SFOBB West Span BPM PathFeasibility and Environmental Public Workshop
Pier 1 – Bayside RoomJanuary 20, 2016
![Page 2: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/2.jpg)
22
Welcome!
![Page 3: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/3.jpg)
33
Workshop Agenda
• Arrival (6:00)• Presentation (6:10-6:45)• General Q&A (6:45-7:00)• Feedback Stations (7:00-7:40)
o Project Process, Funding, and Environmentalo San Franciscoo Main Spano Yerba Buena Island (YBI)
• Station Reports (7:40-7:45)• Adjourn (7:45)
![Page 4: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/4.jpg)
44
Previous Studies
• Feasibility Study (2002) PSR-PDS (2014)
![Page 5: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/5.jpg)
55
Project Goals
• Downtown San Francisco bicycle & pedestrian link to East Bay & Treasure Island
• Facilitate and not hinder Caltrans maintenance access • Buildable and fundable alternative
InspiringApprovableAffordable
![Page 6: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/6.jpg)
66
• San Francisco touchdown ~2500 feet or ½ mile• Main Span 10,000 feet or ~ 2 miles• YBI touchdown and path ~ ½ mile
Profile to follow
Project Description
DowntownSan Francisco Main Span
Yerba Buena Island
![Page 7: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/7.jpg)
77
Project Benefits
• Transportation link from East Bay and Treasure Island to/from San Francisco.
• Connects to East Span Pathway (Bay Bridge Trail)• Tourism, health and recreation• Closure link for the Bay Trail• Class 1 - Protected from vehicular traffic • Accessible (ADA) – 5% or less continuous or 12H:1V
w/landings
![Page 8: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/8.jpg)
88
Workshop Goals
• Project information and process• Feedback on initial alternatives• How will you use the path?• Where should the path connect?• Features and Amenities• Suggestions or Concerns
![Page 9: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/9.jpg)
Pathway Options
![Page 10: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/10.jpg)
1010
The Distance
Pathway SegmentsLength(miles) (mins) (mins)
BPM Pathway 2.9 17 57SF Approach 0.5Main Span (West) 2.0YBI Approach and Path 0.4
Bay Bridge Trail 4.4 26 88East Span 2.3Approach 1.1Emeryville(Shellmound) 1.0
Total Bay Bridge Trail & Pathway 7.3 44 145
• How far and how long?
![Page 11: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/11.jpg)
1111
Pathway Section
Ohlone Greenway: El Cerrito
![Page 12: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/12.jpg)
1212
Pathway Width
East Span 15½’ Golden Gate:10’ max
Tilikum Crossing 2 x 14’ Brooklyn 8’ to 16’
![Page 13: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/13.jpg)
1313
Amenities
• Benches• Look Out• Lighting• Safety/ Call Boxes• Wayfinding• Interpretive Displays
![Page 14: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/14.jpg)
San Francisco Landing Options
![Page 15: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/15.jpg)
1515SFOBB West Span BPM Path
• 19 Alternatives 6 Alternatives
• Touchdown locations range from Essex Street to The Embarcadero
• North and South bridge connections
Downtown SF ApproachesWhere should the path connect in San Francisco?
