share fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · hook-up and commissioning...

18
Share Fair 2016 Re-engineering how we engage with the supply chain © Amec Foster Wheeler 2016

Upload: others

Post on 08-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

1

Share Fair 2016Re-engineering how we engage with the supply chain

© Amec Foster Wheeler 2016

Page 2: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

In case of emergency

2

A

B

C

D

E

Aker Solutions (AM)Amec Foster Wheeler (PM)

BP

Innovation Hub

Chevron (AM)TOTAL (PM)

Nexen

Page 3: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

Forward looking statements

Certain statements in this presentation are forward looking statements. By their nature, forward looking statementsinvolve a number of risks, uncertainties or assumptions that could cause actual results or events to differ materiallyfrom those expressed or implied by the forward looking statements. These risks, uncertainties or assumptionscould adversely affect the outcome and financial effects of the plans and events described herein. Forward lookingstatements contained in this presentation regarding past trends or activities should not be taken as representationthat such trends or activities will continue in the future. You should not place undue reliance on forward lookingstatements, which apply only as of the date of this presentation.

This presentation does not constitute or form part of any offer or invitation to sell, or any solicitation of any offer topurchase any shares in the Company, nor shall it or any part of it or the fact of its distribution form the basis of, orbe relied on in connection with, any contract or commitment or investment decisions relating thereto, nor does itconstitute a recommendation regarding the shares of the Company.

Past performance cannot be relied upon as a guide to future performance.

3

Page 4: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

Amec Foster WheelerAt a glance

4

Page 5: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

Amec Foster WheelerOil & Gas capabilities

5

Facilities Engineering

Operations and Maintenance Support

Major Brownfield Projects

Production Operations

Duty Holder

Major Greenfield Projects

Project Management Contractor (PMC)

Opex

Capex

Design &Construct

Hook-Up &Commission Operate Decommission

Concept &Front End

Asset Support

Operationalreadiness Start -Up

Oil & Gas Capabilities

Page 6: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

Amec Foster WheelerNorth Sea Upstream Centre of Excellence

6

► Operations & maintenance► Duty holder► Brownfield expertise► Consultancy► Commissioning & completions► Late life & decommissioning

Driving business efficiency

across safe operations

5,000 people across 8 locations

Page 7: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

More 4 Less

7

PROCESSWhat we do !PROCESS

What we do !

PERFORMANCEHow well we do it !PERFORMANCEHow well we do it !

PEOPLEWho does it !

PEOPLEWho does it !

Improving delivery and adding value by doing things differently, removing wasted effort and unproductive processes - and their related costs.

Page 8: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

Why are we here?

8

Engage with the supply

chain

Learn about new technology and innovation

Drive industry

sustainabilityShare

information

Page 9: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

9

Amec Foster Wheeler Opportunities

Project / contract Scope

Hook-up and commissioning services

Operations, maintenance and project support

Hook up, commissioning and follow-on engineering

Engineering, procurement and construction services

Engineering, procurement and construction services

Operations and maintenance

BP Clair Ridge HUC

BP Forties Pipeline System (FPS)

BP Glen Lyon FPSO

Centrica Storage Limited

ConocoPhillips E&C

ConocoPhillips O&M

2017

2020

2017

2021

2017

2020

Planned completion dateClient

Page 10: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

10

Amec Foster Wheeler Opportunities

Project / contract Scope

Hook up and commissioning services

Operating support

Integrated services contract

Engineering, procurement and construction services

Engineering services support (call-off basis)

Hook up and commissioning services

Offshore labour supply

2017

2018

2018

2020

2019

2017

2019

Planned completion dateClient

Cygnus

Dunlin

Maersk Oil

Nexen

Repsol Sinopec ESS

Repsol Sinopec MAR

Repsol Sinopec OLS

Page 11: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

11

Our subsidiariesOpportunities

Project / contract Scope

Engineering

Offshore labour supply

Commissioning

Repair orders

2020

2021

2018

2017

Planned completion dateSubsidiary

Marathon Oil

Marathon Oil

Apache

Chevron

Page 12: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

12

What do we need?

Category 2

Valves Major tagged items

Category 1

Mechanical packagesE&I packages

Category 3

Stud boltsGasketsPiping bulksE&I bulks

Category 4

FabricationInstrument tubing & fittingsSupply house services

Supply Risk

Valu

e / C

ompl

exity

Low High

High

Page 13: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

13

Industry related initiatives

Amec Foster Wheeler has consistently achieved the highest award from Oil & Gas UK in line with the Supply Chain Code of Practice (SCCoP) tiered compliance

This means

► We provide up to date information on supply chain opportunities

► We pay our suppliers on time

► We conduct our business safely, ethically and respectful of the environment

2015 2014 20122013 2011 2009-2010

2016

Page 14: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

More 4 Less procurementHelp us add value to our clients’ operations

14

► New ideas► New materials► Challenge scopes

► Collaboration► Reduce costs► Reduce time spent

► Right first time► Eliminate risks► Zero harm

Page 15: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

What do we look for in a supplier?Supplier pre-qualification and selection

15

► Registered within the Achilles FPAL database

► Top quartile performance feedback

► What differentiates you from your competition?

► What efficiency and innovation can you bring to More 4 Less procurement?

Page 16: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

Collaboration – we’re actually doing it! Developing strategic relationships with suppliers

16

Supplier governance

Development &

collaboration

Performance management /

KPIs

Supplier rationalisation

70% reduction in no. ofsuppliers / admin costs

Quarterly sponsorship engagements

Opportunities for collaborative working

Cost efficiencies & volumeleverage£

Increased supplier performance analysis against set KPIs

Quicker response to sharp end requirements

Sharper governance structure

Developing an integrated E2E supply chain

Page 17: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and

Contact us: [email protected]

Register at:http://www.amecfw.com/services/supply-chain-management

17

Page 18: Share Fair 2016oilandgasuksharefair.co.uk/wp-content/uploads/2016/... · Hook-up and commissioning services Operations, maintenance and project support Hook up, commissioning and