section l: lighting plans - south dakotaapps.sd.gov/hc65c2c/ebs/lettings/electronicplans/... · 2 2...
TRANSCRIPT
2
289 S
T
CH
AR
LES MIX C
OU
NT
Y
Creek
& BEGIN PH 0018(190)348 - 04JXBEGIN NH-PH 0050(114)324 - 04HN
Wagner
TO
Wagner
TO
12
1114
1324
23
36
26
25
7
8
18
17
19
20
31
32 29
7
8
121
6
5
293 S
T
292 S
T
291 S
T
290 S
T
288 S
T
287 S
T
18
50
2932
30
25
391 AVE
35
36
31
2
1
6
5
TO J
CT. S
D 3
7
285 S
T
284 S
T
393 AVE
286 S
T
24
30 19 18
2029
31
36
5
6
1
46
50
13
294 S
T
295 S
T
296 S
T
298 S
T
392 AVE
391 AVE
32
17
235
14
23
26
2512
7
8
11
TO R
AVINIA
281
281
30
DO
UG
LAS C
OU
NT
Y
26
18
Choteau
393 AVE
T95N
T96N
R64
WR
63
W
T96NT95N
281
RES
ER
VA
TIO
N B
OU
ND
AR
Y
FO
RM
ER Y
AN
KT
ON I
NDIA
N
18
325
4 33
343
389 AVE
390 AVE
R63
W
296 S
T
283 S
T
46
388 AVE
298 S
T
R64
W
11
T97N
T97N
T98N
T98N
END NH-PH 0050(114)324 - 04HN
PROJECT NH 0046(75)282 - 06JY
END PH 0281(108)35 - 04JE& END PH 0018(190)348 - 04JXBEGIN PH 0281(108)35 - 04JE
Station 211+90.53
Station 500+00.00 Station 0+00.00
Station 871+61.56 Station 981+17.80
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
& NH 0046(75)282PH 0018(190)348, PH 0281(108)35,
NH-PH 0050(114)324,
INDEX OF SHEETS
Standard PlatesL8-L11
Wiring DiagramL7
Conduit LayoutsL4-L6
Estimate With General Notes & TablesL2-L3
General Layout With IndexL1
SECTION L: LIGHTING PLANS
U:\rd\prj\C
mix
04
HN\title
L.d
gn
File -
Plotting Date: 08/14/2019
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
4286
L1 L11
L2 L11
TOTALSHEETS
PROJECT SHEETSTATE OF SOUTH DAKOTA (190)348, PH 02
k NH 0046(75)282
NH-PH 0050 32481(108)35,PH 0018SECTION L ESTIMATE OF QUANTITIES (PCN 04HN) All costs for removing the footing of the existing luminaire pole will be
incidental to the contract unit price per each for “Remove Luminaire Pole Footing”.
08/14/2019Plotting Date:
LUMINAIRESBID ITEM NUMBER
QUANTITYITEM UNITThe lighting design for the intersection of SD-46 & SD-50(392nd Ave) used the following parameters and provides 0.8 and greater average maintained foot- candles and uniformity ratios of 5:1 (average maintained to minimum maintained foot-candles) and 6:1 (maximum to minimum maintained foot candles:
REMOVE AND RESET LUMINAIRE POLE635E0050 Each5Breakaway Base Luminaire Pole with Arm, 50' Mounting Height
Existing luminaire pole EL1 will be removed and reset as REL1 as shown on the plan sheets. The Contractor will coordinate with the pole manufacturer to determine the necessary anchor rod dimensions to be in conformance with Section 972.1 C of the Specifications.
635E3700 Roadway Luminaire, LED with Photoelectric Cell Each5
2' Diameter Footing Ft635E5020 40.0
635E5301 Type 1 Electrical Junction Box 2 Each Setback:Lamp Loss Factor (LLF): Mounting Height:Arm Length Lamp:
0 Ft.635E5302 Type 2 Electrical Junction Box Each1 0.8
50 Ft.Electrical Service Cabinet635E5400 Each16 Ft.2" Rigid Conduit, Schedule 40635E8120 870 Ft
It will be the Contractor’s responsibility to obtain the bolt circle pattern for the relocated poles from the pole manufacturer listed below. The poles were originally installed with Project No. 0018(00)348, Drawing No. SD4W85996.