![Page 16: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/16.jpg)
1616
Downtown SF North Approaches
SFOBB West Span BPM Path
• 3 Alternatives considered for further study1. Essex Street 2. Caltrans Paint Yard 3. The Embarcadero
1
2 3
![Page 17: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/17.jpg)
1717
Downtown SF South Approaches
SFOBB West Span BPM Path
• 3 Alternatives considered for further study1. Beale Street2. Caltrans Paint Yard3. The Embarcadero
1 2 3
![Page 18: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/18.jpg)
1818
Elevator Option • At Pier W1 – touchdown just
west of Embarcadero
• Elevator Only Option – no ramps
• Dual High Speed – high capacity
![Page 19: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/19.jpg)
1919
Essex Street Landing
![Page 20: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/20.jpg)
2020
Paint Yard Landing
![Page 21: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/21.jpg)
2121
Embarcadero Landing
![Page 22: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/22.jpg)
2222
San Francisco Path OptionsCross-Sections
Stand-alone
Attach to Existing
On-deck
![Page 23: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/23.jpg)
Yerba Buena Island Options
![Page 24: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/24.jpg)
2424
YBI Options
SFOBB West Span BPM Path
• Interface with ongoing projects
![Page 25: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/25.jpg)
2525
YBI Options
SFOBB West Span BPM Path
• 6 major options
![Page 26: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/26.jpg)
2626
YBI - East Bike/Ped Vista Point• Connection from East Span Trail• Vista Point w/bathrooms, water, bike racks, signage/info
SFOBB West Span BPM Path
![Page 27: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/27.jpg)
2727
YBI – Below Hillcrest-1 • Cut or retained fill with some structures• Interference with Cost Guard Access
Retained Wall - Fill
![Page 28: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/28.jpg)
2828
YBI – Below Hillcrest-2• Cut or retained fill with some structures• Steep terrain and slopes
Typical Viaduct
Retained Wall - Fill
Retained Wall - Cut
![Page 29: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/29.jpg)
2929
YBI – Above Hillcrest – N/S• Cut or retained fill above Hillcrest (to inside)• North option – use of west side ramps
SFOBB West Span BPM Path
![Page 30: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/30.jpg)
3030
YBI – Suspended & Tunnel Options
SFOBB West Span BPM Path
• Tie-in to Main Span Suspended Option• Option to continue through crown of existing tunnel
Suspended Path at West Portal
![Page 31: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/31.jpg)
Main Span Options
![Page 32: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/32.jpg)
3232
Main Span Alignments• North or South Options; similar alignments
• Suspended Elevated Deck Option
• Structural and architectural alternatives
![Page 33: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/33.jpg)
3333
North or SouthDo you prefer the path on the north or south side of the bridge?
![Page 34: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/34.jpg)
3434
Propped Cantilever Options
![Page 35: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/35.jpg)
3535
Cantilever Beam w/Moment Connection
![Page 36: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/36.jpg)
3636
Pinned Boomerang Deck
Extended Alternate
![Page 37: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/37.jpg)
3737
Outboard Deck w/Existing Suspension Cable
![Page 38: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/38.jpg)
3838
Deck Uplift w/stay cables
Tamar Bridge Path Addition
![Page 39: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/39.jpg)
3939
Suspended Elevated Deck
![Page 40: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/40.jpg)
4040
Suspended Elevated Deck
![Page 41: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/41.jpg)
4141
Project Timeline• Funding required to advance design and construction
Public Workshops
Current BPM Project Future Phases (Est. 8‐10 Years)2015 2016
Alternatives Screening
Conceptual Design
Preliminary Design
Environmental Studies
Final Design (PS&E)
Funding/Procurement
Construction
![Page 42: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/42.jpg)
4242
Agenda – Q&A
• Arrival (6:00)• Presentation (6:10-6:45)• General Q&A (6:45-7:00)• Feedback Stations (7:00-7:40)
o Project Process and Environmentalo San Franciscoo Main Spano Yerba Buena Island (YBI)
• Station Reports (7:40-7:45)• Adjourn (7:45)
![Page 43: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/43.jpg)
4343
Breakout Stations
• Arrival (6:00)• Presentation (6:10-6:45)• General Q&A (6:45-7:00)• Feedback Stations (7:00-7:40)
o Project Process and Environmentalo San Franciscoo Main Spano Yerba Buena Island (YBI)
• Station Reports (7:40-7:45)• Adjourn (7:45)
![Page 44: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/44.jpg)
4444
Summary of Breakouts
• Project Overview and Planning• San Francisco Touchdown• Main Span• Yerba Buena Island
SFMain SpanYBI
![Page 45: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/45.jpg)
4545
Next Steps
• Evaluate Feedback – inform design process• Conceptual design and initial cost estimates• 2nd Workshop – Fall 2016• Complete Environmental Studies• Final Design• Funding• Construction
SFOBB West Span BPM Path
![Page 46: SFOBB West Span BPM Path Public Workshop](https://reader035.vdocuments.site/reader035/viewer/2022062401/5870a6f21a28ab31318b54b2/html5/thumbnails/46.jpg)