unless an and evacuations centres Report any incidences to the Centre Manager
50
emergency)
Building Management
Building Owners / Building Managers
Provide availability of building to operate as a shelter and/or evacuation centre
Notify building tenants of buildings and seek cooperation
Provide building access keys / cards to the SECC
Arrange clearance of the car park / basement area / storage areas where possible
Report any faults or issues to the SECC
Advise SECC of any area off limits / not to be used
Participate in the handover and hand back process
Catering The Salvation Army
Provide catering services and supplies for agency personnel and evacuees at evacuation centres
Supply of skilled personnel to provide the catering services
Provision of adequate food and refreshments at scheduled meal intervals
Provision of cutlery, crockery & serving utensils
Maintain a sufficient food stock inventory and resupply
Report any incidences and resource needs to the Centre Manager
Bedding / Clothing Supplies
St Vincent De Paul Society
Seventh Day Adventist Church
Provide adequate bedding and clothing supplies at the evacuation centres
Coordinate the bedding and clothing requirements at the centre/s
Provide sufficient bedding requirements (e.g. mattresses, blankets, pillows etc.)
Provide sufficient clothing needs
Report any incidences and resource needs to the Centre Manager
Welfare Support of Evacuation Centres
Centacare North Qld
Provide counselling services for agency personnel and evacuees at evacuation centres
Provide welfare and recovery support services at evacuation centres
Monitor agency personnel and evacuees for signs of fatigue, stress etc.
Where appropriate, provide counselling to Agency personnel and evacuees
Assist in relaying information to evacuees to ensure they understand
Assist evacuees in accessing welfare support and Centrelink opportunities and referral to other appropriate agencies after event
Assist evacuees in their recovery back into the community
51
Child Support Save The Children Organisation
Provide child support services at evacuation centres
Ensure children are adequately cared for and accommodated within the centres
Establish/ set up appropriate Child Friendly Areas within the centres
Report any incidences to the Centre Manager
Evacuation of Homeless
CASE Coordination Group
Coordinate the plan for evacuation of homeless persons to Places of Refuge
Refer to separate plan
52
APPENDIX 3 – AGENCIES CAPACITY TO RESPOND
Capacity to Respond – DEPARTMENT OF EDUCATION TRAINING (DET)
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter NO Facility only DET will not be providing
staff
NIL DET will not be providing staff to man centres
Place of Refuge NO Facility only DET will not be providing
staff
NIL DET will not be providing staff to man centres
Evacuation Centre NO Facility only DET will not be providing
staff
NIL DET will not be providing staff to man centres
NOTE: Nominated evacuation centres at school sites may or may not be available after an event. It will be determined on whether or not the facility will be
required for education purposes. Example, if classrooms are damaged, the nominated evacuation facilities may be required to be used as temporary classrooms
etc.
Capacity to Respond – AUSTRALIAN RED CROSS
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter YES
10-15
1 x team Provide for registration than a smaller team during lockdown for
psychological welfare.
Place of Refuge NO NIL NIL
Evacuation Centre YES
6-8 2 x teams
2 x teams to open 2 x evacuation centres. 6-8 people per centre in the
first 8 hours. Can bring in more
53
people if required.
Capacity to Respond – CENTACARE NORTH QLD
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter NO NIL NIL
Place of Refuge NO NIL NIL
Evacuation Centre YES 2 Depends on staff availability year to year and type of
event
List is made annually and on-call contact can give an approximate
figure when contacted
Capacity to Respond – QUEENSLAND POLICE SERVICE (QPS)
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter YES 2 2 X teams QPS officers will be found to have a presence in each type
Place of Refuge YES 2 5-6 x teams QPS officers will be found to have a presence in each type
Evacuation Centre YES 2 As required QPS officers will be found to have a presence in each type
Capacity to Respond – QUEENSLAND AMBULANCE SERVICE (QAS)
Presence required Minimum number of staff Minimum number of Comments
54
per building team building teams available Public Cyclone Shelter YES 4 1
Place of Refuge YES 0 As required
Evacuation Centre YES 0 As required
Capacity to Respond – ST JOHN AMBULANCE QLD
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter YES NA NA NA
Place of Refuge YES 2
Evacuation Centre YES 2
Capacity to Respond – QUEENSLAND FIRE AND EMERGENCY SERVICES (QFES)
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter YES
4 x persons: (1 x station officer
3 x fire fighters)
A crew for each cyclone shelter
1-2
Place of Refuge As required Dependent on number of people and power situation
Evacuation Centre As required Dependent on number of people and power situation
NOTE: Damage assessment in conjunction with council of shelters, places of refuge and evacuation centres. Will provide a report to council on damage
assessment.
