session 22.7 - demand 5 commodities in upstream oil and...
TRANSCRIPT
Agenda:
4/20/15
1. Tinjauan Umum 2. Tujuan 3. ParCsipasi KKKS 4. ImplementaCon Milestone 5. ApplicaCon Architecture 6. Business Flow 7. Next Steps 8. Cost Saving
1. Tinjauan Umum
4/20/15
Centralized Integrated Vendor Database (CIVD) merupakan media sentralisasi database rekanan KKKS terintegrasi yang berbasis jaringan.
2. Tujuan CIVD
4/20/15
q Penyelarasan dengan ketentuan PTK-‐007/SKKO0000/2015/S0. q Standardisasi penilaian kualifikasi rekanan yang diberlakukan
lintas KKKS.
q Transparansi dan Akuntabilitas dalam proses pendaYaran dan penilaian kualifikasi rekanan.
q Peningkatan efisiensi dalam proses pengadaan, baik dari aspek tata waktu pengadaan dan maupun aspek penghematan biaya.
3. ParAsipasi KKKS
4/20/15
BADAN OPERASI BERSAMA PT. BUMI SIAK PUSAKO-‐PERTAMINA HULU
PT MEDCO E&P INDONESIA
PT CHEVRON PACIFIC INDONESIA PT PERTAMINA EP
CNOOC SES Ltd PT PERTAMINA HULU ENERGI OFFSHORE NORTH WEST JAVA
CONOCOPHILLIPS INDONESIA INC. LTD PETROCHINA INTERNATIONAL JABUNG LTD.
JOB PERTAMINA-‐TALISMAN (OK) Ltd PREMIER OIL NATUNA SEA B.V.
JOB PERTAMINA-‐TALISMAN JAMBI MERANG STAR ENERGY (KAKAP) LTD.
EMP MALACCA STRAIT S.A KANGEAN ENERGY INDONESIA LTD.
14 KKKS berparCsipasi dalam CIVD
4. ImplementaAon Milestone
4/20/15
MOU of CIVD IniCaCve
CompleCon of CIVD Blueprint
MOU Contract Sharing
IniCaCng Tender Process
Bid Award
Aug-‐2010
Feb-‐2012
Mei-‐2013
Sep-‐2014 Apr-‐2015
Go Live
Des-‐2015
7. Next Steps
4/20/15
• To be completed by end of April 2015 Bid Award
• EsCmated to start by May 2015 • DuraCon is 7 months (including UAT)
System Development
Go Live & SocializaCon
Change Management
• Managing resistances due to implementaCon the New System.
• System Go Live scheduled for December 2015 • Will be followed by socializaCon and training programs for parCcipaCng KKKS
8. Cost Saving
4/20/15
Service Items Qty Unit Price (US$) Subtotal (US$)
1 Infrastructure & Datacenter Facility 5 Year 2.100,00 10.500,00 2 CIVD Development Services 14 AU 987.500,00 13.825.000,00 3 CIVD Support Services 5 Year 2.800,00 14.000,00
TOTAL = 13.849.500,00
Service Items Qty Unit Price (US$) Subtotal (US$)
1 Infrastructure & Datacenter Facility 5 Year 2.100,00 10.500,00 2 CIVD Development Services 1 AU 987.500,00 987.500,00 3 CIVD Support Services 5 Year 2.800,00 14.000,00
TOTAL = 1.012.000,00
Biaya untuk 1 (satu) KKKS:
Biaya untuk 14 (empat belas) KKKS, dengan asumsi bahwa project CIVD dapat menghemat biaya ‘development’, sementara untuk biaya infrastructure dan support services untuk 1 atau 14 KKKS adalah sama besarnya.
US$ 12.837.500,00
POTENSI PENGHEMATAN (selama 5 tahun)