LED2" Rigid Conduit, Schedule 80635E8220 270 Ft
1/C #6 AWG Copper Wire635E9016 3,535 Ft The following LED luminaires meet the requirements for this design:635E9710 2/C #10 AWG Copper Pole and Bracket Cable 325 Ft
Valmont Industries, Inc. P.O. Box 358 Valley, NE 68064 Phone: (402) 359-2201
a.) Eaton: NVN-AF-04-LED-U-T2R
SECTION L ESTIMATE OF QUANTITIES (PCN 04JX1 b.) AEL: ATB2 80BLEDE10 R2 4000K
BID ITEM NUMBER
ITEM QUANTITY UNIT Damage to the luminaire pole or luminaire that occurs during relocation will be repaired or the item replaced by the Contractor at no cost to the State.
LIGHTNING PROTECTION110E1540 Remove Luminaire Pole Footing 1 Each All luminaire poles, tower lighting poles, and service cabinets will be equipped
with industrial lightning arrestors compliant with current NEMA and UL Standards for lightning arrestors. Cost for ground rods and lightning arrestors will be incidental to the contract unit price per each for the corresponding luminaire pole and electrical service cabinet contract item.
635E5020 2' Diameter Footing 8.0 Ft All costs involved with removing and resetting the existing luminaire poles, including new anchor bolts with associated hardware, will be incidental to the contract unit price per each for “Remove and Reset Luminaire Pole”.
635E5301 Type 1 Electrical Junction Box 1 Each
635E5400 Electrical Service Cabinet Each1
635E7500 Remove and Reset Luminaire Pole 1 Each
635E8120 2" Rigid Conduit, Schedule 40 205 Ft 05TABLE OF FOOTING DATA 73
WIRE SPLICING FOR LIGHTING635E8220 2” Rigid Conduit, Schedule 80 35 Ft Oo
CO635E9016 1/C #6 AWG Copper Wire Ft745 Site FootingDiameter
* Footing Depth
Spiral Diameter
**SpiralLength
VerticalReinforcement
wAll wire splices for lighting will be made using TE Connectivity GTAP connectors, NSI Industries Polaris Blue connectors, or an approved equal.
Designation oz
2’ - 0” 8’ - 0” 1-8 54’ - 9” 8-#7 x 3’ - 6”REL 1 X■'TO
L1-L5 2’ -0’ 8’ - 0” r-8’ 54’- 9” 8-#7 x 4’ - 6’ ESUPPLYING AS BUILT PLANS o
CL
* Footing depth will be below ground level. The size of all spirals will be #3.If the roadway lighting systems are constructed differently than what is stated
in the plans, the Contractor will supply as built plans to the Engineer and a copy will be sent to the Traffic Design Engineer. The as built plans may include conduit layouts, wiring diagrams, or other drawings depicting the changes from the original plans.
**
JUNCTION BOXES
At the intersection of SD-50 & US-18, junction boxes JL3- JL5 will be placed to intercept the existing 2” conduit. The conduit shall be exposed and modified to properly enter the new junction box.SHOP DRAWING AND CATALOG CUTS SUBMITTALS
The Contractor will submit shop drawings and catalog cuts in accordance with Section 985 of the Specifications. All costs associated with exposing the existing conduit, modifying the existing
conduit, and placing the new junction boxes shall be incidental to the contract unit price per each for “Type 1 Electrical Junction Box.”Adobe PDF submittals will be sent to the following email addresses:
[email protected]@state.sd.us ELECTRICAL SERVICE CABINET
At the intersection of SD-50 & US-18, the Contractor shall coordinate with Charles Mix Electric to disconnect the existing meter and electrical service and connect to the new meter and service as shown on these plans. All costs associated with the disconnection and installation shall be incidental to the contract unit price for “Electrical Service Cabinet.”
REMOVE LUMINAIRE POLE FOOTING
The footing of existing luminaire pole EL1 will be removed by the Contractor to a minimum of 3’ below the ground surface. Restoration of the disturbed area will be to the satisfaction of the Engineer.
