Overview Project New two post open rack will be installed to house Telco equipment (such as router/switch/firewall/WAAS/patch panel), Old 4 Post 38U rack will be empty out then retired. Old full size 46U rack (which was housing IBM servers)will be re-used to house windows servers. New Rack & cable management bracket will be installed after business hour once IBM Vendor (Vicom) has completed their migration process. Vicom will take the responsibility of patching cables Between New IBM server RACK and Network Switch. The project can take up to maximum of 5 days. Scope of Work Exemption and analyze/visual inspect current rack population Design & build new rack population layout Relocate & re-seat equipment's to new Two 2 Post open rack Empty out old 36U rack and relocate all the devices to new 2 Post open rack & old IBM serverack Mark & Label patch cable(such as router, firewall, servers), install cable management bracket , Re-connect all the patch cable back to appropriate devices

Upload: gs-cho

Post on 12-Apr-2017

584 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Server room cable clean up Project

Overview Project

New two post open rack will be installed to house Telco equipment (such as router/switch/firewall/WAAS/patch panel), Old 4 Post 38U

rack will be empty out then retired. Old full size 46U rack (which was housing IBM servers)will be re-used to house windows servers.

New Rack & cable management bracket will be installed after business hour once IBM Vendor (Vicom) has completed their migration

process. Vicom will take the responsibility of patching cables Between New IBM server RACK and Network Switch.

The project can take up to maximum of 5 days.

Scope of Work

Exemption and analyze/visual inspect current rack population

Design & build new rack population layout

Relocate & re-seat equipment's to new Two 2 Post open rack

Empty out old 36U rack and relocate all the devices to new 2 Post open rack & old IBM serverack

Mark & Label patch cable(such as router, firewall, servers), install cable management bracket , Re-connect all the patch cable back to

appropriate devices

Page 2: Server room cable clean up Project

1

Before & After Server Room Layout

BEFORE AFTER

Page 3: Server room cable clean up Project

2 Post Open Rack Over Head Cable Raceway KVM over IP

Picture

Installed Equipment List

Page 4: Server room cable clean up Project

3

Before Server Room Layout

Page 5: Server room cable clean up Project

4

After Server Room Layout

Rack Rack

Entrance Door

2 post open rack

w/cable mgmt bracket

Cable mgmt ladder

CCTV,

출입통제

Aircon

Patch Cable Path

1 Cable from IBM servers

1

2

2 Cable from DELL/SAN servers

Cable Clamp

Page 6: Server room cable clean up Project

Back of RACK

01

05

10

15

20

25

30

35

40

02

03

04

06

07

08

09

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

01

05

10

15

20

25

30

35

40

02

03

04

06

07

08

09

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

DS

K-5

94-5

00G

B

7 2

K S

AT

A

50

0G

B

CONSOLE A GE 0/0 S A GE 0/1 S

!

Wide Area Virtualization Engine 594

AUTO

Smart-UPS

2 2 0 0

Test

I

O

www.apcc.com

Smart-UPS

2 2 0 0

Test

I

O

www.apcc.com

Smart-UPS

2 2 0 0

Test

I

O

www.apcc.com

1

5

10

15

20

25

30

35

40

45

2

3

4

6

7

8

9

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

43

44

1

5

10

15

20

25

30

35

40

45

2

3

4

6

7

8

9

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

43

44

Smart-UPS

2 2 0 0

Test

I

O

www.apcc.com

Smart-UPS

2 2 0 0

Test

I

O

www.apcc.com

Smart-UPS

2 2 0 0

Test

I

O

www.apcc.com

Smart-UPS

2 2 0 0

Test

I

O

www.apcc.com

Catalyst 2950 SERIES

SYST

MODE

SPEEDDUPLX

UTILSTATRPS

1X

18X

17X

16X2X

15X 31X

32X 34X

33X 47X

48X

1000 Base-SX

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10

1 2

CABLE MANAGEMENT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Catalyst 2950 SERIES

SYST

MODE

SPEEDDUPLX

UTILSTATRPS

1X

18X

17X

16X2X

15X 31X

32X 34X

33X 47X

48X

1000 Base-SX

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10

1 2

Overhead cable management bracket

01

05

10

15

20

25

30

35

40

02

03

04

06

07

08

09

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

01

05

10

15

20

25

30

35

40

02

03

04

06

07

08

09

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

IBM

Server & UPS

2 Post Open Rack Old IBM Rack New IBM Rack

1

5

10

15

20

25

30

35

40

45

2

3

4

6

7

8

9

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

43

44

1

5

10

15

20

25

30

35

40

45

2

3

4

6

7

8

9

11

12

13

14

16

17

18

19

21

22

23

24

26

27

28

29

31

32

33

34

36

37

38

39

41

42

43

44

2 Post Open Rack

Catalyst 2950 SERIES

SYST

MODE

SPEEDDUPLX

UTILSTATRPS

1X

18X

17X

16X2X

15X 31X

32X 34X

33X 47X

48X

1000 Base-SX

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10

1 2

Catalyst 2950 SERIES

SYST

MODE

SPEEDDUPLX

UTILSTATRPS

1X

18X

17X

16X2X

15X 31X

32X 34X

33X 47X

48X

1000 Base-SX

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10

1 2

POWER STATUS ACTIVE VPN FLASH

CISCO ASA 5510 series

Adaptive Security Appliance

POWER STATUS ACTIVE VPN FLASH

CISCO ASA 5510 series

Adaptive Security Appliance

DO NOT REMOVE DURING NETWORK OPERATION

Cisco 2800 Series

PWR

SYS

PWR AIM0 CFCOMPACT FLASH

AUX/CONSOLE

AUX

SYS 1

0

100-240V ~ 3A

50/60Hz

OPTIONAL RPS INPUT

12V - - - ___

18A

DO NOT REMOVE DURING NETWORK OPERATION

Cisco 2800 Series

PWR

SYS

PWR AIM0 CFCOMPACT FLASH

AUX/CONSOLE

AUX

SYS 1

0

100-240V ~ 3A

50/60Hz

OPTIONAL RPS INPUT

12V - - - ___

18A

DO NOT REMOVE DURING NETWORK OPERATION

Cisco 2800 Series

PWR

SYS

PWR AIM0 CFCOMPACT FLASH

AUX/CONSOLE

AUX

SYS 1

0

100-240V ~ 3A

50/60Hz

OPTIONAL RPS INPUT

12V - - - ___

18A

Catalyst 2950 SERIES

SYST

MODE

SPEEDDUPLX

UTILSTATRPS

1X

18X

17X

16X2X

15X 31X

32X 34X

33X 47X

48X

1000 Base-SX

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10

1 2

Cisco 1800 Series

SYS

PWR

SYS

OK

ESX1 (vSPHERE 4)

ESX2 (vSPHERE 4)

vCenter

DELL PowerVault

MD3200i SAN storage

CABLE MANAGEMENT

PowerConnect SAN SW

Old PDU

CABLE MANAGEMENT

5

After Server Room

Page 7: Server room cable clean up Project

Page 6

Project Schedule