settlement of mothballed rmr resources for system capacity november 15, 2011 rdtf meeting

18
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011

Upload: amarante-kamida

Post on 14-Mar-2016

57 views

Category:

Documents


9 download

DESCRIPTION

Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting. Ino González ERCOT November 14, 2011. RMR for Summer 2011. RMR Contracts for Mothballed Units - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Settlement of Mothballed RMR Resourcesfor

System Capacity

November 15, 2011RDTF Meeting

Ino GonzálezERCOT

November 14, 2011

Page 2: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 2

RMR for Summer 2011

RMR Contracts for Mothballed Units

ERCOT signed RMR Agreements with three Resource Entities to return Mothballed Generation Resources to service to mitigate capacity shortages during the extreme heat and drought conditions impacting the ERCOT Region.

OutcomeContracts

RMR

Page 3: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 3

RMR for Summer 2011

RMR Contracts for Mothballed Units

• Garland Power & Light– Spencer 4– Spencer 5

• NRG Texas Power, LLC– SR Bertron 1– SR Bertron 2

• Contracts terminated October 31, 2011

OutcomeContracts

RMR

122 MW

292 MW

Page 4: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 4

RMR for Summer 2011

Operation for these RMR Units was as follows:

• No Three Part Supply Offers• Not offered into DAM• Committed only by Hourly RUC• Resources came on-line with no Energy

Offer Curve

OutcomeOperation

s

RMR

Page 5: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 5

RMR for Summer 2011

What happens when an on-line Resource has no Energy Offer Curve?

– ERCOT creates proxy Offer Curve

OutcomeOperation

s

RMRMW

$/MWh

Proxy Energy Offer Curve

0

$2999.99LSL+1MW

-$250

$3000

LSL

HSL

Page 6: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 6

RMR for Summer 2011

What happens when an on-line Resource has no Energy Offer Curve?

– Resource is very expensive to dispatch above LSL

OutcomeOperation

s

RMRMW

$/MWh

Proxy Energy Offer Curve

0

$2999.99LSL+1MW

-$250

$3000

LSL

HSL

Page 7: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 7

RMR for Summer 2011

Payment process for RMR unitsOutcomeSettlement

s

The Settlement process for these RMR Resources followed

standard RMR Settlement practices per Protocol section 6.6.6 & Reliability Must-Run

Settlement

Page 8: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 8

RMR for Summer 2011

Payment process for RMR units

ERCOT ultimately provides two types of payments to the QSE for an RMR Resource

– Standby Payment◦ Includes costs to return to operational

status◦ Ongoing operation and maintenance costs

– Energy Payment◦ Fuel costs

» Incremental Heat Rate» Fuel Index Price and Fuel adder» Startup fuel

OutcomeSettlement

s

Page 9: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 9

RMR for Summer 2011

Payment process can be complex

Lots of other Moving Parts for RMR Settlement

– Real-Time Energy Imbalance Payment

– RUC Make-Whole Payment– RUC Clawback Charge

OutcomeSettlement

s

???

QSE is exposed to the usual Payments and Charges for a

Resource

Page 10: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 10

RMR for Summer 2011

OutcomeSettlement

s

ERCOT then Reverses these Charges and payments through

the RMR Adjustment Charge

???

Payment process can be complex

Lots of other Moving Parts for RMR Settlement

– Real-Time Energy Imbalance Payment

– RUC Make-Whole Payment– RUC Clawback Charge

Page 11: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 11

RMR for Summer 2011

Costs Uplifted to QSEs with Load

Net of all RMR charges and payments– Standby payment– Energy Payment– RMR Adjustment Charge– RMR Non-Performance Charge

◦ $10,000 per event of Unexcused Misconduct◦ Would reduce charge to QSEs with Load

OutcomeSettlement

s

???

Page 12: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 12

RMR for Summer 2011

A few notes about Capacity Short Charges

• QSEs who are capacity short pay a portion of the RUC Make Whole Costs

• The RUC Capacity Short Charges are not affected by the RMR Adjustment Charge

OutcomeSettlement

s

???

QSEs who are capacity short will still pay RUC Capacity Short Charge, even

if RUC Make-Whole payments were calculated only for these RMR units

Page 13: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 13

RMR for Summer 2011

Intervals of RUC deployment for SPNCE_4 RMR Unit

Operating Day

RUC Make Whole

$

Number of Intervals

TWTG ≤ LSL1

Number of Intervals

TWTG > LSL1

8/23/118/24/118/28/118/29/118/31/11

0000

2,834.76

72654

1922242118

Total in period =

Percent in period =

24

19

104

81

1 Where TWTG (MW) = TWTG (MWh) *4

Page 14: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 14

RMR for Summer 2011

Intervals of RUC deployment for SPNCE_5 RMR Unit

Operating Day

RUC Make Whole

$

Number of Intervals

TWTG ≤ LSL1

Number of Intervals

TWTG > LSL1

8/23/118/24/118/28/118/29/118/31/11

0000

4,805.36

5108

116

1620211516

Total in period =

Percent in period =

40

31

88

69

1 Where TWTG (MW) = TWTG (MWh) *4

Page 15: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 15

RMR for Summer 2011

Intervals of RUC deployment for SRG_G2 RMR Unit

Operating Day

RUC Make Whole

$

Number of Intervals

TWTG ≤ LSL1

Number of Intervals

TWTG > LSL1

8/28/118/29/118/31/11

10/10/11

000

18,647.2

Total in period =

77

1114

39

1813134

48

Percent in period = 45 55

1 Where TWTG (MW) = TWTG (MWh) *4

Page 16: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 16

RMR for Summer 2011

Relevant Charge Types Impacted by Capacity RMR Units

Charge Type by Name

Bill Determinant Code

Description

RMR Standby Payment

• RMRSBAMT• RMRSBPR• RMRMNFC

• RMR Standby Payment• RMR Standby Price• RMR Monthly Non-Fuel Cost

RMR Payment for Energy

• RMREAMT• RMRSUFQ• RMRCEFA• RMRHR• RMRMFCOST• RTMG

• RMR Energy Amount• RMR Startup Fuel Quantity• RMR Contracted Fuel Adder• RMR Incremental Heat Rate• RMR Monthly Actual Fuel Cost• Real-Time Metered Generation

Page 17: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 17

RMR for Summer 2011Relevant Charge Types Impacted by Capacity RMR Units- Cont.

Charge Type by Name

Bill Determinant Code

Description

RMR Adjustment Charge

• RMRAAMT• RTEIAMT• RUCMWAMT• RUCDAMT

• RMR Adjustment Charge• Real-Time Imbalance Amount• RUC Make-Whole Amount• RUC Decommitment Amount

RMR Service Charge

• LARMRAMT•RMRSBAMTTOT• RMREAMTTOT• RMRAAMTTOT• HLRS

• Load-Allocated RMR Amount•RMR Standby Amount Total• RMR Energy Amount Total• RMR Adjustment Amount• Hourly LRS

Page 18: Settlement of Mothballed RMR Resources for  System Capacity November 15, 2011 RDTF Meeting

Slide 18

RMR for Summer 2011

RMR Reports Available through MIS*OutcomeMIS Posting

* https://mis.ercot.com – Requires a Digital Certificate