L3 L11
TOTALSHEETS
PROJECT SHEETSTATE OF SOUTH
DAKOTACONDUIT AND CABLE QUANTITIES (190)348, PH 02 k NH 0046(75)282
NH-PH 0050 32481(108)35,PH 0018
08/14/2019Plotting Date:
Rigid Conduit Copper WirePole and Bracket
CableSchedule 40 Schedule 80
2" 2" 1/C 2/C#6 #10
AWG AWGFt FtLocation to Location Ft Ft
LIGHTING (PCN 04HN)L1 JL1 75 235JL1 L2 250 775L2 JL2 145 115 805JL2 L4 80 250JL2 L5 230 710JL2 L3 120 370JL2 SERVICE CABINET 125 390
LUMINAIRE POLES
LUMINAIRE POLE L1 65LUMINAIRE POLE L2 65LUMINAIRE POLE L3 65LUMINAIRE POLE L4 65LUMINAIRE POLE L5 65
TOTAL (PCN 04HN): 870 270 3,535 325LIGHTING (PCN 04JX)
TRANSFORMER SERVICE CABINET 50 155SERVICE CABINET JL3 60 185
JL3 REL1 95 35 405
c■O
3"DcoO-O
IOXEoQ_
0
TOTAL (PCN 04JX): 205 35 745
405+00 406+00 407+00 408+00
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
& NH 0046(75)282PH 0018(190)348, PH 0281(108)35,
NH-PH 0050(114)324,
40SCH2"
#63
40SCH2"
#63
L1 405+38-34' R
SD HWY 46
L2 407+80-32' L
1" = 40'SCALE
CONDUIT LAYOUT
U:\rd\prj\c
mix
04
HN\4
05c.d
gn
File -
Plotting Date: 08/14/2019
Plot Scale -
1:4
0Plotted Fro
m -
trpr1
4286
SD HWY 46
R.O.W.
R.O.W.
ESTIMATE OF QUANTITIES
EST UNITQUANTKEY ITEM
EACH
EACH
EACH
EACH
Electrical Service Cabinet
Not a Bid ItemGalvanized Steel Utility Pole
Not a Bid ItemMeter Socket
2" Rigid Conduit, Schedule 40 FT
2" Rigid Conduit, Schedule 80 FT
FT1/C #6 AWG Copper Wire
FT2/C #10 AWG Copper Pole & Bracket Cable
EACH
EACH
M
40SCH2"
#6
R.O.W.
R.O.W.
50' Mounting Height (L1-L5)Breakaway Base Luminaire Pole w/6' Arm
(L1-L5)Roadway Luminaire, LED with P.E.
5
5
FT40
1
80SCH2"
JL1
(JL2)Type 2 Electrical Junction Box
EACH1
1
1
80SCH2"
#63
1
270
3,535
325
(PCN 04HN)
(L1-L5)2' Diameter Footing
(JL1)Type 1 Electrical Junction Box
870
L4 L11
P
TT
408+00 409+00 410+00 411+00 412+00 413+00
210+00
211+00
211+91
211+91
M
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
& NH 0046(75)282PH 0018(190)348, PH 0281(108)35,
NH-PH 0050(114)324,
40SCH2"
#63
40SCH2"
#63
40SCH2"
#63
80SCH2"
#63
40SCH2"
#63
40SCH2"
#63
40SCH2"
#63
L4 410+19-34' R
SD HWY 46
SD H
WY 5
0
L5 412+49-38' L
L3 210+86-26' L
L2 407+80-32' L
U:\rd\prj\c
mix
04
HN\4
08c.d
gn
File -
Plotting Date: 08/14/2019
Plot Scale -
1:4
0Plotted Fro
m -
trpr1
4286
R.O.W.
R.O.W.
R.O.W.
R.O.W.
R.O.W.
R.O.W.R.O.W.
R.O.W.
1" = 40'SCALE
CONDUIT LAYOUTSD HWY 46
POWER SOURCE
CHARLES MIX ELECTRICBy
1 Phase, 3 Wire Service120/240 v.a.c., 60 hz.,
JL2
L5 L11
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
& NH 0046(75)282PH 0018(190)348, PH 0281(108)35,
NH-PH 0050(114)324,
T
P
0+00 1+00500+00501+00
M
U:\rd\prj\C
mix
04
HN\0
00c.d
gn
File -
Plotting Date: 08/14/2019
Plot Scale -
1:4
0Plotted Fro
m -
trpr1
4286
CONDUIT LAYOUTSD HWY 50 & US HWY 18
40SCH2"
#63
#63
40SCH2"
1" = 40'SCALE
R.O.W. R.O.W.