Capacity to Respond – ST VINCENT DE PAUL SOCIETY
55
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter N/A NA NA NA
Place of Refuge N/A NA NA NA
Evacuation Centre YES - Supplies only 0 0 Only to supply bedding etc.
Capacity to Respond – THE SALVATION ARMY
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter N/A NA NA NA
Place of Refuge N/A NA NA NA
Evacuation Centre YES
Capacity to Respond – SAVE THE CHILDREN ORGANISATION
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter N/A NA NA NA
Place of Refuge N/A NA NA NA
Evacuation Centre YES
Capacity to Respond – STATE EMERGENCY SERIVES (SES)
Presence required Minimum number of staff Minimum number of Comments
56
per building team building teams available Public Cyclone Shelter YES 4 ( to manage rest breaks) 2 Pre-deployment teams from other
areas available through RM SES
Place of Refuge YES 4 2
Evacuation Centre YES – if available
2
2
Dependent on needs of community. May need all hands on deck at
Green Street.
Capacity to Respond – TOWNSVILLE ABORIGINAL AND ISLANDERS HEALTH SERVICES LTD (TAIHS)
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter ? ? ? ?
Place of Refuge
Evacuation Centre
Capacity to Respond – CASE COORDINATION GROUP (HOMELESS)
Presence required Minimum number of staff per building team
Minimum number of building teams available
Comments
Public Cyclone Shelter ? ? ? ?
Place of Refuge
Evacuation Centre
57
APPENDIX 4 –SUPPORT AGENCY PRESENCE AT EACH FACILITY
FACILTY SUPPORT AGENCIES
Heatley Public Cyclone Shelter State Emergency Service (SES)
Qld Police Service (QPS)
Qld Fire & Emergency Services (QFES)
Qld Ambulance Service (QAS)
St John’s Ambulance
Places of Refuge State Emergency Service (SES)
Qld Police Service (QPS)
Qld Ambulance Service (QAS)
St John’s Ambulance
Evacuation Centres Australian Red Cross or State Emergency Service (SES)
Qld Police Service (QPS)
Qld Ambulance Service (QAS)
St John’s Ambulance
Salvation Army
Centacare NQ
Save the Children Provision of supplies:
St Vincent De Paul’s
Seventh Day Adventist
58
APPENDIX 5 – ROLE OF THE SECC
The SECC is responsible for undertaking the following:
Phase: Responsibility:
Pre-cyclone season
(undertaken by the Team Manager Environmental Health (TMEH))
Annual review and update of the sub-plan and operating procedure
Consult with support agencies for the review and update of the sub-plan and procedures
Put arrangements in place and undertake preparedness activities
Implement improvements to the shelter and evacuation centre process
Organise relevant training and coordinate exercises for key personnel in the shelter and evacuation centre process
Chair Shelter and Evacuation Centre Group (SECG) meetings
Provide regular reports to the TLDMG
Keep up to date with state government legislation and guidelines relating to shelters and evacuation centres
Alert (undertaken by the Team Manager Environmental Health (TMEH))
Remain alert and ready to respond
Inform SECG members and RSD staff of the current situation
Lean Forward (SECC appointed by GMRS depending on staff availability)
Take preparations to identify shelter and evacuation centre requirements
Contact and alert building owners and/or take measures to take possession of particular facilities if necessary
Contact SECG members and put them on stand-by
Inform RSD staff of the current situation
Determine staff availability and capacity to respond
Alert council’s Stores department regarding the possibility of the need for supplies
Stand Up (SECC appointed by GMRS depending on staff availability)
Contact all SECG members to provide them an update on the situation
Contact directly support agencies that will be required in the response for activation
Form a response team with Regulatory Services Department to assist with activation
Organise with the building owners to take possession and handover of their facility
Coordinate the set-up of the necessary facilities (either shelters or evacuation centres)
Coordinate the delivery and set up of supplies in each facility
Coordinate with support agencies to ensure there are adequate personnel to manage the facility
59
Communicate status and readiness with the TLDMG
Continue to provide regular updates to SECG members and the TLDMG
Attend TLDMG meetings
Monitor each facility and provide support and assistance to Shelter or Centre Managers
Organise for the re-supply of requirement at each facility
Stand Down (SECC appointed by GMRS depending on staff availability)
Provide advice to Shelter or Centre Managers when to close the facility
Assist Shelter and Centre Manager where possible with closing the facility
Organise for any supplies and equipment to be removed and returned to Stores or external suppliers
Coordinate the clean-up and repair of facilities where necessary
Coordinate the hand-back of the facility to the building owners
Inform TLDMG when facilities have been closed
Organise a debrief with Shelter or Centre Managers and staff at each facility
Organise a debrief with Regulatory Services Department staff
Attend TLDMG meetings
Provide a report to the TLDMG with an overview of the activation, lessons learnt and future improvements
Review and update the shelters and evacuation centres sub-plan and procedures
Finalise payment, collate invoices/receipts and account for any procurement in council’s corporate system
60
APPENDIX 6 – SECG TERMS OF REFERANCE
1. Purpose
The Shelters and Evacuation Centres Group (SECG) provides a forum for a
collaborative approach between Townsville City Council and supporting agencies for implementing the Shelters and Evacuation Centres Sub Plan under the authority of the Townsville Local Disaster Management Plan (TLDMP).
