1 SH114/SH121 DFW Connector Public Hearing February 24, 2009

Upload: others

Post on 28-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

1

SH114/SH121 DFW Connector

Public HearingFebruary 24, 2009

Page 2: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

2

SH 114/SH 121 DFW Connector Public Hearing

SH 114 - FROM: Business 114LTO: International Pkwy

City of Grapevine, City of Southlake, City of Coppell, Tarrant and Dallas County, Texas

CSJs: 0353-03-059, 0353-03-079, 0364-01-072, 0364-01-112, 0364-01-113, 0364-01-115

Grapevine Convention CenterFebruary 24, 2009

SH 121 - FROM: SH 360TO: FM 2499

Page 3: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

3

Project Vicinity Approximately 14.4 Total Miles

D/FWAirport

SH121

FM2499

SH114

SH121

SH360

635

City ofGrapevine

City ofCoppell

Town ofSouthlake

City ofColleyville

SH26

SH114

Dal

las

Cou

nty

Tarr

ant C

ount

y

Page 4: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

4

A CDA:

Is a Public/Private Partnership

Enables TxDOT to Construct Projects to Reduce Congestion and Improve Traffic Operations

Provides Assistance to TxDOT through Right-of-Way/Utility Services, Design, Construction and Capital Maintenance of the DFW Connector.

Project Implementation

Page 5: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

5

TxDOT has solicited proposals to enter into a Comprehensive Development Agreement (CDA) for the DFW Connector Project.

SH 114: From Business 114L to International ParkwaySH 121: From SH 360 to FM 2499

Project Implementation

Page 6: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

6

Project Information:

Estimated Start of Construction: 2009(utilizing a CDA process)

Estimated Duration of Construction: 5 years

Project Implementation

Page 7: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

7

Project Overview

Page 8: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

8

Inform Attendees Of Project Status And Present Recommendations

Describe The Project So Attendees Can Determine How They May Be Affected

Provide Another Opportunity To Provide Input

Public Hearing Purpose

Page 9: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

9

Welcome & IntroductionsMs. Maribel P. Chavez, P.E.

Project OverviewMs. Judith J. Anderson, P.E.

Project DesignMr. Brian Swindell, P.E.

Right-of-Way Acquisition and RelocationMr. Scott Hall

20 Minute Recess

Public CommentsMs. Judith J. Anderson, P.E

AdjournmentMs. Maribel P. Chavez, P.E.

Public Hearing Agenda

Page 10: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

10

Oral Statements Tonight:Please sign up at the front desk to speak

Mail Written Comments to: Ms. Maribel P. Chavez, P.E.ATTN: Curtis Loftis, P.E.

Texas Department of TransportationP.O. Box 6868

Fort Worth, Texas 76115

** Written Comments must be postmarked by March 6, 2009

Public Comments

Page 11: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

11

Prior Public Involvement

1st Public Mtg (5/21/97) – Project Kickoff2nd Public Mtg (9/3/98) – Alternative Identification3rd Public Mtg (12/10/98) – Initial Screening4th Public Mtg (4/27/99) – Preferred Mode Selection5th Public Mtg (7/15/99) – Emphasis Area Evaluations6th Public Mtg (2/23/06) – Proposed Alternative Presentation

Technical Advisory Committee Meetings– Members include:

TxDOTCitiesCountiesD/FW AirportFort Worth TDARTFHWANCTCOGOthers

Page 12: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

12

DFW Connector Capacity SH114/SH121 Concurrent Segment

2030 Demand = 369,000 veh/dayExisting Capacity = 160,000 veh/dayCapacity Required = 209,000 veh/day

Page 13: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

13

The Environmental Assessment prepared for the proposed project is based on the design that is being presented tonight.

The Environmental Assessment evaluated effects of the proposed project on various physical, biological, social, and economic categories.

NEPA Process

Page 14: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

14

Project Design

Page 15: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

15

Project Location/ Corridor Features

Tarrant CountyDallas CountyTxDOT-Fort WorthTxDOT-DallasFHWANCTCOG

D/FW Airport

City of GrapevineCity of CoppellCity of ColleyvilleTown of Flower MoundCity of Southlake