SD HWY 50
REL1 00+71-32' L
EL1
JL3
40SCH2"
#63
POWER SOURCE
CHARLES MIX ELECTRICBy
1 Phase, 3 Wire Service120/240 v.a.c., 60 hz.,
40SCH2"
#63
#63
40SCH2"
#63
US H
WY 1
8
#63
80SCH2"
80SCH2"
EL
ESTIMATE OF QUANTITIES
EST UNITQUANTKEY ITEM
EACH
EACH
EACH
Electrical Service Cabinet
Not a Bid ItemGalvanized Steel Utility Pole
Not a Bid ItemMeter Socket
2" Rigid Conduit, Schedule 40 FT
2" Rigid Conduit, Schedule 80 FT
FT1/C #6 AWG Copper Wire
M
40SCH2"
#6
FT8
80SCH2"
(EL1)Relocate Existing Luminaire Pole
1 EACH
(EL1)Remove Existing Luminaire Pole Footing
1 EACH
EACH1
1
1
1
(PCN 04JX)
(REL1)2' Diameter Footing
205
745
(JL3)Type 1 Electrical Junction Box
35
L6 L11
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
& NH 0046(75)282PH 0018(190)348, PH 0281(108)35,
NH-PH 0050(114)324,
U:\rd\prj\c
mix
04
HN\4
05413
w.d
gn
File -
Plotting Date: 08/14/2019
Plot Scale -
1:4
0Plotted Fro
m -
trpr1
4286
WIRING DIAGRAMSD HWY 46 & 392ND AVE
BK
WT
BK
WT
LU
MIN
AIR
E
WTLUMINAIRE
BK
WT
BK
L1
L2
JL1
JL2
L4BK
WT
BK
WTLUMINAIRE
BK
WT
BK
WT
LU
MIN
AIR
E
L5
WTLUMINAIRE
BK
WT
BK
L3
E
R
T
M
E SERVICE CABINET
BK
50 amp
BK
WT
100 amp
#6
#6
#6
#6#6
#6
included in these plans.Quantities for bonding conductors are notwith the NATIONAL ELECTRICAL CODE.All circuits shall be bonded in accordanceNOTE:
WTLUMINAIRE
BK
WT
BK
#6
REL1
LUMINAIRE: LED
Sodium Lamp
LEGEND:
FUSE: 10 amp. Fuse
E
R
T
M
E SERVICE CABINET
BK
50 amp
BK
WT
100 amp
JL3
#6
#6
WT LUMINAIRE
BK
WT
BK
EL
PHOTOCELL
PHOTOCELL
1 Phase, 3 Wire Service
120\240 v.a.c., 60hz.,
CHARLES MIX ELECTRIC1 Phase, 3 Wire Service
120\240 v.a.c., 60hz.,
CHARLES MIX ELECTRIC
L7 L11
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
& NH 0046(75)282PH 0018(190)348, PH 0281(108)35,
NH-PH 0050(114)324,
...\prj\c
mix
04
HN\s
63501s63521.d
gn
File -
Plotting Date: 08/14/2019
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
4286
L8 L11
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
& NH 0046(75)282PH 0018(190)348, PH 0281(108)35,
NH-PH 0050(114)324,
...\prj\c
mix
04
HN\s
63535s63555.d
gn
File -
Plotting Date: 08/14/2019
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
4286
L9 L11
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
& NH 0046(75)282PH 0018(190)348, PH 0281(108)35,
NH-PH 0050(114)324,
...\c
mix
04
HN\s
63565_1s63565_2.d
gn
File -
Plotting Date: 08/14/2019
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
4286
L10 L11
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
& NH 0046(75)282PH 0018(190)348, PH 0281(108)35,
NH-PH 0050(114)324,
U:\rd\prj\c
mix
04
HN\s
63576.d
gn
File -
Plotting Date: 08/14/2019
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
4286
L11 L11