2. Roles and Responsibilities
To actively participate in the reviews and evaluations of the Shelters and
Evacuation Centres Sub Plan and provide expert advice to help refine the roles and responsibilities and key actions required to ensure the effective implementation of the sub plan.
To confirm each agency individual emergency response plans meet the requirements of this sub plan.
To communicate this sub plan within each agency and provide the appropriate training as required.
To actively participate in the SECWG meetings.
To actively participate in any exercises testing the performance of this sub plan and provide constructive evaluations and suggested improvements.
To provide reports to the LDC – TLDMG via the Team Manager Environmental Health as necessary.
3. Chairperson
The Chairperson will be the Team Manager Environmental Health.
If that person is not present, then a delegate from the Regulatory Services Department will be provided.
In the absence of these representatives, members at the meeting can elect a chairperson for that meeting.
4. Secretariat
The Team Manager Environmental Health will arrange the secretariat duties
at each meeting
In the absence of the Team Manager, members at the meeting can elect a secretariat for that meeting.
Duties include:
o maintaining the membership register o recording and distributing agenda, minutes and other required documents
for meetings o maintaining an updated contact register o coordinating and tracking action items arising from each meeting, and o attending to any other business of the SECWG.
61
5. Membership
Core Membership is to include:
Team Manager Environmental Health (Chair)
Secretariat
LDC - TLDMG
SES Controller
Representatives from:
o Australian Red Cross o Centacare o QPS o QAS / St John Ambulance Qld o St Vincent de Paul Society o Save the Children Organisation o The Salvation Army o TAIHS o QFES o TCC Media Team
6. Communication
Face to face meetings - at least two times per year
Email communications as needed
Teleconferencing/Video Teleconferencing (if available) 7. Meetings
To be held two times per year being:
March - to update learning’s from the past season and confirm exercise planning
Late Oct / early Nov – to confirm all plans and documents are ready for upcoming season
Meeting to be called by the Chairperson
Members may request a special meeting to the Chairperson in which the Chairperson may call a special meeting depending on the circumstances.
8. Agenda
Agenda will be distributed at least five working days prior to the next
scheduled meeting.
The membership can request an item to be placed on the agenda up to seven working days prior to the next meeting. Alternatively, the item can be introduced as Other Business.
9. Proxies
Members are encouraged to nominate a proxy if they are unable to attend a
meeting.
62
10. Quorum
No business should be conducted at meetings without a quorum.
The Chairperson will decide whether the meeting will go ahead.
Quorum will comprise half the membership plus one
11. Training and Exercises
According to the Sub-plan
63
APPENDIX 7 – MEMORAMDUM OF AGREEMENTS
Townsville City Council has the following Memorandum of Agreements in place to support the shelter and evacuation centre process.
Agencies Expiry Date Reference Number
ECM Set ID No. Salvation Army 11th September 2019 10547114
Department of Education Training and Employment (DETE)
30th June 2017 10547095
Australian Red Cross 28th February 2017 10558298
64
APPENDIX 8 – FUTURE IMPROVEMENTS / ACTIONS
Below is a list of identified future improvements or actions which will ensure that
RSD continues to be adequately prepared for activation of this Sub-plan:
Review of all current evacuation centre to ensure they are still fit for purpose
Identify buildings that may be suitable for use as places of refuge or
evacuation centres not already identified.
Review occupancy rates and layout / design in accordance with the Australian
Red Cross Preferred Sheltering Practices for Emergency Sheltering in
Australia
Develop a pool of trained and capable personnel to fill the Shelter Manager
role at Heatley Public Cyclone Shelter and Places of Refuge
Identify which shelters will be utilised for each type of vulnerable group
Implement an arm band or identification system for directed evacuations
Set up formal agreements or MoU’s with building owners for shelters and
evacuation centres which are non-government facilities
Develop a fire safety plan for all shelters