DARTFort Worth TDFW Rail

Grapevine Mills MallBass Pro ShopGaylord TexanBaylor Hospital

City ofGrapevine

City ofCoppell

Town ofSouthlake

City ofColleyville

SH121

FM2499

SH26 SH

114

SH114 635

SH121

SH360

D/FWAirport

Dal

las

Cou

nty

Tarr

ant C

ount

y

Page 16: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

16

Operational Constraints

SH121

FM2499

SH26

SH114

SH121

SH360

SH114 635 Spacing

1 Mile

1 Mile

2.5 Miles

1 Mile

6 Interchanges4

3

3

3

43

10 System Connectio ns

Page 17: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

17

Existing Facility SH114/SH121 Concurrent Segment

FrontageRoad

FrontageRoad

4 4

WestboundGeneralPurposeLanes

EastboundGeneralPurposeLanes

Page 18: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

18

Proposed Facility SH114/SH121 Concurrent Segment

FrontageRoad

FrontageRoad

Managed (Toll)Lanes

7 2 2 6

EastboundGeneralPurposeLanes

WestboundGeneralPurposeLanes

Page 19: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

19

The Proposed Preferred Alternative

Route Continuity

Lane Balance

Interchange Design

Collector- Distributor

Managed Facility

Utility Considerations

Accommodate Light/Commuter Rail

SH121

FM2499

SH26 SH

114

SH121

SH360

SH114

635

Page 20: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

20

DFW Connector Computer Visualization

Page 21: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

21

Right-of-Way Acquisition

and Relocation

Page 22: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

22

US Constitution (First Amendment) protects individual rights to own property.

Fifth Amendment to the Constitution establishes the Laws of Eminent Domain.

Eminent Domain Law applies only to projects with a demonstrated public need.

Advanced planning identifies a need and through public involvement and local coordination, compelling support for the project is established.

Public Need for Private Property

Page 23: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

23

1. Law passed in 1970 that was designed to ensure that anyone who owned property needed for a public purpose would be treated fairly.

2. The law establishes guidelines for the acquisition of property and the relocation of displaced individuals and businesses.

Uniform Relocation Assistance and Real Property Acquisition Act of 1970

Page 24: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

24

Property owner must be notified in writing of the need for his/her property.

An independent appraiser is hired to do a detailed appraisal of the property.

Appraiser must have experience in appraising properties similar to the subject property.

Property owner must be given the opportunity to accompany the appraiser when the property is inspected.

Appraisal report must be reviewed by another appraiser who will certify that uniform standards of appraisal practice were used in determining value.

Acquisition of Property

Page 25: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

25

A written offer to the property owner is made based on the valuedetermined in the appraisal.

Property owner is given a minimum of 30 days to consider the offer.

If the offer is acceptable, a closing at a title company is arranged.

If the property owner considers the offer unacceptable, the options available to the landowner under the laws of eminent domain will be explained.

Acquisition of Property

Page 26: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

26

At the time of the offer of purchase or shortly thereafter, a Relocation Assistance Agent will meet with the property owner toexplain the benefits of the program.

This program is designed to ensure that a displaced residential occupant is properly relocated with no undue financial hardship and minimum inconvenience.

Business displacees are entitled to reimbursement of cost to move personal property and inventories.

Some reestablishment expenses are eligible for reimbursement under this program.

Relocation Assistance

Page 27: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

27

Right of Way Acquisition Process

Page 28: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

28

Displacements and Relocations

– 192 acres of right-of-way required – Majority is DFW Airport property

– 0 residential displacements– 7 buildings displaced including 16 businesses

Project Timing

– Anticipate being released to begin right of way acquisition by Summer 2009.

Project Specifics

Page 29: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

29

It is the policy of the Texas Department of Transportation that individuals impacted by transportation systems expansion shall not be denied benefits excluded from participation or otherwise be subjected to discrimination based on the grounds of race, color, sex, age, handicaps, or national origin.

Equal Treatment Policy

Page 30: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

30

If you have questions, please call.817-370-6551

In the months ahead if you have questions or hear rumors about what's happening with this project, please call our office and we will get your questions answered.

Caution and Concerns

Page 31: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

31

Public Officials

Page 32: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

32

TxDOT- Fort Worth District Office2501 Southwest Loop 820Fort Worth, Texas 76115

Contact: Phyllis Thompson, District Librarian(817) 370-6549

City of Grapevine – City Hall200 S. Main St., 1st Floor

Grapevine, TX 76051Contact: Linda Huff, City Secretary

(817) 410-3182

Public Inquiries

City of Grapevine – Library1201 Municipal WayGrapevine, TX 76051

Contact: Janis Robertson, Library Director(817) 410-3410

City of Coppell255 Parkway BlvdCoppell, TX 75019

Contact: Ken Griffin(972) 304-3686

City of Southlake1400 Main Street, Suite 310

Southlake, TX 76092Contact: Ken Baker

(817) 748-8621

Environmental Assessment and Schematics may be viewed at…

Page 33: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

33

20 Minute Recess– Please register your attendance and sign up to speak at

the front desk

Public Comment PeriodFollowing Recess

Recess

Page 34: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

34

Public Comment Period

Please note that we will not attempt to respond to your comments at this time.

Please state your name and address for the record.

Public Comments

Page 35: SH114/SH121 DFW Connector - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/ftw/dfw_connector_presentation_2.pdfFeb 24, 2009  · Maintenance of the DFW Connector. Project Implementation

35

Mail Comments to:

Ms. Maribel P. Chavez, P.E.ATTN: Curtis Loftis, P.E.

Texas Department of TransportationP.O. Box 6868

Fort Worth, TX 76115

Written comments must be postmarked byFriday March 6, 2009

THANK YOU FOR YOUR ATTENDANCE.

Public Comments